L-86-506, Monthly Operating Repts for Nov 1986
| ML20211P015 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 11/30/1986 |
| From: | Grant N, Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| L-86-506, NUDOCS 8703020271 | |
| Download: ML20211P015 (18) | |
Text
..
AVERAGE DAILY UNIT POWER Livst DOCKET NO.
10
- UNIT Turkey Point 3 DATE Daepmher 19, 1986 N.W. Grant COMPLETED BY TELEPHONE (305) 694-44~32 MONTH Mnvamhar-14R6 DAY AVERACE DAILY POWER LEVEL (MWe Nes) 11/ 1/86 687 11/ 2/86 690 11/ 3/86 687 11/ 4/86 667 11/ 5/86 575 11/ 6/86 685 11/ 7/86 686 11/ 8/86 692 31/ 9/86 694 11/10/06 694 11/11/86 693 11/12/86 692 11/13/86 607 11/14/86 684 11/15/06 689 11/16/86 685 11/17/86 688 11/18/86 686 11/19/86 683 11/20/86 680 11/21/86 683 11/22/86 687 11/23/86 695 11/24/86 693 11/25/86 694 11/26/86 690 11/27/06 690 11/28/86 688 11/29/86 688 11/30/86 686 o\\
P888&isung Q\\
PDH j
OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 12/11/86 COMPLETED BY N. W. GRANT TELEPHONE-305/694/4432 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD: NOVEMBER 1986
- 3. LICENSED THERMAL POWER (MWT): ______________ 2200
- 4. NAMEPLATE RATING (GROSS MWE):
760
- 5. DESIGN ELECTRICAL RATING (NET MWE):
693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
700
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
666
- 8. IF' CHANGES DCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
720 8016 122625.6
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
720.0 6354.5 85432.2
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 844.4
- 14. HOURS GENERATOR ON-LINE _________________
720.0 6187.0 84593.8
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
121.8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1577530 13250005 175455526
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 516300 4303591 56175136
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 492379 4075738 53185319
- 19. UNIT SERVICE FACTOR ____;________________
100.0 77.2 69.0
- 20. UNIT AVAILABILITY FACTOR ________________
100.0 77.2 69.1
- 21. CAPACITY FACTOR (USING MDC NET) 102.7 76.3 66.6
- 22. CAPACITY FACTOR (USING DER NET) 98.7 73.4 62.6
- 23. UNIT FORCED OUTAGE RATE _________________
0 18.1 7.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
REFUELING 3/5/97, 81 DAYS ______________________________________________
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-250 UNIT NAME Turkey Point Unit #3 DATE
)ecember 12. 1986 COMPLETED BY
- 4. W. Grant REPORT MONTH November. 1986 TELEPHONE (305) 694-4432
)g5 Ei Licensee E
5?
"h L
Cause & Corrective k"l h
Date i
3g i
2 Event u '2 Action to
$5 j di g Report a rE C Prevent Recurrence S
Unit #3 had no shutdowns or significant power reductions.
I I
2 3
4 F Foiced Reason :
Method:
Exhibit G -Instructions 5 Scheduled A Lquipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scrarn.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D Regulator) Restriction 9 Other (Explain) 0161) 4 1.-Operator Training & License Eumination F-Administ rative p
5 G-Operaticnal I i ror ( F splam )
4-. /. 4a 4 4 eve.,..es Exhibit I Same Source t'8/77)
Il-Ot her ( E xplaini l
1
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.-
sn_pso UNIT Turkey Point Unit }__
DATE December 12. 1986 COMPLETED BY N. W. Grant TELEPHONE (305) 694-4432 REP RT HONTH November. 1986 Unit #3 operated at essentially full power and had no " unit shutdowns or significant power reductions."
l
Am AVER AGE DAILY UNITPOWER LivrL DOCKET NO. 50-251 Turkey Point 4 g,7 DATE Decomhor 17, 1986 ant COMPLETED BY TELEPHONE MONTH November. 1986 DAY AVERAGE DAILY POWER LEVEL (MWe Net) 11/ 1/86 218 11/ 2/86 592 11/ 3/86 686 11/ 4/86 688 11/ 5/86 689 11/ 6/86 687 11/ 7/86 688 11/ 8/86 691 11/ 9/86 692 11/10/86 281 11/11/86 416 11,'12/86 617 l
11/13/86 680 l
11/14/86 368 11/15/86 686 11/16/86 685 11/17/86 695 11/18/86 498 11/19/86 563 11/20/86 679 11/21/86 678 11/22/86 603 l
I 11/23/86 692 11/24/86 689 11/25/86 690 11/26/86 692 11/27/86 695 11/28/86 694 11/29/06 692 11/30/86 688
,t OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 12/11/86 COMFLETED BY N. W. GRANT TELEPHONE.
305/694/4432 OPERATING STATUS 1.
UNIT'NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD NOVEMBER 1986
- 3. LICENSED THERMAL POWER (MWT):
2200
- 4. NAMEPLATE RATING (GROSS MWE):
760
- 5. DESIGN ELECTRICAL RATING (NET MWE):
493
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
700 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE):
666
- 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
720 8016 116357.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
706.4 2304.2 79939.3
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 166 6
- 14. HOURS GENERATOR ON-LINE _________________
702 1 2087.9 77183.0
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
32.1
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1459367 4184009 163221738
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 471225 1334266 51976838
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 448349 1236869 49198077
- 19. UNIT SERVICE FACTOR _____,_______________
97.5 26.0 66.3
- 20. UNIT AVAILABILITY FACTOR ________________
97.5 26.0 66.4
- 21. CAPACITY FACTOR (USING MDC NET) 93.5 23.2 64.9
- 22. CAPACITY FACTOR (USING DER NET) 89.9 22.3 61.0
- 23. UNIT FORCED OUTAGE RATE _________________
2.5 13.4 6.7
- 24. SHUTD,0WNS SCHEDULED OVER NEXT 6 MONTHS :
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
i t
I
)
4
,.,,-__.,--,--,,.,~.,_.4.,
,..__,,,-, ~,_., m
.,,_,m.m.v.-
m.,_
,.,.m.
,v _ _,.__
m.- -, m e w.-._..my,_.m,ww,w_mm__,.
PAGE 1 of 2 DOCKET NO.
50-251 UNIT SHUTD0wNS AND POWER REDUCTIONS UMT NABIE Turkov Po-nt Uni t 4.
DATE 3ecember
.2.
1986 i
REPORT MONDg N n vomh p r. 1986 (30 5 432 i
% =3 g
\\
e e.
E:
E gsx Licensee ge, km, ca.,, a co,,,c,g,,
No.
Dale
{
ij g it
,gg&
Event sg f'g Action lo
$3 E
jiEj R*P"'8
EU Prevent Recurrence 6
i i
10 861023 F
0.0 H
4 HC HTEXCH The return to full power operation from the outage l
to inspect for condenser 1eaks was delayed for l
secondary chemistry control and condenser leak checking.
1 i
11 861110 F
17.9 A
3 251-86-25 HH VALVEX The reactor tripped foT10 wing the failure of a solenoid i
coil in a feedwater flow control valve which resulted l
in low steam generator level.
l The coil was replaced,and full power operation was resumed after. a hold for secondary 2
ch'emistry control, I
I 2
3 4
F Forced Reason:
Method:
Exhibit G. Inseructions i
S Scheduled A Equipenent Failure (Explain) l-Manuel for Preparation of Data 1
B-Maintenance of Test 2-Manuel Scrasn.
Entry Sheets for Licensee I
C Refueling 3-Autosnatic Scrain.
Event Report iLER) File INUREG-D-Regulator) Reser.ction
$4ther(Explaen) 01611 I -Operator Tsaining A Ucens I samination 1
F Adnunistrative 5
G Operatiinul I reur IF splain I c. /.e a sadowca..,#
Exhibit I Same Source l'8/77)
II-Other i Laplain) j
i 4
PAGE 2 of 2 DOCKET NO. 50-251 UNIT 5HUTDOWNS AND FOWER REDUCDONS UNIT NAME Turkey Po-nt Unit 4 I
DATE December
.2, 1986 f
COMPLETED ay fl.
W.
Grant REPORT MONTH N o ve mb e r, 1986 1ELEPHONE (305) 694-4432 "i
l
-E'
)Yk E_ E 3
Licensee E,
kw.
Cause & Corrective No.
Date h
3g
(
f'l yE Event E?
Action to Prevent Recurrence E
jiji g Repor
- mO d
12 861118 F
0.0 A
5 HH VALVEX Power was reduced to approximately 10% to repair the 4A feedwater regulator valve which had'a problem wi th the positioner.
Following repairs and a secondary chemistry hold, the unit returned to full power operation.
l l
3 4
f Forced Reason:
Method:
Exhibit G Instructions S Scheduled A Equiprnent Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event ReporI (LER) File (NUREG-D-Regulatory Rest iction
@Osher(Explain) 0161) 1.-Operator Training & Ucense Examination F-Adnunist rative 5
G Operatomal I r ror iF splain >
g _ f.e ao 44em..,#
Exhibit I Same Source l'8/77) ll Other (Explain) i
~
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-251 UNIT Turkey Point Unit 4 DATE Decembe r 12. 1986 COMPLETED BY N v. Grant TELEPHONE f100 694-4432 REP RT HONTH November, 1986 See the " unit shutdown and power reductions" report.
,-,,,-,,..,,,-.,,~w.,,--
,-a,
- -,,. - _,.. ~.
5 AVER AGE DAILY ONIT PCtf R LivgL DOCKET No.
50 m i
UNIT St. Lucie Unit 1 DATE December 12, 1986 i
N.W. Grant COMPLETED BY TELErilONE (305)694-4432 November, 1986 h00 NTH DAY AVERACE DAILY POWER LEVEL IMWefdeo 11/ 1/86 843 11/ 2/86 843 11/ 3/86 845 11/ 4/86 843 11/ 5/86 844 11/ 6/86 841 11/ 7/06 839 11/ 8/86 838 11/ 9/86 810 11/10/86 812 l
l 11/11/86 849 I
11/12/86 849 l
11/13/06 816 11/14/06 826 11/15/86 847 i
11/16/86 848 11/17/86 848 11/18/86 819 11/19/86 818 11/20/86 846 11/21/86 848 11/22/86 848 11/23/86, 848 11/24/96 848 11/25/86 847 11/26/86 843 11/27/86 847 11/28/86 844 11/29/86 842 11/30/86 842 i
~
~.-
OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 12/11/86 i
COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS l
- 1. UNIT NAHE!
ST. LUCIE UNIT 1
- 2. REPORTING PERIOD NOVEMBER 1986 3.' LICENSED THERMAL POWER (MWT):
2700 I
4.
NAMEPLATE RATING (GROSS MWE):
850
- 5. DESIGN ELECTRICAL RATING (NET MWE):
830
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
872
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
839
- 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
[
'SINCE LAST REPORT, GIVE REASONS:
__________________________________F ANY (NET MWE)________________________
I
- 9. POWER LEVEL TO WHICH RESTRICTED, s'ie. REASONS FOR RESTRICTIONS, IF ANY:
I MONTHLY
-YTD-CUMULAT'IVE
- 11. HOURS IN REPORT PERIOD:
720 8016-87168.0 l
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
720.0 7672.7 63828.7 i
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 205 3
- 14. HOURS GENERATOR ON-LINE _________________
720.0 7609.6 63411.7 i
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
39.3
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1933003 20333077 161225344
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 636510 6746940 52823445
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 604271 6423606 49857398
- 19. UNIT SERVICE FACTOR _____________________
100.0 94.9 72.7
- 20. UNIT AVAILABILITY FACTOR ________________
100.0,
94.9 7'28
- 21. CAPACITY FACTOR (USING MDC NET) 100.0 95.5 71.6 i
- 22. CAPACITY FACTOR (USING DER NET) 101.1 96.5 70.1 i
- 23. UNIT FORCED OUTAGE RATE _________________
0 1.2 4.0
- 24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS :
REFUELING 2/14/87, 63 DAYS _____________________________________________
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
j i
l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-335 UNITNAME St I in-ia Ifni t #1 DATE December 12, 1986 i
COWLETED BY N. W. Grant REPORTMONTH November.1986 1ELEPHONE (305) 644-4437 E
c
!?
3 j $5 Licensee
$g Cause & Corrective No Date i
3g
.3 s 5 Event g'2 E0 Action to
$~
jgg Report a mO Prevent Recurrence g
6 Unit #1 had no shutdowns or significant power reductions.
l i
j l
I I
2 3
4
- j F Forced Reason
Method:
Exhibit G - Instructions i
5 Sched uled A Lyuipment Failure (Explam) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C. Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-4 D-Regulatory Restriction
%-Other (Explain 1 0161) 1: Operator Training & Ucense Examination F-Ad numst rative p
5 t
G Operatomal I irnr ( F splain t c
Ao4. 44 eve Exhibit I - Same Source I
(9/77)
II4hher iL splain)
')
SUZH4ARY OF OPERATING EXPEILTENCE DOCKET NO.
50-335 UNIT St. Lucie Unit 1 DATE December 12. 1986 COMPLETED BY N. W. Grant TELEPHONE f305) 694-4432 REPORT HONTH November 1986 Unit #1 operated at essentially full power and had no " unit shutdowns or significant power reductions".
In accordance with requirements of Technical Specifications 6.9.1.6, there were no challenges to PORV or safety valves during the report month.
{
l l
l l
l L
AVERAGE DAILY UNIT POWf t tsvfL DOCKET NO. 50-:M9 UNIT St. I ncio finit 2 DATE December 12, 1986 COMPLETED BY N.W. Grant TELEPHONg (305)604-4432 MONTH November, 1986 DAY AVERAGE DAILY POWER LEVEL (MWe Net) 11/ 1/86 860 11/ 2/86 859 11/ 3/86 838 11/ 4/86 801 11/ 5/86 850 11/ 6/86 862 11/ 7/86 862 11/ 8/86 862 11/ 9/86 862 11/10/86 862 l
11/11/86 862 11/12/86 862 11/13/86 862 11/14/86 860 11/15/06 062 11/16/86 861 11/17/86 861 11/18/86 861 11/19/86 860 11/20/86 860 11/21/86 860 11/22/86 861 11/23/86' 860 11/24/86 860 11/25/86 859 11/26/86 860 l
11/27/86 860 11/28/86 860 l
11/29/86 858 11/30/06 837
't OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 12/11/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS
- 1. UNIT NAME:
ST. LUCIE UNIT 2 2.
REPORTING PERIOD NOVEMBER 1986
- 3. LICENSED THERMAL POWER (MWT):
2700
- 4. NAMEPLATE RATING (GROSS MWE):
850
- 5. DESIGN ELECTRICAL RATING (NET MWE):
830
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
882
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
839
- 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)__-_-________
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
720 8016 29065.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
720.0 6582.7 24631.6
- 13. REACTOR RESERVE SHUTDOWN HOURS _______-__
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE _--___-__________
720.0 6511.5 24083.8
- 15. UNIT RESERVE SHUTDOWN HOURS __--_-_-_____
0 0
0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1936676 17387313 62033846
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 649530 5814200 20720880
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 616873 5507096 19578139 l
- 19. UNIT SERVICE FACTOR ____--________-______
100.0 81.2 82.9 l
- 20. UNIT AVAILABILITY FACTOR ---_________-___
100.0 81.2 82.9
- 21. CAPACITY FACTOR (USING MDC NET) 102.1 81.9 82.9 l
- 22. CAPACITY FACTOR (USING DER NET) 103.2 82.8 82.4 l
- 23. UNIT FORCED OUTAGE RATE _________________
0 1.1 8.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
1
(
l l
l
-l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-389 UNITNAME St. Lucie Unit #2 DATE December 12, 1986 COMPLETED BY N. W. Grant REPORT MONDI November. 1986 TELEPHONE (3050 644-4439 i
"E 3 - :4 Licensee g *,
=
re a
1 E
Cause & Corrective c
y N"
Date i
35 4
.255 Event ET 3
Action to
$3 E
j di j Report =
<N 0 jO Prevent Recurrence 6
Unit #2 had no shutdowns or significant Power reductions.
I I
2 3
4 f Forced Reason:
Method:
Exhibit G Instructions S Scheduled A-Lquipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event ReporI(LER) File (NUREG.
D-Regulatory Restriction
@-Other (Explain) 0161) 1 -Operator Training & License Examination F-Ad nu nist ra t ive 5
G Oper4tional i ror if splam) s
/.o ao 44 eve..et Exlubit I Same Source 49/77)
Il-Ot her i E splain )
SU21 MARY OF OPERATING EXPERIENCE DOCKET NO.
g0_389 UNIT St. Lucie Unit 2 DATE Decomhpr 12. 1986 COMPLETED BY N. W. Grant TELEPHONE (305) 694-4432 REPORT MONTH November. 1986 Unit #2 operated at essentially full power and had no " unit shutdowns or significant power reductions".
In accordance with requirements of Techni. cal Specifications 6.9.1.6, there were no challenges to PORV or safety valves during the report month.
l i
~
g-P. O. BOX 14000. JUNO BEACH, FL 33408-0420 a
j)Q
~
DECEMBER 12 1986 L-86-506 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units I an-12 Docket Nos. 50-335 and 50-389 Monthly Operatina Report
Dear Sir:
Attached are the November 1986 Operating Status Reports and Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit Nos. I and 2.
Very truly yours, Ach,/
C.O.W y/
Group V President Nuclear nergy COW /NWG/gp Attachment cc:
Dr. J. Nelson Grace, USNRC, Region ll Harold F. Reis, Esquire i
/t/
4 NWGI/005/l PEOPLE.. SERVING PEOPLE
-