L-85-395, Monthly Operating Repts for Sept 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Sept 1985
ML20138B848
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 09/30/1985
From: Grant N, Williams J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
L-85-395, NUDOCS 8512120394
Download: ML20138B848 (17)


Text

.

AVERAGE DAltY UNif P058ER LEVEL DOCKET NO.

50 A gn Turkey Point 3 DATE 10-14-85 N.. rant COMPLETED BY TELErilONE (3051552-3675 September, 1985 g

DAY AVERACE DAILY POWER LEVEL (MWe Net) 9/ 1/85 656 9/ 2/85 684 9/ 3/85 680 9/ 4/85 686 9/ 5/85 681 9/~6/85 675 9/ 7/85 675 9/ 8/85 680 9/ 9/85 682 9/10/85 684 9/11/85 682 9/12/85 642 9/13/85 646 9/14/85 689 9/15/85 691 9/16/85 692 9/17/85 691 9/18/85 690 9/19/85 694 9/20/85 696 9/21/85 691 9/22/85 683 9/23/85 675 9/24/85 677 9/25/85 682 9/26/85 686 9/27/85 683 9/28/85 677 9/29/85 682 9/30/85 683 0512120394 850930 ER ADOCK 050 0

Y Y$

0 J

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 10/14/85 CCE LFTED BY N. W. MANT TELEFh]E 305/552/3675 0FERATING STATUS

1. LNIT NAE: TLREY POIKT LNIT 3
2. REPORTING PERIOD SETENER 1985
3. LICENSED TERMAL POER (141T):

2200

4. NAPEPLATE RATING (@0SS PIE):

744

5. DESIGN ELECTRICAL RATING (ET ISE):

693

6. MAXIPLM DEFOOABLE CAPACITY (GRCGS PbE):

700

7. MAXIPt.M DEFOOABLE CAPACITY (ET 16E):

6M

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS PU'EER 3 TFROUG4 7)

SINCE LAST REFORT, GIVE REASOG:

9. FOER LEVEL TO WilCH RESTRICTED, IF ANY (ET PSE)
10. REASCNS FOR RESTRICTIONS, IF ANY:

MCNTM.Y

-YTD-C1M LATIVE f

11. HOLRS IN REPORT F5'.!CO:
  • 720 6551 112400.6
12. PUEER OF HOLRS REACTOR WAS CHI 11 CAL

' 720.0 3732.6 77405.4

13. REACTCR RESERVE SHJID0bN KLRS 0.0 0.0 844.4
14. HOLRS CEERATOR ON-LIE 720.0 3584.5 76763.6
15. LNIT REETNE SHITD0bN HCLRS 0

0 221.8

16. GROSS TEEMAL EERGY ENERATED (ISHi' 1575804 7640729

.156770240

17. EOSS ELECTRICAL EERGY GETERATED (Plei) _

515090 2497440

'50753135 490657' ~M7

  • 48051833
18. ET ELECTRICAL EERGY GEERATED (IW4) _i_
19. [ NIT ERVICE FACTOR 100.0 54.7 68.3
20. LNIT AVAILABILITY FACTCR 100.0 54.7 68.4
21. CAPACITY FACTOR (USING POC ET) 102.3 54.0 65.8 22.T CAPACITY FACTOR (USING DER ET) 98.3 51.9 61.7
23. tNIT FCR D OUTAGE RATE O

i 9.1 6.5

24. EHJTDC6tG SOEDLLED O'4R EXT 6 MONTHS :

i-1

\\

7 5

i

/

25. IF SHJT D0bN AT FJO OF REPORT PERIOD, ESTIMATED DATE OF STARTLP:

g 2,

3 k

e Q' %

9 1

h s.

1-

50-250 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME Turkey Point Unit #3 DATE 10-14-85 REPORT MONTH September, 1985 COMPLETED BY N.U. Grant TEI,EPHONE (305) 552-3675 "k

)3E E ~k Licensee Cause & Corrective 3?

E No.

Date E

?

il 2

Event

  • 7 Active to jU 2$

E j dii g Report 8 iN G Prevent Recurrence d

Unit #3 had no " shutdowns or significant power reductions".

4 1

2 3

4 F Forced Reatim:

Method:

Exhibit C Instructi ms 5 Scheduled A Equipment Failure (Explain)

I Manust for Preparation of Dara R Maintenance or Test 2 Manuel Screm.

Entry Sheets for IJeensee C Refueling 3 Automatic Scram.

Event Report ILER) File f NUREG-D Regulatory Restrictiim

$0iherIExplain) 01611 l

IX)perator Training A Ucente Fiamination F Administrative M' O*d"""#^

G-Operational Frror IFiplain) c 4,4. m,.,#

Eshibit I - Same Source t'8/77 )

Il Other ( E uplain) i 1

i

SUMMARY

OF OPERATINC E:<PERIENCE DOCKET NO.

50-250 UNIT Turkey Point Unit #3 October 14, 1985 DATE COMPLETED BY N.11. Grant TELEPHONE (305) 552-3675 REPORT ttONTH September, 1985 Unit #3 operated at essentially full power and had no " unit shutdowns and power reductions".

L l

a a

. m..-

m-

AVERAGE DAILY UNif r0 Wilt LEvat DOCXET NO. 50-251 UN11 Turkey Point 4 10-14-85 DATE N.W. Grant COMPLETEDSY (305)552-3675 TELEPHONE September, 1985 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe Net) 9/ 1/85 672 9/ 2/85 670 9/ 3/85 666 9/ 4/85 673 9/ 5/85 664 9/ 6/85 662 9/ 7/85 662 9/ 8/85 666 9/ 9/85 663 9/10/85 668 9/11/85 664 9/12/85 672 9/13/85 602 9/14/85 344 9/15/85 682 9/16/85 685 9/17/85 684 9/18/85 681 9/19/85 687 9/20/85 687 9/21/85 683 9/22/85 675 9/23/85 671 9/24/85 670 9/25/85 675 9/26/85 678 9/27/85 676 9/28/85 673 9/29/85 671 9/30/85 680 i

OFCRATING DATA REPWT DOCKET NO 50 - 251 DATE 10/14/85 C0ffLETED BY N. W. GRANT TELEPHOE 305/552/3675 OPERATING STATUS

1. tNIT NAE: TWKEY POINT LNIT 4
2. REKRTING PERIOD:SETEKER 1985
3. LIGNSED T}EBMAL POER (PWT):

2200

4. NAPEPLATE RATING (GROSS ISE):

760

5. DESIGN ELECTRICAL RATING (ET ISE):

693

6. MAXIPLM DEEN 0AELE CAPACITY (GROSS ISE):

700

7. MAXIPLM DEF90ABLE CAPACITY (ET 19E):

666

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS PUEER 3 TEOUGi 7)

SINCE LAST REPORT, GIVE REASONS:

9. PC6ER LEdl. TO lei 1CH RESTRICTEI), IF ANY (ET ISE)
10. REASONS FCR RESTRICTICNS, IF AW:

PKNT}LY

-YTD-C1M LATIVE

11. HOWS IN REPORT PERIOD:

720 6551 106132.0

12. N. PEER CF KlWS REACTOR WAS CRITICAL 720.0 291.4 75609.7
13. REACTOR RESERVE SHJTD0644 HELES 0.0 0.0 166.6

- 14. HOWS EERATOR ON-LIE 720.0 5842.2 73082.3

15. LNIT RESERVE SHJTD0144 HOWS O

O 31.2

16. GROSS TWfftAL EERGY EERATED (1944) 1556865 1221452 154681558
17. @0SS El.ECTRICAL EERGY GERERATED (ISH) _

-497165 4037730 49230127

18. ET ELECTRICAL EERGY GENERATED (ISH) ___

475328 3834367 4M17648

19. LNIT SERVICE FACTOR 100.0 89.2 68.9
20. LNIT AVAILABILITY FACTOR 100.0 89.2 68.9
21. CAPACITY FACTOR (USING POC ET) 99.1 87.9 67.6
22. CAPACITY FACTOR (USING DER ET) 95.3 84.5 63.4
23. LNIT FCRCED OUTAGE RATE O

9.2 6.4

24. S4JTDCleG SCEDLLED OVER EXT 6 MCNTtG :

REFLELING 1/86,11 TO 12 EEKS

25. IF SHJT D0bH AT EM) 0F REPORT PERIOD, ESTIMATED DATE OF STARTLP:

50-251 DOCKETPf0.

UNIT SHU1 DOWNS AND POWER GEDUCnONS Turkey Point Unit f4 UNIT NAME DATg 10-I4-85 COMPLEfrasy N. w. c, ant REPORT MONTy September, 1985 TELEPHONE

('insi sq7_ if;7q

.?

E*m Oswee & Correcthe jg

'h jM Licensee E v, g,

6.

Acthm to j}

N...

Date E

42 4

2s&

Event uy C

jf 2

ygg Report n N

Prevent Reeverence 6

19 850913 S

0.0 A

5 Power was reduced to 50% for approximately 28.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> in order to repair a feedwater pump suction line.

The unit then returned to full power operation.

4 4

i i

2 3

4 F Forced Ressem:

Method:

Enhibit G Instrectiims j

S 56heduled A Equipment Failure (Emplain)

I M en wel for Preparstic of Data R-Maintenance or Test 2 Menuel Screm.

Entry Sheets for hymee C Refueling

3. Automatic Sersm.

Event Report t LER) File (NURf G.

D Reguletory Restrictism

@-01her (Explain) 0161)

I. Operator Training A Utenw Fiaminatism M "* C

  • d * "'#*

5 F Administrative G-Operati mal ree.t (Fip!ain t g. g.e 4.

44twc.,..,#

Ethihit I Same Source t.s/77)

Il Other (Emplain t

7 SUF41ARY OF OPERATING EXPEllIENCE DOCKET NO.

50-251 UNIT Turkey Point Unit #4 DATE October 14, 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT !!ONTH September, 1985 See the " Unit shutdowns and power reduction" report.

s

AVERAGE DAILY UNIT PSWER L EVEL DOCKET NO.

50 m UNir St. Lucie Unit 1 10-14-85 DATE N.W. Grant COMPLETED BY (305)SS2-3675 TELEPHONE MONTH September 1985 DAY AVERAGE DAILY POWER LEVEL (MWe Net) 9/ 1/85 844 9/ 2/85 846 9/ 3/85 840 9/ 4/85 839 9/ 5/85 844 9/ 6/85 840 9/ 7/85 833 9/ 8/85 826 9/ 9/85 828 9/10/85 gg7 9/11/85 830 9/12/85 834 9/13/85 835 9/14/85 g3g 9/15/85 g33 9/16/85 g32 9/17/85 g34 9/18/85 g37 9/19/85 g37 9/20/85 832 9/21/85 325 9/22/85 823 9/23/85 818 9/24/85 815 9/25/85 814 9/26/85 gi4 9/27/85 313 9/28/85 816 9/29/85 811-9/30/85 g13

i OFERATING DATA REFUtT DOCET NO 50 - 335 DATE 10/14/85 CCW LETED BY N. W. GRANT TELEPKRE 305/552/3675 0FERATING STATUS

1. LNIT NAE : ST. LUCIE LNIT 1
2. REPORTING PERIOD:SETDEER 1985
3. LICENSED TERMAL POER (194T):

2700

4. NAEPLATE RATING (20SS ISE):

850

5. DESIGN ELECTRICAL RATING (ET 16E):

830

6. MAXIPLM DEPDOABLE CAPACITY (GROSS ISE):

872

7. MAXIlt.M DEFOOABLE CAPACITY (ET 16E):

827

8. IF CHAtES OCCUS IN CAPACITY RATINGS (ITEMS POEER 3 TEOUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POER LEVEL TO leilCH RESTRICTED, IF ANY (ET 1%E)
10. REASOPG FOR RESTRICTICNS, IF ANY:

MCNTH.Y

-YTD-CtMLATIVE

11. HJmS IN REPORT FERIOD:

720 6551 76943.0

12. POEER OF HOWS REACTOR WAS CRITICAL 720.0 6547.0 55568.3
13. REACTOR RESERVE DUTD064J HEWS 0.0 0.0 205.3
14. HOWS EERATOR ON-LIE 720.0 6544.0 55277.5
15. LNIT RESERVE SHJTDC6N HOWS O

O 39.3

16. M OSS T RMAL EERGY GEERATED (Plei) 1929908 17442207 139579743
17. GROSS ELECTRICAL EERGY GERERATED (Plei) _

629300 5787770 45646425

18. ET ELECTRICAL EERGY GEERATED (ISH) __

596781 5494626 43056974

19. LNIT SERVICE FACTCR 100.0 99.9 71.8
20. LNIT AVAILABILITY FACTOR 100.0 99.9 71.9
21. CAPACITY FACTOR (USING IOC ET) 100.2 101.6 70.4
22. CAPACITY FACTCR (USING DER ET) 99.9 101.1 68.8
23. LNIT FORCED OUTA T RATE O

.1 4.3

24. SHJTD0bNS SCEDLLED OVER EXT 6 MENTHS :

REFLELING, OCTCEER 20, 1985 10 EEKS

25. IF SHIT D0641 AT DO OF REPORT PERIOD, ESTIMATED DATE OF STARTLP:

1 l

l

50-335 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

5t. Lucie Unit #1 UNIT NAME DATE 10-14-85 REPORT MONTy September 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 5?

3 E

Licensee E*

Cause A Correceive -

[k.

N..

Date E.

?

255 Event U7 Action to 4

jT E

j 5, g Report

  • N0 U

Prevent Recurrence d

t Unit #1 had no " shutdowns or signi ficant power reductions".

l 3

4 F: Forced Reason:

Method:

Exhibit G Instructions 5 Scheduled A. Equipment Failure (Emplain) 1 M an ust for Preparation of Data B-Maintenance of Test 2 Manuel Screm.

Entry Sheets for 1.ieensee C. Refueling 3 Automatic Sersm.

Event ReportiLER) FileiNUREG.

D.Reguistory Restriction

@-Other IExplain1 0I611 l.-Operator Training A Utenw Fuamination F-Administrative 5

G-Operational Feror IF iplain) 6_ /,e ao Asapwe.,..,#

E thibit I - Same Source

('8/77 )

110ther (Explain t 4

SUMMARY

OF OPERATINC EXPERI)D:CE DOCKET NO, 50-335 UNIT St. Lucie Unit #1 DATE October 14, 1985 COMPLETED-BY N. W. Grant TELEPHONE (305) 552-3675 REPORT ttONTH September, 1985 Unit #1 operated at essentially full power and had no " Unit Shutdowns and Power Reductions."

In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month, i

r 4

4

~

-y

.-w, y

-,w

~ ~ ~. -

w----=<r-

AVERACE DAILY UNITPOWER LEVEL DOCKET No, 50-389 UNIT St. I ucia trait 2 10-14-85 DATE COMPLETED BY N.W. Grant TELENIONg (3051552-3676 September, 1985 MONTH DAY AVERAGE DAILY POWER LEVEL IMWe Nef) 9/ 1/85

-6 9/ 2/85

-4 9/ 3/85

-3 9/ 4/85

-3 9/ 5/85

-6 9/ 6/85

-23 9/ 7/85 406 9/ 8/85 841 9/ 9/85 439 9/10/85 673 9/11/85

-23 9/12/85

-6 9/13/85

-4 9/14/85

-3 9/15/85

-3 9/16/85

-3 9/17/85

-3 9/18/85

-3 9/19/85

-4 9/20/85

-22 9/21/85 16 9/22/85 820 9/23/85 846 9/24/85 844 9/25/85 842 9/26/85 842 9/27/85 840 9/28/85 841 9/29/85 837 9/30/85 839

a OPERATING DATA EKET DOCKET M3 EO - 389 DATE 10/14/85 CCtftETED BY N. W. EANT TELEPHOE 305/552/3675 OPERATING STATUS

1. LNIT NAE: ST. LUCIE LNIT 2
2. REPORTING PERIOD:SETEEER 1985
3. LICENSED T1EFA POER (ISIT):

2700

4. NAEPLATE RATING (GROSS ISE):

850

5. DESIGN ELECTRICAL RATING (ET ISE):

830

6. MAXIPLM DEPEEAEL.E CAPACITY (GROSS ISE): ___ 892
7. MAXIMM DEPE?0ABLE CAPACITY (ET ISE):

837

8. IF CHANCES OCCUS IN CAPACITY RATINGS (ITEMS PUCER 3 TWKUGH 7)

SINCE LAST REPORT, GIVE REAS0tG:

9. POER LEVEL TO 14IICH RESTRICTED, IF ANY (ET PSE)
10. REASONS FOR RESTRICTICtG, IF AtW:

MCNTH.Y

-YTD-C1M LATIVE

11. HCUG IN REPORT PERICO:

720 6551 18840.0

12. POEER OF HOLFG REACTOR WAS CRITICAL 306.7 5306.6 15912.8
13. REACTOR RESERVE SUTD0bN HCtFG 0.0 0.0 0.0
14. HOLRS GEERATOR ON-LIE 294.8 5245.3 15445.9
15. LNIT REEERVE SUTDM HJLRS 0

0 0

16. EOSS TERMAL EERGY GE)ERATED (ISH) 76535 13624407 38982972 252840 4567540 13017240
17. GROSS ELECTRICAL EERGY GETERATED (Pl+1) _

234988 4316746 12279158

18. ET ELECTRICAL EERGY E)ERATED (fSH) __._

40.9 80.1 82.0

19. LNIT SERVICE FACTCR
20. LNIT AVAILABILITY FACTCR 40.9 80.1 82.0
21. CAPACITY FACTOR (USING POC ET) 39.0 80.3 81.7
22. CAPACITY FACTCR (USING DER ET) 39.3 80.2 80.5
23. LNIT FCRCED OLRAGE RATE 59.1 16.7 11.7
24. SHJTD0bNS SCEDLLED OVER EXT 6 MONTHS :

REFLELING, 2/05 7 EEKS

25. IF 9UT 00bN AT E70 0F REPCRT PERIOD, ESTIMATED DATE OF STARTLP:

DOCKETNO.

50-389 UNIT SHUTDOWNS AND POWER REDUCTIONS 5t. Lucie Unit #2 UNIT NAME DATE 10-14-85 COMPT.ETED gy N. W _ Gra n t REPORT MONTit September, 1985 TELEPHONE f ln8ii 8;6') _ vi7 s; E

e*

E2 Licensee Eg g*l, Cause & Cerrective 3-3 y; 2g Event uv 9

Actiim to lhie F-

e g

j

4 j@

d j;5g Report *-

  1. 0 Prevent Rerverence 6

12 850822 F

150.2 A

1 ZZ ZZZZZZ Unit #2 reactor startup aborted due to high vibration on reactor coolant pump 2A2.

Discovered oil leak from motor lower oil reservoir and damage to internal components.

Damage re-paired and the unit returned to power operation.

13 850909 F

275.0 A

2 389-85-09 ZZ ZZZZZZ Unit #2 was manually' tripped from full power when high vibrations and oil leak occurred on reactor coolant pump 2A2.

Shaft vibrations on RCP 2A2 caused damage to internal components of the motor lower oil reservoir.

Recommended modifications were made to the internal components and the unit returned to power operation.

I 2

3 4

F Finced Reasem:

Method:

Exhibit G. Instructiems I-Manust for Preparation of Data S 56heduled A Equipment Failure (Esplain)

B Maintenance or Test 2 Manuel Screm.

Entry Sheets for Lkensee C Refueling 3 Automatic Scram.

Event Report iLER) File (NUPEG.

D Regulatory Resttktion

@-Other (Explain) 0161)

I Operator Training A License Fiamination 9,

F-Administrative 5

G-Operatoimal F rror (F splain t

4. /.. a n ewe.,..,#

Exhibit I Same Source so/77)

IlOher (Emplain t

.C

SUMMARY

OF OPERATING E.%PERIENCE DOCKET NO.

50-389 UNIT St. Lucie Unit #2 DATE October 14, 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH September, 1985 See the " Unit shutdowns and Power reductions" Report.

In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORY or safety valves during the report month.

I l

P.O. 00X 029100 Mi AMI. F L 33102 6

FLORID A POWER & LIGHT COMPANY October 15,1985 L-85-395 56-aG@

'M - D S.L Director, Office of Resource Management 54-335 U. S. Nuclear Regulatory Commission 54 '35'9 Washington, D. C. ?'s555

Dear Sir:

Attached are the September 1935 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2.

Ver truly yours,

/

Ske $d/6s J. W. Williams, 3r.

Group Vice President Nuclear Energy '

3WW/NWG/dh Attachment cc:

Dr. 3. Nelson Grace Harold F. Reis, Esquire PNS-LI-85-359/1 1

3 o

[

!~

l l

4 L

f l