AVERAGE DAILY UNIT POWER Livst DOCKET NO.

10

  • UNIT Turkey Point 3 DATE Daepmher 19, 1986 N.W. Grant COMPLETED BY TELEPHONE (305) 694-44~32 MONTH Mnvamhar-14R6 DAY AVERACE DAILY POWER LEVEL (MWe Nes) 11/ 1/86 687 11/ 2/86 690 11/ 3/86 687 11/ 4/86 667 11/ 5/86 575 11/ 6/86 685 11/ 7/86 686 11/ 8/86 692 31/ 9/86 694 11/10/06 694 11/11/86 693 11/12/86 692 11/13/86 607 11/14/86 684 11/15/06 689 11/16/86 685 11/17/86 688 11/18/86 686 11/19/86 683 11/20/86 680 11/21/86 683 11/22/86 687 11/23/86 695 11/24/86 693 11/25/86 694 11/26/86 690 11/27/06 690 11/28/86 688 11/29/86 688 11/30/86 686 o\\

P888&isung Q\\

PDH j

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 12/11/86 COMPLETED BY N. W. GRANT TELEPHONE-305/694/4432 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: NOVEMBER 1986
3. LICENSED THERMAL POWER (MWT): ______________ 2200
4. NAMEPLATE RATING (GROSS MWE):

760

5. DESIGN ELECTRICAL RATING (NET MWE):

693

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

700

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

666

8. IF' CHANGES DCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

720 8016 122625.6

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

720.0 6354.5 85432.2

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 844.4

14. HOURS GENERATOR ON-LINE _________________

720.0 6187.0 84593.8

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

121.8

16. GROSS THERMAL ENERGY GENERATED (MWH) 1577530 13250005 175455526
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 516300 4303591 56175136

- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 492379 4075738 53185319

19. UNIT SERVICE FACTOR ____;________________

100.0 77.2 69.0

20. UNIT AVAILABILITY FACTOR ________________

100.0 77.2 69.1

21. CAPACITY FACTOR (USING MDC NET) 102.7 76.3 66.6
22. CAPACITY FACTOR (USING DER NET) 98.7 73.4 62.6
23. UNIT FORCED OUTAGE RATE _________________

0 18.1 7.9

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :

REFUELING 3/5/97, 81 DAYS ______________________________________________

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-250 UNIT NAME Turkey Point Unit #3 DATE

)ecember 12. 1986 COMPLETED BY

4. W. Grant REPORT MONTH November. 1986 TELEPHONE (305) 694-4432

)g5 Ei Licensee E

5?

"h L

Cause & Corrective k"l h

Date i

3g i

2 Event u '2 Action to

$5 j di g Report a rE C Prevent Recurrence S

Unit #3 had no shutdowns or significant power reductions.

I I

2 3

4 F Foiced Reason :

Method:

Exhibit G -Instructions 5 Scheduled A Lquipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scrarn.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D Regulator) Restriction 9 Other (Explain) 0161) 4 1.-Operator Training & License Eumination F-Administ rative p

5 G-Operaticnal I i ror ( F splam )

4-. /. 4a 4 4 eve.,..es Exhibit I Same Source t'8/77)

Il-Ot her ( E xplaini l

1

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.-

sn_pso UNIT Turkey Point Unit }__

DATE December 12. 1986 COMPLETED BY N. W. Grant TELEPHONE (305) 694-4432 REP RT HONTH November. 1986 Unit #3 operated at essentially full power and had no " unit shutdowns or significant power reductions."

l

Am AVER AGE DAILY UNITPOWER LivrL DOCKET NO. 50-251 Turkey Point 4 g,7 DATE Decomhor 17, 1986 ant COMPLETED BY TELEPHONE MONTH November. 1986 DAY AVERAGE DAILY POWER LEVEL (MWe Net) 11/ 1/86 218 11/ 2/86 592 11/ 3/86 686 11/ 4/86 688 11/ 5/86 689 11/ 6/86 687 11/ 7/86 688 11/ 8/86 691 11/ 9/86 692 11/10/86 281 11/11/86 416 11,'12/86 617 l

11/13/86 680 l

11/14/86 368 11/15/86 686 11/16/86 685 11/17/86 695 11/18/86 498 11/19/86 563 11/20/86 679 11/21/86 678 11/22/86 603 l

I 11/23/86 692 11/24/86 689 11/25/86 690 11/26/86 692 11/27/86 695 11/28/86 694 11/29/06 692 11/30/86 688

,t OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 12/11/86 COMFLETED BY N. W. GRANT TELEPHONE.

305/694/4432 OPERATING STATUS 1.

UNIT'NAME: TURKEY POINT UNIT 4

2. REPORTING PERIOD NOVEMBER 1986
3. LICENSED THERMAL POWER (MWT):

2200

4. NAMEPLATE RATING (GROSS MWE):

760

5. DESIGN ELECTRICAL RATING (NET MWE):

493

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

700 7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE):

666

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

720 8016 116357.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

706.4 2304.2 79939.3

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 166 6

14. HOURS GENERATOR ON-LINE _________________

702 1 2087.9 77183.0

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

32.1

16. GROSS THERMAL ENERGY GENERATED (MWH) 1459367 4184009 163221738
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 471225 1334266 51976838
18. NET ELECTRICAL ENERGY GENERATED (MWH) 448349 1236869 49198077
19. UNIT SERVICE FACTOR _____,_______________

97.5 26.0 66.3

20. UNIT AVAILABILITY FACTOR ________________

97.5 26.0 66.4

21. CAPACITY FACTOR (USING MDC NET) 93.5 23.2 64.9
22. CAPACITY FACTOR (USING DER NET) 89.9 22.3 61.0
23. UNIT FORCED OUTAGE RATE _________________

2.5 13.4 6.7

24. SHUTD,0WNS SCHEDULED OVER NEXT 6 MONTHS :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

i t

I

)

4

,.,,-__.,--,--,,.,~.,_.4.,

,..__,,,-, ~,_., m

.,,_,m.m.v.-

m.,_

,.,.m.

,v _ _,.__

m.- -, m e w.-._..my,_.m,ww,w_mm__,.

PAGE 1 of 2 DOCKET NO.

50-251 UNIT SHUTD0wNS AND POWER REDUCTIONS UMT NABIE Turkov Po-nt Uni t 4.

DATE 3ecember

.2.

1986 i

REPORT MONDg N n vomh p r. 1986 (30 5 432 i

% =3 g

\\

e e.

E:

E gsx Licensee ge, km, ca.,, a co,,,c,g,,

No.

Dale

{

ij g it

,gg&

Event sg f'g Action lo

$3 E

jiEj R*P"'8

EU Prevent Recurrence 6

i i

10 861023 F

0.0 H

4 HC HTEXCH The return to full power operation from the outage l

to inspect for condenser 1eaks was delayed for l

secondary chemistry control and condenser leak checking.

1 i

11 861110 F

17.9 A

3 251-86-25 HH VALVEX The reactor tripped foT10 wing the failure of a solenoid i

coil in a feedwater flow control valve which resulted l

in low steam generator level.

l The coil was replaced,and full power operation was resumed after. a hold for secondary 2

ch'emistry control, I

I 2

3 4

F Forced Reason:

Method:

Exhibit G. Inseructions i

S Scheduled A Equipenent Failure (Explain) l-Manuel for Preparation of Data 1

B-Maintenance of Test 2-Manuel Scrasn.

Entry Sheets for Licensee I

C Refueling 3-Autosnatic Scrain.

Event Report iLER) File INUREG-D-Regulator) Reser.ction

$4ther(Explaen) 01611 I -Operator Tsaining A Ucens I samination 1

F Adnunistrative 5

G Operatiinul I reur IF splain I c. /.e a sadowca..,#

Exhibit I Same Source l'8/77)

II-Other i Laplain) j

i 4

PAGE 2 of 2 DOCKET NO. 50-251 UNIT 5HUTDOWNS AND FOWER REDUCDONS UNIT NAME Turkey Po-nt Unit 4 I

DATE December

.2, 1986 f

COMPLETED ay fl.

W.

Grant REPORT MONTH N o ve mb e r, 1986 1ELEPHONE (305) 694-4432 "i

l

-E'

)Yk E_ E 3

Licensee E,

kw.

Cause & Corrective No.

Date h

3g

(

f'l yE Event E?

Action to Prevent Recurrence E

jiji g Repor

  • mO d

12 861118 F

0.0 A

5 HH VALVEX Power was reduced to approximately 10% to repair the 4A feedwater regulator valve which had'a problem wi th the positioner.

Following repairs and a secondary chemistry hold, the unit returned to full power operation.

l l

3 4

f Forced Reason:

Method:

Exhibit G Instructions S Scheduled A Equiprnent Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event ReporI (LER) File (NUREG-D-Regulatory Rest iction

@Osher(Explain) 0161) 1.-Operator Training & Ucense Examination F-Adnunist rative 5

G Operatomal I r ror iF splain >

g _ f.e ao 44em..,#

Exhibit I Same Source l'8/77) ll Other (Explain) i

~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-251 UNIT Turkey Point Unit 4 DATE Decembe r 12. 1986 COMPLETED BY N v. Grant TELEPHONE f100 694-4432 REP RT HONTH November, 1986 See the " unit shutdown and power reductions" report.

,-,,,-,,..,,,-.,,~w.,,--

,-a,

- -,,. - _,.. ~.

5 AVER AGE DAILY ONIT PCtf R LivgL DOCKET No.

50 m i

UNIT St. Lucie Unit 1 DATE December 12, 1986 i

N.W. Grant COMPLETED BY TELErilONE (305)694-4432 November, 1986 h00 NTH DAY AVERACE DAILY POWER LEVEL IMWefdeo 11/ 1/86 843 11/ 2/86 843 11/ 3/86 845 11/ 4/86 843 11/ 5/86 844 11/ 6/86 841 11/ 7/06 839 11/ 8/86 838 11/ 9/86 810 11/10/86 812 l

l 11/11/86 849 I

11/12/86 849 l

11/13/06 816 11/14/06 826 11/15/86 847 i

11/16/86 848 11/17/86 848 11/18/86 819 11/19/86 818 11/20/86 846 11/21/86 848 11/22/86 848 11/23/86, 848 11/24/96 848 11/25/86 847 11/26/86 843 11/27/86 847 11/28/86 844 11/29/86 842 11/30/86 842 i

~

~.-

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 12/11/86 i

COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS l

1. UNIT NAHE!

ST. LUCIE UNIT 1

2. REPORTING PERIOD NOVEMBER 1986 3.' LICENSED THERMAL POWER (MWT):

2700 I

4.

NAMEPLATE RATING (GROSS MWE):

850

5. DESIGN ELECTRICAL RATING (NET MWE):

830

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

872

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

839

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

[

'SINCE LAST REPORT, GIVE REASONS:

__________________________________F ANY (NET MWE)________________________

I

9. POWER LEVEL TO WHICH RESTRICTED, s'ie. REASONS FOR RESTRICTIONS, IF ANY:

I MONTHLY

-YTD-CUMULAT'IVE

11. HOURS IN REPORT PERIOD:

720 8016-87168.0 l

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

720.0 7672.7 63828.7 i

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 205 3

14. HOURS GENERATOR ON-LINE _________________

720.0 7609.6 63411.7 i

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

39.3

16. GROSS THERMAL ENERGY GENERATED (MWH) 1933003 20333077 161225344
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 636510 6746940 52823445
18. NET ELECTRICAL ENERGY GENERATED (MWH) 604271 6423606 49857398
19. UNIT SERVICE FACTOR _____________________

100.0 94.9 72.7

20. UNIT AVAILABILITY FACTOR ________________

100.0,

94.9 7'28

21. CAPACITY FACTOR (USING MDC NET) 100.0 95.5 71.6 i
22. CAPACITY FACTOR (USING DER NET) 101.1 96.5 70.1 i
23. UNIT FORCED OUTAGE RATE _________________

0 1.2 4.0

24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS :

REFUELING 2/14/87, 63 DAYS _____________________________________________

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

j i

l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-335 UNITNAME St I in-ia Ifni t #1 DATE December 12, 1986 i

COWLETED BY N. W. Grant REPORTMONTH November.1986 1ELEPHONE (305) 644-4437 E

c

!?

3 j $5 Licensee

$g Cause & Corrective No Date i

3g

.3 s 5 Event g'2 E0 Action to

$~

jgg Report a mO Prevent Recurrence g

6 Unit #1 had no shutdowns or significant power reductions.

l i

j l

I I

2 3

4

j F Forced Reason

Method:

Exhibit G - Instructions i

5 Sched uled A Lyuipment Failure (Explam) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C. Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-4 D-Regulatory Restriction

%-Other (Explain 1 0161) 1: Operator Training & Ucense Examination F-Ad numst rative p

5 t

G Operatomal I irnr ( F splain t c

Ao4. 44 eve Exhibit I - Same Source I

(9/77)

II4hher iL splain)

')

SUZH4ARY OF OPERATING EXPEILTENCE DOCKET NO.

50-335 UNIT St. Lucie Unit 1 DATE December 12. 1986 COMPLETED BY N. W. Grant TELEPHONE f305) 694-4432 REPORT HONTH November 1986 Unit #1 operated at essentially full power and had no " unit shutdowns or significant power reductions".

In accordance with requirements of Technical Specifications 6.9.1.6, there were no challenges to PORV or safety valves during the report month.

{

l l

l l

l L

AVERAGE DAILY UNIT POWf t tsvfL DOCKET NO. 50-:M9 UNIT St. I ncio finit 2 DATE December 12, 1986 COMPLETED BY N.W. Grant TELEPHONg (305)604-4432 MONTH November, 1986 DAY AVERAGE DAILY POWER LEVEL (MWe Net) 11/ 1/86 860 11/ 2/86 859 11/ 3/86 838 11/ 4/86 801 11/ 5/86 850 11/ 6/86 862 11/ 7/86 862 11/ 8/86 862 11/ 9/86 862 11/10/86 862 l

11/11/86 862 11/12/86 862 11/13/86 862 11/14/86 860 11/15/06 062 11/16/86 861 11/17/86 861 11/18/86 861 11/19/86 860 11/20/86 860 11/21/86 860 11/22/86 861 11/23/86' 860 11/24/86 860 11/25/86 859 11/26/86 860 l

11/27/86 860 11/28/86 860 l

11/29/86 858 11/30/06 837

't OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 12/11/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAME:

ST. LUCIE UNIT 2 2.

REPORTING PERIOD NOVEMBER 1986

3. LICENSED THERMAL POWER (MWT):

2700

4. NAMEPLATE RATING (GROSS MWE):

850

5. DESIGN ELECTRICAL RATING (NET MWE):

830

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

882

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

839

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)__-_-________
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

720 8016 29065.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

720.0 6582.7 24631.6

13. REACTOR RESERVE SHUTDOWN HOURS _______-__

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE _--___-__________

720.0 6511.5 24083.8

15. UNIT RESERVE SHUTDOWN HOURS __--_-_-_____

0 0

0

16. GROSS THERMAL ENERGY GENERATED (MWH) 1936676 17387313 62033846
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 649530 5814200 20720880
18. NET ELECTRICAL ENERGY GENERATED (MWH) 616873 5507096 19578139 l
19. UNIT SERVICE FACTOR ____--________-______

100.0 81.2 82.9 l

20. UNIT AVAILABILITY FACTOR ---_________-___

100.0 81.2 82.9

21. CAPACITY FACTOR (USING MDC NET) 102.1 81.9 82.9 l
22. CAPACITY FACTOR (USING DER NET) 103.2 82.8 82.4 l
23. UNIT FORCED OUTAGE RATE _________________

0 1.1 8.4

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

1

(

l l

l

-l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-389 UNITNAME St. Lucie Unit #2 DATE December 12, 1986 COMPLETED BY N. W. Grant REPORT MONDI November. 1986 TELEPHONE (3050 644-4439 i

"E 3 - :4 Licensee g *,

=

re a

1 E

Cause & Corrective c

y N"

Date i

35 4

.255 Event ET 3

Action to

$3 E

j di j Report =

<N 0 jO Prevent Recurrence 6

Unit #2 had no shutdowns or significant Power reductions.

I I

2 3

4 f Forced Reason:

Method:

Exhibit G Instructions S Scheduled A-Lquipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event ReporI(LER) File (NUREG.

D-Regulatory Restriction

@-Other (Explain) 0161) 1 -Operator Training & License Examination F-Ad nu nist ra t ive 5

G Oper4tional i ror if splam) s

/.o ao 44 eve..et Exlubit I Same Source 49/77)

Il-Ot her i E splain )

SU21 MARY OF OPERATING EXPERIENCE DOCKET NO.

g0_389 UNIT St. Lucie Unit 2 DATE Decomhpr 12. 1986 COMPLETED BY N. W. Grant TELEPHONE (305) 694-4432 REPORT MONTH November. 1986 Unit #2 operated at essentially full power and had no " unit shutdowns or significant power reductions".

In accordance with requirements of Techni. cal Specifications 6.9.1.6, there were no challenges to PORV or safety valves during the report month.

l i

~

g-P. O. BOX 14000. JUNO BEACH, FL 33408-0420 a

j)Q

~

DECEMBER 12 1986 L-86-506 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units I an-12 Docket Nos. 50-335 and 50-389 Monthly Operatina Report

Dear Sir:

Attached are the November 1986 Operating Status Reports and Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit Nos. I and 2.

Very truly yours, Ach,/

C.O.W y/

Group V President Nuclear nergy COW /NWG/gp Attachment cc:

Dr. J. Nelson Grace, USNRC, Region ll Harold F. Reis, Esquire i

/t/

4 NWGI/005/l PEOPLE.. SERVING PEOPLE

-