_

AVERAGE DAILY UNITPOWER LEVEL DOCKET NO.50-76n UNIT Turkey Point 3 DATE September 15, 1986 COMPLETED BY N.W. Grant TELErilONE (305 ) 694-4432 MONTH Aucust, 1986 DAY AVERAGE DAILY POWER LEVEL (MWe Net) 8/ 1/86 -17 8/ 2/86 -23 8/ 3/86 -24 i 8/ 4/86 -25 .

8/ 5/86 -24 8/ 6/86 189 8/ 7/86 499 8/ 8/86 664 8/ 9/86 667 8/18/86 671 8/11/86 683 8/12/86 279 8/13/86 37 8/14/86 297 8/15/86 673

, 8/16/86 667 8/17/86 668 8/18/86 668 8/19/86 674 8/28/86 581 8/21/86 98 8/22/86 377 8/23/86 389 8/24/86 -19 8/25/86 -19 8/26/86 127 8/27/86 397 8/28/86 673 8/29/86 673 8/38/86 673 8/31/86 674 l

hhg kDC R n

19t'l 1 I il

l .

~

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 9/12/86 COMPLETED BY N.'W. GRANT TELEPHONE 305/694/4432

-OPERATING STATUS

~~

1.' UNIT NAME: TURKEY POINT UNIT 3

2. REPORTING PERIOD: AUGUST 1986
3. LICENSED THERMAL POWER CMWT): __ _ ____ 2200
4. NAMEFLATE RATING CGROSS MWE): _____ 760
5. DESIGN ELECTRICAL RATING CNET MWE): _ 693
6. MAXIMUM DEPENDABLE CAPACITY CGROSS MWE): 700
7. MAXIMUM DEPENDABLE CAPACITY CNET MWE): _____ 666
8. IF CHANGES OCCUS IN CAPACITY RATINGS CITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS'

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY CNET MWE)____ __ _ __
10. REASONS FOR RESTRICTIONS, IF ANY- ~

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: _ ._ 744 5831 120440.6
12. NUMBER OF HOURS REACTOR WAS CRITICAL __ 642.3 4181.8 83259.5 i
13. REACTOR RESERVE SHUTDOWN HOURS _____ 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE ______ 527.2 4016.5 82423.3
15. UNIT RESERVE SHUTDOWN HOURS __________. 0 0 121.8
16. GROSS THERMAL ENERGY GENERATED CMWH) _ 975435 8516638 170722159
17. GROSS ELECTRICAL ENERGY GERERATED CMWH) _ 299380 2769020 54640565
18. NET ELECTRICAL ENERGY GENERATED CMWH) ___ 278076 2613320 51722901
19. UNIT SERVICE FACTOR - ______ _ __ 70.9 68.9 68.4 l 20. UNIT AVAILABILITY FACTOR _____ ___- 70.9 68.9 68.5
21. CAPACITY FACTOR CUSING MDC NET) _________ 56.1 67.3 66.0
22. CAPACITY FACTOR CUSING DER NET) __ __ 53.9 64.7 62.0
23. UNIT FORCED OUTAGE RATE _ ____ 23.3 25.2 8.1 3 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :

a i

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ________

i e

m

! Page 1 of 3 -

~

UNIT SH'UTDOWNS AND POWER REDUCTIONS DOCKETNO.

' UNITNAME Turkey Point Unit 3

  • I DATE September 15, 1986 August, 1986 COMys.ETED gy M. W. Grant

! REPORT MONTil TER.EPHONE (305) 694-4432 -

]

f i

4 -

"h .)Ih 3 li Licensee E*,

N. . Date

{ 7, ! 2 3 ac Event ET Cause & Coereceive Acti,m to

$E a'l . j #i g Repost

  • A0 j'1 Peevent Recurrence 6

i e

l 08 860715 S 56. 2 Il 4 EB ENGINE The unit was shutdown to perform

) electrical system modifications required

, for Emergency Diesel Generator Load

! considerations.

C l

860803 F 74. 6 A 4 till VALVE X The unit was delayed in coming back on line to correct a hydrogen leak on the electrical generator. Full power

! operation offer going on line was delayed j for secondary chemistry control, repair i of a feedwater pump, and reactor flux l mopping.

l l 09 860811 F 0.0 A 5 till llTEXCil Power was . reduced to opproximately 50% for secondary chemistry concerns.

I 2 3 4 I- Forced Ressem: Method:

Enhible G . Instrucilons 5 Stheduled A-Equipment FailureiEnplain) 1. Manual for Prepseathm of Data B Maintenance or Test 2-Manual Scrain. Entry $ heels for t.icensee C. Refueling J. Automatic Scram. Event Repose iLERI File tNUREG-D-Regulatusy Restrictiim $0iher (Explaini DI6fl I? Operator Training & Ucense Fnamination F Administrative Y ~ C * *' '* " " 8* 5 G Operational I esor fl% plain) 4 4eao sitsewc.,. .cs Eshibit I Same 5 mice i l'il17 ) 11 Othen iE splaint i~

l Page 2 of 3 -

0 UNIT SffUTDOWNS AND POWER REDtKTIONS DOCKET NO.

UNIT NAME Turkey Point Unit 3

  • DATE September ;.5. 1986 i REPORY MONTfg August,1986 COMPLETED sy N. W. Urani, TELEPflONE (305) 694-4432__ -

i 1 "

,_ .. 3% '"'"

l *,

lC 3!l

~

Cause & Correctl,e N. .'. I)st, g, =$ *3" E""' E,'? Q: Acthm to c og

$. "- j fl [ Report a nu l O. p,,,,,,g,,,,,,,,,

6 10 860813 F 17.4 H 3 250-86-32 IA INSTRU The unit automatically tripped from 53% power due to o spurious actuation of

! the Pressurizer Low Pressure - 2/3

] chonnels logic in the Reactor Protection j System. The most probable cause was o l lightning strike.

l The return to full power operation was

! delayed due to secondary chemistry and i to place o feedwater pump back in service.

]

i I 2 3 4 l T rosced Restem: Method: Enlifbit G . Instructhms

!  % Scheduled A L uipment l Tsilure(Emplain) I Manast for Prepsestion oI Dets B-Maintensnce of Test 2 M no Iscesm. Entry Sheets foe Ilcensee C ReIveling 3 Automatic Scism. Event Repoet (LERI Tile INUREG.

D Reguistoty Restrict!nn %Other (Emplaint 01611 E-Uperator Tesining A Ucense T.nsminathm F Administestive Y~ 0*** " '8" 3

, G Upers limst I e .t It'ipisin) 4 _ f.6 4. Areuc ..,# Eshibli 1 Same Source 1 l'ff 7 7) Il-Othes tEspisint i

Page 3 of 3 ,

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNo.

i UNITNAME lurkey Point Unit 3 '

1 DAtt september 15. 1986

! REPORT MONTH August, 1986 COMrtETED ay N. W. Urang j tatErnONE (J05) 694-4432 -

j

% e e e. .3 l*en*e j y,;' ,3,' } j li a

g

=

i Ji ac g

Event E *,,

aY 35 Cause A Careceive Acthm to x

$j-

" 5 j4[

6 Repmt* A0 f Prevent Retweence 2

i 11 860820 F 12.7 A 1 IIH HTEXCH The unit was shutdown to correct secondary chemistry caused by in-leokoge. Af ter ine unit come back on line, full power operation was delayed for secondary chemistry cleanup. Power was held at opproximately 50% to pursue a loss of vacuum. Power was further reduced due to o condenser tube leak.

j 12 860823 F 59.5 A 1 ' HH HTEXCH The unit was shut down to conduct a

! Hotwell inspection and repair a

! feedwater heater leak, leaking tubes in the condenser and a crocked instrument j line. Full power operation was delayed for secondary chemistry cleanup and a

! 50% hold for a vacuum leak.

t  : 3 4

, r: Forced Ressen: Method:

Exhible G. Instewethms 5 Scheduled A Fsquipment Tsifere tEmpl:In) I Manost 1 for Peerseaihm of Dets B Maintenance of Test 2-Manvol 5cesm. Entry Sheets for IAemee

! C Refueling J. Automatic scesm. Event Repose tLERI file (NUREG-D-Regulstory Restricthm

  • 9-Other (Explaint 91611 l' Operator Training A lAense Fasminathm F.Administistive Y ~ O * ** "' 5 G Operothmst I vene it'ipfeln) 4 . 44 A. Asewe

.,7 Exhibit 1 Same Simece '

i t'ef 77 I II-Other (Emplain) 4

  • l C I

f i

SUMMARY

OF OPERATING E.XPERIENCE DOCKET NO. 50-250 UNIT _

Turkey Point Unit 3 l

DATE September 15, 1986

_ l COMPLETED BY N. W. Grant TELEPHONE (305) 694-4432 REP RT HONTH August, 1986 See the " unit" shutdowns and power reductions report.

l 5

I l

l

- - . , , , , . . . ._, -._.-..._.--,.,,.--.--.------,.e-,-.,,,-,,, .,,-- ,_ ,,- - _ - _ --.._- n..-- -,, . , - , - - , . - - - - - -

AVER AGE DAILY UNITPOWER LEVEL

~

DOCKET NO. 50-251 UNIT Turkey Point 4 DATE September 15, 1986 COMPLETED BY N.W. Grant TELENIONE 005 ) 694-4432 August, 1986 MONTH DAY AVERACE DAILY POWER LEVEL iMWe Net) 8/ 1/86 -3 ~

8/ 2/86 ~

8/ 3/86 _g .

8/ 4/86 _g 8/ 5/86 _g 8/ 6/86 _33 8/ 7/86 -15 8/ 8/86 -16 8/ 9/86 _39 8/18/86 _19 8/11/86 .

-18 8/12/86 -18 8/13/86 -20 8/14/86 _g 8/15/86 34 8/16/86 37 8/17/86 _19 8/18/86 -20 8/19/86 -20 8/20/86 -20 8/21/86 -21 8/22/86 -22 '

8/23/86 -22 8/24/86 -22 8/25/86 _gg 8/26/86 -21 8/27/86 -21 8/28/86 -21 8/29/86 _gg 8/30/86 _g3 8/31/86 -22

i

. i i

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 9/12/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 '

OPERATING STATUS 1.' UNIT NAME: TURKEY POINT UNIT 4

2. REPORTING PERIOD: AUGUST 1986  !
3. LICENSED THERMAL POWER CMWT): ___________--_ 2200 ,
4. NAMEPLATE RATING CGROSS MWE): _____- _ _ 760
5. DESIGN ELECTRICAL RATING CNET MWE): ____-___ 693
6. MAXIMUM DEPENDABLE CAPACITY CGROSS MWE): --_ 700
7. MAXIMUM DEPENDABLE CAPACITY CNET MWE): _ 666
8. IF CHANGES OCCUS IN CAPACITY RATINGS CITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS *

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY CNET MWE)________________--_____-
10. REASONS FOR RESTRICTIONS, IF ANY: _______--____________________-_-_______

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: ___-_____________ 744 5831 114172.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL _____ 106.5 332.0 77967.1
13. REACTOR RESERVE SHUTDOWN HOURS __-_______ 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE ____-____________ 0.0 225.1 75320.2
15. 'T RESERVE SHUTDOWN HOURS _________-___ 0 0 32.1
16. ,SS THERMAL ENERGY GENERATED CMWH) ____ 0 440167 159477896
17. GROSS ELECTRICAL ENERGY GERERATED CMWH) _ 0 139235 50781807
18. NET ELECTRICAL ENERGY GENERATED CMWH) _-_ -13254 107966 48069174
19. UNIT SERVICE FACTOR _______--____________ 0.0 3.9 66.0
20. UNIT AVAILABILITY FACTOR ___________-___- 0.0 3.9 66.0
21. CAPACITY FACTOR CUSING MDC NET) _________ 0.0 2.8 64.7
22. CAPACITY FACTOR CUSING DER NET) __---- 0.0 2.7 60.8
23. UNIT FORCED OUTAGE RATE ____--___--______ 0 0 6.4
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 9/1/86

l UNIT SHUTDOWNS AND POWER REDUCTIONS DDCKET NO. M-2M UNIT NAME Iurkey Point Unit 4 -

DATE $eDtember 15. 1986 REPORT M TH August, 1986 COMPLETED BY N. W. Grant TELEPHONE (1n0 6Qa ad19 i

', ~h -

=. .. .3: LIC'"8 g"I, 1 _= E 2 54  !*e, k" Cause & Corrective

    • N

l b ~E 4 2s& Event r. T Action to i

$3 E. j di g Repart

  • N0 !d Prevent Recurrence I

i j 02 860110 S 744.0 C 4 RC FUEL XX Unit 4 remained shutdown for refueling

and scheduled maintenance.

)

l 1

i J

j

.i I,

I i l  : 3 . 4 l r Forced Reason: Method: Eahlbit G -Instructions i 5 S(heduled A-Equipment Failure (Emplain) 1 Manual for Preparatism of Data j B-Maintenanceof Test 2 Manuel Scram. Entry Sheets for Licensee j C-Refueling 3 Automatoc Scram. Event Repor ILER)FileINUREG-I D-Regulatory Restrictiim $0her (Explam) 01611 1: Operator Training & I.icense Fuamination '

F-Administrative ,

5 GOperatiemal Isent IF splain) 4_ y. 4. 4seve .,# E mhibit I - Same Source j 19177) IIOher IEsplaini l

b l

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turkey Point Unit 4 DATE September 15, 1986 COMPLETED BY N. W. Grant TELEPHONE (305) 694-4432 REPORT HONTH August, 1986 Unit 4 remained ~out of service for refueling and scheduled maintenance.

AVER AGE CAlLY UNIT PLC'ER LEvgL DOCKET NO. 50-11; UNIT St. Lucie Unit 1 September 15, 1986 DATE COMPLETED BY ll W. Grant TELEPilONE 005 ) 694-4432 August, 1986 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe Net) 8/ 1/86 851 8/ 2/86 853 8/ 3/86 855 -

8/ 4/86 857 -

8/ 5/86 843 8/ 6/86 788 8/ 7/86 745 8/ 8/86 724 8/ 9/86 814 8/10/86 852 8/11/86 855 8/12/86 835 8/13/86 798 8/14/86 803 8/15/86 831 8/16/86 859 8/17/86 858 8/18/86 858 8/19/86 849 8/20/86 850 8/21/86 833 8/22/86 825 8/23/86 849

  • 8/24/86 848 8/25/86 844 8/26/86 845 8/27/86 846

,8/28/86 850 8/29/86 853 8/30/86 848 8/31/86 849

OPERATING DATA REPORT DOCKET NO 50 _ 335 DATE 9/12/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS 1.' UNIT NAME: ST. LUCIE UNIT 1

2. REPORTING PERIOD: AUGUST 1986

__ 3. LICENSED THERMAL POWER CMWT): ______________ 2700

4. NAMEPLATE RATING CGROSS MWE)* 850
5. DESIGN ELECTRICAL RATING CNET MWE): ____ _ 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___ 872
7. MAXIMUM DEPENDABLE CAPACITY CNET MWE): _____ 827
8. IF CHANGES OCCUS IN CAPACITY RATINGS CITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS *

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY CNET MWE)________________________
10. REASONS FOR RESTRICTIONS, IF ANY' MONTHLY -YTD- CUMULATIVE u
11. HOURS IN REPORT PERIOD
  • 744 5831 84983.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL _____ 744.0 5511.3 61667.3
13. REACTOR RESERVE SHUTDOWN HOURS __________ 0.0 0.0 205.3
14. HOURS GENERATOR ON-LINE _________________ 744.0 5479.8 61281.9
15. UNIT RESERVE SHUTDOWN HOURS _____________ 0 0 0
16. GROSS THERMAL ENERGY GENERATED CMWH) ____ 1975834 14679951 155572218
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _ 653830 4908300 50964805
18. NET ELECTRICAL ENERGY GENERATED CMWH) ___ 620779 4661466 48095258
19. UNIT SERVICE FACTOR _____________________ 100.0 94.0 72.1
20. UNIT AVAILABILITY FACTOR ________________ 100.0 94.0 72.2
21. CAPACITY FACTOR CUSING MDC NET) _________ 100.9 96.7 70.9
22. CAPACITY FACTOR CUSING DER NET) _________ 100.5 96.3 69.4
23. UNIT FORCED OUTAGE RATE _________________ 0 0 4.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ________

r

50-335 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

  • UNIT NAME 5t. Lucie Unit 1 DATE SeotePh.er 15. 1986 COtetKTED gy N. W Grant REPORT MONTH August, 1986 -

TEI.EPHONE tJU5) 694-4432 I

i 1

1  %

=_ e. .3: E* 3 N'-

2 :- E 2sa 1.icensee g4 Cause & Corrective j IIc h 5g 4 .2 s E Ewns Ii q Acthe to

$E E. j di y Repswt

  • i# 0 j' Prevent Recurrence 6

1 Unit I had no shutdowns or 1

significant power reductions.

I 4

1 r

i 1 ,

j I 2 3 4 i r F.wced Reanim: Method: EdelWe G-Instrections 1

% Scheduled A-Equipenent Failues(Explain) 1-Manuel for Pteparation of Deta

! B-Maineenance or Test 2-Manuel Screm. Entry Sheets for IAvneee 1 C Refueling 3-Autosnatic Scram. Event Report (t.ER) File (NUREG-D-Regulatewy Restricthm $Osher (Explain 1 016l)

I Operator Training & License F=aminathm

) F-Adevenistrative M ~ C '* " *** 5 j r Go eratiemal FesserIFsplain) 4. 4 4. Amewc .,7 Eshibit I - Same Simree en/77) II4hher IEuplain 1 -

SUMMARY

OF OPERATINC E.XPERIENCE

-535 DOCKET NO.

UNIT St. Lucie Unit 1 DATE September 15, 1986 COMPLETED BY N. W. Grant TEI,EPHONE (305)694-4432 REPORT HONTH August, 1986 Unit 1 operated at essentially full power and had no " unit shutdowns'and power reductions".

~

In accordance with requirements of Technical Specifications 6.9.1.6 there were no challenges to PORV or safety valves during the report month.

O

AVEA AGE DAILY UNIT Po'ff 4 LEvil DOCKET NO. 50-389 UNIT St. I uHo finit 2 September 15, 1986 M7E COMPLETED BY N.W. Grant TELE!1 TONE . (305) 694-4432 August, 1986 DAY AVERAGE DAILY POWER LEVEL 4MWe Net) 8/ 1/86 861 8/ 2/86 862 8/ 3/86 863 8/ 4/86 862 8/ 5/86 862 8/ 6/86 862 8/ 7/86 843 8/ 8/86 799 8/ 9/86 827 8/18/86 867 8/11/86 867 8/12/86 868 8/13/86 868 8/14/86 866 8/15/86 870 8/16/86 868 8/17/86 867 8/18/86 868 8/19/86 869 8/20/86 865 8/21/86 863 8/22/86 862 8/23/86 859 -

8/24/86 857 8/25/86 854 8/26/86 857 8/27/86 856 8/28/86 860 8/29/86 861 8/30/86 859 8/31/86 857

n OPERATING DATA REPORT DOCKET NO 58 - 389 DATE 9/12/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS 1.* UNIT NAME: ST. LUCIE UNIT 2

2. REPORTING PERIOD: AUGUST 1986
3. LICENSED THERMAL POWER (MWT)' _______- _ 2700
4. NAMEPLATE RATIN6 (GROSS MWE) 850
5. DESIGN ELECTRICAL RATING CNET MWE): ________ 830
6. MAXIMUM DEPENDA8LE CAPACITY (GROSS MWE): ___ 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____ 837
8. IF CHAN6ES OCCUS IN CAPACITY RATINGS CITEMS NUM8ER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS: ____________________ _________________

~ ~ ~ ~

9. P6E5R L5V5L T6~E556A 55ST516T567 iF AAY~C55T 5EEI((~(((((((((((((([~(((([
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: _________________ 744 5831 26880.0
12. NUM8ER OF HOURS REACTOR WAS CRITICAL _____ 744.0 4405.3 22454.2
13. REACTOR RESERVE SHUTDOWN HOURS __________ 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE _________________ 744.0 4348.1 21920.4
15. UNIT RESERVE SHUTDOWN HOURS _____________ 0 0 39.3
16. GROSS THERMAL ENERGY GENERATED (MWH) ____ 2001625 11585980 56232513
17. GROSS ELECTRICAL ENER6Y GERERATED (MWH) _ 672620 3879200 18785880
18. NET ELECTRICAL ENER6Y GENERATED (MWH) ___ 639054 3670784 17741827
19. UNIT SERVICE FACTOR _____________________ 100.0 74.6 81.5
20. UNIT AVAILA8ILITY FACTOR ________________ 100.0 74.6 81.5
21. CAPACITY FACTOR CUSING MDC NET) _________ 102.6 75.2 81.5
22. CAPACITY FACTOR (USING DER NET) _________ 103.5 75.8 80.9
23. UNIT FORCED OUTAGE RATE _________________ 0 1.2 9.0
24. SHUTD0WNS SCHEDULED OVER NEXT 6 MONTHS :

_________________________________________________________________________ l

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ________

s

~ '

UNIT SNUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT nab 8E St. Lucie Unit 2 -

DATE Sectember 15, 1986 m ay 14. W. Grant REPORTbOONTH Aucust. 1986 TELPFIGONE (305) 694-4432 .

. 'i -

    • . Ih'*

5E li ?

3 4 2iA Ei Licensee Even E*,,

ET k

k" Cause & Corrective Act6,,n to

$5 E. ~4g 6

R*P'** * 'N 0 f Prevent Recurrence Unit 2 had no shutdowr.s or significant power reductions.

! I 2 3 4

! F Fiwced Ressun beethod: Edibit G. instructions

% Scheduled A-Equipenens Failwe(Emplain) I-teeneel For Preparation 4 Desa R-teenneenence or Test 2-teenwel Scram. Entry Sheets for Licensee C-Refueleng 3 Antonistse Scram. Event Repor iLER) FileiNUREG.

D-Regulatewy Restriction $0ther iEsplain) 0161) i Operatur Training k litnse Fsanenathm F-AJnuestrative M~ C * *"*8* 5 G Oreratoimal Firew (F=plam t g . 4. m Aseve_,..d E shabit I . Same Source t'8/77) llother iE uplamil

+

SUMMARY

OF OPERATINC EXPElt.TENCE DOCKET NO. 50-389 UNIT St. Lucie Unit 2 DATE September 15, 1986 COMPLETED BY N. W. Grant TELEPHONE (305)694-4432 ,

August, 1986

. REPORT MONTH Unit 2 operated at essentially full power and no " unit shutdowns and power reductions".

In accordance with requirements of Technical Specifications 6.9.1.6, there were no challenges to PORV or safety valves during the report month.

P. O. BOX 14000, JUNO BE ACH. F L 33408 I=pti FLORIDA POWER & LIGHT COMPANY W 1 51986 L-86-375 Director, Of fice of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Attached are the August 1986 Operating Status Reports and Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit Nos. I and 2.

Very truly yours, hk.04 C. O. Woody M3 3

  1. ( Group Vice President Nuclear Energy COW /NWG/gp A t tachment cc: Dr. J. Nelson Grace, USNRC, Region 11 Harold F. Reis, Esquire i

l

\

l 3p 2'/

Il et oru . sonvisc, etoru NWGl/001/