Monthly Operating Repts for Nov 1978
ML17208A510
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 12/06/1978
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A509 List:
References
NUDOCS 8004240440
Download: ML17208A510 (17)


Text

~VERAGE DEWILY UNIT POWER LEVEL DOCKET NO.

DATE Dec.

6 19.78 COMPLETED BY V. T. Chilson MONTH NOVEMBER, 19 78 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net)

I 674 DAY AVERAGE DAILYPOWER LEVEL (KIWe-Net) 675 17 10 12 14.

15 16 INSTRUCTIONS 675 679 672 670 669 673 673 18 19 20 21 24 25 26 27 28 29 30 678 672 671 449 262 NOTE:

Average daily power level. greater than'66 MHe due to cooler condenser cooling water.

On this format, list the average daily unit power level in ~AVe.Net for each day in the reporting tm)ntit. CompUte to the nearest whole megawatt.

(9/77) 800gage +gg

/g

OPERATING DATAREPORT OPERATING STATUS I. Unit Name:

Turke Poi t

2. Reporting Period:

November 1978

3. Licensed Thermal Po~er (MWt):
4. Nameplate Rating (Gross MWe):

S. Design Electrical Rating (Net i%1We):

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

728 700 666 DOCKET NO.

OAT< D~e.6 1

78 COMPLETED BY EZ~~on TELEPHONE QQ!0 '~-3824 Notes-Unit No.

3 operated at approximately 100K 'R.P'. ex-cept for outages of Nov. 27 28 and the load reduction of Novembez,27-30, 1978.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

NO Yr.-to-Date This Month 720. 0 718.7 8 016.0 6 611.4

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (ivIWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service, Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.

Scheduled refue1in maintenan e

'a'0-'3.5 714.1 6 367.0 12.3 1 481 730

=- 13 440 796 472 265 4 256 565 99.2 79.4

99. 2 79.6 93.6 75.5 90.0 72.6 0.8 1.0 Date, and Duration of Each):

Cumulative 41 837.3 194.6 4

4

97. 3 25 540 910
77. 1 69.8
25. IfShut Down At End Of Report Period. Estimated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Ic>/77)

UNITSIIUTDOWNS ANDPOWER REDUCTIONS DOCKETNO.

it No.3 REPORT MONTI( NOVEHBER 1978 Page 1 of 2 NII.

Dale rcK a-I'

à rj CJ

~e tJ U< c

~M g Licenscc Event Rcport rr

~A 0c Q l3 F. u O

Cause 4 Corrcclivc Action to Prevent Rccurrcncc 28 78-11-27 A 4

N/A HC HTEXCH (D)

Load reduction to repair condenser tube leak.

(Non-nuclear system) 78-11-27 1.7 N/A IA RELAYX Unit was tripped by'he reactor pro-tection system caused by the spurious actuation of underfrequency relay No.

3A2.

(Nuclear System) 30 78-11-27 P

1.6 3

N/A HB ZQZZZZ Unit was tripped by steam generator No.

3C level protection system due to a transient condition while increas-ing load after the unit was returned to service.

(Non-nuclear system) 31 78-11-28 2.6 N/A IA RELAYX Unit was tripped by t:he reactor pro-tection sys tern caused by tile spurious actuation of underfrequency relay No.3A2.

Corrective actions included F: I'orecd-S: Scheduled

('t/17)

Reason:

A.Lquipmcnt Failure (Explain)

II hlaintcnancc oi Test C.Refueling D.Regulatory Restriction I:.Operator Trailringh, License Exanlinatiun I'drninistrativc C Opcfallollal I'rior(I:xplaln)

II Otl'Icf(Exl)lalrt) 3 Method:

I -hlanual 2.hlanual Scram.

3-Aulonlalic Scram.

4 Otlrcr (Explain) relay.

Nuclear system) 4 Exhibit G - lnstruclio>>s for Prcpafalloll of Data Entry Sheets for Lice>>sec Event Rcport (LER) File (NUREG-OI6I )

Exhibil I - Sante Source

UNll SIIUTDOWNS AND P01YEIL REDUCTIONS REPORT hlON rII NOVEMBER 1978 Pa e

2 of 2 DOCKET NQ.

it No.3 NLI.

Date LIaK a-rI a

I CJ Lic nscc Event.

Report rr 0 eU E~

CJ Cause h. Corrcctivc Action to Prevent Rccurrcnce 32 78-11-28 F

0 N/A HC HTEXCH (n)

Unit was operated at approximately SOX R.P. to repair condenser tube leak.

(Non-nuclear system)

I: Forced S: Scheduled (9/77)

Reason:

A.Equipmcnt Failure (Explain)

II-hlaintcnancc or Test C-Itcrucling D Regulatury Restriction E Operator Training E'iccnsc Exan>ination F-Adndnislra tive G.Operational Lrror (I:xplaln)

I I Otl>cr (I:xplain) 3 Method:

I -hlanual 2.hlanual Scram.

3-Autontatic Scran>.

4 Other (Explain)

Exhibit G - Instructions for PrcparaliLul or Data Entry Sl>cets I'or Licensee Event Report (LER) File (NUREG-OI6 I )

5 Exltibit I - Satnc Source

AVERAGE DAILYUNITPOWER LEVEL DOCKET NO 25 ur ey own DATE Dec.

6 1978 COMPLETED BY V. T. Chilson MONTH NOVEMBER 19 78 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 1 658 48 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 658 17 18 19 20 21 10 II 12 13 14 15 16 INSTRUCTIONS 652 6

3 656

.94 26 27 28 29 30 NOTE:

07 07 305 Average daily power level greater than 666 MWe due to cooler condenser cooling water.

On this format, list the average daily unit power level in IIIVe.Net for each day in the reporting month. Compute to the nearest whole megawatt.

(ii/77 }

OPERATING DATAREPORT OPERATING STATUS 728 700 I. Unit Name:

Turkey Point Unit No.

4

2. Reportfng period:

November 19 78

3. Licensed Thermal Power (MWt):

2200

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

DOCKETNO. 50 - 251 DATE tLee~6. ~98 CO<IIPLETED BY ~~on TEI.EPHONE {Z~~-3824 Notes-'Unit No.

4 operated at approximately 100% 'R.P. until Nov. 20, 1978, when'oad was reduced. to, approximately 50%

R.P..'o extend operation of

'ore Cycle V..

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted, lfAny (Net MWe):
10. Reasons For Restrictions. IfAny:

NONE This Month Yr..to.Date Cumdative 8 016.0 6 337.6 3 847 520 3 638 971 77.1 Il. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical 720.0
13. Reactor Reserve Shutdown Hours '4.

Hours Generator On<inc 720.0

15. Unit Reserve Shutdown Hours

)7. Gross Electrical Energy Generated (MWH) 413 345

18. Net Electrical Energy Generated (MWH) 390 485
19. Unit Service Factor 100 '0
20. Unit AvailabilityFactor 100.0
21. Unit Capacity Factor (Using MDC Net)

SL2

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):

Scheduled refuelin maintenance "and'ns ections 46'2

.0 21 671 445 6.9 64

'5.

IfShut Down At End Of Report Period, Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation):

- Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COi~IMERCIALOPERATION

('>/ZZ)

UNITSIIUTDOWNS ANDPOWER REDUCTIONS DOCKET NO 50 251 REPORT MONTII Ho.

Date C

Vl I

r>

O EJ Llccnscc Event Rcport 0 0~

a QIo P5 Cause Ec, Corrccllvc Action to Prcvcnt Rccurrcnce 16 78-11-20 N/A ZZ ZZZZZZ Load was reduced to approximately 50X R.P.

to extend operation of Core Cycle V.

I F: Forced S: Scltedulcd I')/77)

Reason:

A-Equiprncnt Failure (Explain) ll.hlalntenancc or Test C-Refueling D Regulatory Restriction r:.Operator Training'ccnsc Examination F-Administrative G Operational Error (Explain)

I I.Other (Explain)

Method:

I -hlanual 2.Manual Scram.

3-Automatic Scrant.

4-Other (Explain)

Exhibit G - Instructions I'rPreparation of Data Entry Sheets I'or Licensee Event Rep or t (LER) File (NUREG-OI6I) 5 Exhibit I - Satnc Source

AVERAGE DAILYUNITPOWER LEVEL DOCKET NO. St. Lucre Dec.

6 1978 COMPLETED BY V. T ~

MONTH NOVEMBER 19 78 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net)

DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 788 17 18

,'7 8

10 12 13 14 IS 16 INSTRUCTIONS 735 685 784 779 782 787 19 20 21 22 24 95 26 27 28

'79 30 NOTE:

787 786-785

.78 8 788 789 784 Average daily power level greater than 777 MNe due to cooler condenser cooling water.

On this format, list the average daily unit power level in ilI~Ve-Net for each day in the reporting month. Compute tu the nearest whole megawat t.

(9/77)

OPERATING DATAREPORT DOCKET ilO.

DATE Q~~8 COMPLETED BY on TELEPHONE 305 552-3824 OPERATliiG STATUS I. Unit Name:

St. Lucie Unit No.

1

2. Reporting Period.

Novembe

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

8

5. Design Electrical Rating (Net MWe):
6. i>faximum Dependable Capacity (Gross MWe)t 822
7. Maximum Dependable Capacity (Net MWe):
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through Notes

'Unit operated at ap-"

proximately 100* R.P. after the unit was returned to ser-vice on Noy. 9, '1978 follov-ing completion of scheduled

'steam generator tube inspec-tion program.

7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net ice):
10. Reasons For Restrictions, IfAny:

NONE This Month Yr. to-Date Cumulative 14 104.4 118.5 13 679.4 4 757 830 0

9'19'44

71. 9 6.3 MUL1LS LIO4QJL
12. Number Of Hours Reactor Was Critical 528.7 6 204.3
13. Reactor Reserve Shutdown Hours

-Ow 16.9

14. Hours Generator On-Line 510.2 5 997.7
15. Unit Reserve Shutdown Hours
17. Gross Electrical Energy Generated (MWH) 417 240
18. Net Electrical Energy Generated (MWH) 392 635 4 477 067
19. Unit Service Factor 70.9 74.8
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net) 70.2 74.9
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 1.1
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Scheduled refuelin maintenance

'and'nspections

- Aoril 1 - Ma 26 97

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALEI.ECTRICITY COMMERCIAL OPERATION I'>/77)

UNITSIIUTDOIUNS ANDPOWER REDUCTIONS No.l REPORT hlON Ol 19 78 Ho.

l)atc IP FQ U~ c

~ M o

Liccnscc Event Rcport ¹ E~

4l 4P ro G EP~i/i O

4' O

CJ Cause Sc Corrective Action to Prevent Rccurrcnce 22 78-10-28 S

209.8 B

N/A CB HTEXCH (p)

Unit was removed from service to perform steam generator tube inspec-tion program.

(Continued from previous month)

~ (Nuclear system)

F: Forced S: Scheduled

(')/77)

Reason.

A.Equipmcnt Failure (Explain)

II-Maintenance oi Test C-Refueling D-Regulatory Restriction E-Operator Training b. Liccosc Examioalion F-Administrative G.Operational Error (lixplaitt)

I I Other (Explain) hlethod:

I.Manual 2 Manual Scram.

3-Automatic Scratn.

4.Other (Explain)

Exltibit G - Instructions for Preparation of Data Entry Sltcets tor Liccosec Event Report (LER) File (NUREG-Ol 6I )

Exltibit I

~ Sante Source

December 12, 1978

.Office of Pwnagement Xnfoxmation and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

C Attached are the November, 1978, Operating Summaxy Reports.

for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit.

No. 1.

Very truly yours,

~

~

Vice President Povex Resources VTC/DDC cc:

Mr. Games P. O'Reilly Robert Lowenstein, Esquire

SUY21ARY OF OPERATXNG EZPERXEHCE DOCKET HO 50 - 250 Turkey Point UNIT Unit No.

3 Di'.TZ December 9,

1978 COMPLETED BY V. T. Chilson REPORT MONTE NOVEMBER 1978 TELEPHONE 305 552 3824 Unit operated at approximately 100$ R;P. except for outages of November 27 and 28 and the. load reduction of November 27-30, 1978.

Refer to "Unit Shutdowns and Power Reductions" section of the November,

1978, Operating Status Report for additional information.

Ho Major Safety-related maintenance was performed du ing the month.

$UHNARzZ OF OPERATXNG EXPERIENCE DOCKET NO.

UNZT

.50 - 251 urkey Point Unit: No.

4 D2'.TE December 9,

J.978 COMPLETED BY V. T. Chilson

~PORT MO'LLTH NOVEMBER, 19 78 TELEPHONE (305) 552-3824 Unit operated at approximately 100% R.P. until November 20, 1978, when load was reduced to approximately 50% R.P. to extend operation of Core Cycle V.

Refer to "Unit Shutdowns and Power Reductions" secti'on of the November, 1978, Operating Status Report for additional infor-ma'tion.

No.Major Safety-related maintenance was perfc~

dur'"g the month.

$UMNARY OP OPERATING EZPERZENCE DOCKET NO.

50 - 335 S t. Lucie UNXT Unit No.

1 D2'..TZ December 9,

1978 COMP~~TED BZ V. T. Chilson

~PORT MONTE NOVEMBER 1978 TELEPHONE

( 305) ~

552-3824 Unit operated at approximately 100% R.P. after the unit was returned to service on November 9, 1978 following completion of scheduled steam generator tube inspection program.

Refer to "Unit Shutdowns and Power Reductions" section of'the November, 1978, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Completed Steam Generator Tube -inspection Program.

Completed installation of additional neutron shielding.

V g

N I'