Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
AYERAGE DAILY UÃITPDwER LEYEL e poe gee 3/7 DOCKET IVO.
II" 1
COMPLETED BY >- T. Chilson MONTH APRIL, 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe LVet) (MWe-Net 1 I 663 17 531 665 18 56 662 19 666 657 50 664 654 666 22 667 23 25 10 654 26 7'T 657 12 658 28 13 658 19 666 30 661 15 591 16 NOTE: Average daily power level greater than 666 MWe due to cooler condenser cooling water.
INSTRUCTIONS Qn this format, list the avera(Ie daily unit power level in MWe.Viet for each day in the reportinR nii>ntlt. Compute to the nearest whole me((awat t.
(9/77)
OPERATING DATA REPORT DOCKET NO.
~~
DATE ~~Ma . 80 COMPLETED BY TELEPHONE
~~~son 3824 OPERATING STATUS Turke Point Unit No. 3 Notes- Unit No. 3 operated at
- 2. Reporting Period:
approximately 100K R.P.,
2200 except for outages of April
- 3. Licensed Thermal Power (MWt):
15-16, and 16-17, 1980.
- 4. Nameplate Rating (Gross MWe):
S. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
.8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr..to-Date Cumulative
- 11. Hours In Reporting Period 719.0 2 903.0 64 904. 6
- 12. Number Of Hours Reactor Was Critical 715.6 2 095.1 49 364.7
- 13. Reactor Reserve Shutdown Hours 213.3
- 14. Hours Generator On-Line 696. 3 1 946.6 47 636.8
- 15. Unit Reserve Shutdown Hours 121.8
- 16. Gross Thermal Energy Generated (MWH) 1 513 229 2 797 227 94 265 861 MO- . 327 045 30 408 045
- 18. Net Electrical Energy Generated (MWH) 454 486 1 254 849 28 775 943
- 19. Unit Service Factor 7.1 73.4
- 20. Unit Availability Factor 96.8 67.1 73.6
- 64. 67.1
- 22. Unit Capacity Factor (Using DER iVet) 91.2 64.0'2.4
- 23. Unit Forced Outage Rate 1.7 2.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):
e Tnsoection Pro ram dc>>.. 4 - Oc t. 31, 1980.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITI A L CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
DOCKET NO.
UNIT SIIUTDO'IVNS AND POIVER REDUCTIONS 8
it No. 3 REPORTMPNfll APRIL 19&0 COMPLETED'. T. Chilson rr A<<
C V Cl L ice IiSec Q
Cause h Corrective No. Date ~ A cc Event Action to
~
Q
~ Ul Report ¹ C Q
Q Prevent Recurrence 80-04-15 10.8 N/A VALVEX Unit was removed from service (delib-erate manual turbine shutdown) to o
repair inoperable turbine control valve servomotor test valve assembly.
(Non-nuclear system) 10 80-04-16 Ir 11.9 ~
4 N/A HC HTEXCH Unit was removed from service due to (D) secondary water chemistry limitations Corrective actions included repairing condenser tube leaks. (Non-nuclear-system)
F: Forced Reason: Method: Exhibit G - Instructions S: Sclieduled A-Equipment Failure (Explain) I.hIanua1 for Preparation of Data II Maintenance or Test ~
2-Manual Scram. Entry Sheets for Licensee C-Refueling 3.AUlolnatlc Scfalll. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Oilier (Explain) OI 6I )
E.Operator Training k Liccnsc Examination F-Administ ra t ive G Operational Lrror (Explain) Exhibit I - Sante Source
{'t/77) I I Ollicr (Explain)
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50 251 COMPLETED BY U. T. ChilSOn TELEPHONE MONTH 8 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1 MWe-Net) ~ (MWe-i%et) 5 5 17 18 54 648 651 20 48 647 21 649 652 654 655 639 25 10 646 26 7'>
650 2S 13 649 59 14 650 30 15 655 16 659 INSTRUCTIONS On this format, list the average daily unit power level in Mme Net for each day in the rep<>rting ini>nth. Ci>mpute to the nearest whole megawat t.
lo/77)
OPERATING DATA REPORT DOCKET NO. 5Q ~1 DATE COMPLETED BY
~~~0
~~son TELEPHONE (.~>~824 OPERATING STATUS I. Unit Name: V tNo. 4 Notes- Unit No. 4 operated at approximately 100X R.P.
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt): 2200 util the unit vas removed 760 from service to perform
- 4. Nameplate Rating (Gross MWe): scheduled maintenance and
- 5. Design Electrical Rating (Net MWe): inspections, ezcept for
- 6. Maximum Dependable Capacity (Gross MWe): 700 outage on April 7, 1980,
- 7. Maximum Dependable Capacity (Net MWe): 666 .redu tion on A ril.
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month, Yr:to-Date Cumulative
- 11. Hours In Reporting Period 719.0 2 903.0 58 632.0
- 12. Number Of Hours Reactor Was Critical 623.0 2 666.0 43 493.8
- 13. Reactor Reserve Shutdown Hours 12.3 166.5
- 14. Hours Generator On-Line .620. 2 2 616.1 41 798;6
- 15. Unit Reserve Shutdown Hours 12.3 31.2
- 16. Gross Thermal Energy Generated (MWH) 1 333 904 5 644 654 86 863 634
- 17. Gross Electrical Energy Generated (MWH) 416 085 1 780 840 27 684 318
- 18. Net Electrical Energy Generated (MWH) 394 581 1 689 369 26 219 365
- 19. Unit Service Factor 86.3 90.1 71.3
- 20. Unit Availability Factor 86. 3 90.5 71. 3
- 21. Unit Capacity Factor (Using MDC Net) 67.6
- 22. Unit Capacity Factor (Using DER i let) 79.2 84.0 64.5*
- 23. Unit Forced Outage Rate 0.5 0.4 3.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: 1 80
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
DOCKET NO. 0-2 UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAME DATE it No.4 COhIPLETED BY REPORT hIONTII 0 TELEPIIONE CJ Ltccoscc 4l 4l Cause h Corrective iVii. Date Event 'ei Ih Action Iii Report ~ cn C E ~ Prevcot Reeurrcnce 80-04-01 A N/A HC HTEXCH Load reduction to repair condenser (D) tube leak. (Non-nuclear system) 12 80-04-07 F 3.4 N/A HH NOTORX Unit was tripped by steam generator level protection system during a tran ient condition caused by tlte failure of condensate pump motor No. 4A. Cor-rective actions included repairing failed electrical insulation on the motor. (Non-nuclear system) 13 80-04-26 S 95.4 N/A HB HTEXCH Unit was removed from service to per-.
(F) form scheduled maintenance and HB TURBIN inspections, including Steam Generator Tube Inspection Program, and Turbine L.P. rotor changeout. (Nuclear and Non-nuclear systems) 3 4 F: F()reed Reason: Method: Exhibit G - Inst rue t i on s S: Sclieduletl A-Equipment Failure (Explain) I -hlanual for Preparaliint of Data B-hlaintenance or Test 2-Manual Scram. Entry Sheets for Licensee C.Refueling 3-Aulomattc Scraot. Evcot Report (LL'R) File (NUREG-D Regulatory Restriction 4-Otltcr (Explattt) OI6I )
E-Operator Training A, Liecosc Examinatio>>
F.Adntinistrative G.Operational Error (Fxplain) Exhtbtt I - Sante Source I I.Other (Explain)
0 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
II" Si, Lucre
"'OMPLETED BY TELEPHONE MONTH APRXL 1980 DAY AVERAGE DAlLYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL iiMWe Net) (MWe.Net) 17 18 19 20 21 22.
23
'>4
'75 10 26 27'8 12 13 '>9 14 30 IS 16 INSTRUCTlONS On this format. list the average daily unit p(>wer Ievi.'I in ~OVe.Net for each day in the rep<>rting >ni>nth. C>>n>pote to the nearest whole megawatt.
Io/771
OPERATING DATA REPORT DATE ~~80 DOCKET NO 5Q 335 COMPLETED BY V-T. Chilson TELEPHONE ~05 552-3824 OPERATING STATUS
- 1. Unit Name: St. Luc e it VLo. 1 Notes Scheduled refueling,
- 2. Reporting period: A ril 1980 maintenance, and inspections continued during month.
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe): 850 S. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. IfChanges Occur in Capacity Ratings (Items'Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe) t
- 10. Reasons For Restrictions, If Any:
This Month Yr:to.Date Cumula t>ve
- 11. Hours In Reporting Period 1IRJ! 2 03.0 29 447.0
- 12. Number Of Hours Reactor Was Critical 2 2.9
- 13. Reactor Reserve Shutdown Hours 129.5
- 14. Hours Generator On-Line 22 610'.6 IS. Unit Reserve Shutdown Hours 32. 0
- 16. Gross Thermal Energy Ge'nerated (MWH) 4 487 283 54 746 849
- 17. Gross Electrical Energy Generated (MWH) 17 744 150 "w ")
1 366 133 61.3 16 694 029 76.8
- 19. Unit Service Factor
- 20. Unit Availability Factor 61'. 3 76.9
- 21. Unit Capacity Factor (Using MDC Net) 60.6 73.0
- 22. Unit Capacity Factor (Using DER Net) 58.7 '0.7
- 23. Unit Forced Outage Rate 0.9 5.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each}:
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: Na 10 1980
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
('}/77 }
UNIT Sl!UTDOWNS AND POlVER REDUCTIONS DOCKET NO.
COhlPLETED BY REPORT MONTII APRIL 1980 rg Q u Lu:cnscc Cl Cl Cause 4 Cllrreclrve Nu. Dale ~ A Event A Action lrl a-gz J Rcport >
~
ul G Prevent Recurrcn<<c
~ C/1 80-03-15 S 719.0 C N/A RC PUELXX Unit was removed from service for scheduled refueling, maintenance, and inspect:iona. (Continued from previous month) (Nuclear and Non-nuclear systems)
F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I hlanual for Preparation of Data B.hlaitttenancc or Test . 2.hlanual Scram. Entry Sheets I'or Licensee C-Refueling 3-Aututnat tc Scraln. Fvcnt Report (LER) File (NUREG-D.Regulatory Restriction 4-Other (Lxplain) 016I )
f E-Operator Training k, Liccnsc xanlinalion I"Ad nll l1 st ra I lvc 1
G.Operational Lrrur (Explain) Exhibit I - Sante Source I I.Other (Explain)
SOX 529IQO, 'MIAMI, FL 33I62 FLCRI A?CVIER 8 ~-!GH CC'<PANY May 3, 1980 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the April, 1980, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
Very truly yours, D. chmidt Vice President Power Resources VTC/DDC cc: Mr. James P.Reilly Robert Lowenstein, Esquire PHCP':-...:- - VIAG? ECP ~:-
III
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50 - 250 Turkey Point UNIT Unit No. 3 DATE Ma 3 1980 COMPLETED BY V. T. Chilson TELEPHONE 305 552- 8 REPORT MONTH Unit No. 3 operated at approximately 100% R.P., except for outages of April 15-16, and. 16-17, 1980. Refer to "Unit Shutdowns and Power Reductions" section of April, 1980, Operating Status Report for additional information.
Major Safety-related. maintenance activities performed during the month
.included:
Florida Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.
DOCKET NO. 0 -'51 Turkey Point UNIT Unit No. 4 C
DATE Ma 3 1980 COMPLETED BY V. T. Chilson TELEPHONE 305 552-382 REPORT .MONTH APRIL 1980 Unit No. 4 operated at approximately 100% R.P. until the unit was removed from service to perform scheduled maintenance and inspections, except for outage on April 7, 1980, and load reduction on April 1, 1980. Refer to "Unit Shutdowns and. Powe'r Reductions" section of the April, 1980, Oper-ating Status Report, for additional information.
Major Safety-related maintenance activities performed during the month included:
Florida Power & Light Company commitments for NUREG-0578 implementation are continuing.
Refer.to correspondence between FPL and NRC for additional information.
Inspections and requirements of IE Bulletins and NUREG-0578 in progress.
Steam Generator Tube Inspection Program in progress.
Turbine L.P. rotor changeout in progress.
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO- 5 - 335't.
Lucie UNiT Unit No. 1 DATE Ma 3 1980 COMPLETED BY V. T. Chilson TELEPHONE 305 552-3824 REPORT MONTH APRIL 1980 Scheduled refueling, maintenance, and inspections continued during the month,. Refer to "Unit Shutdowns and Power Reductions" section of the April, 1980, Operating Status Report for additional information.
Major Safety-related. maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
Completed installation of 88 new. fuel assemblies.
Completed inspection program for turbine L.P.
rotors.
Steam Generator Tube Inspection Program in progress.
Installation of charging pump suction piping pulsation dampeners: in progress.
Completed modification of boric acid makeup system.