L-86-110, Monthly Operating Repts for Feb 1986

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1986
ML20210Q709
Person / Time
Site: Turkey Point  
Issue date: 02/28/1986
From: Grant N, Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
L-86-110, NUDOCS 8605140227
Download: ML20210Q709 (17)


Text

- _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _

AVERAGE DAILY UNIT POWER LEVEL l

DOCKET NO.

50 '/4n UNIT Turkey Point 3 DATE March 14. 1986 N.ld. Grant COMPLETED BY TELENIONE (3051552-3675 MONTH Februnrv. 1986 DAY AVERAGE DAILY POWER LEVEL iMWe Net) 2/ 1/86 704 2/ 2/86 701 2/ 3/86 699 2/ 4l86 688 2/ 5/86 688 2/ 6/86 689 2/ 7/86 651 2/ 8/86 321 2/ 9/86 565 2/10/86 686 2/11/86 375 2/12/86 8

2/13/86 458 2/14/86 649 2/15/86 698 2/16/86 696 2/17/86 694 2/18/86 692 2/19/86 694 2/20/86 690 2/21/86 689 2/22/86 686 2/23/86 681 2/24/86 679 2/25/86 685 2/26/86 694 2/27/86 692 2/28/86 692 8605140227 860228 l

PDR ADOCK 05000250 R

pg

[b,j o

OPERATING DATA REPORT

-DOCKET NO 50 - 250 DATE 3/13/86 COMPLETED BY N.

W.

GRANT TELEPHONE 305/552/3675 t

OPERATING STATUS 1.

UNIT NAME: TURKEY POINT UNIT 3 2.

REPORTING PERIOD: FEBRUARY 1986 3.

LICENSED THERMAL POWER (MWT):

2200 4.

NAMEPLATE RATING (GROSS MWE):

760 5.

DESIGN ELECTRICAL RATING (NET MWE):

~

693 6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

700 7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____

666 8.

IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) ________________________

10. REASONS FOR RESTRICTIONS, IF ANY:

r MONTHLY-

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

672 1416 116025.6

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

644.6 1154.5 80232.1

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 844.4 14 HOURS GENERATOR ON-LINE _________________

642.1 1134.8 79541.6

15. UNIT RESERVE SHUTDOWN HOURS 0

0 121.8

16. GROSS THERMAL ENERGY GENERATED (MWH) ____

1349846 2416425 164621946

17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _

443190 793070 52664615

18. NET ELECTRICAL ENERGY GENERATED (MWH) ___

421114 750235 49859816

19. UNIT SERVICE FACTOR _____________________

95.6 80.1 68.6

20. UNIT AVAILABILITY FACTOR ________________

95.6 80.1 68.7

21. CAPACITY FACTOR (USING MDC NET) 94.1 79.6 66.1
22. CAPACITY FACTOR (USING DER NET) 90.4 76.5 62.0
23. UNIT FORCED OUTAGE RATE 4.4 19.9 7.2
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
25. IF SHUT DOWN A T END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

s UNIT SHUTDOWNS AND POWER REDUCTIONS ETNO u

Point Unit #3 DATE 3-14-86 REPORT MONTH March, 1986 COnet.ETED BY N.W. G ran t TEt.EPHONE (305) 552-3675 E

c fp 3

j Ei Licensee Eg "L

Cause & Corrective N..

1) ate

{

32

(

jj&

Event g?

A' "" ' "

gI u

j 5; Report a mV EV a

e-g Prevent Recurrence

'4 6

03 860211 F

29.9 G

3 250-86-06 1A INSTRU As a result of a procedure with in-adequate guidance a reactor trip occurred while clearing a construc-tion activity related inadvertent containment insulation and high pressure signal.

Following a review of the event and performance of necessary testing the unit returned to power operation.

l I

2 3

4 F Forced Reasem:

Method:

Enhibit G. Instructions 5 Scheduled A-Equipment FailureIEmpiain) l Manual for Preparalmn of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for 1.icensee C-Refueling 3 Automatic Scram.

Eveni Repose iLE RI File (NUREG.

D-Regulatory Restriction

$4)iher (Explatal 01611 I Operator Training & lxense F=aminati m F Administrative M " O *** ** "8 88 5

G Operati. mal I s tor iF splain t 4_

g., 4.

seve,,..d Esinbit I Same Source 128/ 7 7 )

Il Other iExplaml

1 SUZ1 MARY OF OPERATING EXPERIENCE DOCKET NO.

50-250 UNIT Turkey Point Unit #3 DATE March 14, 1986 COMPLETED BY N.W. Grant

' TELEPHONE (305) 552-3675 REPORT I40 NTH Februarv. 1986 See the ' unit shutdowns and power reductions" report.

1 0

l l

l 1

4 i

.,.,_,,,,,m,

.,m,,

.,e

AVER AGE DAILY UNITPOWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point 4 DATE March 14, 1986 N.W. Grant COMPLETED 3y (305)552-3675 1TLEPJIONE MONTH February, 1986 DAY AVERACE DAILY POWER LEVEL (MWe Net) 2/ 1/86

-1 2/ 2/86

-1 2/ 3/86

-1 2/ 4/86

-1 2/ 5/86

-1 2/ 6/86

-1 2/ 7/86

-1 2/ 8/86

-1 2/ 9/86 0

2/10/86

-1 2/11/86

-1 2/12/86 0

2/13/86

-1 2/14/86

-1 2/15/86

-1 2/16/86 0

2/17/86 0

2/18/86 0

2/19/86 0

2/20/86

-1 2/21/86 0

2/22/86 0

2/23/86 0

2/24/86 0

2/25/86 0

2/26/86 0

2/27/86 0

2/28/86 0

i 4

OPERATING DATA REPORT r

DOCKET NO 50 - 251 i

DATE 3/13/86 COMPLETED BY N.

W.

GRANT TELEPHONE 305/552/3675 OPERATING STATUS l

l 1.

UNIT NAME: TURKEY POINT UNIT 4 2.

REPORTING PERIOD: FEBRUARY 1986 3.

LICENSED THERMAL POWER (MWT): ______________ 2200 4.

NAMEPLATE RATING (GROSS MWE):

760 5.

DESIGN ELECTRICAL RATING (NET MWE):

693 6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

700 7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE):

666 8.

IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)

10. REASONS FOR RESTRICTIONS, IF ANY:

l MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

672 1416 109757.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

0.0 225.4 77860.6

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 166.6 l

14. HOURS GENERATOR ON-LINE 0.0 225.1 75320.2
15. UNIT RESERVE SHUTDOWN HOURS 0

0 32.1

16. GROSS THERMAL ENERGY GENERATED (MWH) ____

0 440167 159477896

17. GROSS ELECTRICAL ENERGY GERERATED (MWH)

.0 139235-50781807

18. NET ELECTRICAL ENERGY GENERATED (MWH)

-984 129483 48090691

19. UNIT SERVICE FACTOR _____________________

0.0 15.9 68.6

20. UNIT AVAILABILITY FACTOR 0.0 15.9 68.7
21. CAPACITY FACTOR (USING MDC NET) 0.0 13.7 67.4
22. CAPACITY FACTOR (USING DER NET) 0.0-13.2 63.2
23. UNIT FORCED OUTAGE RATE _________________

0 0

6.4 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :

l

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

5/7/86 l

UNIT SHUTDOWNS AND POWER REDUCTIONS E

r Point Unit 4 N

E N-*

DATE REPORT MONTH February, 1986 CoteLETED BY N.W. Grant TELEPHONE (305) 552-3576 E

c

.!E 3

y E5 Licensee E,

g*.,

Cause & Corrective No.

Date

{

3g

(

,;g g &

Event 37 f'l a

Actiem to

$E 5

j di g R'P"'t

  • wi U Prevent Recurrence i

d 02 860110 S

672.0 C

4 RC FUELXX Unit #4 remained shutdown for re-fueling and scheduled maintenance.

i r

I l

l 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions 5 Stheduled A.Eqmpment Failure (Explain) 1 Manual for Preparation of Dasa B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C. Refueling 3-Aufomatic Scram.

Event Repost I LER) File (NUREG-D-Regulasory Restriction

$0her(Explain 1 0161I I:-Operator Training a lxense Fuamination F Administrative Y ~ O '** ** "" #*

5 G Operatiemal I isur (F splain t r

/,e ao Adewc.,..,#

Eshibit I Same Source t'8/77) lieher (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET FO.

50-251 UNIT Turkey Point Unit #4 DATE March 14, 1986 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REP RT MONTH February, 1986 Unit #4 was shutdown for refueling and scheduled maintenance.

J

AVER AGE DAILY UNIT POWER LEvgL DOCKET NO.

50-1w UNIT St. Lucie Unit 1

.T <

DATE h rch 14. 1986 COMPLETED BY N.W. Grant (305)SS2-3675 TELENIONE MONTH February. 1986 DAY AVERACE DAILY POWER LEVEL IMWe Net) 1 2/ 1/86 862 2/ 2/86 862 2/ 3/86 860 2/ 4/86 861 2/ 5/86 861 2/ 6/86 393 2/ 7/86 813 2/ 8/86 859 2/ 9/86 857 2/10/86 859 2/11/86 863 2/12/86 864 2/13/86 865 2/14/86 867 2/15/86 866 2/16/86 865 2/17/86 864 2/18/86 864 2/19/86 865 2/20/86 863 2/21/86 862 2/22/86 863 2/23/86 862 2/24/86 855 2/25/86 858 2/26/86 866 2/27/86 866 2/28/86 865

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 3/13/86 COMPLETED BY N.

W.

GRANT-TELEPHONE 305/552/3675 OPERATING STATUS 4

1.

UNIT NAME:

ST. LUCIE UNIT 1 2.

REPORTING PERIOD: FEBRUARY 1986 3.

LICENSED THERMAL POWER (MWT):

2700 4.

NAMEPLATE RATING (GROSS MWE):

850 5.

DESIGN ELECTRICAL RATING (NET MWE):

830 6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___

872 7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE):

~

827 8.

IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

i 9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

672 1416 80568.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

663.6 1407.6 57563.6

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 205.3

14. HOURS GENERATOR ON-LINE _________________

661.1 1493.6 57205.7

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

39.3

16. GROSS THERMAL ENERGY GENERATED (MWH) 1773239 3736950 14462921 a
17. GROSS ELECTRICAL ENERGY GERERATED (MWH)
18. NET ELECTRICAL ENERGY GENERATED (MWH) 596690 1260400 4731690L 567109 1197903 44631695
19. UNIT SERVICE FACTOR _____________________

98.4 99.1 71.0

20. UNIT AVAILABILITY FACTOR ________________

98.4 99.1 71.1

21. CAPACITY FACTOR (USING MDC NET) 102.0 102.3 69.5
22. CAPACITY FACTOR (USING DER NET) 101.7 101.9 68.0
23. UNIT FORCED OUTAGE RATE _________________

1.6

.8 4.3

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

50-335 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT N AME St. Lucie Unit #1 DATE 3-14-86 g

{

((

CN REPORT MONTH Februarv. 1986 36/5 c

jE 3

j E~

Licensee P,

g*.,

Cause & Correceive No.

Date g

3g

{

jgy Even 37

^i""'"

Eg' Prevent Recurre. ice fE E

jgg Report a mO H

d 01 860206 F

10.9 A

3 335-86-02 1A CKTBRK While at full power, an automatic reactor trip occurred during the monthly Reactor Protection System (RPS), Logic Matrix Test. A failed RPS relay trip select switch al-lowed a logic matrix relay to de-energize out of sequence causing the trip.

The switch was replaced and the unit returned to power.

I 3

4 r Finced Reason:

Method:

Exhibie G Instructitms

% Stheduled A-Equipment Failure (Explain) 1-Manual for Prepararion of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C.Refuehng 3 Automatic Sciam.

Event Report t1.ER) File (NUREG-D-Regulatory Restrictmn

$0iher (Explain) 01611 I Operator Training & Ucense Examination F Adnunistrative Y - O * ** '* *' # ##

5 G4)peratiemal I s eur f liplaml 6.

4. g.

Aseve,..d Estubit I Same Source

(*r/77 )

Il-Other Euplaint

SUMMARY

OF OPERATINC EXPERIENCE DOCKET NO.

50-335 UNIT st. Lucie Unit #1 DATE March 14, 1986 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REPORT ttONTH February, 1986 See the " unit shutdowns and power reductions" report.

In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month.

i l-

AVER AGE DAILY UNIT POWf R LEVIL

=

DOCKET NO. 50-389 UNIT St. I ncio finit 2 DATE March 14 1986 COMPLETED SY N.W. Grant TELENIONE (305)552-3676 MONTH February, 1986 DAY AVERACE DAILY POWER LEVEL IMWe Net) i 2/ 1/86 852 2/ 2/86 846 2/ 3/86 831 2/ 4/86 854 2/ 5/86 855 2/ 6/86 855 2/ 7/86 856 2/ 8/86 856 2/ 9/86 854 2/10/86 855 2/11/86 859 2/12/86 858 2/13/86 858 2/14/86 860 2/15/86 859 2/16/86 858 2/17/86 859 2/18/86 859 2/19/86 858 2/20/86 857 2/21/86 855 2/22/86 857 2/23/86 856 2/24/86 856 2/25/86 842 2/26/86 847 2/27/86 864 2/28/86 865

I

.j,

1 1 3 OPERATING DATA REPORT i

DOCKET NO 50'- 389 DATE 3/13/86 COMPLETED BY N.

W.

GRANT TELEPHONE 305/552/3675 OPERATING STATUS 1.

UNIT NAME:

ST. LUCIE UNIT 2 l

2.

REPORTING PERIOD: FEBRUARY 1986 3.

LICENSED THERMAL POWER (MWT):

2700 4.

NAMEPLATE RATING (GROSS MWE):

850 5.

DESIGN ELECTRICAL RATING (NET MWE):

830 6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

882 7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE):

837 8.

IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

PUUER LEE 5L iU~UUI6U~k55TRICTEU,'[F~ UE~iUET sU5)((((_~~(((([_~[_~((((_~((~((

~

~

~

9.

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

672 1416 22465.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

672.0 1400.2 19449.1

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE _________________

672.0 1383.5 18955.8

15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGY GENERATED (MWH) 1806646 3698089 48344622 17 GROSS ELECTRICAL ENERGY GERERATED (MWH)
18. NET ELECTRICAL ENERGY GENERATED (MWH) 605310 1240990 16147670 574584 1176689 15247732
19. UNIT SERVICE FACTOR _____________________

100.0 97.7 04.4

20. UNIT AVAILABILITY FACTOR ________________

100.0 97.7 84.4

21. CAPACITY FACTOR (USING MDC NET) 102.2 99.3 84.4
22. CAPACITY FACTOR (USING DER NET) 103.0 100.1 83.5
23. UNIT FORCED OUTAGE RATE _________________

g 0 2.3 10.2 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :

REFUELING, MARCH 29, 1986, 7 WEEKS

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

l 4

l i

b r

r

50-389 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS St. Lucie Unit #2 UNIT NAME DATE 3-14-86 COMPLETED BY N.W. Grant REPORT MONTH Februarv-1986 TELEPHONE (305) 552-3675 e.

E 2

jg 3

j E* 5 Licensee Eg Cause & Corrective N...

Oate t

3g il 2sn Event g'ir Ai"" '"

Eg' Prevent Recurrence jE j ;f3 g Report e mO d

Unit #2 had no shutdowns or significant power reductions.

I 2

3 4

F: Forced Reasim:

Method:

Exhibit G - Instructions f

S Scheduled A-Equipment Failure (Explain) 1 -Manual for Prenaration of Dara B. Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automati: Scram.

Event Repori t LER) File (NUKEG-D-Regulatory Restrictior:

@-Other (Englain) 0161) 0-Operator Training & License Fxamination M*"

O'****""#"

5 F Administrative G-Operatismal hror (Fsplain)

,y 4

4, 4 4 eve.,..,#

Eshibit I. Same Source l'8/77)

II-Other (E uplain t

M i

SU.'IMARY OF ' OPERATING EXPERIENCE 1

DOCKET NO.

50-389 UNIT

_ st. Lucie Unit.'2 r'

DATE

~

~

March 14 1986 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 R1 MORT HONTH February, 1986.-

Unit #2 operated at essentially full power and had no " unit shutdowns and power reductions'.'.

In accordance with requiremento or' Technical Specifications 6.9.1.6, there were no challenges to"PORV or safety valves durf.ng the report

month, f

e.

I s

M 4

?

t i

f 9

f/

/

~

U*

g 80

/

  • /

/

4

,s'.

%v0 Ir a

w/

J.

P..

P.O. BOX 029100 MI AMI, F L 33102

)

f {fQ

~

FLORID A POWER & LIGHT COMPANY hO

[o' MAR 1 7 f.86 L-86-110 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

Attached are the February 1986 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2.

Very truly yours, NWC&b/

C. O. Woodyf Group VicePresident Nuclear Energy JWW/NWG:am Attachment cc:

Dr. J. Nelson Grace Harold F. Reis, Esquire PNS-LI-86-Il0 1

PEOPLE.. SERVING PEOPLE