L-86-161, Monthly Operating Repts for Mar 1986
| ML20211H064 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 03/31/1986 |
| From: | Grant N, Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| L-86-161, NUDOCS 8606230081 | |
| Download: ML20211H064 (17) | |
Text
. __ ______ _ _____
AVERACE DAILY UNIT POWER Livst DOCKET NO.50-99n UNIT Turkey Point 3 DATE April 10, 1986 COMPLETED Sy
_N.W. Grant TELEPHONE (3051552-3675 f
MONTH. March. 1986 DAY AVERACE DAILY POWER LEVEL IMWe Met) j 3/ 1/86 691 3/ 2/86 699 3/ 3/86 702 3/ 4/86 690 3/ 5/86 5
3/ 6/86
-5 3/ 7/86
-4 3/ 8/86.
-4 3/ 9/86
-5 3/10/86
-7 3/11/86
-6 3/12/86
-5 3/13/86
-5 3/14/86
-5 3/15/86
-5 3/16/86
-5 3/17/86
-5 3/18/86
-5 l
3/19/86
-5 l
3/20/86
-5 3/21/86
-5 3/22/86
-3 3/23/86
-3 3/24/86
-3 3/25/86
-2 3/26/86
-4 l
3/27/86
-4 3/28/86
-4 3/29/86
-9 3/30/86
-10 3/31/86
-9 I
8606230081 860331 PDR ADOCK 05000250 R
PDR I E.W Ili
OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 4/ 8/86 COMPLETED BY N.
W.
GRANT OPERATING STATUS TELEPHONE 305/552/3675 1.
UNIT NAME: TURKEY POINT UNIT 3 2.
REPORTING PERIOD:
MARCH 1986 3.
LICENSED THERMAL POWER (MWT): ______________ 2200 4.
NAMEPLATE RATING (GROSS MWE):
760 5.
DESIGN ELECTRICAL RATING (NET MWE):
693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
700 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
664 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
POWER LEVEL TO WHICH RESTRICTED,_____________________________________
9.
IF ANY (NET MNE)___________________________
10.
REASONS FOR RESTRICTIONS, IF ANY:
4 MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
744 2160 116769.6 12.
NUMBER OF HOURS REACTOR WAS CRITICAL _____
REACTOR RESERVE SHUTDOWN HOURS 98.0 1252.5 00330.2 t
13.
0.0 0.0 844.4 14.
HO UR S G EN ER A TO R ON-L I NE _ __ __ __ __ __ ___ __ _ _
97.8 1232.5 79639.4
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
101.8 16.
GROSS THERMAL ENERGY GENERATED (MWH) 212700 2629205 164834726 17.
GROSS ELECTRICAL ENERGY GERERATED (MWH)
NET ELECTRICAL ENERGY GENERATED (MWH) 70580 863650 52735195 18.
63064 813299 49922880
- 19. UNIT SERVICE FACTOR _____________
13.1 57.1 68.2
- 20. UNIT AVAILABILITY FACTOR _________________
13.1 57.1 68.3 21.
CAPACITY FACTOR (USING MDC NET) 12.7 56.5 65.7
- 22. CAPACITY FACTOR (USING DER NET) 12.2 54.3 61.7
- 23. UNIT FORCED OUTAGE RATE _________________
86.9 42.9 7.9 24.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 25.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP4/ 09/96 l
i l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-250 UNIT NAME Tiirkey Point. Unit #3 DATE 4-10-86
!! arch,1986 ColeLETED sY N.
IL Grnnt REPORT MONTH MNE 305/552-3675 e.
E c
.!E 3
j $* E Licensee Eg Cause & Corrective No.
Date k
3g 4
2s&
Event 3,7 A' """ ' "
Eg' Prevent Recurrence F
$E 5
j di g Repor 8 v) U 5
I 04 860305 F
540.7 A
1 250-86-009 WG ZZZZZZ Unit 3 shut down to resolve potential concerns with the component cooling water (CCW) system which arose during a FPL i
initiated in depth review of select plant systems. Following testing and flow balarming of the CCW system and investigation and evaluation of potential concerns with diesel generator loading, the unit ;fepared M commence heat up to support returning to power operation in early April.
1 I
2 3
4 4
F: Forced Reassm:
Method:
Exhibit G -Instauctions
]
S Scheduled A Equipenent Failure (Emplain) 1-Manual for Preparatiim of Dasa B-Maintenance or Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LE RI File INUREG-D-Regulatory Restriction
$4hher(Explasn) 01611 E4)perator Training a license Examinati<m F. Administrative M ~ C '*' *
- 8*
5 i
G Operatismal Fsror (F splain) 4.
4 4.
A se w.,..,#
Eshibit 1 Same Source i
(9/77)
II-Osher (E splain) i UE O
SUFJ4ARY OF OPERATING EXPER.TENCE DOCKET NO.
50-250 UNIT Turkey Point Unit #3 DATE April 10, 1986 COMPLETED BY N. W. Grant TELEPHONE nos) 552-3675 REPC.tT ttONTH March. 1986 See the" unit shutdowns and power reductions" report.
l i
AVER AGE DAILY UNITPOWElt L EVIL DOCKET NO. 50-251 UNIT Turkey Point 4 DATE April 10, 1986 N.W.Gran t COMPLETED SY (305)552-3675 TELENIONE March, 1986 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe Net) 3/ 1/86 0
3/ 2/86 0
3/ 3/86 0
3/ 4/86 0
3/ 5/86 0
3/ 6/86 0
3/ 7/86 0
3/ 8/86 0
3/ 9/86 0
3/10/86 0
3/11/86 0
3/12/86 0
3/13/86 0
3/14/86 0
3/15/86 0
3/16/86 0
3/17/86 0
3/18/86 0
3/19/86 0
3/20/86 0
3/21/86 0
3/22/86 0
3/23/86 0
3/24/86
-1 3/25/86
-1 3/26/86
-1 3/27/86
-1 3/28/86
-1 3/29/86
-1 3/30/86
-1 3/31/86 0
l
~
OPERATING DATA REPORT DOCKET NO 50 251 DATE 4/ 8/86 COMPLETED BY N.
W.
GRANT TELEPHONE 305/552/3675 OPERATING STATUS L
1.
UNIT NAME: TURKEY POINT UNIT 4 2.
REPORTING PERIOD:
MARCH 1986 3.
LICENSED THERMAL POWER (MWT):
2200 4
NAMEPLATE RATING (GROSS MWE):
760
- 5. DESIGN ELECTRICAL RATING (NET MWE):
693 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
700 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
~
666 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
P6EER L5 VEL T6~EHiUH kE5TRiUTE6[~iF A E~i ETME5)~~~~~~~~~[_~~~~~~~~~~~~~~
~
~
~
~
~
9.
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
744 2160 110501.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
0.0 225.4 77860.6
- 13. REACTOR RESERVE SHUTDOWN HOURS ____
0.0 0.0 166.6
- 14. HOURS GENERATOR ON-LINE __________________
0.0 225.1 75320.2 15.
UNIT RESERVE SHUTDOWN HOURS._____________
0 0
32.1
- 16. GROSS THERMAL ENERGY GENERA TED (MWH) 0 440167 159477896
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 139235 50781807
-931 128552 48089760
- 19. UNIT SERVICE FACTOR _____________________
0.0 10.4 68.2
- 20. UNIT AVAILABILITY FACTOR 0.0 10.4 68.2
- 21. CAPACITY FACTOR (USING MDC NET) _________
0.0 8.9 66.9
- 22. CAPACITY FACTOR (USING DER NET) ______
0.0 G.6 62.8
- 23. UNIT FORCED OUTAGE RATE _________________
0 0
6.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
5/7/86 1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME Turkey Point Unit #4 DATE 4-10-86 REPORT MONTH March, 1986 COtrLETED BY N_
IJ. C rn n e-TELEPHONE /in;i ;9 L 1r>79 e.
E c
.! E "h
j $* 3 Licensee E,
- e.
Cause & Corrective No.
Date k
3g il 2s&
Event 3,7 EO
^ ' " " " ' "
jE E
j ;lij g Report a mO Prevent Recurrence g
d 02 860110 S
744.0 C
4 RC FUELXX Unit 4 remained shutdown for refueling and scheduled maintenance.
I 2
3 4
0 Forced Reason:
Method:
Exhibit G Instructions
% Scheduled A Equipment Failure (Emplain) 1-Manual for Preparation of Data B-Maintenance or Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report ILE R) File INUREG-D-Regulatory Restriction
$ Of her (Explam) 01611 E-Operator Training & Ucense Fuamination F Administrative 9,, C,,,,,,,,,
5 G Operatiemal F r ror (F splaini 4.
4 a Asee..cl Eshibit 1 - Same Source t'#/77 )
Il-Ogher IExplain t L3:1
SUMMARY
- OPERATING EXPER.TENCE DOCKET NO.
50-251 UNIT Turkey Point Unit #4 DATE April 10,1986 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT HONTH March, 1986 Unit #4 remained out of service for refueling and scheduled naintenance.
AVER AGE DAILY UNIT POCf R LEvgL DOCKLT NO.
50-11; UNIT St. Lucie Unit 1 DATE Aorf1 10 1986 COMPLETED 3Y N.W. Grant (305)552-3675 TELEN10NE MONTH March. 1986 DAY AVERACE DAILY POWER LEVEL (MWe Net) 3/ 1/86 865 3/ 2/86 868 3/ 3/86 868 3/ 4/86 867 3/ U/86 867 3/ 6/86 865 3/ 7/86 866 3/ 8/96 863 3/ 9/86 863 3/10/86 864 3/11/86 861 3/12/86 861 3/13/96.
860 3/14/96 861 3/15/86 863 3/16/86 861 3/17/86 862 3/18/86 861 3/19/86 861 3/20/86 863 3/21/86 865 3/22/86 866 3/23/86 868 3/24/86 867 3/25/86 865
.3/26/86 852 j
3/27/86 824 3/28/86 839 3/29/86 865 3/30/86 863 3/31/86 862 i
1 1
OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 4/ 8/86 COMPLETED BY N.
W.
GRANT TELEPHONE 305/552/3675 OPERATING STATUS 1.
UNIT NAME:
ST. LUCIE UNIT 1 2.
REPORTING PERIOD:
MARCH 1986 3.
LICENSED THERMAL POWER (MWT):
2700 4.
NAMEPLATE RATING (GROSS MWE):
850
- 5. DESIGN ELECTRICAL RATING (NET MWE):
830 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
872 7.
MAXIMUM DEPENDABLE CAPACITY (NST MWE):
827 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS: ___________________________
POWER LEVEL TO WHICH RESTRICTED,------------------------------------------------------------___________
9.
IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
744 2160 81312.0 12.
NUMBER OF HOURS REACTOR WAS CRITICAL _____
744.0 2151.6 58307.6 13.
REACTOR RESERVE SHUTDOWN HOURS ______
0.0 0.0 205.3 14.
HOURS GENERATOR ON-LINE _____-____________
744.0 2147.6 57949.7 15.
UNIT RESERVE SHUTDOWN HOURS _____________
0 0
39.3 16.
GROSS THERMAL ENERGY GENERATED (MWH) 2004406 5741356 146633623
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 673930 1934330 47990835 640942 1838345 45272637 19.
UNIT SERVICE FACTOR _________________ ___
100.0 99.4 71.3 20.
UNIT AVAILABILITY FACTOR _________________
100.0 99.4 71.3 21.
CAPACITY FACTOR (USING MDC NET) 104.2 102.9 69.9
- 22. CAPACITY FACTOR (USING DER NET) 103.8 102.6 68.4 23.
UNIT FORCED OUTAGE RATE _________________
0
.5 4.2
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-335 UNIT NAME St. I.ucie Unit #1 DATE 4-16-86 CORWLETED BY N. W. Grant REPORT MONTH f fa rch, 1986 TELEPHONE (105) 557-1675 e.
E E
.! E 3
j E5 Licensee Eg
- vt Cause & Corrective N...
Date k
5g 4
2s&
Event 3,7 Eh A' 'b "
jE E
j iji g Report
- vi O Prevent Recurrence g
d Unit I had no shutdowns or significant power reductions.
l 3
4 F-Forced Reason:
Method:
Exhitpit G - Inst ructions 5
Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance or Test 2 Manual Scram.'
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report iLE RI File (NUREG-D Regulatory Restriction
$Other (Explain 1 01611 I Operator Training & Ucense Fxamination F Administrative M~
O'**""#*
5 G Operational bror (Fiplain t 4.
tode AEowc.,..,#
E shibit I - Same Source l'8/77) lif)ther (E xplaint L3:1
SUMMARY
OF OPERATINC EXPERIEr:CE DOCKET NO.
g_,,,
UNIT
_ st. Lucie Unit #1 DATE April 10,1986 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH March, 1986 Unit #1 operated at essentially full power with no" Unit shutdowns or power reductions'.'.
In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report month.
1
)
l
AVER A$E DAILY UNIT POWfit LEVIL DOCKET NO. 50-389 UNIT St. lucia finit 2 DATE April 10 1986 COMPLETED BY N.W. Grant TELENIONg (305)552-367 5 MONTH March. 1986 DAY AVERAGE DAILY POWER LEVEL IMWe Net) 3/ 1/86 862 3/ 2/86 866 3/ 3/86 859 3/ 4/86 853 3/ 5/86 864 3/ 6/86 863 3/ 7/86 151 3/ 8/86 gg7 3/ 9/86 856 3/10/86 857 3/11/86 856 3/12/86 855 3/13/86.
855 3/14/86 856 3/15/86 857 3/16/86 855 3/17/86 856 3/18/86 854 3/19/86 gg4 3/20/86 857 3/21/86 857 3/22/86 858 3/23/86 857 3/24/86 854 3/25/86 851 3/26/86 845 3/27/86 341 3/28/86 838 3/29/86 837 3/30/86 836 3/31/86 834
OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 4/ 8/86 COMPLETED BY N.
W.
GRANT TELEPHONE 305/552/3675 OPERATING STATUS 1.
UNIT NAME:
ST. LUCIE UNIT 2 2.
REPORTING PERIOD:
MARCH 1986 3.
LICENSED THERMAL POWER (MWT):
______________ 2700 4.
NAMEPLATE RATING (GROSS MWE):
850 5.
DESIGN ELECTRICAL RATING (NET MWE):
830 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
882 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
837 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS: _________________________________
POWER LEVEL TO WHICH RESTRICTED,-----------------------------------------------------------------
9.
IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
744 2160 23209.0 12.
NUMBER OF HOURS REACTOR WAS CRITICAL _____
725.6 2125.9 20174.8 13.
REACTOR RESERVE SHUTDOWN HOURS _____
0.0 0.0 0.0 14.
HOURS GENERATOR ON-LINE __________________
723.3 2106.8 19679.1 15.
UNIT RESERVE SHUTDOWN HOURS ___________.,__
0 0
0 16.
GROSS THERMAL ENERGY GENERATED (MWH) 1942023 5640112 50286645
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 647030 1888020 16794700 613260 1789949 15860992 19.
UNIT SERVICE FACTOR _________________ ___
97.2 97.5 H84.8
- 20. UNIT AVAILABILITY FACTOR,,________________
97.2 97.5 84.8 21.
CAPACITY FACTOR (USING MDC NET) 98.5 99.0 84.9
- 22. CAPACITY FACTOR (USING DER NET) 99.3 99.8 84.0
- 23. UNIT FORCED OUTAGE RATE _________________
Z.8 2.5 10.0
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS REFUELING, APRIL 1,.1986, 7
WEEKS ______________________
25.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
t 4
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-189 UNIT NAME sr. Lucie I!n f r #2 DATE A in_96
~
REPORT MONTH March, 1986 COWTED BY N. W. Gran t TELEPHONE (105) 55?-1675 E
E jE 3
j E5 Licensee p,
Cause & Corrective N...
Date i
3g 4
2s&
Ever :
3,7 Ed A' 'I"" '"
$E 5
j if5 y Report a ta U Prevent Recurrence g
d 04 360307 F
20.7 A
2 C3 ACCUML Unit 2 shutdown to repair a quench tank rupture disc. The unit then returned to power operation.
l I
i 2
3 4
F-Forced Reasem:
Method:
Exhibit G. instructions 5 Scheduled A-Equipment Failure (Emplain) 1 Manual for Preparatiim of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report tLER) File (NUREG-D Regulatory Restrictism
$-Other (Explain) 01611 I -Operator Training & Ucense Fzamination F Administrative M~
O***'*""#8 5
G Operatismal F eror iFiplain) 4.
/,e 4.
Aseve.,..,#
E shibit I - Same Source i
P8/77)
Il4)ther (Explain)
L3:1
SUMMARY
OF OPERATINC E.%PERTENCE DOChTT NO.
50-389 UNIT St. Lucie Unit #2 DATE April 10, 1986 COMPLETED BY N. v. crant TELEPHONE 905)552-3675 REPORT HONTH Ma rch, 1986
'See the " Unit shutdowns and Power Reductions" report.
In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report month.
[ o.
FLORIDA POWER & LIGHT COMPANY APR 1 0 1988 L-86-161 I
Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Attached are the March 1986 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2.
Very truly yours, i
<.T
. O. Wood Group Vi esident Nuclear Energy COW /MWG:de Attachment cc: Dr. J. Nelson Grace i
Harold F. Reis, Esquire PNS-LI-86-117 t
5*d,\\'