Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
L-85-313, Monthly Operating Repts for Jul 198531 July 1985Monthly Operating Repts for Jul 1985
L-85-347, Changes,Tests & Experiments Made W/O Prior Commission Approval for Jul 1984 - June 1985, Per 10CFR50.59(b).Related Info Encl30 June 1985Changes,Tests & Experiments Made W/O Prior Commission Approval for Jul 1984 - June 1985, Per 10CFR50.59(b).Related Info Encl
L-85-362, Monthly Operating Repts for Aug 198531 August 1985Monthly Operating Repts for Aug 1985
L-85-395, Monthly Operating Repts for Sept 198530 September 1985Monthly Operating Repts for Sept 1985
L-85-434, Monthly Operating Repts for Oct 198531 October 1985Monthly Operating Repts for Oct 1985
L-85-460, Monthly Operating Repts for Nov 198530 November 1985Monthly Operating Repts for Nov 1985
L-86-110, Monthly Operating Repts for Feb 198628 February 1986Monthly Operating Repts for Feb 1986
L-86-161, Monthly Operating Repts for Mar 198631 March 1986Monthly Operating Repts for Mar 1986
L-86-252, Monthly Operating Repts for May 198631 May 1986Monthly Operating Repts for May 1986
L-86-283, RO 86-3:on 860708 & 10,loss of Lighting in Spent Fuel Pool Occurred.Caused by Deenergization of 4-kV Bus 4C.Bus Realigned to Normal Power Supply.Work Plans Discussed in 860708 Telcon11 July 1986RO 86-3:on 860708 & 10,loss of Lighting in Spent Fuel Pool Occurred.Caused by Deenergization of 4-kV Bus 4C.Bus Realigned to Normal Power Supply.Work Plans Discussed in 860708 Telcon
L-86-292, Monthly Operating Repts for June 198630 June 1986Monthly Operating Repts for June 1986
L-86-375, Monthly Operating Repts for Aug 198631 August 1986Monthly Operating Repts for Aug 1986
L-86-377, Special Rept:On 860819,condenser Air Ejector High Range Noble Gas Effluent Monitor Exceeded 7 Day Outage Reportability Limitations Established in Tech Spec Table 3.5-5.Caused by Water Intrusion Into Casing of Detector18 September 1986Special Rept:On 860819,condenser Air Ejector High Range Noble Gas Effluent Monitor Exceeded 7 Day Outage Reportability Limitations Established in Tech Spec Table 3.5-5.Caused by Water Intrusion Into Casing of Detector
L-86-424, Monthly Operating Repts for Sept 198630 September 1986Monthly Operating Repts for Sept 1986
L-86-456, Special Rept:Fire Barriers Breached for Longer than 7 Days. Caused by App R Work in Progress.Breached Barriers Listed6 November 1986Special Rept:Fire Barriers Breached for Longer than 7 Days. Caused by App R Work in Progress.Breached Barriers ListedFire Barrier
L-86-465, Monthly Operating Repts for Oct 198631 October 1986Monthly Operating Repts for Oct 1986
L-86-485, Special Rept:On 861030,electric Driven Fire Pump Out of Svc for More than 7-day Tech Spec Limit.Caused by Independent Failure of Low Pressure Start Switch & Flow Indicator, Resulting in Unscheduled Maint.Bearing Seal Replaced1 December 1986Special Rept:On 861030,electric Driven Fire Pump Out of Svc for More than 7-day Tech Spec Limit.Caused by Independent Failure of Low Pressure Start Switch & Flow Indicator, Resulting in Unscheduled Maint.Bearing Seal Replaced
L-86-500, Ro:Fire Barriers Breached for More than 7 Days.Caused by App R Work Which Still Remains to Be Completed.Compensatory Measures Implemented.Affected Fire Barrier/Conduit Seals Listed8 December 1986Ro:Fire Barriers Breached for More than 7 Days.Caused by App R Work Which Still Remains to Be Completed.Compensatory Measures Implemented.Affected Fire Barrier/Conduit Seals ListedFire Barrier
L-86-506, Monthly Operating Repts for Nov 198630 November 1986Monthly Operating Repts for Nov 1986
L-87-140, Special Rept:On 870225,electric Driven Fire Pump Exceeded 7- Day Tech Spec Limit for Permissible Time Pump May Remain Out of Svc W/O NRC Notification.Caused by Leakage of Bearing Grease Past Seal.Shaft,Sleeves & Bearings Replaced27 March 1987Special Rept:On 870225,electric Driven Fire Pump Exceeded 7- Day Tech Spec Limit for Permissible Time Pump May Remain Out of Svc W/O NRC Notification.Caused by Leakage of Bearing Grease Past Seal.Shaft,Sleeves & Bearings Replaced
L-87-141, RO 87-03:on 870315,NRC Notified of Intention to Remove IAEA Seals on Equipment Hatch & Reactor Missile Shields.Caused by Performance of Maint & Insps on Reactor Head.Addl Work Will Be Performed When Reactor Head Removed25 March 1987RO 87-03:on 870315,NRC Notified of Intention to Remove IAEA Seals on Equipment Hatch & Reactor Missile Shields.Caused by Performance of Maint & Insps on Reactor Head.Addl Work Will Be Performed When Reactor Head Removed
L-87-167, Monthly Operating Repts for Mar 198731 March 1987Monthly Operating Repts for Mar 1987Boric Acid
L-87-214, Monthly Operating Repts for Apr 198730 April 1987Monthly Operating Repts for Apr 1987
L-87-250, Monthly Operating Rept for May 198731 May 1987Monthly Operating Rept for May 1987
L-87-344, Monthly Operating Repts for Jul 198731 July 1987Monthly Operating Repts for Jul 1987
L-87-365, Changes,Tests & Experiments Made W/O Prior Commission Approval,For Jul 1986 - June 198730 June 1987Changes,Tests & Experiments Made W/O Prior Commission Approval,For Jul 1986 - June 1987Safe Shutdown
Boric Acid
Fire Barrier
Coatings
Earthquake
Fire Protection Program
L-87-382, Monthly Operating Repts for Aug 198731 August 1987Monthly Operating Repts for Aug 1987
L-87-421, Monthly Operating Repts for Sept 198730 September 1987Monthly Operating Repts for Sept 1987
L-87-475, Monthly Operating Repts for Oct 198731 October 1987Monthly Operating Repts for Oct 1987
L-88-366, Changes,Tests & Experiments Made W/O Prior Commission Approval for Jul 1987 - June 198830 June 1988Changes,Tests & Experiments Made W/O Prior Commission Approval for Jul 1987 - June 1988Safe Shutdown
Boric Acid
Emergency Lighting
FLEX
L-89-316, Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of Jul 1988 - June 198930 June 1989Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of Jul 1988 - June 1989Safe Shutdown
Boric Acid
Fire Barrier
Stroke time
Safe Shutdown Earthquake
Post Accident Monitoring
Coatings
Anchor Darling
Temporary Modification
Emergency Lighting
Earthquake
L-95-089, Special Rept:On 950517,Standby Feedwater Pump B Removed from Svc & Returned to Operable Status 950710.Caused by Prime Mover for B Standby Feedwater Pump Being Changed from Electric Motor to Diesel Driver Per Amend 164/15821 April 1995Special Rept:On 950517,Standby Feedwater Pump B Removed from Svc & Returned to Operable Status 950710.Caused by Prime Mover for B Standby Feedwater Pump Being Changed from Electric Motor to Diesel Driver Per Amend 164/158
LD-84-063, Part 21 Rept Re Evaluation & Corrective Action for Excessive Setpoint Drift in Some Potentiometers in Auxiliary Feedwater Actuation Sys Cabinet at St Lucie Unit 2 & Plant Protection Sys Cabinets at Palo Verde26 October 1984Part 21 Rept Re Evaluation & Corrective Action for Excessive Setpoint Drift in Some Potentiometers in Auxiliary Feedwater Actuation Sys Cabinet at St Lucie Unit 2 & Plant Protection Sys Cabinets at Palo Verde
ML17053D16727 May 1982Annual Financial Rept 1981High winds
ML17053D1691 March 1982Annual Financial Rept 1981
ML17208A4458 February 1980Annual Financial Rept 1979
ML17208A4495 April 1980Monthly Operating Repts for Mar 1980
ML17208A4549 February 1980Monthly Operating Repts for Jan 1980
ML17208A4588 March 1980Monthly Operating Repts for Feb 1980
ML17208A4754 August 1979Monthly Operating Repts for Jul 1979
ML17208A4837 July 1979Monthly Operating Repts for June 1979
ML17208A4953 June 1978Monthly Operating Repts for May 1978Packing leak
ML17208A4984 September 1978Monthly Operating Repts for Aug 1978
ML17208A5036 April 1978Monthly Operating Repts for Mar 1978Packing leak
ML17208A5106 December 1978Monthly Operating Repts for Nov 1978
ML17208A5137 October 1978Monthly Operating Repts for Sept 1978
ML17208A51910 August 1978Monthly Operating Repts for Jul 1978
ML17208A5224 November 1978Monthly Operating Repts for Oct 1978
ML17208A5251 July 1978Monthly Operating Repts for June 1978
ML17208A5693 May 1980Monthly Operating Repts for Apr 1980Boric Acid