Monthly Operating Repts for Apr 1980
ML17208A569
Person / Time
Site: Saint Lucie, Turkey Point  
Issue date: 05/03/1980
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A568 List:
References
NUDOCS 8005120397
Download: ML17208A569 (13)


Text

AYERAGE DAILYUÃITPDwER LEYEL e poe gee 3/7 DOCKET IVO.

II" 1

COMPLETED BY >- T. Chilson MONTH APRIL, 1980 DAY AVERAGE DAILYPOWER LEVEL (MWe LVet)

I 663 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net 1 531 17 665 662 657 654 18 19 50 56 666 664 666 667 22 23 10 12 13 15 16 INSTRUCTIONS 654 658 658 591 25 26 7'T 28 19 30 NOTE:

657 666 661 Average daily power level greater than 666 MWe due to cooler condenser cooling water.

Qn this format, list the avera(Ie daily unit power level in MWe.Viet for each day in the reportinR nii>ntlt. Compute to the nearest whole me((awat t.

(9/77)

OPERATING DATAREPORT OPERATING STATUS Turke Point Unit No.

3

2. Reporting Period:
3. Licensed Thermal Power (MWt):

2200

4. Nameplate Rating (Gross MWe):

S. Design Electrical Rating (Net MWe):

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

DOCKET NO.

DATE

~~Ma 80 COMPLETED BY ~~~son TELEPHONE ~~ 3824 Notes-Unit No.

3 operated at approximately 100K R.P.,

except for outages of April 15-16, and 16-17, 1980.

.8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9. Power Level To Which Restricted. IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Cumulative 64 904. 6 49 364.7 Yr..to-Date 2 903.0 719.0 2 095.1 213.3 47 636.8 1 946.6 121.8 2 797 227 94 265 861 30 408 045 28 775 943 327 045 1 254 849 73.4 7.1 73.6 67.1 67.1 64.

64.0'2.4 2.6

t. 31, 1980.
11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 715.6
13. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line 696. 3
15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 1 513 229 MO-.
18. Net Electrical Energy Generated (MWH) 454 486
19. Unit Service Factor
20. Unit AvailabilityFactor 96.8
22. Unit Capacity Factor (Using DER iVet) 91.2
23. Unit Forced Outage Rate 1.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):

e Tnsoection Pro ram dc>>..

4 Oc

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

UNITSIIUTDO'IVNSAND POIVER REDUCTIONS REPORTMPNfll APRIL 19&0 DOCKET NO.

8 COMPLETED'. T. Chilson it No. 3 No.

Date rr

~A Q

A<<V C

~ cc

~ Ul Lice IiSec Event Report ¹ Cl Q

C Q Q

Cause h Corrective Action to Prevent Recurrence 80-04-15 10.8 N/A VALVEX Unit was removed from service (delib-erate manual turbine shutdown) to repair inoperable turbine control valve servomotor test valve assembly.

(Non-nuclear system) o 10 80-04-16 Ir 11.9

~ 4 N/A HC HTEXCH (D)

Unit was removed from service due to secondary water chemistry limitations Corrective actions included repairing condenser tube leaks.

(Non-nuclear-system)

F: Forced S: Sclieduled

{'t/77)

Reason:

A-Equipment Failure (Explain)

II Maintenance or Test

~

C-Refueling D Regulatory Restriction E.Operator Training k Liccnsc Examination F-Administ ra t ive G Operational Lrror (Explain)

I I Ollicr(Explain)

Method:

I.hIanua1 2-Manual Scram.

3.AUlolnatlc Scfalll.

4-Oilier (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-OI 6I )

Exhibit I - Sante Source

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

50 251 COMPLETED BY U. T. ChilSOn TELEPHONE MONTH 8

DAY AVERAGE DAILYPOWER LEVEL 1 MWe-Net) 5 5

DAY AVERAGE DAILYPOWER LEVEL

~

(MWe-i%et) 17 10 13 14 15 16 648 647 652 639 646 650 649 650 655 659 18 20 21 25 26 7'>

2S 59 30 54 651 48 649 654 655 INSTRUCTIONS On this format, list the average daily unit power level in Mme Net for each day in the rep<>rting ini>nth. Ci>mpute to the nearest whole megawat t.

lo/77)

OPERATING STATUS OPERATING DATAREPORT DOCKET NO. 5Q ~1 DATE ~~~0 COMPLETED BY ~~son TELEPHONE (.~>~824 Notes-Unit No.

4 operated at approximately 100X R.P.

util the unit vas removed from service to perform scheduled maintenance and inspections, ezcept for outage on April 7, 1980,

.redu tion on A ril.

tNo.

4 760 700 666 3 Through 7) Since Last Report, Give Reasons:

I. Unit Name:

V

2. Reporting Period:
3. Licensed Thermal Power (MWt):

2200

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. IfChanges Occur in Capacity Ratings (Items Number
9. Power Level To Which Restricted. IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month, Yr:to-Date 2 903.0 2 666.0 719.0 623.0 12.3

.620. 2 2 616.1 12.3 5 644 654 1 333 904 416 085 1 780 840 394 581 1 689 369 86.3 90.1

86. 3 90.5 84.0 79.2 0.5 0.4 (Type. Date. and Duration of Each):
11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 17.

Gross Electrical Energy Generated (MWH)

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER ilet)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months Cumulative 58 632.0 43 493.8 166.5 41 798;6 31.2 86 863 634 27 684 318 26 219 365 71.3
71. 3 67.6 64.5*

3.2

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

1 80 Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION

REPORT hIONTII 0

UNITSIIUTDOWNS ANDPOWER REDUCTIONS DOCKET NO.

UNITNAME DATE COhIPLETED BY TELEPIIONE 0-2 it No.4 iVii.

Date Ltccoscc Event Report ~

4l 4l

'ei Ih cn C CJ E ~

Cause h Corrective Action Iii Prevcot Reeurrcnce 12 80-04-01 80-04-07 F 3.4 A

N/A N/A HC HH HTEXCH (D)

NOTORX Load reduction to repair condenser tube leak.

(Non-nuclear system)

Unit was tripped by steam generator level protection system during a tran ient condition caused by tlte failure of condensate pump motor No. 4A. Cor-rective actions included repairing failed electrical insulation on the motor.

(Non-nuclear system) 13 80-04-26 S

95.4 N/A HB HB HTEXCH (F)

TURBIN Unit was removed from service to per-.

form scheduled maintenance and inspections, including Steam Generator Tube Inspection Program, and Turbine L.P. rotor changeout.

(Nuclear and Non-nuclear systems)

F: F()reed S: Sclieduletl Reason:

A-Equipment Failure (Explain)

B-hlaintenance or Test C.Refueling D Regulatory Restriction E-Operator Training A, Liecosc Examinatio>>

F.Adntinistrative G.Operational Error (Fxplain)

I I.Other (Explain) 3 Method:

I -hlanual 2-Manual Scram.

3-Aulomattc Scraot.

4-Otltcr (Explattt) 4 Exhibit G - Inst rue t ion s for Preparaliint of Data Entry Sheets for Licensee Evcot Report (LL'R) File (NUREG-OI6I )

Exhtbtt I - Sante Source

0 AVERAGE DAILYUNITPOWER LEVEL DOCKET NO. Si, Lucre II"

"'OMPLETED BY TELEPHONE MONTH APRXL 1980 DAY AVERAGE DAlLYPOWER LEVEL iiMWe Net) 10 12 13 14 IS 16 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 17 18 19 20 21 22.

23

'>4

'75 26 27'8

'>9 30 INSTRUCTlONS On this format. list the average daily unit p(>wer Ievi.'I in ~OVe.Net for each day in the rep<>rting >ni>nth. C>>n>pote to the nearest whole megawatt.

Io/771

OPERATING STATUS OPERATING DATAREPORT DOCKET NO 5Q 335 DATE ~~80 COMPLETED BY V-T. Chilson TELEPHONE ~05 552-3824

1. Unit Name:

St. Luc e it VLo.

1

2. Reporting period:

A ril 1980

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

850 S.

Design Electrical Rating (Net MWe):

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

Notes Scheduled refueling, maintenance, and inspections continued during month.

8. IfChanges Occur in Capacity Ratings (Items'Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe)t
10. Reasons For Restrictions, IfAny:

This Month Yr:to.Date 2

03.0 4 487 283 1 366 133 61.3 61'. 3 60.6 58.7 0.9 Date. and Duration of Each}:

11. Hours In Reporting Period 1IRJ!
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line IS. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Ge'nerated (MWH) 17.

Gross Electrical Energy Generated (MWH)

"w ")

19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.

Cumula t>ve 29 447.0 2 2.9 129.5 22 610'.6

32. 0 54 746 849 17 744 150 16 694 029 76.8 76.9 73.0

'0.7 5.1

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Na 10 1980 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

('}/77 }

UNITSl!UTDOWNS AND POlVER REDUCTIONS REPORT MONTII APRIL 1980 DOCKET NO.

COhlPLETED BY Nu.

Dale gza-rg

~A J

Q u

~

C/1 Lu:cnscc Event Rcport >

Cl Cl

~A ul G Cause 4 Cllrreclrve Action lrl Prevent Recurrcn<<c 80-03-15 S

719.0 C

N/A RC PUELXX Unit was removed from service for scheduled refueling, maintenance, and inspect:iona.

(Continued from previous month)

(Nuclear and Non-nuclear systems)

F: Forced S: Scheduled Reason:

A-Equipment Failure (Explain)

B.hlaitttenancc or Test C-Refueling D.Regulatory Restriction E-Operator Training k, Liccnsc fxanlinalion I"Adnlll1 1 st ra Ilvc G.Operational Lrrur (Explain)

I I.Other (Explain)

Method:

I hlanual 2.hlanual Scram.

3-Aututnat tc Scraln.

4-Other (Lxplain)

Exhibit G - Instructions for Preparation of Data Entry Sheets I'or Licensee Fvcnt Report (LER) File (NUREG-016I )

Exhibit I - Sante Source

SOX 529IQO, 'MIAMI,FL 33I62 FLCRI A?CVIER 8 ~-!GH CC'<PANY May 3, 1980 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Attached are the April, 1980, Operating Summary Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. l.

Very truly yours, D.

chmidt Vice President Power Resources VTC/DDC cc:

Mr. James P.Reilly Robert Lowenstein, Esquire PHCP':-...:- - VIAG?ECP ~:-

SUMMARY

OF OPERATING EXPERIENCE III DOCKET NO.

50 - 250 Turkey Point UNIT Unit No.

3 DATE Ma 3

1980 COMPLETED BY V. T. Chilson REPORT MONTH TELEPHONE 305 552-8 Unit No.

3 operated at approximately 100% R.P.,

except for outages of April 15-16, and. 16-17, 1980.

Refer to "Unit Shutdowns and Power Reductions" section of April, 1980, Operating Status Report for additional information.

Major Safety-related.

maintenance activities performed during the month

.included:

Florida Power

& Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for ad-ditional information.

DOCKET NO.

0 -'51 Turkey Point UNIT Unit No.

4 C

DATE Ma 3

1980 COMPLETED BY V. T. Chilson TELEPHONE 305 552-382 REPORT.MONTH APRIL 1980 Unit No.

4 operated at approximately 100% R.P. until the unit was removed from service to perform scheduled maintenance and inspections, except for outage on April 7, 1980, and load reduction on April 1, 1980.

Refer to "Unit Shutdowns and. Powe'r Reductions" section of the April, 1980, Oper-ating Status Report, for additional information.

Major Safety-related maintenance activities performed during the month included:

Florida Power

& Light Company commitments for NUREG-0578 implementation are continuing.

Refer.to correspondence between FPL and NRC for additional information.

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Steam Generator Tube Inspection Program in progress.

Turbine L.P. rotor changeout in progress.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO-5 335't.

Lucie UNiT Unit No.

1 DATE Ma 3

1980 COMPLETED BY V. T. Chilson TELEPHONE 305 552-3824 REPORT MONTH APRIL 1980 Scheduled refueling, maintenance, and inspections continued during the month,.

Refer to "Unit Shutdowns and Power Reductions" section of the April, 1980, Operating Status Report for additional information.

Major Safety-related.

maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

Completed installation of 88 new. fuel assemblies.

Completed inspection program for turbine L.P.

rotors.

Steam Generator Tube Inspection Program in progress.

Installation of charging pump suction piping pulsation dampeners: in progress.

Completed modification of boric acid makeup system.