Monthly Operating Repts for Apr 1980
ML17208A569
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 05/03/1980
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A568 List:
References
NUDOCS 8005120397
Download: ML17208A569 (13)


Text

AYERAGE DAILY UÃITPDwER LEYEL e poe gee 3/7 DOCKET IVO.

II" 1

COMPLETED BY >- T. Chilson MONTH APRIL, 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe LVet) (MWe-Net 1 I 663 17 531 665 18 56 662 19 666 657 50 664 654 666 22 667 23 25 10 654 26 7'T 657 12 658 28 13 658 19 666 30 661 15 591 16 NOTE: Average daily power level greater than 666 MWe due to cooler condenser cooling water.

INSTRUCTIONS Qn this format, list the avera(Ie daily unit power level in MWe.Viet for each day in the reportinR nii>ntlt. Compute to the nearest whole me((awat t.

(9/77)

OPERATING DATA REPORT DOCKET NO.

~~

DATE ~~Ma . 80 COMPLETED BY TELEPHONE

~~~son 3824 OPERATING STATUS Turke Point Unit No. 3 Notes- Unit No. 3 operated at

2. Reporting Period:

approximately 100K R.P.,

2200 except for outages of April

3. Licensed Thermal Power (MWt):

15-16, and 16-17, 1980.

4. Nameplate Rating (Gross MWe):

S. Design Electrical Rating (Net MWe):

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

.8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr..to-Date Cumulative

11. Hours In Reporting Period 719.0 2 903.0 64 904. 6
12. Number Of Hours Reactor Was Critical 715.6 2 095.1 49 364.7
13. Reactor Reserve Shutdown Hours 213.3
14. Hours Generator On-Line 696. 3 1 946.6 47 636.8
15. Unit Reserve Shutdown Hours 121.8
16. Gross Thermal Energy Generated (MWH) 1 513 229 2 797 227 94 265 861 MO- . 327 045 30 408 045
18. Net Electrical Energy Generated (MWH) 454 486 1 254 849 28 775 943
19. Unit Service Factor 7.1 73.4
20. Unit Availability Factor 96.8 67.1 73.6
64. 67.1
22. Unit Capacity Factor (Using DER iVet) 91.2 64.0'2.4
23. Unit Forced Outage Rate 1.7 2.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):

e Tnsoection Pro ram dc>>.. 4 - Oc t. 31, 1980.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITI A L CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

DOCKET NO.

UNIT SIIUTDO'IVNS AND POIVER REDUCTIONS 8

it No. 3 REPORTMPNfll APRIL 19&0 COMPLETED'. T. Chilson rr A<<

C V Cl L ice IiSec Q

Cause h Corrective No. Date ~ A cc Event Action to

~

Q

~ Ul Report ¹ C Q

Q Prevent Recurrence 80-04-15 10.8 N/A VALVEX Unit was removed from service (delib-erate manual turbine shutdown) to o

repair inoperable turbine control valve servomotor test valve assembly.

(Non-nuclear system) 10 80-04-16 Ir 11.9 ~

4 N/A HC HTEXCH Unit was removed from service due to (D) secondary water chemistry limitations Corrective actions included repairing condenser tube leaks. (Non-nuclear-system)

F: Forced Reason: Method: Exhibit G - Instructions S: Sclieduled A-Equipment Failure (Explain) I.hIanua1 for Preparation of Data II Maintenance or Test ~

2-Manual Scram. Entry Sheets for Licensee C-Refueling 3.AUlolnatlc Scfalll. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Oilier (Explain) OI 6I )

E.Operator Training k Liccnsc Examination F-Administ ra t ive G Operational Lrror (Explain) Exhibit I - Sante Source

{'t/77) I I Ollicr (Explain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50 251 COMPLETED BY U. T. ChilSOn TELEPHONE MONTH 8 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1 MWe-Net) ~ (MWe-i%et) 5 5 17 18 54 648 651 20 48 647 21 649 652 654 655 639 25 10 646 26 7'>

650 2S 13 649 59 14 650 30 15 655 16 659 INSTRUCTIONS On this format, list the average daily unit power level in Mme Net for each day in the rep<>rting ini>nth. Ci>mpute to the nearest whole megawat t.

lo/77)

OPERATING DATA REPORT DOCKET NO. 5Q ~1 DATE COMPLETED BY

~~~0

~~son TELEPHONE (.~>~824 OPERATING STATUS I. Unit Name: V tNo. 4 Notes- Unit No. 4 operated at approximately 100X R.P.

2. Reporting Period:
3. Licensed Thermal Power (MWt): 2200 util the unit vas removed 760 from service to perform
4. Nameplate Rating (Gross MWe): scheduled maintenance and
5. Design Electrical Rating (Net MWe): inspections, ezcept for
6. Maximum Dependable Capacity (Gross MWe): 700 outage on April 7, 1980,
7. Maximum Dependable Capacity (Net MWe): 666 .redu tion on A ril.
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month, Yr:to-Date Cumulative

11. Hours In Reporting Period 719.0 2 903.0 58 632.0
12. Number Of Hours Reactor Was Critical 623.0 2 666.0 43 493.8
13. Reactor Reserve Shutdown Hours 12.3 166.5
14. Hours Generator On-Line .620. 2 2 616.1 41 798;6
15. Unit Reserve Shutdown Hours 12.3 31.2
16. Gross Thermal Energy Generated (MWH) 1 333 904 5 644 654 86 863 634
17. Gross Electrical Energy Generated (MWH) 416 085 1 780 840 27 684 318
18. Net Electrical Energy Generated (MWH) 394 581 1 689 369 26 219 365
19. Unit Service Factor 86.3 90.1 71.3
20. Unit Availability Factor 86. 3 90.5 71. 3
21. Unit Capacity Factor (Using MDC Net) 67.6
22. Unit Capacity Factor (Using DER i let) 79.2 84.0 64.5*
23. Unit Forced Outage Rate 0.5 0.4 3.2
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup: 1 80
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

DOCKET NO. 0-2 UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAME DATE it No.4 COhIPLETED BY REPORT hIONTII 0 TELEPIIONE CJ Ltccoscc 4l 4l Cause h Corrective iVii. Date Event 'ei Ih Action Iii Report ~ cn C E ~ Prevcot Reeurrcnce 80-04-01 A N/A HC HTEXCH Load reduction to repair condenser (D) tube leak. (Non-nuclear system) 12 80-04-07 F 3.4 N/A HH NOTORX Unit was tripped by steam generator level protection system during a tran ient condition caused by tlte failure of condensate pump motor No. 4A. Cor-rective actions included repairing failed electrical insulation on the motor. (Non-nuclear system) 13 80-04-26 S 95.4 N/A HB HTEXCH Unit was removed from service to per-.

(F) form scheduled maintenance and HB TURBIN inspections, including Steam Generator Tube Inspection Program, and Turbine L.P. rotor changeout. (Nuclear and Non-nuclear systems) 3 4 F: F()reed Reason: Method: Exhibit G - Inst rue t i on s S: Sclieduletl A-Equipment Failure (Explain) I -hlanual for Preparaliint of Data B-hlaintenance or Test 2-Manual Scram. Entry Sheets for Licensee C.Refueling 3-Aulomattc Scraot. Evcot Report (LL'R) File (NUREG-D Regulatory Restriction 4-Otltcr (Explattt) OI6I )

E-Operator Training A, Liecosc Examinatio>>

F.Adntinistrative G.Operational Error (Fxplain) Exhtbtt I - Sante Source I I.Other (Explain)

0 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

II" Si, Lucre

"'OMPLETED BY TELEPHONE MONTH APRXL 1980 DAY AVERAGE DAlLYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL iiMWe Net) (MWe.Net) 17 18 19 20 21 22.

23

'>4

'75 10 26 27'8 12 13 '>9 14 30 IS 16 INSTRUCTlONS On this format. list the average daily unit p(>wer Ievi.'I in ~OVe.Net for each day in the rep<>rting >ni>nth. C>>n>pote to the nearest whole megawatt.

Io/771

OPERATING DATA REPORT DATE ~~80 DOCKET NO 5Q 335 COMPLETED BY V-T. Chilson TELEPHONE ~05 552-3824 OPERATING STATUS

1. Unit Name: St. Luc e it VLo. 1 Notes Scheduled refueling,
2. Reporting period: A ril 1980 maintenance, and inspections continued during month.
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 850 S. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. IfChanges Occur in Capacity Ratings (Items'Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe) t
10. Reasons For Restrictions, If Any:

This Month Yr:to.Date Cumula t>ve

11. Hours In Reporting Period 1IRJ! 2 03.0 29 447.0
12. Number Of Hours Reactor Was Critical 2 2.9
13. Reactor Reserve Shutdown Hours 129.5
14. Hours Generator On-Line 22 610'.6 IS. Unit Reserve Shutdown Hours 32. 0
16. Gross Thermal Energy Ge'nerated (MWH) 4 487 283 54 746 849
17. Gross Electrical Energy Generated (MWH) 17 744 150 "w ")

1 366 133 61.3 16 694 029 76.8

19. Unit Service Factor
20. Unit Availability Factor 61'. 3 76.9
21. Unit Capacity Factor (Using MDC Net) 60.6 73.0
22. Unit Capacity Factor (Using DER Net) 58.7 '0.7
23. Unit Forced Outage Rate 0.9 5.1
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each}:
25. If Shut Down At End Of Report Period, Estimated Date of Startup: Na 10 1980
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

('}/77 }

UNIT Sl!UTDOWNS AND POlVER REDUCTIONS DOCKET NO.

COhlPLETED BY REPORT MONTII APRIL 1980 rg Q u Lu:cnscc Cl Cl Cause 4 Cllrreclrve Nu. Dale ~ A Event A Action lrl a-gz J Rcport >

~

ul G Prevent Recurrcn<<c

~ C/1 80-03-15 S 719.0 C N/A RC PUELXX Unit was removed from service for scheduled refueling, maintenance, and inspect:iona. (Continued from previous month) (Nuclear and Non-nuclear systems)

F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I hlanual for Preparation of Data B.hlaitttenancc or Test . 2.hlanual Scram. Entry Sheets I'or Licensee C-Refueling 3-Aututnat tc Scraln. Fvcnt Report (LER) File (NUREG-D.Regulatory Restriction 4-Other (Lxplain) 016I )

f E-Operator Training k, Liccnsc xanlinalion I"Ad nll l1 st ra I lvc 1

G.Operational Lrrur (Explain) Exhibit I - Sante Source I I.Other (Explain)

SOX 529IQO, 'MIAMI, FL 33I62 FLCRI A?CVIER 8 ~-!GH CC'<PANY May 3, 1980 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the April, 1980, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.

Very truly yours, D. chmidt Vice President Power Resources VTC/DDC cc: Mr. James P.Reilly Robert Lowenstein, Esquire PHCP':-...:- - VIAG? ECP ~:-

III

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 - 250 Turkey Point UNIT Unit No. 3 DATE Ma 3 1980 COMPLETED BY V. T. Chilson TELEPHONE 305 552- 8 REPORT MONTH Unit No. 3 operated at approximately 100% R.P., except for outages of April 15-16, and. 16-17, 1980. Refer to "Unit Shutdowns and Power Reductions" section of April, 1980, Operating Status Report for additional information.

Major Safety-related. maintenance activities performed during the month

.included:

Florida Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

DOCKET NO. 0 -'51 Turkey Point UNIT Unit No. 4 C

DATE Ma 3 1980 COMPLETED BY V. T. Chilson TELEPHONE 305 552-382 REPORT .MONTH APRIL 1980 Unit No. 4 operated at approximately 100% R.P. until the unit was removed from service to perform scheduled maintenance and inspections, except for outage on April 7, 1980, and load reduction on April 1, 1980. Refer to "Unit Shutdowns and. Powe'r Reductions" section of the April, 1980, Oper-ating Status Report, for additional information.

Major Safety-related maintenance activities performed during the month included:

Florida Power & Light Company commitments for NUREG-0578 implementation are continuing.

Refer.to correspondence between FPL and NRC for additional information.

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Steam Generator Tube Inspection Program in progress.

Turbine L.P. rotor changeout in progress.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO- 5 - 335't.

Lucie UNiT Unit No. 1 DATE Ma 3 1980 COMPLETED BY V. T. Chilson TELEPHONE 305 552-3824 REPORT MONTH APRIL 1980 Scheduled refueling, maintenance, and inspections continued during the month,. Refer to "Unit Shutdowns and Power Reductions" section of the April, 1980, Operating Status Report for additional information.

Major Safety-related. maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

Completed installation of 88 new. fuel assemblies.

Completed inspection program for turbine L.P.

rotors.

Steam Generator Tube Inspection Program in progress.

Installation of charging pump suction piping pulsation dampeners: in progress.

Completed modification of boric acid makeup system.