Monthly Operating Rept for June 1999 for Shearon Harris Npp. with 990713 Ltr
ML18016B015
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/30/1999
From: ALEXANDER D B, ROGERS S
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-99-110, NUDOCS 9907200204
Download: ML18016B015 (6)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)FACIE)~50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROGFRS,S.Carolina Power S Light Co.ALEXANDER,D.B.

Carolina Power 8 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET¹05000400

SUBJECT:

rept for June 1999 for Shearon Harris NPP.With 9 0713 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZZ: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed.05000400 E RECIPIENT ID CODE/NAME LAUFER,R.INTERNAL: ACRS OC/DBA/PAD RGN2 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME FTLE CENTER 01 REEfDRKX/GERRE COPIES LTTR ENCL 1 1 1 1 EXTERNAL: LMITCO MARSHALL NRC PDR 1 1 1 1 NOAC 1 1 D N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 Carolina Power&Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 J5L i3 I99s Serial: HNP-99-110 United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT Dear Sir or Madam 1 In accordance with Carolina Power&Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of June"1999 is provided.Sincerely, D.B.Alexander Manager, Regulatory Affairs Harris Plant SGR Enclosure'9"P07200204

'P'it0630 PDR ADQCK 05000400 R PDR c: Mr.J.B.Brady-NRC Senior Resident Inspector'r.R.J.Laufer-NRC Project Manager Mr.L.A.Reyes-NRC Regional Administrator 5413 Shearon Harris Road New Hill NC I I, k: I gp f3 GBV H I Enclosure to Serial HNP-99-110 Sheet 1 of 2 CP6cL CO.RUN DATE 07/13/99 RUN TIME 06:09:57 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36-000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1.UNIT NAME: HARRIS UNIT 1 2.REPORTING PERIOD: JUNE 99 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 5.DES1GN ELECTRICAL RATING (NET MWE): 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET klWE): 860.0 8 IF CHANGES OCCUR ZN CAPACITY RATINGS (ITEMS 3 THRU 7)SXNCE LAST REPORT~GIVE REASONS: 9.POWER LEVEL TO WHZCH RESTRICTED XF ANY (NET MWE): 10.REASONS FOR RESTRICTION ZF ANY: THIS MONTH YR TO DATE CUMUL ATIVE 11.HOURS IN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LINE 15.UNZT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNXT SERVICE FACTOR 20.UNIT AVAXLABILITY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 720.00 720.00.00 720.00.00 1991746.26 656673.00 617134.00 100.00 100.00 99.67 95.24.00 (TYPE, DATE, 106632.00 90407.21.00 89492.72.00 240612626.52 80072316.00 74731347.00 83.93 83.93 81.49 77.87 3.21 4343.00 4181.60.00 4107.11.00 11192902.56 3728279.00 3494475.00 94.57 94.57 93.56 89.40 5.43 AND DURATION OF EACH): 25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OP START UP: 26.UNITS IN TEST STATUS (PRZOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED XNITIAL CRITICALXTY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 4~~Enclosure to Serial: HNP-99-110 Sheet 2 of 2 CP&L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 07/13/99 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 06:10:10 HARRIS UNIT 1 PAGE 1 RPD39-000 JUNE 1999 DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG.DAILY POWER LEVEL (MWE-NET)DAY AVG.DAILY POWER LEVEL (MWE-NET)10 12 13 15 16 860 856 855 860 862 861 854 854 849 851 860 862 858 853 857 861 17 18 19 20 21 22 23 25 26 27 28 29 30 865 867 865 867 866 865 863 861 855 854 825 848 850 853 C.~'I