Text
AVERAGE DAILYUNITPOWER LEVEL DOCKET NO.
50 250 COMPLETED BY TELEPHONE son A
MONTH JULY 1979 DAY AVERAGEDAILYPOWER LEVEL (MWe-Net)
DAY AVERAGE DAILYPOWER LEVEL
() IWe-Net I 643 17 I'
10 12 13 14 15 16 350 496 646 648 647 647 649 647 647 650 645 640 18 19 20 21 23 24 25 26 28 29 30 31 642 655.
651 643 645 INSTRUCTIONS On this format. list the average daily unit power levt
~I in Mme-Net for each day i>> the reporti>>" >>lonth. C))>>)pute to the nearesi whole megawatt.
{<7/77 I 80 U l2 30g-9
OPERATING DATAREPORT DOCKET NO. 50 DATE 4u~~4~19 79 COMPLETED BY V~~hilson TELEPHONE QE~~824 OPERATING STATUS Turke Point Unit No.
3 Notes-Uni:t operated at approx Jul 1979 mately 100% R.P. after unit
~was returned to serv'ice fol-ower (MWt):
lowing completion of repairs Gross MWe):
to mechanical seals on re-ating (Net MWe):
actor coolant pump Nos.
3A ble Capacity (Gross ~IWe):
and 3C, except for outages o
I. Unit Name:
- 2. Reporting Period:
- 3. Licensed Thermal P
- 4. Nameplate Rating (
- 5. Design Electrical R
- 6. Maximum Dependa
- 7. Maximum Dependable Capacity (Net XIWe):
666 693
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Net MWe)
IO. Reasons For Restrictions; lfAny:
This Month Yr:to Date Cumulative 58 328.6 44 619.2 2 046.9 194.6 43 095;2 7
.6 97.3 4 118 312 85 885 260 2
8 764 73.9 74.1 67.2 35.8
'64.0 2.7 Nov. 15, 1979 - Jan.
12, 1980
7a 5"
087.0'2, Number Of Hours Reactor Was Critical
'24. 3 l3. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line IS. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Ge'nerated (MWH) 1 556 985 l9. Unit Service Factor
- 95. 6
- 37. 7 2l. Unit Capacity Factor (Using MDC Net)
- 91. 8
- 22. Unit Capacity Factor (Using DER Net)
- 88. 2
- 34. 4
- 23. Unit Forced Outage Rate 6.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Wcbedu ed refue" in maintenance and ins ection
- 25. IfShut Down At End Of Report Period, Estimated Date ofStartup:
- 26. Units ln Test Status(Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMh IERCIAL OPERATION
(')/77)
UNITSHUl DOWNS AND POlVER REDUCTIONS REPORT MONTII ~U< Y DOCKET NO. 5 UNIfNAMI. Turke Point Unit No. 3 COMPLETED BY V rr I
a pcs
~ C/7 Liccnscc Event Rcport =
Cause A, Corrcctivc At.tion to Prcvcnl Recurrence 10 79-06-17 20.0 N/A CB PUIIPXX Unit was removed from service to repair mechanical seals on reactor coolant pump Nos.
3A and 3C.
(Nuclear system)
(Continued from previous month) 12 79-07-01 79-07-02 5.2 7.1 A
N/A N/A HH ZZZZZZ.
HA ZZZZZZ Unit was tripped by steam generator No.
3A level protection system during a transient condition while increasing load after the unit was returned to service.
(Non-nuclear system)
Unit was tripped by steam generator No.
3A level protection system dur-ing. a transient condition caused hy sudden drop in control oil pressure in the turbine control system.
(Non-.nuclea~
F: For<<cd S: Schcdu!ed Reason:
A-Equipmcnt Failure (Explain)
B.IIaintcnance or Test-C-Refueling D Regulatory Restriction E.Operator Training h, Liecnsc Exantination F-Administ rat ivc G Operational Error (Explain)
II.Other (Explain)
Method:
I-Manual 2-Manual Scratn.
3-Autontatic Scram.
4-Other (Explain)
Exhibit G ~ Instructions for Preparation ol Data Entry Sheets for Licensee Event Report (LER) File (NUREG-016I )
Exhibit I ~ Sante Source
AVERAGE DAILYUNITPOWER LEVEL DOCKET NO.
50 2S 1 Turkey Point COMPLETED BY V on MONTH JULY 1979 DAY AVERAGE DAILYPOWER LEVEL
{MWc.Net )
DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 17 10 13 I4 15 16 6~0 642 643 641 640 642 643 639 638 6
7 636 18 19 20 23
'>5 26 27 28 30 31 639 640 647 655 655 653 648 650 648 648 638 633 636 633 INSTRUCTIONS Qn this format. list the average "aily unit power lc!pl in M)Ve.>Net for each tlay in thc rcp<>rting >n!>nth. C!>n>putc to the nearest whole megawatt.
{')(77)
OPERATING DATAREPORT DOCKET NO.
50-251 DATE ~~~t79 COMPLETED BY QLZ~hQ.son TELEPHONE ~).'~52=3824 OPERATING STATUS Unit o pe rated at approximately 100% R.P.
I. Unit Name:
Tur ev Po t ni No.
4
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
760
- 5. Design Electrical Rating (Net MWe):
Maxi um De endable Ca acit Net MWe:
693 666 I
m I
p y(
)
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Rest..'cted. IfAny (Net MWe}:
- 10. Reasons For Restrictions, IfAny:
NONE This Month Yr:to.Date Cumulative 5 087.0
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 744.0
- 13. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line 744. 0
- 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Ge'nerated (MWH) 1 634 193
- 17. Gross Electrical Energy Generated (MWH) 501 740
- 18. Net Electrical Energy Generated (MWH) 477 966
- 19. Unit Service Factor 100.0
- 20. Unit AvailabilityFactor 100.0 96.5 3 215.8
<<0-3 138.4 6 103 244 1 887 813 1 777 887 61.7 61.7 52.5 0.4 Oct.
14 - Nov. 11, 1979
- 21. Umt Capacity Factor (Usmg MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
Steam Generator Tube Znsnection Pro ram 52 056;0 37 563.5 138.8 35 957;4 74 243 ill 23 723 538 22 462 592, 69.1 69.1 65'. 2
'2.3 2.6
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved lNITIALCRITICALlTY INITIALELECTRICITY COMMERCIALOPERATION
('i(771
UNITSHUTDOIVNS ANI)POIVER REI)UCTIONS DOCKETNO. 50 251 REPORT MOiVfil NEI.
Date I
i
~ Vl Llccnsec Event Rcport ~
=~t AC O
g7 C7 C +
Cause h Corrcctivc Action to Prevent Recurrence NONE F: Forced S: Scheduled
('>/77)
Reason:
A-Equipment Failure (Explain)
B.h(aintcnance or Test.
C-Refueling D.Regulatory Restriction E-Operator Training Ec Liccnsc Examination F.Administrative G.Operational Error (Explain)
H-Other (Explain) 3 Method:
I-Manual 2.Manual Scram.
3-Automatic Scrant.
4.Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG.
OI6l)
Exhibit I - Same Source
AVERAGE DAILYUNITPOWER LEVEL COMPLETED BY TELEPHONE MONTH DAY AVERAGEDAlLYPOWER LEVEL (illWe-Net) 777 7
6 5
544 DAY AVERAGE DAILYPOWER LEVEL (ilIWe.Net I 778 17 IS 19 20 21 22 23 10 25 26 12 13 14 IS 16 INSTRUCTIONS 770 38 2S 79 30 31 NOTE:
787 783 749 795 Average daily power level greater than 777 MNe due to cooler condenser cooling water.
On this format. list the average daily onit power level iit M'Ne.Net for each day in the reportin< ttninth. Coinpute to the nearest whole megawar t.
<<>/77>
OPERATING DATAREPORT DOCKET NO. 50 335 DATE A~o>~19 79 COMPLETED BY~~~on TELEPHONE QOS~~824 OPERATING STATUS Notes Unit operated at approximately 100% R.P.,
except for load reductions of July 5-6, 6-7, and 19, 1979.
St. Lucie Unit No. 1 I. Unit Name:
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum De endable Ca acit Net MWe:
2 60 850 802 822 p
p y(
)
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Yr.-to Date Cumulative 2 550 530 Oct.
1 13, 1979
- 11. Hours ln Reporting Period 744.0 5 087.0
- 12. Number Of Hours Reactor Was Critical 744. 0 3 474.2
- 13. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line 744.0 3 248.0
- 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 1 836 859 7 900 841 I 7. Gross Electrical Energy Generated (MWH) 591 120
- 18. Net Electrical Energy Generated (MWH) 558 346 2'94 811
- 19. Unit Service Factor 100 '
63.8
- 20. Unit AvailabilityFactor 100.0
- 63. 8
- 21. Unit Capacity Factor (Using MDC Net) 96.6
- 60. 6 58.7
- 23. Unit Forced Outage Rate 5.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Outage to erforta insaections re uired b XE Bulleti 79-13 22 871.0 18 261.'8 118.5 17 607.2 21.0 42 118 989 13 657 480 12, 837 649
- 77. 0
- 77. 1 72.2
'70.0 6.3
- 25. IfShut Down At End Of Report Period, Estimated Date ofStartup:
- 26. Units ln Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY
)NITlAL ELECTRICITY COMMERCIALOPERATION
UNITSHUTDO)VNS AND POIVER REDUCTIONS REPORT hIONTII UNITNAME Kf ~~~No 1
Date fP A
~ C/l Liecnscc Event Rcport ~
Cause & Corrcetivc Action to Prevent.Recurrence 13 79-07-05 F
N/A PUMPXX Load reduction to approximately 50%
R.P. to clean condensate pump suction strainers.
(Non-nuclear system) 14 79-07-06 F
~
0 N/A HH Load reduction to approximately 50%
R.P. to clean condensate pump suction strainers.
(Non-nuclear system) 15 79-07-19 B
N/A HH PtkiPXX Load reduction to approximately 50%
R.P. to clean condensat:e pump suction strainers.
(Non-nuclear system)
F: Forced S: Schedu!cd Reason:
A-Equipment Failure (Explain)
B.hlaintenance or Test
~
C-Refueling D-Regulatory Restriction E.Operator Training & Liccnsc Examination F-Administrative G-Operational Error (Fxplain)
II-Other (Explain) 3 hlethod:
i hlanual 2.hlanual Scram.
3.Autonmtic Scram.
4.Other (Explah>)
Exhibit G - instructions I'or Preparation ol'ata Entry Sheets for Licensee Event Report ( LER) File (NUREG-OI6I)
Exit!bit I - Sante Source
P.O. BOX 529>00, MIAMLPL 33>52 FLORIOA POWcR 8, LiGHTCOMPANY August 4, 1979 Office of Manager. nt Xnformation and Program Can ~ls U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
Attached are t e July, 1979, Operating Summary Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. 1.
Very truly yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc:
Mr. James P. O'Reilly Robert Lowenstein, Esquire
SUIIMARY OF OPERATING EXPERiENCE POCKET NO.
50 250 Turkey Point UNXT Unit No.
3 DATE Au ust 4, 1979 COMPLETED BY V. T. Chilson REPORT 51ONTK JULY, 19 79 TELEPHONE (305) 552-3824 Unit operated at approximately 100% R.P. after unit was retu'rned to ser-vice following completion of repairs to mechanical seals on reactor coolent pump Nos.
3A and 3C, except for outages on July 1, and 2, 1979.
Refer to "Unit Shutdowns and Power Reductions" section of the July, 1979, Operating Status Report fo additional information.
No ~Iajor Safety-related.
maintenance was performed during the month.
SUMMARY
OF OPERATING EXPERiENCE DOCKET NO.
50' 251 Turkey Point, Unit No.
4 DATE August 4, 1979 COMPLETED BY V. T. Chilson REPORT MONTH JULY, 19 79 TELEPHONE (305) 552-3824 Unit operated at. approximately 100%, R.P.
Refer to "Unit Shutdowns and Power Reductions" section of the July, 1979, Operating Status Report for additional information.
No Major Safety-related maintenance was performed during the month.
SUMlMRY OF, OPERATXNG EXPERIENCE DOCKET NO.
0
5 St. Lucie UN~T Unit No.
1 DATE AG 4
19 79 COMPLETED BY '.
T. Chilson TELEPHONE (305) 552-3824 REPORT MONTii JUr~
s a79 Unit operated at approximately.100%
R.P., except for load reductions of July 5-6, 6-7, and 19, 1979.
Refer 'to "Unit Shutdowns and Power Reductions" section of the July, 1979, Operating Status Report for additional'n fo mation.
No Major Safety-related maintenance was performed. during the month.