AVERAGE DAlLYUNITPOWER LEVEL DOCKET NO.
uNn'ATE COMPLETED BY TELEPHONE 50 250 V. T. Chilson MONTH JULY, 1978 DAY AVERAGEDAILYPOWER I EVEL.
(hIWe-Net)
I 632 631 632 17 18 524 I9 20 DAY AVERAGE DAILYPOWER LEVEL
{MWe-Net) 6'38 468 21 22 633 633 8
9 10
]2 13 15 16
'54 6 637 635 26 27 28 30 31 633 629 628 366 INSTRUCTIONS On this format, list the average daily unit power level in Mac.Nct for each day in the reportin tnonth. Cotnputc to the nearest whole n)egawat t.
OPERATING DATAREPORT DOCKET NO. 2425~
DATE B,ug ~978 COMPLETED EY Y~Chilson TELEPHONE UQ2 552-3824 OPERATING STATUS 60 700
- 1. Unit Name
-Turkev Point Uni.t No.
3
- 2. Reportmg Period:
Jul 1978
- 3. Licensed Thermal Power (MWt):
2200
. 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net hIWe):
693
- 6. Maximum Dependable Capacity (Gross hIWe):
Notes - Unit No.
3 operated at approximately 100% R.P.
exce for outages on July 6; 7, an'd 30, 1978 and load reductions on July'0, 13, and 18,,'978.
\\
p y(
)
S. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
IO. Reasons For Restrictions, IfAny; NONE'his Month Yr:to-Date CumuLative 49 568.6.
5 087.0 39 086.6 3 860.7 73.9 185.0 37 761.9' 3
675.6'0-85'.0 4
186 23 745 740 427 840 2 461 395 404 452 2 '327 '147 22 473 797 72.3 76.2 72.3
.76.2
- 68. 7.
68.8 66.0 65.4 1.5 2.7 tion of Each):
October
.2 1978
- 11. Hours In Reporting Period 744.0
- 12. Number Of.Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line 673.5
.15. Unit Reserve Shutdown pours 17. Gross Electrical Energy Generated (MWH)
'S:
Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 90.5
- 22. Unit Capacity Factor {Using.DER i/et)
- 23. Unit Forced Outage Rate 4.8
- 24. Shutdowns Scheduled Over Next 6 hlonths {Type. Date. and Dura Stea Generator Tube Tns ection Pro ram.
- 25. IfShut Down At End Of Report Period, Estimated Date ofStartup'.
- 26. Units In Test Status {Prior to Commercial Operation):
A ust 8' 978 Forecast Achieved INITIALCRITICALITY
'NITIAL ELECTRICITY COhIMERCIAL OPERATION
UNITSHUTDOWNS AND POWER REDUCTIONS Turke Point Unit: No.3 REPORTMQNTII JULX 1978 Page 1 of 3 No ~
I'
~
Vla CJ ft'j I
o 4
m ~cc
~ C/l Licensee Event Report 4s Ptf 4l o cn M CO~
0 U E~
to Cause &Corret.ttvc Action to Prevent Recurrence 78-07-06 S
19.4 B
N/A VALVEX (F)
Unit No.
3 was removed from service to repair a leaking valve body that could not be isolated.
Corrective actions included replace-ment of the valve.
(Non-nuclear system) 78-07-07 3.0 A
N/A VALVEX (C)
Unit trip caused by the malfunction of the. turbine control system while increasing load after returning the unit to service.
(Non-nuclear system 15 78-07-07 F
241 A
N/A HC HTEXCH (I))
Unit was removed from service to locate and repair condenser tube leak (Non-nuclear system)
F: Forced S: Scheduled I9/77)
\\
Reason:
A-Equipmcnt Failure (Explain)
B-hfafntenance oi Test C-Refueling D Regulatory Rcstrletion E-Operator Training & Uccnsc Examination F-Administrative G Operational Error (Explain)
II.Other (Explain) 3 Method:
I-Manual 2-Manual Scram.
3-Automatic Scram..
4.Other (Explain) 4 Exhibit G - instructions for Preparation of'ata Entry Shccts f'r Licenscc
~
Event Report (LER) File (NUREG.
01 6 I )
Exhibit I ~ Satnc Source
UNITSHUTDOWNS jLNDPOWER REDUCTIONS nit No.3 REPORT MONTH Jm.Y 19 78 Page 2 of 3 No.
Date o
5~ c C5 Licensee.
Event Rcport rr C
~Vl o rr QE~
V
.'ause
&. Corrective Action to Prevent Recurrcncc 16 17 78-07-10 78-07-13 N/A
= N/A HC HA HTEXCII (D)
VALUEX Load reduction to locate and repair condenser tube leaks.
(Non-nuclear sys tern)
Load reduction to exercise components in.the turbine control system.
(Non-nuclear sys tern) 18 78-07-18 HC HTEXCH (D)
Load reduction to locate and repair condenser tube leak.
(Non-nuclear system)
,I F: Furced S: Scheduled
(')177)
Reason:
A-Equipment Failure (Explain) 9-Maintenance or Test C-Refueling D Regulatory Rcstrlction E.Operator Trainintr, & Uccnsc Examination F-Administrative G.Operational Error (Explain)
II Other (Explain) 3 hicthod:
I -hlanual 2.hianual Scr'am, 3-Autonmtic Scram.
4-Other (Explain) 4 Exhibit G - instructions for Preparation of Data Entry Shccts for Liccnsce Event Rcport (LER) File (NUREG.
0161)
Exhibit I - Satne Source
UNITSHUTDOWNS 'AND POWER REDUCTIONS REPORT MONTH JULY 1978 Page 3 of 3 DOCKET NO.
50 2SO COMPLETED BY No.
I I V1 rJ Cl gr,I O A<<
tJ C 0 m ¹CC 0
C Liccnscc Event Report ¹ P) cl Q
U Euo Cause A Corrcctivc Action lo Prevent Recurrence 19 78-07-30 323 A
1 N/A CB HTEXCH (P)
Unit w'as removed from service to locate and repair steam generator No..
3C tube leak.
.(Nuclear system)
I F: Forced S; Scheduled (9/77)
Reason:
A-Equipmcnt Failure (Explain)
B-Maintenance or Test C.Refueling D Regulatory Restriction E-Operator Training &. License Examination.
F-Administrative G.Operational Error (Explain)
H.Other (Explain) 3 'ethod:
I -h(anual
.2 hianual Scram.
3-Automatic Scram.
4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG.
016l)
Exhibit I - Satnc Source
0 AVERAGE DAlLYUNITPOWER LEVEL 0 DOCKET NO.
Turkey Point COMPLETED IIY V
T. ChilSOn MONTH DAY
. AVERAGEDAILYPOWER LEVEL (hIWe-Net) 584 DAY ~
AVERAGEDAlLYPOWER LEVEL (hIWMet) 592 17 3*
'5 7.
9 IQ 12, 13 14 IS 16 585 586 586 19 20.
21'2 23'4 26 28 30 31 220 INSTRUCTIONS On this format, list the average daily unit power level in M~Ve.Net for each day in the reporting month. Compute tu the nearest whole megawatt.
(9/77l
OPERATING DATAREPORT DOCKET NO. '50 251 DATE ~~10 1978 COMPLETED BY ~~wilson TELEPHONE ~Q 552-3824 OPERATING STATUS Notes-Unit No; 4'perated at approximately 100%'.P. until July 20,, 1978, when reactor power was reduced to approxi-mately 50% R.P., exce'pt'for the outages of July 7, and 30-31, 1978.'urke Point Unit No. 4 760 700
- l. Unit Name:
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
2200
- 4. Nameplate Rating (Gross MWe):
S. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net ilIIVe):
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.: Power Level To which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE h
This Month Yr:to-Date Cumulative 43 296.0 4 525.3 4 513.3 64 625 367 20 764 125 2 '789 569 70.8 70.8 82.3 79.1 0.1
~
31 998.2
- 13. Reactor Reserve Shutdown Hours '138.8
- 14. Hours Generator On-Line
~
~
737-3 30 636.6 17. Gross Electrical Energy Generated (MPH) 363 710 2 940 200 18; Net Electrical Energy Generated (MWH) 19 $86 054
- 19. Unit Service Factor'9.1 88.7
- 20. Unit AvailabilityFactor 99.1 88.7
- 21. Unit Capacity Factor (Using MDCNet) 68.8 68.8
- 22. Unit Capacity Factor (Using DER Net) 66.1 65.6
- 23. Unit Forced Outage Rate 0.9 2.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
enance and ins ections Au ust 13>> October.
T 1978
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup:,
- 26. Units ln Test Status (Prior to Commercial Operation):
Forecast Acfiieved INiTIALCRITICAL!TY INITIAL ELECTRICITY COMMERCIALOPERATION
UNITSHUTDOWNS ANDPOWER REDUCTIONS REPORT MONTH JULY 1978 Page l of 2 DOCKET NO.
q COMPLETED Ity V. T. Chilson No.
Date rc IA CJ WjI J)
~
~lA gQa License c Event Rcport Ew CP 0
~
g cn G c~
o ~
E~
t3 Cause &, Corrective Action to Prcvcnt Recurrcncc 78-07-07 P
0.7 N/A IiH
-INSTRU (C)
Unit wa" tripped by steam generator No.
4A level protection system when the feedwater control valve opened in response to an erroneous control signal that resulted from the failure of an,electr'onic component in the feedwater control system.
(Non-nuclear system) 78-07-20 S
N/A zz zzzzzz.
Load was reduced to approximately 50% R.P. to extend operation of Core Cycle IV.
F: Forced S: Scheduled
(')177)
Reason:
A-Equipment Failure (Explain)
B.Maintenance or Test C-Refueling D.Regulatory Restriction E-Operator Training h, Liccnsc Examination
. F-Administrative G-Operational Error (Explain)
II Other (Explain) 3 Method:
I.Mariual 2.Manual Scrarri.
3-Automatic Scram.
4-Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NUREG.
016I) 5 Exhibit I - Satnc Source
P UNITSHUTD01UNS AND POWER REDUCTIONS DOCKETNO. 5 DATE Au.
10 1978 Page 2 of 2 No.
Date C ~
'0 vl
\\
I a 'X Q ~
Licenscc Event Report rr CN 4P 0
~
Q wwo
~m O~'UIo
.Cause &, Corrective Action to Prevent Recurrence 78-07-30 P
6.0 3
N/A PIPEXX (A)
Unit was removed from service to repair leak on a drain line on the main steam supply'ine.to moisture-separator-reheater No. 4A.
(Non-nuclear system)
F: Forced S: Scheduled t
Reason:,
A.Equipment Failure (Explain)
B Maintcnancc or Test C.Refueling D Regulatory Restriction E-Operator Training &, License Examination F-Administrative G-Operational Error (Explain) ii-Other (Explain) 3 Method I.Manual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain)
Exhibit G - instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NUREG.
0)6l )
5 Exhibit I - Sante Source
AVERAGE DAILYUNITPOWER LEVEL DOCKET NO. 5OSt. Lucre
- ~7 I
TELEPHONE MONTH JULY, l978 DAY AVERAGEDAILYPOWER LEVEL (MWe Net)
I 776 784
~ 781-DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)
~
784 17 IS 19 10 13 15 16 INSTRUCTIONS 765 674 4
783 78 785 782 774 20 21 22 23 24 25 26 27 2S 29 30 31 NOTE:
783 782 778 769 791 788 Average daily power level greater than 777 MWe due to cooler condenser oooling water.
On this format, list thc average daily unit power level in Mme.Nct for each day in thc rcportinr. month. Compute to the nearest whole megawatt.
(')l771
OPERATING STATUS OPERATING DATAREPORT DOCKETNO.
-'?o -~i DATE hug '~978 COMPLETED BY ~~bilson TELEPHONE Q~H2-3824 Notes- 'Unit operated at ap-proximately 100X during month.
I. Unit Name:
- 2. Reportfng Period:
Jul 1978
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net i~IWe):
- 6. Ihlaximum Dependable Capacity (Gross MWe):
Iaxi m De endable b
cit et MWe:
2560 850 802 822 777 7
5 mu p
Cpa y(N
)
S. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
ID. Reasons For Restrictions, IfAny:
NONE Yr:to-Date Cumulative 14 111.0 118.5 5 087.0
'6;9 3 408.6 11 090.3 '26 106, 236 8 257 022 2 688 100 8 482 860 7 967 699 2 525 122 67.0 78.6 78.6 6.7.0 63.9 72.7 61.9.
- 70. 4 1.6 7.5 No ~emb e 25 78 This Month
- 11. Hours In Reporting Period
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 1 877 051
- 17. Gross Electrical Energy Generated (MWH) 609 350 IS: Net Electrical Energy Generated (MWH) 576 237
- 19. Unit Service Factor
- 21. Unit Capacity Factor (Using MDC Net) 99.7
- 22. Unit Capacity Factor (Using DER Net)
'6.6
- 23. Unit Forced Outage Rate 24. Shutdowns Scheduled OverNext 6 Months (Type, Date, and Duration of Each)
S a
G ezatoz Tube Tnsnection Pzo zam 'Octo er 22
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
N A Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION I'/77)
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
No.
Date rr tj CJ
~r, 1r c
Q r Q~ C/l Ltkenscc Event Report rr Cw V 0 rn Cr
~e 0C Q U E PJ 0
CJ Cause &, Correct tvc Action to Prcvcnt Rccurrcnce NONE I
F: Forced S: Scheduled t
Reason:
A.Equipmcnt Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E.Operator Training &, License Examination F-Administrative G.Operational Error (Explain)
H-Other (Explain) 3 Method:
I-Manual
..2-Manual Scram.
3-Automatic Scram.
4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
~
Exhibit I - Same Source
FLORIOA POWER 8( LIGHTCOMPANY August '10.,
1978 Office of Management Information and Program Controls S. Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
Attached are the July, 1978, Operating Summary Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. 1.
Very truly yours, A. D. Schmidt.
Vice President Power Resources VTC/DDC cc:
Mr. James P. O'Reilly Robert Lowenstein, Esquire PEOPLE
~.
~ SERVING PEOPLE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50
0 Turkey Point UNIT DATE Au 10 COMPLETED BY V. T. Chilson
~PORT MONTH JULY r 1978 TELEPHONE 305) 552-3824 Turkey Point Unit No.
3 operated at approximately 100% R.P. except for outages on July 6, 7,
and 30, 1978 and. load reductions on July 10, 13,.and 18, 1978.
Refer to the Unit Shutdowns and Power Reductions Section of the Operating Status Report for details.
Major Safety-related maintenance activities performed during the month included steam generator No.
3C tube leak repairs.
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO-
. 50 251 Turkey Point UNIT Unit No.
4 DATE Au
. 10, 1978 COMPLETED BY V. T. Chilson
~PORT MONTH JULY, 1978 TELEPHONE (305) 552-3824 Turkey Point Unit No.
4 operated at approximately 100% R.P. until July 20, 1978, when reactor power was reduced to approximately 50% R.P.,
except for the outages of Ju1y 7, and 30-31, 1978.
Refer to the Unit Shutdowns and Power Reductions Section of the Operating Status Report for details.
No Major Safety-related maintenance was performed during the month.
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
- .50 335 St. Lucie
, UNIT Unit No.
1 DATE Au 10 1978 COMPLETED BY'. T. Chilson TELEPHONE 305 552-3824 REPORT MONTH JULY, 1978 St. Lucie Unit No.
1 operated at approximately 100% R.P.'uring month-No Major Safety-related maintenance was performed during the month.