Text
- _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _
AVERAGE DAILY UNIT POWER LEVEL l
DOCKET NO.
50 '/4n UNIT Turkey Point 3 DATE March 14. 1986 N.ld. Grant COMPLETED BY TELENIONE (3051552-3675 MONTH Februnrv. 1986 DAY AVERAGE DAILY POWER LEVEL iMWe Net) 2/ 1/86 704 2/ 2/86 701 2/ 3/86 699 2/ 4l86 688 2/ 5/86 688 2/ 6/86 689 2/ 7/86 651 2/ 8/86 321 2/ 9/86 565 2/10/86 686 2/11/86 375 2/12/86 8
2/13/86 458 2/14/86 649 2/15/86 698 2/16/86 696 2/17/86 694 2/18/86 692 2/19/86 694 2/20/86 690 2/21/86 689 2/22/86 686 2/23/86 681 2/24/86 679 2/25/86 685 2/26/86 694 2/27/86 692 2/28/86 692 8605140227 860228 l
PDR ADOCK 05000250 R
pg
[b,j o
OPERATING DATA REPORT
-DOCKET NO 50 - 250 DATE 3/13/86 COMPLETED BY N.
W.
GRANT TELEPHONE 305/552/3675 t
OPERATING STATUS 1.
UNIT NAME: TURKEY POINT UNIT 3 2.
REPORTING PERIOD: FEBRUARY 1986 3.
LICENSED THERMAL POWER (MWT):
2200 4.
NAMEPLATE RATING (GROSS MWE):
760 5.
DESIGN ELECTRICAL RATING (NET MWE):
~
693 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
700 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____
666 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) ________________________
- 10. REASONS FOR RESTRICTIONS, IF ANY:
r MONTHLY-
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
672 1416 116025.6
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
644.6 1154.5 80232.1
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 844.4 14 HOURS GENERATOR ON-LINE _________________
642.1 1134.8 79541.6
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 121.8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) ____
1349846 2416425 164621946
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _
443190 793070 52664615
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) ___
421114 750235 49859816
- 19. UNIT SERVICE FACTOR _____________________
95.6 80.1 68.6
- 20. UNIT AVAILABILITY FACTOR ________________
95.6 80.1 68.7
- 21. CAPACITY FACTOR (USING MDC NET) 94.1 79.6 66.1
- 22. CAPACITY FACTOR (USING DER NET) 90.4 76.5 62.0
- 23. UNIT FORCED OUTAGE RATE 4.4 19.9 7.2
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
- 25. IF SHUT DOWN A T END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
s UNIT SHUTDOWNS AND POWER REDUCTIONS ETNO u
Point Unit #3 DATE 3-14-86 REPORT MONTH March, 1986 COnet.ETED BY N.W. G ran t TEt.EPHONE (305) 552-3675 E
c fp 3
j Ei Licensee Eg "L
Cause & Corrective N..
- 1) ate
{
32
(
jj&
Event g?
A' "" ' "
gI u
j 5; Report a mV EV a
e-g Prevent Recurrence
'4 6
03 860211 F
29.9 G
3 250-86-06 1A INSTRU As a result of a procedure with in-adequate guidance a reactor trip occurred while clearing a construc-tion activity related inadvertent containment insulation and high pressure signal.
Following a review of the event and performance of necessary testing the unit returned to power operation.
l I
2 3
4 F Forced Reasem:
Method:
Enhibit G. Instructions 5 Scheduled A-Equipment FailureIEmpiain) l Manual for Preparalmn of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for 1.icensee C-Refueling 3 Automatic Scram.
Eveni Repose iLE RI File (NUREG.
D-Regulatory Restriction
$4)iher (Explatal 01611 I Operator Training & lxense F=aminati m F Administrative M " O *** ** "8 88 5
G Operati. mal I s tor iF splain t 4_
g., 4.
seve,,..d Esinbit I Same Source 128/ 7 7 )
Il Other iExplaml
1 SUZ1 MARY OF OPERATING EXPERIENCE DOCKET NO.
50-250 UNIT Turkey Point Unit #3 DATE March 14, 1986 COMPLETED BY N.W. Grant
' TELEPHONE (305) 552-3675 REPORT I40 NTH Februarv. 1986 See the ' unit shutdowns and power reductions" report.
1 0
l l
l 1
4 i
.,.,_,,,,,m,
.,m,,
.,e
AVER AGE DAILY UNITPOWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point 4 DATE March 14, 1986 N.W. Grant COMPLETED 3y (305)552-3675 1TLEPJIONE MONTH February, 1986 DAY AVERACE DAILY POWER LEVEL (MWe Net) 2/ 1/86
-1 2/ 2/86
-1 2/ 3/86
-1 2/ 4/86
-1 2/ 5/86
-1 2/ 6/86
-1 2/ 7/86
-1 2/ 8/86
-1 2/ 9/86 0
2/10/86
-1 2/11/86
-1 2/12/86 0
2/13/86
-1 2/14/86
-1 2/15/86
-1 2/16/86 0
2/17/86 0
2/18/86 0
2/19/86 0
2/20/86
-1 2/21/86 0
2/22/86 0
2/23/86 0
2/24/86 0
2/25/86 0
2/26/86 0
2/27/86 0
2/28/86 0
i 4
OPERATING DATA REPORT r
DOCKET NO 50 - 251 i
DATE 3/13/86 COMPLETED BY N.
W.
GRANT TELEPHONE 305/552/3675 OPERATING STATUS l
l 1.
UNIT NAME: TURKEY POINT UNIT 4 2.
REPORTING PERIOD: FEBRUARY 1986 3.
LICENSED THERMAL POWER (MWT): ______________ 2200 4.
NAMEPLATE RATING (GROSS MWE):
760 5.
DESIGN ELECTRICAL RATING (NET MWE):
693 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
700 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
666 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
l MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
672 1416 109757.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
0.0 225.4 77860.6
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 166.6 l
- 14. HOURS GENERATOR ON-LINE 0.0 225.1 75320.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 32.1
- 16. GROSS THERMAL ENERGY GENERATED (MWH) ____
0 440167 159477896
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH)
.0 139235-50781807
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
-984 129483 48090691
- 19. UNIT SERVICE FACTOR _____________________
0.0 15.9 68.6
- 20. UNIT AVAILABILITY FACTOR 0.0 15.9 68.7
- 21. CAPACITY FACTOR (USING MDC NET) 0.0 13.7 67.4
- 22. CAPACITY FACTOR (USING DER NET) 0.0-13.2 63.2
- 23. UNIT FORCED OUTAGE RATE _________________
0 0
6.4 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
l
- 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
5/7/86 l
UNIT SHUTDOWNS AND POWER REDUCTIONS E
r Point Unit 4 N
E N-*
DATE REPORT MONTH February, 1986 CoteLETED BY N.W. Grant TELEPHONE (305) 552-3576 E
c
.!E 3
y E5 Licensee E,
g*.,
Cause & Corrective No.
Date
{
3g
(
,;g g &
Event 37 f'l a
Actiem to
$E 5
j di g R'P"'t
- wi U Prevent Recurrence i
d 02 860110 S
672.0 C
4 RC FUELXX Unit #4 remained shutdown for re-fueling and scheduled maintenance.
i r
I l
l 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions 5 Stheduled A.Eqmpment Failure (Explain) 1 Manual for Preparation of Dasa B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C. Refueling 3-Aufomatic Scram.
Event Repost I LER) File (NUREG-D-Regulasory Restriction
$0her(Explain 1 0161I I:-Operator Training a lxense Fuamination F Administrative Y ~ O '** ** "" #*
5 G Operatiemal I isur (F splain t r
/,e ao Adewc.,..,#
Eshibit I Same Source t'8/77) lieher (Explain)
SUMMARY
OF OPERATING EXPERIENCE DOCKET FO.
50-251 UNIT Turkey Point Unit #4 DATE March 14, 1986 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REP RT MONTH February, 1986 Unit #4 was shutdown for refueling and scheduled maintenance.
J
AVER AGE DAILY UNIT POWER LEvgL DOCKET NO.
50-1w UNIT St. Lucie Unit 1
.T <
DATE h rch 14. 1986 COMPLETED BY N.W. Grant (305)SS2-3675 TELENIONE MONTH February. 1986 DAY AVERACE DAILY POWER LEVEL IMWe Net) 1 2/ 1/86 862 2/ 2/86 862 2/ 3/86 860 2/ 4/86 861 2/ 5/86 861 2/ 6/86 393 2/ 7/86 813 2/ 8/86 859 2/ 9/86 857 2/10/86 859 2/11/86 863 2/12/86 864 2/13/86 865 2/14/86 867 2/15/86 866 2/16/86 865 2/17/86 864 2/18/86 864 2/19/86 865 2/20/86 863 2/21/86 862 2/22/86 863 2/23/86 862 2/24/86 855 2/25/86 858 2/26/86 866 2/27/86 866 2/28/86 865
OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 3/13/86 COMPLETED BY N.
W.
GRANT-TELEPHONE 305/552/3675 OPERATING STATUS 4
1.
UNIT NAME:
ST. LUCIE UNIT 1 2.
REPORTING PERIOD: FEBRUARY 1986 3.
LICENSED THERMAL POWER (MWT):
2700 4.
NAMEPLATE RATING (GROSS MWE):
850 5.
DESIGN ELECTRICAL RATING (NET MWE):
830 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___
872 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
~
827 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
i 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
672 1416 80568.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
663.6 1407.6 57563.6
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 205.3
- 14. HOURS GENERATOR ON-LINE _________________
661.1 1493.6 57205.7
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
39.3
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1773239 3736950 14462921 a
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 596690 1260400 4731690L 567109 1197903 44631695
- 19. UNIT SERVICE FACTOR _____________________
98.4 99.1 71.0
- 20. UNIT AVAILABILITY FACTOR ________________
98.4 99.1 71.1
- 21. CAPACITY FACTOR (USING MDC NET) 102.0 102.3 69.5
- 22. CAPACITY FACTOR (USING DER NET) 101.7 101.9 68.0
- 23. UNIT FORCED OUTAGE RATE _________________
1.6
.8 4.3
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
50-335 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT N AME St. Lucie Unit #1 DATE 3-14-86 g
{
((
CN REPORT MONTH Februarv. 1986 36/5 c
jE 3
j E~
Licensee P,
g*.,
Cause & Correceive No.
Date g
3g
{
jgy Even 37
^i""'"
Eg' Prevent Recurre. ice fE E
jgg Report a mO H
d 01 860206 F
10.9 A
3 335-86-02 1A CKTBRK While at full power, an automatic reactor trip occurred during the monthly Reactor Protection System (RPS), Logic Matrix Test. A failed RPS relay trip select switch al-lowed a logic matrix relay to de-energize out of sequence causing the trip.
The switch was replaced and the unit returned to power.
I 3
4 r Finced Reason:
Method:
Exhibie G Instructitms
% Stheduled A-Equipment Failure (Explain) 1-Manual for Prepararion of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C.Refuehng 3 Automatic Sciam.
Event Report t1.ER) File (NUREG-D-Regulatory Restrictmn
$0iher (Explain) 01611 I Operator Training & Ucense Examination F Adnunistrative Y - O * ** '* *' # ##
5 G4)peratiemal I s eur f liplaml 6.
- 4. g.
Aseve,..d Estubit I Same Source
(*r/77 )
Il-Other Euplaint
SUMMARY
OF OPERATINC EXPERIENCE DOCKET NO.
50-335 UNIT st. Lucie Unit #1 DATE March 14, 1986 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REPORT ttONTH February, 1986 See the " unit shutdowns and power reductions" report.
In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month.
i l-
AVER AGE DAILY UNIT POWf R LEVIL
=
DOCKET NO. 50-389 UNIT St. I ncio finit 2 DATE March 14 1986 COMPLETED SY N.W. Grant TELENIONE (305)552-3676 MONTH February, 1986 DAY AVERACE DAILY POWER LEVEL IMWe Net) i 2/ 1/86 852 2/ 2/86 846 2/ 3/86 831 2/ 4/86 854 2/ 5/86 855 2/ 6/86 855 2/ 7/86 856 2/ 8/86 856 2/ 9/86 854 2/10/86 855 2/11/86 859 2/12/86 858 2/13/86 858 2/14/86 860 2/15/86 859 2/16/86 858 2/17/86 859 2/18/86 859 2/19/86 858 2/20/86 857 2/21/86 855 2/22/86 857 2/23/86 856 2/24/86 856 2/25/86 842 2/26/86 847 2/27/86 864 2/28/86 865
I
.j,
1 1 3 OPERATING DATA REPORT i
DOCKET NO 50'- 389 DATE 3/13/86 COMPLETED BY N.
W.
GRANT TELEPHONE 305/552/3675 OPERATING STATUS 1.
UNIT NAME:
ST. LUCIE UNIT 2 l
2.
REPORTING PERIOD: FEBRUARY 1986 3.
LICENSED THERMAL POWER (MWT):
2700 4.
NAMEPLATE RATING (GROSS MWE):
850 5.
DESIGN ELECTRICAL RATING (NET MWE):
830 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
882 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
837 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
PUUER LEE 5L iU~UUI6U~k55TRICTEU,'[F~ UE~iUET sU5)((((_~~(((([_~[_~((((_~((~((
~
~
~
9.
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
672 1416 22465.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
672.0 1400.2 19449.1
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE _________________
672.0 1383.5 18955.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1806646 3698089 48344622 17 GROSS ELECTRICAL ENERGY GERERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 605310 1240990 16147670 574584 1176689 15247732
- 19. UNIT SERVICE FACTOR _____________________
100.0 97.7 04.4
- 20. UNIT AVAILABILITY FACTOR ________________
100.0 97.7 84.4
- 21. CAPACITY FACTOR (USING MDC NET) 102.2 99.3 84.4
- 22. CAPACITY FACTOR (USING DER NET) 103.0 100.1 83.5
- 23. UNIT FORCED OUTAGE RATE _________________
g 0 2.3 10.2 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
REFUELING, MARCH 29, 1986, 7 WEEKS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
l 4
l i
b r
r
50-389 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS St. Lucie Unit #2 UNIT NAME DATE 3-14-86 COMPLETED BY N.W. Grant REPORT MONTH Februarv-1986 TELEPHONE (305) 552-3675 e.
E 2
jg 3
j E* 5 Licensee Eg Cause & Corrective N...
Oate t
3g il 2sn Event g'ir Ai"" '"
Eg' Prevent Recurrence jE j ;f3 g Report e mO d
Unit #2 had no shutdowns or significant power reductions.
I 2
3 4
F: Forced Reasim:
Method:
Exhibit G - Instructions f
S Scheduled A-Equipment Failure (Explain) 1 -Manual for Prenaration of Dara B. Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automati: Scram.
Event Repori t LER) File (NUKEG-D-Regulatory Restrictior:
@-Other (Englain) 0161) 0-Operator Training & License Fxamination M*"
O'****""#"
5 F Administrative G-Operatismal hror (Fsplain)
,y 4
4, 4 4 eve.,..,#
Eshibit I. Same Source l'8/77)
II-Other (E uplain t
M i
SU.'IMARY OF ' OPERATING EXPERIENCE 1
DOCKET NO.
50-389 UNIT
_ st. Lucie Unit.'2 r'
DATE
~
~
March 14 1986 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 R1 MORT HONTH February, 1986.-
Unit #2 operated at essentially full power and had no " unit shutdowns and power reductions'.'.
In accordance with requiremento or' Technical Specifications 6.9.1.6, there were no challenges to"PORV or safety valves durf.ng the report
- month, f
e.
I s
M 4
?
t i
f 9
f/
/
~
U*
g 80
/
- /
/
4
,s'.
%v0 Ir a
w/
J.
P..
P.O. BOX 029100 MI AMI, F L 33102
)
f {fQ
~
FLORID A POWER & LIGHT COMPANY hO
[o' MAR 1 7 f.86 L-86-110 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Sir:
Attached are the February 1986 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2.
Very truly yours, NWC&b/
C. O. Woodyf Group VicePresident Nuclear Energy JWW/NWG:am Attachment cc:
Dr. J. Nelson Grace Harold F. Reis, Esquire PNS-LI-86-Il0 1