Monthly Operating Repts for Jul 1985
ML20132G122
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 07/31/1985
From: Grant N, Williams J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
L-85-313, NUDOCS 8510010477
Download: ML20132G122 (18)


Text

- _ _ _ _ _ _ _ _ _ ___ __

[.. !

AsLI;4C,L1:416 ) tN1 PO= t 5. L l s i l

'~

6 DOCKETNO.

50 Mn UNil Turkey Point 3 DATE 8/14/85 N.W. Grant COMPLETED BY TELEPHONg (305)SS2-3675 MONTN July. 1985 DAY AVERACE DAILY powgR LEVEL iMWe&t) 7/ 1/85

,3 7/ 2/85 7/ 3/05 3,

7/ 4/05 I

7/ 5/85 4

7/ 6/85 3

7/ 7/85

.g 7/ 8/85

-6 7/ 9/85 8

7/10/05

_go 7/11/05

.g4 7/12/85

.gg 7/13/05

_,3 7/14/85 4

4,4 7/15/85 7/16/85

_{g 7/17/85

,9 7/10/05

_{$,

7/19/05 g3 7/20/85 42; 7/21/85 ggo 7/22/85

.g3 7/23/05

_n3 7/24/85

.43 7/25/85

.4, 7/26/85 Ty 7/27/05 438 7/28/85 657 7/29/85 0,7 n9 7/30/05 4

7/31/85 34

?

l l

0510010477 850731 ADOCK 05000250 PDH PDR R

L l

1 1

OPERATING DATA REPORT DOCKET NO 50 - 25 DATE S/14/8' COMPLETED DY N.

W.

G F. A N QPERATING STATU3 1.

UNIT NAME: TURKEY POINT UNIT 3 2.

REPORTING PERIOD:

JULY, 1985 3.

LICENSED THERMAL POWER (MWT):

2200 4.

NAMEPLATE RATING (GROSS MWE):

760 5.

DESIGN ELECTRICAL RATING (NET MWE):

693 5.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

700 7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE):

466 8.

IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7 SINCE LAST REPORT. GIVE REASONS:

t

9. PUUER EEUEL'i6~U555H~555IRICYEDI~5F AUY~I5ET MU5I~I~~22:2~~I~~~_~~22 2222

~

~

~

10. REASONS FOR RESTRICTIONS, IF ANY:

10NTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

744 5087 110936.

NUMBEI: CF HOURS REACTOR WAS CRITIC 238.3 2295.3 75968.

12.

REACTOR RESIRVE SHUTDOWN HOURS...AL_____

13.

0.0 0.0 944.

14. HOURS OCNERATOR ON-LINE 143.8 2155.5 75334.
15. UNIT RESERVE SHUTDOWN HOURS 0

0 121.

16. GROGS THERMAL ENERGY DENERATED (MWH) 232394 4540761 15567027
17. GROSS ELECTRICAL ENERGY GERERATED (MUH) 48774 1490699 4974639
18. NET ELECTRICAL ENER0Y GENERATED (MWH) 54583 1397009 4709421 19 UNIT SERVICE FACTOR............__.....__

17.3 42.4 67.

20. UNIT AVAILABILITY FACTOR 19.3 42.4 68.
21. CAPACITY FACTOR (USING MDC NET) 11.0 41.2 65.
20. CAPACITY FACTOR (USING DER NET) 10.6 39.6 61.
23. UNIT FORCED OUTAGE RATE... __.___......_

58.4 13.1 6.

24. SHUTDOWNS SCHEDULED QVER NEXT 6 MONTHS :

1

____............____.............__.___.___........_____........... ____ i

25. IF SHUT DOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUP:

l l

l l

m

1 of 2 UNITSHUTDOWNS ANDPOWER REMN gyg Pnint t! nit #3.'

l DATE 8/14/85 ND BY h W. Grant REPORT MONTH Jul y, 1985 TEtJPMONE (305) 552-3675 l

E c*

{g 3

j Ei Licensee

,E*

g*.

Oswer & Corrective Date E.

e i

2s&

Event s '1 M

Acti'm to N..

C 3i y

I g, e Repewt e in G

!O Prevent Rerverence 0-7 s

u i

6 07 850330 5

398.1 C

1 RC FUELXX Unit #3 returned to power following refueling and scheduled maintenance.

08 850718 5

28.5 B

5 HE TURBINE The unit reduced power from 28% (133 MWE) to hot shutdown for preparation of regularly scheduled turbine over-speed test.

09 850720 F

0.0 A

5 HH

'VALVEX Power escalation suspended due to secondary system (reheates drain tank valve) problems. No power reduction.

10 850721 F

112.9 A

3 250-85-19 IA INSTRU The unit tripped most likely because of a lightning strike in the area.

The outage was extended to' repair auxiliary feedwater flow control valves. The unit then returned to power operation.

I 2

3 4

F-Fiwced Reason:

Method-Exhibit G. Inst ructites C.

Stheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data R Maintenance or Test 2-Manuel Screm.

Entry Sheets for t.ieensee C Refueling

3. Automatic Scram.

Event RepiniILER) File f NUREG-D-Regulatory Restrictiim 30her IExplain) 01611 l.-Operator Training A lxense F=aminatiim 9,

5 F-Administrative G-Operati. mal Ie r.it (F splain t g

4 4.

A siewc.w.,7 Ethibit I - Same S.mece l's/77)

II Other iE splain t

2 of 2 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-?c;n UNIT NAME Torknu pnin, t'ait #37 DATE 8/14/85 REPORT MONTH Jul y, 1985 COMPLETED ay N. W. Grant TELEPHONE (305) 552-3675 I

E E

jg "h

j E5 Licensee E*

g*,

Csese & Corrective N...

Daie E.

e i

2s&

Event s7 a.3 Acti<m to 4

jj y

gg Report n AG V

Prevent Reevrrence 6

12 850729 F

60.7 A

3 250-85-22 IA INSTRU Unit tripped during performance of reactor protection system testing.

The cause is not known, but suspected to be soil contact on one NIS chat 1nel, Following detailed testing of the circuits and repair of a reactor coolant-system valve, the unit re-l turned to power operation.

1 4

i 1

I 2

3 4

F-Forced Reason:

Method:

Exhibit G. Instructitms S Scheduled A. Equipment Failure (Explain)

I-Manual for Preparation of Data B Maintenance of Test

2. Manual Scram.

Entry Sheets for Licensee C. Refueling

3. Automatic Scram.

Event Repor II.ERI File INUREG-D Regulatory Restriction 9-Other (Explain) 01611 1:-Operator Training & License Examination F Administrative G-Operatiemal Feror IFipiain)

.y Leao Asewe,. e#

Exhibit I Same Source l'8/77)

Il Ot her (E xplain) i

SUMMARY

OF OPERATING EXPER.TENCE DOCKET NO-50-250 UNIT Turkey Point Unit #3 _

DATE August 14, 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH Jul v. 1985 See the " Unit shutdowns and power reduction" report.

A\\ LI; AGE !s Alli UNil PO=t1 Li vg i DOCKET NO. 50-251 UNIT Turkey Point 4 DATE 8/14/85 N.W.Gran t COMPLETED BY (305)552-3675 11LErilONE MONTH Jul y, 1985 DAY AVERACE DAILY POWER LEVEL (MWe Net) 7/ 1/85 666 7/ 2/85 669 7/ 3/85 667 7/ 4/85 gyn 7/ 5/85 670 7/ 6/85 664 7/ 7/85 ggo 7/ 8/85 ggy 7/ 9/85 655 7/10/85 657 7/11/85 65G 7/12/85 660 1

7/13/85 665 7/15/85 664 7/14/85 66' 7/16/85 664 7/17/85 104 7/18/85 j

)

7/19/85 veg 7/20/85 639 7/21/85 651 7/22/85 633 7/23/85 65'4 7/24/85 67 7/25/85

'63 7/26/85 660 7/27/85 658 7/28/85 655 7/29/85 649 7/30/85 650 7/31/85 646

-~.

1 OPERATING DATA REPORT DOCKET NO 50 DATE 8/14/8' COMPLETED BY N.

W.

GRAN*

OPERATING STATUS 1.

UNIT NAME: TURKEY POINT UNIT 4 3

2.

REPORTING PERIOD:

JULY, 1985 3.

LICENSED THERMAL POWER (MWT):

2200 4.

NAMEPLATE RATING (GROSS MWE):

760 5.

DESIGN ELECTRICAL RATING-(NET MWE):

693 3

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) 700 7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE) 666 8.

IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THRCUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. 56UER L5UEL~ i 6 ~ U 5 5 C 5 ~ R 5 5 7 5 i 67 5 6 7 ~ 5 F 3 0 Y ~ I U 5 7 ~ E U 5 I I I I ~_ ~ 2 2 ~_ 2 2 ~_ 2 2 : 2 2 2 : 2 2 2.

~

~

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

744 5087 104668.t

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

708.3 4612.3 74330..

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 166..

14. HOURS GENERATOR ON-LINE 704.2 4566.2 71806.;
15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

31.:

16. GROSS THERMAL ENERGY GENERATED (MWH)

~1

17. GROSS ELECTRICAL ENERGY GERERATED (MWH)____

1514791 9792102 15192220:

478265 3155990 4834838~

18. NET ELECTRICAL ENERGY GENERATED (MWH) ___

454267 2996871 4578015:

19. UNIT SERVICE FACTOR 94.7 39.S 68..
20. UNIT AVAILABILITY FACTOR 94.7 S9.8 6 8..
21. CAPACITY FACTOR (USING MDC NET) _________

91.7 88.5 67.:

22. CAPACITY FACTOR (USING DER NET) _________

S8.1 85.0 63.

23. UNIT FORCED OUTAGE RATE _________________

5.3 8.1 6.

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :

refueling, 1/86, 11 to 12 weeks ________________________________________.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

l i

w

,n

UNIT SHUTDOWNS AND POWER REDUCTIONS M

AME r

Point Unit #4 -

DATE 8/14/85 REPORT MONTH Jul y, 1985 CORWLETED BY N. W. Grant TELEPHONE (305) 552-3675.

E c

jg 3

y E5 Licensee

[*,

'l, Cause & Corrective N...

Date

{

}g

(

jjE Event 3, ?

Eb

^ ' " " '

gI y

jg Report sr mO Prevent Recurrence H

g c5 16 850717 F

39.8 A

3 251-85-19

.EB GENERA Unit #4 Loss of instrument inverter resulted in a Turbine Runback which led to a reactor trip on high pressur-izer pressure. The inverter has been replaced as part of a plant modifica-tion to replace all inverters. The unit returned to power operation.

17 850719 F

0.0 H

5 HB HTEXCH Unit held at reduced power following startup for secondary chemistry controls.

l 1

2 3

4 F: Forced Reason:

Method:

Exhibit G. Instructions S Scheduled A Equipment Failure (Explain) 1-Manuel for Preparation of Data R. Maintenance of Test 2 Manusi Screm.

Entry Sheets for Licensee C. Refueling

3. Automatic Scram.

Event ReporiILER1 File (NUREG.

D. Regulatory Restriction

%Other (Explain) 01611 I-Operator Training A Ucense Fuamination p

5 F Administrative G-Operational Feror (F splain) 4

/.o Ao AtAve.v.cf Exhihis I-Same Source 19/77) ll-Ot her ( E xplain t

SUMMARY

OF OPERATING EXPER.TENCE DOCKET NO.

50-251 UNIT Turkey Point Unit #4 DATE August 14, 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH Julv. 1985 See the " Unit shutdowns and power reduction" report.

L.

AVLIE AGE 18 Alli UNil PO=t F. Li vi t DOCKET NO.

50 114 UNil St. Lucie Unit 1 DATE 8/14/85 COMPLETED BY ll.W. Grant (305)552-3675 1TLErilONE MONTH Jul v. 1985 DAY AVERACE DAILY POWER LEVEL IMWe. Net) 7/ 1/85 841 7/ 2/85 634 7/ 3/85 797 7/ 4/85 845 7/ 5/85 842 7/ 6/85 843 7/ 7/85 845 7/ 8/85 841 7/ 9/85 839 7/10/85 840 7/11/85 845 7/12/85 847 7/13/85 841 7/14/85 837 7/15/85 838 7/16/85 838 7/17/85 838 7/18/85 837 7/19/85 834 7/20/85 832 7/21/85 832 7/22/85 807 7/23/85 782 7/24/85 842 7/25/85 840 7/26/85 837 7/27/85 845 7/28/85 837 7/29/85 834 7/30/85 831 7/31/85 828

)

1 OPERATING' DATA REPORT DOCKET NO 50 - 335 DATE S/14/85 COMPLETED BY N.

W.

GRANT TELEPHONE 305/552/3675 OPERATING STATUS 1.

UNIT NAME:

ST. LUCIE UNIT 1 Y

2.

REPORTING PERIOD; JULY, 1985 3.

LICENSED THERMAL POWER (MWT):

2700 4.

NAMEPLATE RATING (GROSS MWE):

850 s

5.

DESIGN ELECTRICAL RATING-(NET MWE); ______-_

S30 6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

867 7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____

S27 8.

IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

.T 9.

POWER LEVEL TO WHICH RESTRICTEDs IF ANY (NET MWE)_-___--_-____--____-____

10. REASONS FOR RESTRICTIONS, IF.ANY:

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD: -_____-________--

744 5087 75479.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL--___

744.0 5083.0 5410.4.2

13. REACTOR RESERVE SHUTDOWN HOURS ______-_--

0.0 0.0 205.2 744.0 5080.0 53813.5 HOURS GENERATOR ON-LINE -_____-__--____-_-_

14.

UNIT RESERVE SHUTDOWN HOURS __-

0 0

39.2 15.

16. GROSS THERMAL ENERGY GENERATED (MWH) ____

1971995 13537055 135674591

17. GROSS ELECTRICAL ENERGY GERERATED (MWH)____
18. NET ELECTRICAL ENERGY GENERATED (MWH) 649450 4506640 44365295 616036 4279409 41841757 19'. UNIT SERVICE FACTOR __________--______-__-

100.0 99.9 71.2

20. UNIT AVAILABILITY FACTOR 100.0 99.9 71.2
21. CAPACITY. FACTOR (USING MDC NET)_-______________

100.1 102.0 69.E

22. CAPACITY FACTOR (USING DER NET) -____--_

99.8 101.4 68.2

23. UNIT FORCED OUTAGE RATE _________-______-

0

.1 4.2

24.. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :

refuelins, 10-20-85, 10 weeks

_-_________________-_--____--_-____--_r-_.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: --___-_.

t

.e l-l t

s,'

i i

i L.

50-335 UNIT SHUTDOWNS AND POWER REDUC 110NS DOCKET NO.

UNIT MAME St. Lucie Unit #1 DATE 8/14/85 COMPLETED sy N W Grant REPORT MONTH July. 1985 TELEPHONE (305) 552-3675 E

a j-3 j E~

Licensee

[*,

g*".

Cause A Corrective a-Actism to

(

N...

Date E

e i

2s@

Event s7

}d 4

j@

j5g Report a N0 Prevent Recurrence c5 02 850702 S

0.0 B

5 HH HTEXCH Unit 1 operated at reduced power due to High Isophase bus temperature, following cleaning of water boxes the unit returned to full power operation I

2 3

4 F Forced Reaum:

Method:

Exhibit G. Instructions 5 Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Screm.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LERI File (NUREG-D Regulstory Restriction 9 Of her (Explain) 01611 I.-Operator Training & License Fuamination p

F Admimstrative 5

G-Operational Frror (Fiplaini 4_ to ao Aseve,..e#

Eshibit i. Same Source t'8/77 )

Il-Other ( Explaini l

i

]

r

SUMMARY

OF OPERATING EXPERIENCE e

DOCKET NO.

50-335 UNIT St. Lucie Unit #1 _,_

DATE August 14, 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH July, 1985 Unit #1 operated at essentially full power and had no " Unit Shutdowns and Power Reductions."

In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month.

0 l

~

A\\ LR AGE !) All i LWil PO=t ). Li vi t DOCKET NO. 50-389 UNil St. I ncia finit 2 DATE 8/14/85 COMPLETED BY N.W. Grant TELEPilONg (305)S52-3676 MONTH Julv. 1985 DAY AVERACE DAILY POWER LEVEL (MWe Net) 7/ 1/95 844 7/ 2/85 852 7/ 3/85 850 7/ 4/85 850 7/ 5/85 848 7/ 6/85 851 7/ 7/85 851 7/ 8/85 850 7/ 9/95 848 7/10/85 847 7/11/85 853 7/12/95 853 7/13/85 849 7/14/85 846 7/15/85 848 7/16/85 849 7/17/85 848 7/18/85 599 7/19/85 425 7/20/85 817 7/21/85 846-7/22/85 849 7/23/85 804 7/24/85 845 7/25/85 850 7/26/85 850 7/27/85 853 7/28/85 851 7/29/85 850 7/30/85 823 7/31/85 759

1

. OPERATING DATA REPORT DOCKET NC 50 - 389 DATE S/14/85 COMPLETED Bf N.

W.

GRANT TELEPHONE 305/552/3675 OPERATING STATUS 1.

UNIT NAME:

ST. LUCIE UNIT 2

2. REPORTING PERIOD:

JULY, 1985 3.

LICENSED THERM 9L POWER (MWT)*

2700 4.

NAMEPLATE RATING (GROSS MWE):

850 5.

DESIGN ELECTRICAL RATING (NET MWE): ________

830 6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___

S67 7.

MAXIMUM DEPENDAELE CAPACITY (NET MWE): _____

837 8.

IF CHANGES DCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORTS GIVE REASONS:

9.

Pd555"L5V5L id U5f C5 555755CT5DI~iF AU "is i EE5I~_~_2"_2"_2"~_~_~~_2~~_~_222"_2222

~

~

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD: _________________.

744 5087 17376.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

737.9 4827.4 15433.6

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE _________________

736.4 4780.4 14981.0

15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGY GENERATED _____________

1934799 12409101

-37767666 (MWH)

17. GROSS ELECTRICAL ENERGY GERERATED (PWH)____

644390 4165260 12614960

18. NET ELECTRICAL ENERGY GENERATED (MWH: ___

610978 3947043 11909455

19. UNIT SERVICE FACTOR 99.0 94.0 86.2
20. UNIT AVAILABILITY FACTOR 99.0 94.0 86.2
21. CAPACITY FACTOR (USING MDC NET) 99.1 95.2 86.3
22. CAPACITY FACTOR (USING DER NET) 98.9 94.7 84.8
23. UNIT FORCED OUTAGE RATE _________________

1.0 1.1 6.5

24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ________

DMSXCT5S3I EOF:

1 W

O e

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 3R9 UNIT NAME St. Lucie Unit #2-DATE 8/14/85 CORWLETED BY N. W. Grant REPORT MONTH Jul v. 1985 TELEPHONE (305) 552-3675

_E e

jg

'h j El Licensee

,E

  • Cause & Corrective g*d N...

Date

{

g i

25&

Event gy E

Prevent Reeverence f2 jgg Report a mO H

g c5 9

09 850718 F

7.6 A

2 389-85-007 IA INSTRV A unit trip occurred during perfor-mance of a ground isolation procedure.

The unit tripped on assymetric steam generator pressure after a MSIV went shut. The procedure did not indicate this would occur. The unit was re-turned to power operation.

10 850719 S

0.0 A

5 HH PUMPXX The unit operated at reduced power to repair condensate pumps, then re-turned to full power operation.

I 2

3 4

F: Forced Resum:

Method:

Exhibit G. Instructions S Scheduled A-Equipment Failure (Explain)

1. Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Repor ILER) FileINUREG-D.Reguistory Restrictiim

$0iher (Explain)

Ol6lI l'. Operator Training A Ucense Examination F Administrative 5

G-Operatiimal Feror IFiplain) 4.

/.e Ao AEEDwe.,..,#

Ethibit I. Same Source to/77)

II.Other IE xplaini

SUMMARY

OF OPERATING EXPER.TENCE DOCKET NO.

50-389 UNIT St. Lucie Unit #2 DATE August 14, 1985 COMPLETED BY N. W. Grant TELEPHONE (305) 552-3675 REPORT MONTH Jul y, 1985 See the " Unit shutdowns and Power reductions" Report.

In.accordance with requirements of Technical Specification 6.9.1.6 there were no challenges to PORV or safety valves during the report month.

L

4 FLORIDA POWER & LIGHT COMPANY August 14, 1985 L-85-313 Director, Of fice of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Attached are the July 1985 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2.

Very truly yours, Ne*

F

3. W. Williams, Jr.

Group Vice President Nuclear Energy JWW/NWG:dkw Attachment cc:

Dr. 3. Nelson Grace Harold F. Reis, Esquire PNS-L1-85-290g

/

, i PEOPLE.. S5RVING PEOPLE

, - - -.. - - -