Monthly Operating Repts for Aug 1978
ML17208A498
Person / Time
Site: Saint Lucie, Turkey Point  
Issue date: 09/04/1978
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A497 List:
References
NUDOCS 8004240363
Download: ML17208A498 (13)


Text

OPERATING DATAREPORT OPERATING STATUS DOCKET NO.

PBTE Sent.4 1978 COMPLETEP BY ~Chilsnn TELEPHONE {3CLQ~-3824 Notes Unit No.

3 operated at approximately 100% R.P,. after the Unit was returned to ser-vice an Aug. 8, 1978, except for load reduction of Aug.

8-9, 1978.

Turkey Point Unit No.

3 I. Unit Name

2. Reporting Period:
3. I.icensed Thermal Power (MWt):
4. Nameplate Rating (Gross hIWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum De endable Ca acit et MWe:

760 700 666 p

p y(N

)

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons;
9. Power Level To Which Restricted, IfAny (Net hIWe):
10. Reasons For Restrictions, IfAny:

NONE This Month Yr..to-Date Cumulative 50 312.6 5 831.0 744.0 39 665. 2 73.9 185. 0 38 325.3

85. 0 8 987 073 24 127 970 22 836 045 76.2 76.3 68.8 65.5 2.7
11. Hours In Reporting Period
13. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line 571 6

4 23&.9

15. Unit Reserve Shutdown IIiours

>>0-

., 16. Gross Thermal Energy Generated (MWH) l7. Gross Electrical Energy Generated (MWH) 382 230 2 843 625 e

19. Unit Service Factor 76.8 72.7
20. Unit AvailabilityFactor 76.8 72.7 69.3
22. Unit Capacity Factor (Using DER Net) 70.3 66.6
23. Unit Forced Outage Rate 1 ~ 3
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Steam Generator Tube Ins ection Pro ram October 9 October 29, 1978

25. IfShut Down At End Of Report Period. Estimated Date of Startup:
6. Units In Test Status(Prior to Commercial Operation):

N/A Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COhIMERCIALOPERATION 80042 gn(T7

>><X

UNITSIIUTDOWNS ANDPOWER REDUCTIONS RF PORT MONTII AUGUST 1978 DOCKETNO.

50 250 UNITNAhIE Turke Point Unit No.3 No.

flatc

.- L 0 o

.a ri Cl Licensee Event Rcport 0 8

0 u Q

Cl EQ CJ Cause &. Corrective Action to Prcvcnt Recurrence 78-07-30 S

172. 5 N/A CB HTEXCH (F)

Unit was removed from service to locate and repair steam generator No.

3C tube leak.

Corrective actions included plugging one leak-ing tube.

(Continued from previous month)

(Non-nuclear system) 20 78-07-30 F N/A HC HTEXCH (D)

Load reduction to locate and repair condenser tube leaks.

(Non-nuclear system)

F: Forced S: Scheduled Reason:

A.Equipment Failure (Explain)

B.Maintenance or Test C-Refueling D.Regulatory Restriction E.Operator Training &, License Examination F-Administrative G Operational Error (Explain)

II-Other (Explain) 3 Method:

I-Manual 2.Manual Scram.

3-Automatic Scram.

4-Other (Explain)

Exhibit G - instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG.

OI6l )

Exhibit I - Satne Source

AVERAGE DAILYUNITPOWER LEVEL DOCKET NO.

Turkey Point COMPLETED IIY V. T. Chi 1son TELEPHONE MONTH AUGUST 1978 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)

I 263 271 272 279 277 260 DAY AVERAGE DAILYPOWER LEVEL (MWe Net) 17 IS 19 20 21 22 23

'>4 25 10 12 13 14 IS 16 283 271 269 26 27 2S

>9 30 31 INSTRUCTIONS On this format, list the average daily unit power level in >WIWe.Net for each day in the reporting n>>>nth. C>>mputc to the nearest whole megawatt.

(<)/77)

OPERATING DATAREPORT DOCKET NO.

50-251 DATE ~~978 COMPLETED 8Y V.T. Chilson TELEPHOiVE

~>OE EEE EEE4 OPERATING STATUS 760 700

1. Unit Name:

Turke Point Unit No. 4

2. Reportfng Period:

u st 978

3. Licensed Thermal Power (MWt):

2200

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWc):
6. Maximum Dependable Capacity (Gross MWe):

N<<cs - Unit No.

4 operated a

approximately 50K R.P. until Aug. 13, 1978, when the Unit was removed from service, for scheduled refueling, mainte-nance and inspections.

p p

y(N

)

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr:to-Date 744.0 5 831.0 9 869 734 3 028 155 864 82.5.

82.5 73.9 7

0.1

11. Hours In Reporting Period
13. Reactor Reserve Shutdown Hours II
14. Hours Generator On.Line
15. Unit Reserve Shutdown pours
16. Gross The~I Energy Generated (MWH) 330 035 l7. Gross Electrical Energy Generated (MWH) 87 955

~

~ "m ")

19. Unit Service Factor 39.8
20. Unit AvailabilityFactor

. 21. Unit Capacity Factor (Using MDC Net) 16.0

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Cumulative 44 040.0

'38.8 64.955 402 20 852 080 76 4

70. 2 70.2

'7.9 64.8 2.9

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units fn Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

('t/77 l

UNlTSIIUTOOWNS ANDPOWER REDUCTIONS COhlPLETED DY it No.4 REPORT htONTf1 78 rl EA u

u

~ cC U~ r.

~ C/l Licensee Event Rcport rr.

C~

0 III IAwG O

cL Cl Eu O

Cause k, Corrective Action tu Prevent Rct.urrcnl.e 78-07-20 S N/A ZZ ZZZZZZ Load was reduced to approximately 50% R.P. to extend operation of Core Cycle IV.

(Continued from previous month) 78-08-13 S

447.9 ZZ ZZZZZZ Unit No.

4 was removed from service for scheduled refueling, maintenance, and inspections.

(Nuclear and non-Nuclear Systems)

F: Forced S: Scheduled Reason:

A-Equipmcnt Failure (Explain)

II-hiaintenance oi Teat C-Refueling D-Regulatory Restriction E-Operator Training A Liccnsc Examination F-Administrative G.Operational Error (Explain)

I I-Other (Explain) hlethod:

I -htanual 2-manual Scram.

3-Automatic Scram.

4-Other (Explaut) '

Exhibit G - Instructions for Preparation of Data Enlry Sheets for Licensee Event Rcport (LL'lh)Fil<<(NURI.'G.

016 l )

5 Exhlblt I - Sallle Source

AVERAGE DAlLYUNITPOWER LEVEL 0 DOCKET NO. St.

Lucz,e COMPLETED BY V. T. Chilson TELEPHONE MONTH AUGUST, 1978 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)

I 779 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 790 17 10 12 13 14 IS 16 791 791 791 782 790 752'88 788 66 729 783 787 788 788 18 19 20 21 22 23 24 25 26 2S o9 30 31 NOTE:

791 791 788 736 777 780 779 781 785 679 365 Average daily power level greater than 777 MWe due to cooler condenser cooling water.

INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting tnonth. Compute to the nearest whole megawatt.

(u/77 )

OPERATING STATUS OPERATING DATAREPORT DOCKET NO. 500'l~

DATE Sap~~78 COMPLETED BY ~~~ison TELEPHONE MiMiM=3824 Notes - Unit operated at ap-proximately 100/ R.P. except for outages of Aug. 10-11, 29-30, and 31,

1978, and loa reductions of Aug. 22-23, an 30-31, 1978.

St.. Lucie Unit No. 1

1. Unit Name
2. Reporting Period:
3. I.icensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum De endable Ca acit Net hIWe:.

850 8

2 822 p

p y(

)

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):

IO. Reasons For Restrictions, IfAny:

This Month Yr.-to-Date Cumula tive 1'4 855.0 744.0 5 831.0 12 212.0 118.5 1 817.5 9.3 9.3 27 888 189 9 062 190 579 330 8 514 368 79.6 79.6 73.8 71.5 7.2

11. Hours In Reporting Period
13. Reactor Reserve Shutdown Hours 16.9
14. Hours Generator On-Line
15. Unit Reserve Shutdown pours 9.3
17. Gross Electrical Energy Generated (MWH) 3 267 430
19. Unit Service Factor 97.7 70.9.
20. Unit AvailabilityFactor
21. Unit Capacity Factor {Using MDC Net) 94.6 67.8
22. Unit Capacity Factor (Using DER Net) 65.7
23. Unit Forced Outage Rate 1.6
24. Shutdowns Scheduled Over Next 6 hlonths {Type. Date, and Duration of Each):

team Generator Tube Tns ection Pro ram October 30 December 3, 1978

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units ln Test Status IPrior to Commercial Operation):

Forecast 78 Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION I')/77 )

UNITSIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.

, No.l REPORT MONTII AUG(IS r 1978 Page 1 of 2 Date rs 5

rl O

Hg0

~ ~

c o u~ c

~ Vl aA Licenscc Event Rcport rr E~

cn G

~J 0U "E~

O CJ Cause 8I. Corrective Action to Prevent Recurrence 15 78-08-10 7.5 A

'3 N/A INSTRU (c)

Unit tripped during a transient con-dition caused by a malfunction of the turbine control system while per-forming a periodic turbine control valve test.

(Non-nuclear ststem) 16 78-08-22 N/A HH FILTER Load reduction to clean steam gener-ator feedwater pump No. 18 suction strainer.

(Non-nuclear system) 17 78-08-29 6.4 A

1 N/A EG TRANSF Unit was removed from service to isolate main power transformer No.

1A to repair an oil leak.

Corrective actions included install-ing a new bushing and seal.

(Non-nuclear system)

F: Forced S: Scheduled Reason:

A Equipmcnt Failure (Explain)

II hlalnlcnance or Test C-Refueling D Regulatory Rcstrictiun E-Operator Training Ec Liccnsc Examination F-Administrative G.Operational Iirrur (Explain)

I I Other (Explain) 3 h(ethod:

I.Manual 2-Manual Scram.

.3-Automatic Scram.

4.Other (Explain)

Exhlblt G - Instructions for Preparation of Data Entry Shccts lor Licensee Event Report (LER) File (NUREG.

OI6I )

Exhibit I - Seine Source

UNlTSllUTDOWNS ANDPOWER REDUCTlONS REPORT MON'fH AUGUST 1978 Page 2 of 2 DOCKET NO. ~0 UN)TNAhlE St. Lucie Unit No.l COMPLETED DY V No.

Dale rl IA CJ pp 0 ~

~ lh Licensee Event Rcport 6 C~

4l wG o ~

Q D E~

CJ Cause 4, Corrective Action lo Prcvcnt Rccurrcnce 18 78-08-30 B N/A EG TRANSF Load'was limited to the capacity of main power transformer No. 1B.

(Non-nuclear system) 78-08-31 2.9 N/A TRANSF Unit was removed from service to protect personnel using a crane to remove a faulty bushing from main transformer No. 1A.

(Non-nuclear system)

F: Forced S: Scheduled

(')177)

Reason:

A Equipment Failure (Explain) 8 hlaintenancc or Test C-Refueling D.Regulatory Restriction E Operator Training Ec Liccnsc Examination F-Administrative G.Operational L'rrur (Explain)

Il Other (Explain) method:

I-hlanual 2 hlanual Scram.

3-Autonlatic Scram.

4 Other (Explain)

Exhibit G

~ Instrttctions for Preparation of Data Entry Sheets I'or Liecnsec Event Report (LER) Fil>> (NUREG-016l )

5 Exhlbil l - Saln>> Source

0 FLORIDA gyral 4F

~

~I,:

t" POWER IIt I.IQHT COMPANY September 8, 1978 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Attached are the August, 1978, Operating Summary Reports for

'turkey Point Unit Nos.

3 and.

4 and St. Lucie Unit No. l.

Very truly yours',

~

~

D. Schmidt Vice President Power Resources VTC/DDC cc:

Mr. James P. O'Reilly Robert Lowenstein, Esquire PECPL=... S=R'/INC P":OP':-

SUMMARY

OF OPERATiNG EXPERIENCE DOCKET NO.

UNIT 50 250 Turkey Point Unit No.

3 QEPORT MONTH Au ust 1978 DATE COMPLETED BY TELEPHONE Sept.

8, 1978 V. T. Chilson (305) 552. 3824 Unit operated at approximately 100 0 R.P. after the Unit was returned to service on August 8, 1978, except for the load reduction of August 8

9, 1978.

Major Safety-related'. maintenance activities performed during the month included plugging one leaking tube in steam. generator No.

3C.

A

$UMMARY OF OPERATING EXPERIENCE DOCKET NO.

UNIT 50 - 251 Turkey Point Unit No.

4 DATE Se t. 8, 1978

~PORT MONTH Au ust 1978 COMPLETED BY TELEPHONE V. T. Chilson 305

.552 3824 P

Unit operated at approximately 50 O'.P., until August 13, 1978 when the Unit was removed from service for scheduled refueling, maintenance, and inspections.

r Major Safety-related maintenance performed during the month included:

Performance of Steam Generator Tube Inspection Program.

Refer to Steam Generator Inspection Report of September 6g 1978 for evaluation of inspection results and tube plugging criteria;

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT 50 335 St. Lucie Unit No.

1 DATE Seat.

8 1978 COMPLETED BY TELEPHONE V. T. Chilson 305 552 38 4

Unit operated at approximately'100

% R.P.

except, for outages of August 10 - 11, 29 30, and 31, 1978 and load reductions of August 22-23, and 30 31, 1978.

No Major Safety-related maintenance was performed during the month.