L-86-375, Monthly Operating Repts for Aug 1986
| ML20212C758 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/31/1986 |
| From: | Grant N, Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| L-86-375, NUDOCS 8612310174 | |
| Download: ML20212C758 (19) | |
Text
_
AVERAGE DAILY UNITPOWER LEVEL DOCKET NO.50-76n UNIT Turkey Point 3 DATE September 15, 1986 N.W. Grant COMPLETED BY TELErilONE (305 ) 694-4432 MONTH Aucust, 1986 DAY AVERAGE DAILY POWER LEVEL (MWe Net) 8/ 1/86
-17 8/ 2/86
-23 8/ 3/86
-24 i
8/ 4/86
-25 8/ 5/86
-24 8/ 6/86 189 8/ 7/86 499 8/ 8/86 664 8/ 9/86 667 8/18/86 671 8/11/86 683 8/12/86 279 8/13/86 37 8/14/86 297 8/15/86 673 8/16/86 667 8/17/86 668 8/18/86 668 8/19/86 674 8/28/86 581 8/21/86 98 8/22/86 377 8/23/86 389 8/24/86
-19 8/25/86
-19 8/26/86 127 8/27/86 397 8/28/86 673 8/29/86 673 8/38/86 673 8/31/86 674 l
hhg kDC R
19t'l n
I il
l
- ~
OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 9/12/86 COMPLETED BY N.'W.
GRANT TELEPHONE 305/694/4432
-OPERATING STATUS
~~
1.' UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD:
AUGUST 1986
- 3. LICENSED THERMAL POWER CMWT):
____ 2200
- 4. NAMEFLATE RATING CGROSS MWE):
760
- 5. DESIGN ELECTRICAL RATING CNET MWE):
693
- 6. MAXIMUM DEPENDABLE CAPACITY CGROSS MWE):
700
- 7. MAXIMUM DEPENDABLE CAPACITY CNET MWE):
666 8.
IF CHANGES OCCUS IN CAPACITY RATINGS CITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS' 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY CNET MWE)____
- 10. REASONS FOR RESTRICTIONS, IF ANY-
~
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
744 5831 120440.6
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL __
642.3 4181.8 83259.5 i
- 13. REACTOR RESERVE SHUTDOWN HOURS _____
0.0 0.0 844.4
- 14. HOURS GENERATOR ON-LINE 527.2 4016.5 82423.3
- 15. UNIT RESERVE SHUTDOWN HOURS __________.
0 0
121.8
- 16. GROSS THERMAL ENERGY GENERATED CMWH) 975435 8516638 170722159
- 17. GROSS ELECTRICAL ENERGY GERERATED CMWH) 299380 2769020 54640565
- 18. NET ELECTRICAL ENERGY GENERATED CMWH) 278076 2613320 51722901
- 19. UNIT SERVICE FACTOR -
70.9 68.9 68.4 l
- 20. UNIT AVAILABILITY FACTOR _____
70.9 68.9 68.5
- 21. CAPACITY FACTOR CUSING MDC NET) 56.1 67.3 66.0
- 22. CAPACITY FACTOR CUSING DER NET) 53.9 64.7 62.0
- 23. UNIT FORCED OUTAGE RATE 23.3 25.2 8.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
3 a
i
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
i e
m Page 1 of 3
~
UNIT SH' TDOWNS AND POWER REDUCTIONS DOCKETNO.
U UNITNAME Turkey Point Unit 3 I
DATE September 15, 1986 August, 1986 COMys.ETED gy M. W. Grant REPORT MONTil TER.EPHONE (305) 694-4432
]
f i
4 3 li "h.)Ih Licensee E*
Cause & Coereceive N..
Date
{
7, !
2 3 ac Event ET j'1 Acti,m to
$E a'l.
j #i g Repost
- A0 Peevent Recurrence 6
i e
l 08 860715 S
- 56. 2 Il 4
EB ENGINE The unit was shutdown to perform
)
electrical system modifications required for Emergency Diesel Generator Load considerations.
C l
860803 F
- 74. 6 A
4 till VALVE X The unit was delayed in coming back on line to correct a hydrogen leak on the electrical generator.
Full power operation offer going on line was delayed j
for secondary chemistry control, repair of a feedwater pump, and reactor flux i
l mopping.
l l
09 860811 F
0.0 A
5 till llTEXCil Power was. reduced to opproximately 50% for secondary chemistry concerns.
I 2
3 4
I-Forced Ressem:
Method:
Enhible G. Instrucilons 5 Stheduled A-Equipment FailureiEnplain)
- 1. Manual for Prepseathm of Data B Maintenance or Test 2-Manual Scrain.
Entry $ heels for t.icensee C. Refueling J. Automatic Scram.
Event Repose iLERI File tNUREG-D-Regulatusy Restrictiim
$0iher (Explaini DI6fl I? Operator Training & Ucense Fnamination F Administrative Y ~ C * *' '* " " 8*
5 G Operational I esor fl% plain) 4 4eao sitsewc.,..cs Eshibit I Same 5 mice i
l'il17 )
11 Othen iE splaint i
~
l Page 2 of 3 0
UNIT SffUTDOWNS AND POWER REDtKTIONS DOCKET NO.
UNIT NAME Turkey Point Unit 3
- DATE September ;.5. 1986 REPORY MONTfg August,1986 COMPLETED sy N. W. Urani, i
TELEPflONE (305) 694-4432__
i 1
3%
l *,
Q:
N..'.
I)st, g,
=$
l 3!l Cause & Correctl,e
~
og C
- 3" E""'
E,'?
Acthm to c
j fl [
Report a nu l O.
p,,,,,,g,,,,,,,,,
6 10 860813 F
17.4 H
3 250-86-32 IA INSTRU The unit automatically tripped from 53% power due to o spurious actuation of the Pressurizer Low Pressure - 2/3
]
chonnels logic in the Reactor Protection j
System. The most probable cause was o l
lightning strike.
l The return to full power operation was delayed due to secondary chemistry and i
to place o feedwater pump back in service.
]
i I
2 3
4 l
T rosced Restem:
Method:
Enlifbit G. Instructhms
% Scheduled A L uipment Tsilure(Emplain)
I Manast for Prepsestion oI Dets l
B-Maintensnce of Test 2 M no Iscesm.
Entry Sheets foe Ilcensee C ReIveling 3 Automatic Scism.
Event Repoet (LERI Tile INUREG.
D Reguistoty Restrict!nn
%Other (Emplaint 01611 E-Uperator Tesining A Ucense T.nsminathm F Administestive Y~
0*** " '8" 3
G Upers limst I e.t It'ipisin) 4 _ f.6 4.
Areuc Eshibli 1 Same Source 1
l'ff 7 7)
Il-Othes tEspisint i
Page 3 of 3
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNo.
UNITNAME lurkey Point Unit 3 '
i 1
DAtt september 15. 1986 REPORT MONTH August, 1986 COMrtETED ay N. W. Urang tatErnONE (J05) 694-4432 j
j e
e.
.3 e
j y,;'
,3,'
}
j li g
i g
l*en*e E *,,
3 Cause A Careceive
$j-5 j4[
Repmt*
A0 f
=
Ji ac Event aY 5
Acthm to a
x" Prevent Retweence 6
2 i
11 860820 F
12.7 A
1 IIH HTEXCH The unit was shutdown to correct secondary chemistry caused by in-leokoge. Af ter ine unit come back on line, full power operation was delayed for secondary chemistry cleanup. Power was held at opproximately 50% to pursue a loss of vacuum. Power was further reduced due to o condenser tube leak.
j 12 860823 F
59.5 A
1 HH HTEXCH The unit was shut down to conduct a Hotwell inspection and repair a
feedwater heater leak, leaking tubes in the condenser and a crocked instrument j
line. Full power operation was delayed for secondary chemistry cleanup and a 50% hold for a vacuum leak.
t 3
4 r: Forced Ressen:
Method:
Exhible G. Instewethms 5 Scheduled A Fsquipment Tsifere tEmpl:In)
I Manost for Peerseaihm of Dets 1
B Maintenance of Test 2-Manvol 5cesm.
Entry Sheets for IAemee C Refueling J. Automatic scesm.
Event Repose tLERI file (NUREG-D-Regulstory Restricthm 9-Other (Explaint 91611 l' Operator Training A lAense Fasminathm F.Administistive Y ~ O * ** "'
5 G Operothmst I vene it'ipfeln) 4. 44 A. Asewe
.,7 Exhibit 1 Same Simece i
t'ef 77 I II-Other (Emplain) 4 l
C I
f i
SUMMARY
OF OPERATING E.XPERIENCE DOCKET NO.
50-250 Turkey Point Unit 3 UNIT DATE September 15, 1986 COMPLETED BY N. W. Grant TELEPHONE (305) 694-4432 REP RT HONTH August, 1986 See the " unit" shutdowns and power reductions report.
l 5
I l
l
-._.-..._.--,.,,.--.--.------,.e-,-.,,,-,,,
n..--
AVER AGE DAILY UNITPOWER LEVEL
~
DOCKET NO. 50-251 UNIT Turkey Point 4 September 15, 1986 DATE N.W. Grant COMPLETED BY 005 ) 694-4432 TELENIONE August, 1986 MONTH DAY AVERACE DAILY POWER LEVEL iMWe Net) 8/ 1/86
-3
~
8/ 2/86
~
8/ 3/86
_g 8/ 4/86
_g 8/ 5/86
_g 8/ 6/86
_33 8/ 7/86
-15 8/ 8/86
-16 8/ 9/86
_39 8/18/86
_19 8/11/86
-18 8/12/86
-18 8/13/86
-20 8/14/86
_g 8/15/86 34 8/16/86 37 8/17/86
_19 8/18/86
-20 8/19/86
-20 8/20/86
-20 8/21/86
-21 8/22/86
-22 8/23/86
-22 8/24/86
-22 8/25/86
_gg 8/26/86
-21 8/27/86
-21 8/28/86
-21 8/29/86
_gg 8/30/86
_g3 8/31/86
-22
i i
i OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 9/12/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS 1.' UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD:
AUGUST 1986
- 3. LICENSED THERMAL POWER CMWT): ___________--_ 2200
- 4. NAMEPLATE RATING CGROSS MWE):
760
- 5. DESIGN ELECTRICAL RATING CNET MWE):
693
- 6. MAXIMUM DEPENDABLE CAPACITY CGROSS MWE):
700
- 7. MAXIMUM DEPENDABLE CAPACITY CNET MWE):
666 8.
IF CHANGES OCCUS IN CAPACITY RATINGS CITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY CNET MWE)________________--_____-
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
744 5831 114172.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
106.5 332.0 77967.1
- 13. REACTOR RESERVE SHUTDOWN HOURS __-_______
0.0 0.0 166.6
- 14. HOURS GENERATOR ON-LINE ____-____________
0.0 225.1 75320.2 15.
'T RESERVE SHUTDOWN HOURS _________-___
0 0
32.1 16.
,SS THERMAL ENERGY GENERATED CMWH) 0 440167 159477896
- 17. GROSS ELECTRICAL ENERGY GERERATED CMWH) 0 139235 50781807
- 18. NET ELECTRICAL ENERGY GENERATED CMWH)
-13254 107966 48069174
- 19. UNIT SERVICE FACTOR _______--____________
0.0 3.9 66.0
- 20. UNIT AVAILABILITY FACTOR ___________-___-
0.0 3.9 66.0
- 21. CAPACITY FACTOR CUSING MDC NET) 0.0 2.8 64.7
- 22. CAPACITY FACTOR CUSING DER NET) 0.0 2.7 60.8
- 23. UNIT FORCED OUTAGE RATE ____--___--______
0 0
6.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
9/1/86
l M-2M UNIT SHUTDOWNS AND POWER REDUCTIONS DDCKET NO.
UNIT NAME Iurkey Point Unit 4 -
DATE $eDtember 15. 1986 August, 1986 COMPLETED BY N. W. Grant REPORT M TH TELEPHONE (1n0 6Qa ad19 i
~h
.3:
1 _=
E 2 54 LIC'"8
!*e, g"I, Cause & Corrective
=.
N
b
~E 4
2s&
Event
- r. T k"
l Action to i
$3 E.
j di g Repart
- N0
!d Prevent Recurrence I
i 02 860110 S
744.0 C
4 RC FUEL XX Unit 4 remained shutdown for refueling j
and scheduled maintenance.
)
l 1
i J
j
.i I,
I i
l 3
4 l
r Forced Reason:
Method:
Eahlbit G -Instructions i
5 S(heduled A-Equipment Failure (Emplain) 1 Manual for Preparatism of Data j
B-Maintenanceof Test 2 Manuel Scram.
Entry Sheets for Licensee j
C-Refueling 3 Automatoc Scram.
Event Repor ILER)FileINUREG-I D-Regulatory Restrictiim
$0her (Explam) 01611 1: Operator Training & I.icense Fuamination F-Administrative 5
GOperatiemal Isent IF splain) 4_
y.
4.
4seve E mhibit I - Same Source j
19177)
IIOher IEsplaini l
b l
\\
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-251 UNIT Turkey Point Unit 4 DATE September 15, 1986 COMPLETED BY N. W. Grant TELEPHONE (305) 694-4432 REPORT HONTH August, 1986 Unit 4 remained ~out of service for refueling and scheduled maintenance.
AVER AGE CAlLY UNIT PLC'ER LEvgL DOCKET NO.
50-11; UNIT St. Lucie Unit 1 September 15, 1986 DATE COMPLETED BY ll W. Grant 005 ) 694-4432 TELEPilONE August, 1986 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe Net) 8/ 1/86 851 8/ 2/86 853 8/ 3/86 855 8/ 4/86 857 8/ 5/86 843 8/ 6/86 788 8/ 7/86 745 8/ 8/86 724 8/ 9/86 814 8/10/86 852 8/11/86 855 8/12/86 835 8/13/86 798 8/14/86 803 8/15/86 831 8/16/86 859 8/17/86 858 8/18/86 858 8/19/86 849 8/20/86 850 8/21/86 833 8/22/86 825 8/23/86 849 8/24/86 848 8/25/86 844 8/26/86 845 8/27/86 846
,8/28/86 850 8/29/86 853 8/30/86 848 8/31/86 849
OPERATING DATA REPORT DOCKET NO 50 _ 335 DATE 9/12/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS 1.' UNIT NAME:
ST. LUCIE UNIT 1
- 2. REPORTING PERIOD:
AUGUST 1986
- 3. LICENSED THERMAL POWER CMWT): ______________ 2700
- 4. NAMEPLATE RATING CGROSS MWE)*
850
- 5. DESIGN ELECTRICAL RATING CNET MWE):
830
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
872
- 7. MAXIMUM DEPENDABLE CAPACITY CNET MWE):
827 8.
IF CHANGES OCCUS IN CAPACITY RATINGS CITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS *
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY CNET MWE)________________________
- 10. REASONS FOR RESTRICTIONS, IF ANY' MONTHLY
-YTD-CUMULATIVE u
- 11. HOURS IN REPORT PERIOD
- 744 5831 84983.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
744.0 5511.3 61667.3
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 205.3
- 14. HOURS GENERATOR ON-LINE _________________
744.0 5479.8 61281.9
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
0
- 16. GROSS THERMAL ENERGY GENERATED CMWH) 1975834 14679951 155572218
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 653830 4908300 50964805
- 18. NET ELECTRICAL ENERGY GENERATED CMWH) ___
620779 4661466 48095258
- 19. UNIT SERVICE FACTOR _____________________
100.0 94.0 72.1
- 20. UNIT AVAILABILITY FACTOR ________________
100.0 94.0 72.2
- 21. CAPACITY FACTOR CUSING MDC NET) 100.9 96.7 70.9
- 22. CAPACITY FACTOR CUSING DER NET) 100.5 96.3 69.4
- 23. UNIT FORCED OUTAGE RATE _________________
0 0
4.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
r
50-335 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME 5t. Lucie Unit 1 DATE SeotePh.er 15. 1986 REPORT MONTH August, 1986 COtetKTED gy N. W Grant I
TEI.EPHONE tJU5) 694-4432 i
1 1
.3:
3
=_
e.
2 :-
E 2sa 1.icensee E*
g4 Cause & Corrective N'-
IIc h
5g 4
.2 s E Ewns Ii q
Acthe to j
j'
$E E.
j di y Repswt
- i# 0 Prevent Recurrence 6
1 Unit I had no shutdowns or significant power reductions.
1 I
4 1
r i
1 j
I 2
3 4
i r F.wced Reanim:
Method:
EdelWe G-Instrections 1
% Scheduled A-Equipenent Failues(Explain) 1-Manuel for Pteparation of Deta B-Maineenance or Test 2-Manuel Screm.
Entry Sheets for IAvneee 1
C Refueling 3-Autosnatic Scram.
Event Report (t.ER) File (NUREG-D-Regulatewy Restricthm
$Osher (Explain 1 016l)
I Operator Training & License F=aminathm
)
F-Adevenistrative M ~ C '* " ***
5 Go eratiemal FesserIFsplain)
- 4. 4 4.
Amewc
.,7 Eshibit I - Same Simree j
r en/77)
II4hher IEuplain 1
SUMMARY
OF OPERATINC E.XPERIENCE
-535 DOCKET NO.
UNIT St. Lucie Unit 1 DATE September 15, 1986 COMPLETED BY N. W. Grant TEI,EPHONE (305)694-4432 REPORT HONTH August, 1986 Unit 1 operated at essentially full power and had no " unit shutdowns'and power reductions".
In accordance with requirements of Technical Specifications 6.9.1.6
~ there were no challenges to PORV or safety valves during the report month.
O
AVEA AGE DAILY UNIT Po'ff 4 LEvil DOCKET NO. 50-389 UNIT St. I uHo finit 2 September 15, 1986 M7E COMPLETED BY N.W. Grant TELE!1 TONE. (305) 694-4432 August, 1986 DAY AVERAGE DAILY POWER LEVEL 4MWe Net) 8/ 1/86 861 8/ 2/86 862 8/ 3/86 863 8/ 4/86 862 8/ 5/86 862 8/ 6/86 862 8/ 7/86 843 8/ 8/86 799 8/ 9/86 827 8/18/86 867 8/11/86 867 8/12/86 868 8/13/86 868 8/14/86 866 8/15/86 870 8/16/86 868 8/17/86 867 8/18/86 868 8/19/86 869 8/20/86 865 8/21/86 863 8/22/86 862 8/23/86 859 8/24/86 857 8/25/86 854 8/26/86 857 8/27/86 856 8/28/86 860 8/29/86 861 8/30/86 859 8/31/86 857
n OPERATING DATA REPORT DOCKET NO 58 - 389 DATE 9/12/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS 1.* UNIT NAME:
ST. LUCIE UNIT 2
- 2. REPORTING PERIOD:
AUGUST 1986
- 3. LICENSED THERMAL POWER (MWT)'
_ 2700
- 4. NAMEPLATE RATIN6 (GROSS MWE) 850
- 5. DESIGN ELECTRICAL RATING CNET MWE):
830
- 6. MAXIMUM DEPENDA8LE CAPACITY (GROSS MWE):
882
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
837
- 8. IF CHAN6ES OCCUS IN CAPACITY RATINGS CITEMS NUM8ER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. P6E5R L5V5L T6~E556A 55ST516T567 iF AAY~C55T 5EEI((~(((((((((((((([~(((([
~
~
~
~
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
744 5831 26880.0
- 12. NUM8ER OF HOURS REACTOR WAS CRITICAL _____
744.0 4405.3 22454.2
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE _________________
744.0 4348.1 21920.4
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
39.3
- 16. GROSS THERMAL ENERGY GENERATED (MWH) ____
2001625 11585980 56232513
- 17. GROSS ELECTRICAL ENER6Y GERERATED (MWH) 672620 3879200 18785880
- 18. NET ELECTRICAL ENER6Y GENERATED (MWH) ___
639054 3670784 17741827
- 19. UNIT SERVICE FACTOR _____________________
100.0 74.6 81.5
- 20. UNIT AVAILA8ILITY FACTOR ________________
100.0 74.6 81.5
- 21. CAPACITY FACTOR CUSING MDC NET) _________
102.6 75.2 81.5
- 22. CAPACITY FACTOR (USING DER NET) _________
103.5 75.8 80.9
- 23. UNIT FORCED OUTAGE RATE _________________
0 1.2 9.0
- 24. SHUTD0WNS SCHEDULED OVER NEXT 6 MONTHS :
_________________________________________________________________________ l
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
s UNIT SNUTDOWNS AND POWER REDUCTIONS DOCKET NO.
~
UNIT nab 8E St. Lucie Unit 2 DATE Sectember 15, 1986 REPORTbOONTH Aucust. 1986 m ay
- 14. W. Grant TELPFIGONE (305) 694-4432
'i
-k Cause & Corrective 5E 3
Ei Licensee E*
k" Ih'*
li ?
4 2iA Even ET Act6,,n to f
~4g R*P'** *
'N 0
$5 E.
Prevent Recurrence 6
Unit 2 had no shutdowr.s or significant power reductions.
I 2
3 4
F Fiwced Ressun beethod:
Edibit G. instructions
% Scheduled A-Equipenens Failwe(Emplain)
I-teeneel For Preparation 4 Desa R-teenneenence or Test 2-teenwel Scram.
Entry Sheets for Licensee C-Refueleng 3 Antonistse Scram.
Event Repor iLER) FileiNUREG.
D-Regulatewy Restriction
$0ther iEsplain) 0161) i Operatur Training k litnse Fsanenathm F-AJnuestrative M~ C * *"*8*
5 G Oreratoimal Firew (F=plam t g. 4. m Aseve_,..d E shabit I. Same Source t'8/77) llother iE uplamil
+
SUMMARY
OF OPERATINC EXPElt.TENCE DOCKET NO.
50-389 UNIT St. Lucie Unit 2 DATE September 15, 1986 COMPLETED BY N. W. Grant TELEPHONE (305)694-4432 REPORT MONTH August, 1986 Unit 2 operated at essentially full power and no " unit shutdowns and power reductions".
In accordance with requirements of Technical Specifications 6.9.1.6, there were no challenges to PORV or safety valves during the report month.
P. O. BOX 14000, JUNO BE ACH. F L 33408 I=pti FLORIDA POWER & LIGHT COMPANY W 1 51986 L-86-375 Director, Of fice of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Sir:
Attached are the August 1986 Operating Status Reports and Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit Nos. I and 2.
Very truly yours, hk.04 M3 C. O. Woody 3
- ( Group Vice President Nuclear Energy COW /NWG/gp A t tachment cc:
Dr. J. Nelson Grace, USNRC, Region 11 Harold F. Reis, Esquire i
l
\\
l 3p 2'/
Il NWGl/001/
et oru. sonvisc, etoru