Text
AVERAGE DAILY UNIT POWin Livat DOCKET NO.
50 76n
~
UNIT Turkey Point 3 DATE November 14, 1986 N.W. Grant COMPLETED gy (305) 694-4432 TELEPHONE October, 1986 MONTH DAY AVERACE DAILY POWER LEVEL (MWe Net) 10/ 1/06 677 10/ 2/86 675 10/ 3/86 677 10/ 4/86 677 10/ 5/86 675 10/ 6/86 672 10/ 7/86 672 10/ 8/86 675 10/ 9/06 676 10/10/86 674 10/11/86 672 10/12/86 673 10/13/86 675 10/14/86 675 10/15/86 674 10/16/86 678 10/17/06 683 10/18/86 690 10/19/86 691 10/20/86 698 10/21/06 695 10/22/86 697 10/23/86 693 10/24/86 695 10/25/86 696 10/26/06 693 10/27/06 690 10/28/96 686 10/29/86 685 10/30/86 686 10/31/86 687 l[kI OOCK I & 9 "f 1/t
W L
OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 11/13/86 COMPLETED BY N. W. GRANT.
TELEPHONE 305/694/4432 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD: OCTOBER 1986
- 3. LICENSED THERMAL POWER (MWT):
2200
- 4. NAMEPLATE RATING (GROSS MWE):
760
- 5. DESIGN ELECTRICAL RATING (NET MWE):
693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___
700
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____
666
- 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. PUUEk~LEVU~L TU~U55bH E55Tk5ETEU,~5F AU5~ihE5"MUE)~_~_~_~_~_$~~__~_~_~_~_[~_~_~~_~~
~
~
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
745 7296 121905.6
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
745 0 5634.5 84712.2
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
O.0 0.0 844.4
- 14. HOURS GENERATOR ON-LINE _________________
745.0 5467.0 83873.8
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
O O
121.8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1643601 11672475 173877996
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _
533250 3787291 55658836
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 508584 3583359 52692940
- 19. UNIT SERVICE FACTOR _____________________
100.0 74.9 68.8
- 20. UNIT AVAILABILITY FACTOR ________________
100.0 74.9 68.9
- 21. CAPACITY FACTOR (USING MDC NET) 102.5 73.7 66.4
- 22. CAPACITY FACTOR (USING DER NET) 98.5 70.9 62.4
- 23. UNIT FORCED OUTAGE RATE _________________
0 20.0 8.0
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS !
REFUELING 3/5/86, 8 WEEKS ______________________________________________
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
t UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO.
50-250 UNIT NAME Turkey Po nt Unit #3 DATE November :.4. 1986 I
CORWLETED ay N. W. Grant REPORTMONTH Octohar-1986 TEI.EPHONE (305) 694-4432 "i
i i;
3
.} !!Ii b
Licensee p,
k, cau= a corrective No.
thic E-(
.a i E Event
- T jd' Action to l
C j f_
s.
g.g g Repwt sr A0 Prevent Recurrence 6
b Unit #3 had no shutdowns or J
significant power reductions.
I i
I i
I 2
3 4
i F F.wced Reamm:
Method:
Exhildt G-Instructions l
N Scheduled A-Equepenent Failure (Enplain)
I-Manuel for Preparation of Data l
B Maintenance of Test 2 Manusi Scrom.
Entry Sheets for t.icensee C-Refueling 3 Automatic Scram.
Event ReporI(LER) File tNUREG.
I D-Regulatory Rest:istion
%Oher (Emplain) 016Ii 1
IX)perator Training & Ucense Ezaminathm i
F-Administrative k ~ O'****"'#*
5 i
GOperati mal b rue iFiplain) 4-. 4 4.
4 4 ewc.,..,#
Eshibit I. Same Source t's/77)
IIOher iE= plain t 1
1 4
r
SUMMARY
OF OPERATING EXPER.TENCE DOCKET NO.
50-250 UNIT Turkey Point Unit 3 DATE November 14, 1986 COMPLETED BY N. W. Grant TEI,EPHONE (305) 694-4432 REPORT HONTH October, 1986 Unit #3 operated at essentially full power and had no " unit shutdowns or significant power reductions."
l l
i l
l l
1
. --_ ~ ~.
AVER AGE dally UNITPOWE A L EVit Y
DOCKET NO. 50-251 Turkey Point 4 UNIT DATE November 14, 1986 N.W.Gran t COMPLETED gy 11LErilONg (305) 694-4432 October, 1986 MONTH DAY AVER ACE DAILY POWER LEVEL (MWe Net) 10/ 1/86 679 10/ 2/06 677 10/ 3/86 679 10/ 4/06 677 10/ 5/86 675 10/ 6/86 672 10/ 7/86 670 10/ 8/86 675 10/ 9/86 676 10/10/86 673 10/11/86 671 10/12/86 670 10/13/86 675 10/14/86 678 10/15/86 673 10/16/86 678 10/17/86 684 10/18/86 695 10/19/86 693 10/20/86 699 10/21/86 695 10/22/86 654 10/23/06 70 10/24/06
-18 10/25/86 -
-17 10/26/86
-18 10/27/86
-16 10/28/86
-16 10/29/86
-17 10/30/86
-18 10/31/86
-11
[
OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS
- 1. UNIT NAMEt TURKEY POINT UNIT 4
- 2. REPORTING PERIOD OCTOBER 1986
- 3. LICENSED THERMAL POWER (MWT):
2200
- 4. NAMEPLATE RATING (GROSS MWE):
760
- 5. DESIGN ELECTRICAL RATING (NET MWE):
693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
700
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
666
- 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORTr GIVE REASONSt ________________________________________
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
- 10. REASONS FOR RESTRICTIONS, IF ANYt MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD!
745 7296 115637 0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
583.3 1597.7 79232.8
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 166.6
- 14. HOURS GENERATOR ON-LINE _________________
536.9 1385 9
-76480 9
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
32 1
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1170599 2724643 161762372
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 377730 863041 51505613
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 356305 788520 48749728
- 19. UNIT SERVICE FACTOR _____________________
72 1 19 0 66.1
- 20. UNIT AVAILABILITY FACTOR ________________
72 1 19.0 66 2
- 21. CAPACITY FACTOR (USING MDC NET) 71.8 16.2 64.8
- 22. CAPACITY FACTOR (USING DER NET) 69.0 15.6 60.8
- 23. UNIT' FORCED OUTAGE RATE _________________
27.9 18.0 6.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS !
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP! ________
s 50-251 UNIT SNUTDOWNE AND POWER REDUCTIONS DOCKET NO.
UNIT NAME Turkey Point Unit 4 041E sovember 14. 1986
- . W. Grant October, 1986 Cour[sTED sy REPORT MONTH uuo; ose-4432 "i
-k
}in Ei Licensee E*
1?
'k Cause & Correctig 2
Ewas IY b
thee
{
H2 4
Acti. to jS
$8 E-j di g Rep'=t
- A0 Prevent Recurrence d
10 861023 F
223.1 H
1 HC HTEXCH The unit was shutdown due to high conductivity in the condenser. flo condenser leak could be found. The investigation of the cause of the chemistry problem is continuing.
Following correction of secondary chemistry the unit returned to power operation.
Full power operation was delayed due to secondary chemistry and correction of turbine generator breaker protection circuitry, t
l l
I 2
3 4
l F-Farced itessun Method:
Enidbit G. Instructkms N Scheduled A Equepenent Faihne(Emplain) 1.Manuel for seiem of Data B-Maineensace of Test 2-Meneel Screm.
Entry is for IAvnsee C-Refuelens 3-Aetomatic Scram.
Event Repues ILER) File (NUREG-D Itelulatewy Resericthm
$0her (Fmplam) 0161) s
[Operseur Training & thense Fmaminatiim F.Adnuaistraceae 5
G Operatiemal F stor (Fsplain)
- 4. 4 4.
Asewr
.,J Eshibit I - Same Source l'8177)
IIOher IE = plaint
SUE 4ARY OF OPERATING EXPERIENCE DOCKET NO.
50-251 UNIT Turkey Point Unit 4 DATE November 14, 1986 COMPLETED BY N. W. Grant (305) 694-4432 TELEPHONE October, 1986 REPORT HONTH See the " unit shutdown and power reductions" report.
1
/
4
-_--,-.,n, -. -,., -,.. -.
.n---
n------,-,.
l AVEA AGE DAILY UNIT POtf R LEvgL DOCKET NO.
50-11; UNIT St. Lucie Unit 1 DATE November 14, 1986 N.W. Grant COMPLETED BY TELENIONE (305) 694-4432 October, 1986 MONTH DAY AVERACE DAILY POWER LEVEL (MWe Net) 10/ 1/86 844 10/ 2/86 842 10/ 3/86 844 10/ 4/86 845 10/ 5/86 846 10/ 6/86 844 10/ 7/06 836 10/ 8/86 839 10/ 9/86 836 10/10/86 837 10/11/86 839 10/12/86 832 10/13/86 804 10/14/06 764 10/15/86 779 10/16/86 809 10/17/86 847 10/18/86 848 10/19/86 852 10/20/86 853 l
10/21/86 855 l
10/22/86 855 l
10/23/86 853 10/24/86 851 l
10/25/86 850 10/26/86 848 10/27/86 846 10/28/06 847 l
10/29/86 846 10/30/86 844 10/31/86 844 l
1
(
l Y
i OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS io UNIT NAME!
ST. LUCIE UNIT 1
- 2. REPORTING PERIODt OCTOBER 1986 30 LICENSED THERMAL POWER (MWT)! ______________ 2700 4o NAMEPLATE RATING (GROSS MWE)!
850
- 5. DESIGN ELECTRICAL RATING (NET MUE)! ________
830
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)!
872 70 MAXIMUM DEPENDABLE CAPACITf (NET MWE)!
839
- 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS!
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
i
- 10. REASONS FOR RESTRICTIONS, IF ANY!
MONTHLY
-YTD-CUMULATIVE l
- 11. HOURS IN REPORT PERIOD 745 7296 86440.0 120 NUMBER OF HOURS REACTOR WAS CRITICAL _____
745.0 6952.7 63108.7 130 REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 205.3 14o HOURS GENERATOR ON-LINE _________________
745.0 6889.6 62691.7
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
39.3 160 GROSS THERMAL ENERGY GENERATED (MWH) 1998087 18400074 159292341
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 657650 6130430 52186935 180 NET ELECTRICAL ENERGY GENERATED (MWH) 624337 5819335 49253127
- 19. UNIT SERVICE FACTOR _____________________
100.0 94.4 72.5
- 20. UNIT AVAILABILITY FACTOR ________________
100.0 94.4 72 6
- 21. CAPACITY FACTOR (USING MDC NET) 99.9 95 1 71.3
- 22. CAPACITY FACTOR (USING DER NET) 101.0 96.1 69.9
- 23. UNIT FORCED OUTAGE RATE _________________
0 13 4.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS !
REFUELING 3/21/86, 8 WEEKS _____________________________________________
l 250 IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt l
l
UNIT SNUTDOWNS AND POWER REDUCTIONS DOCKET NO.
En 115 UNIT N AME St. Lucie Unit #1 DATE November 14. 1986 REPORT h00 NTH October, 1986 COMPLETED BY N
W_
Gra nt TELEFISONE (305) 694-4432 1
i a
11:
'k j El Licensee P,
j th'e k
3y 4
2s&
Event g7 a.1 AI'" '"
- a.
Camer a corrective g
E d:
- 2. jgg Repswa =
wi u g'
Prevent Reeverence
\\
Unit #1 had no shutdowns or significant power reductions.
j i
)
1 2
3 4
F Fawced Reaism:
Method:
Enhibit G. Instructions s Scheduled A-Equipenent Failuee(Emplain) 1.Manuel for Preparatitm of Data l
8-Maineenmace ce Test 2-Manuel Screm.
Entry Sheets for Licensee 1
C-Refueling 3 Automatic Scram.
Event Repor ILER) FileINUREG.
j D-Regulatewy liestrictism
%Oher(Emplain) 016I1 I: Operator Training a license Fuaminatism F-Adnunistrative 5
l G Operati.wial brew (F= plain t g. 4 4.
A sewc.,..,#
Eshibit I - Same Simree
]
t'8/77 )
lleher (Euplaint 1
SUMMARY
OF OPERATINC E.%PER.TENCE DOCKET NO.
50-335 UNIT St. Lucie Unit 1 DATE November 14, 1986 N.
. Grant.
COMPLETED BY TELEPHONE REPORT HONTH October, 1986 Unit #1 operated at essentially full power and had no " unit shutdowns or significant power reductions".
In accordance with requirements of Technical Specifications 6.9.1.6, there were no challenges to PORV or safety valves during the report month.
o L
AVER AGE DAILY UNIT POWf 4 LEVEL DOCKET NO. 50-389 UNir St. l ucia nait 2 DATE November 14, 1986 COMPLETED BY N.W. Grant (305) 694-4432 TELEMIONE MONTH October, 1986 DAY AVERACE DAILY POWER LEVEL (MWeMt) 10/ 1/06 853 10/ 2/86 853 10/ 3/06 853 10/ 4/06 854 10/ 5/86 850 10/ 6/86 847 10/ 7/06 854 10/ 8/86 853 10/ 9/86 040 10/10/86 821 10/11/86 855 10/12/06 852 10/13/86 854 10/14/86 856 10/15/86 856 10/16/86 853 10/17/86 855 10/18/86 857 10/19/86 859 10/20/86 861 10/21/86 861 10/22/86 861 10/23/86 861 10/24/86 861 10/25/86 858 10/26/06 894 10/27/86 830 10/28/86 798 10/29/06 809 10/30/86 799 10/31/86 833 i
_ _ ~. _. _. _ _. _ _ _
=
d 1
OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 11/13/86 COMPLETED EY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS
- 1. UNIT NAME!
ST. LUCIE.
UNIT 2
- 2. REPORTING PERIOD OCTOBER 1986 30 LICENSED THERMAL POWER (MWT)! ______________ 2700 4o NAMEPLATE RATING (GROSS MWE)!
850 50 DESIGN ELECTRICAL RATING (NET MWE)!
830 60 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)!
882
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)!
839 Bo IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS! ________________________________________
- 9. PUEEk"LkVEL iU~UU5CU~kESTREbiEUI~EF AU 'iUEi~5EEI~_2~__~_~_~_~_~_~_~_~_~_~_~_~_~_~
~
~
100 REASONS FOR RESTRICTIONS, IF ANYt MONTHLY
-YTD-CUMULATIVE ilo HOURS IN REPORT PERIOD! _________________
745 7296 28345 0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
745.0 5862.7 23911.6
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 0.0 140 HOURS GENERATOR ON-LINE _________________
745.0 5791 5 23363.8
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
0 160 GROSS THERMAL ENERGY GENERATED (MWH) 1994252 15450637 60097170.
170- GROSS ELECTRICAL ENERGY GERERATED (MWH) 665230 5164670 20071350 18o NET ELECTRICAL ENERGY GENERATED (MWH) 631452 4890223 18961266 19e UNIT SERVICE FACTOR _____________________
100.0 79.4 82.4 200 UNIT AVAILABILITY FACTOR ________________
100.0 79.4 82.4
- 21. CAPACITY FACTOR (USING MDC NET) 101 0 79 9 82 4 220 CAPACITY FACTOR (USING DER NET) 102 1 80.8 81.9 230 UNIT FORCED OUTAGE RATE _________________
0 13 0.6
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS !
25o IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt i
l l
50- 389 UNIT SNUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME St. Lucie Unit #2 DATE November 14, 1986 REPORT 900 NTH October,1986 COneLETEDBY N. W_ Grant i
TELEPHONE (305) 694-4432 1
'~i 1
_!. 3 L""*"
4 C8*** A Corrective s.;
33,,
2 5 se Event ay f'3 a.
Acti,. so a
i j
$E sE.
jdij rep'**
- A0 Prevent Recurrence i
6 l
Unit #2 had no shutdowns or significant power reductions.
l i
1, l
l I
3 4
F Fiwced Reassm:
Method:
Exhibit G-Instructions N Scheduled A-Equipment Failure (Emplain)
I-Menual for Preparatism of Data B-Mameensace or Test 2-Manuel Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report iLERI File (NUREG-D.Regulatewy Restrictiim
$0her (Emplain1 01611 IEperator Training & Ucense Fuarninatiim F-Adnunestrative Y - C * ** ** " '"
5 G Oreratismal F sei.e iF splainI s _ 4 4.
A sewc.,..,#
E shibit I - Sanw Source t'8177 )
lieher (E = plain t i
SUMMARY
OF OPERATING E.%PERIENCE DOCKET NO.
50-389 UNIT St. Lucie Unit 2 DATE November 14, 1986 COMPLETED BY N. W. Grant TELEPHONE (305) 694 4432 REPORT HONTH October, 1986 Unit #1 operated at essentially full power and had no " unit shutdowns or significant power reductions".
In accordance with requirements of Technical Specifications 6.9.1.6, there
~
were no challenges to PORY or safety valves during the report month.
i
AVERAGE DAILY UNIT POWla Livst
~
DOCKET NO.
50 74n UNIT Turkey Point 3 DATE November 14, 1986 N.W. Grant COMPLETED SY (305) 694-4432 TELEI' HONE October, 1986 MONTH DAY AVERACE DAILY POWER LEVEL IMWe Med 10/ 1/86 677 10/ 2/86 675 10/ 3/86 677 10/ 4/86 677 10/ 5/86 675 10/ 6/86 672 10/ 7/86 672 10/ 8/86 675 10/ 9/86 676 10/10/86 674 10/11/86 672 10/12/86 673 10/13/86 675 10/14/86 675 10/15/86 674 10/16/86 678 10/17/86 683 10/10/86 690 10/19/86 e91 10/20/86 698 10/21/86 695 10/22/06 697 10/23/06 693 10/24/86 695 10/25/86 696 10/26/86 693 10/27/86 699 10/28/96 686 10/29/86 685 10/30/86 686 10/31/86 687 l
l
~
~
OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD: OCTOBER 1986
- 3. LICENSED THERMAL POWER (MWT):
2200 4.
NAMEPLATE RATING (GROSS MWE):
760
- 5. DESIGN ELECTRICAL RATING (NET MWE):
693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___
700
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
666
- 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
- 10. REASONS FOR RESTRICTIONS, IF ANY:
_____________________________1____-_-__
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
745 7296 121905.6
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
745.0 5634.5 84712.2
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
O.0 0.0 844.4
- 14. HOURS GENERATOR ON-LINE _________________
745.0 5467.0 83873.8
- 15. UNIT RESERVE SHUTDOWN HOURS ____-________
0 0
121.8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1643601 11672475 173877996
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _
533250 3787291 55658836
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 508584 3583359 52692940
- 19. UNIT SERVICE FACTOR _____________________
100.0 74.9 68.8
- 20. UNIT AVAILABILITY FACTOR ________________
100.0 74.9 68.9
- 21. CAPACITY FACTOR (USING MDC NET) 102.5 73.7 66.4 j
- 22. CAPACITY FACTOR (USING DER NET) -________
98.5 70.9 62.4
- 23. UNIT FORCED OUTAGE RATE _________________
0 20.0 8.0
'4.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
REFUELING 3/5/86, 8 WEEKS _______..______________________________________
l
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ________
I I
l i
,\\
I UNIT SHUTDOWN 5 AND POWER REDUCTIONS DOCKET NO.
50-250 l
UNIT NAME Turkey Po r t Unit #3 DATE November 3. 1986 d
COnetKTED ay N. W. Grant REPORT RIONTH Octnhor. 1986 TELEP900NE (305) 694-4432
'~i e
c.
3 g"
N.
- 1) ale E
j g
.g g Licensee h,,
Cause & Corrective
~
['3
.E s ac Event u9 Actism to a
m
=
c!I al.
jdi[
R*P'wt
- E0 Prevent Recurrence c5 I
Unit #3 had no shutdowns or significant power reductions.
l t
I l
i 1
2 3
4 F Forced Reasim:
Method:
Emidbet G-Instructions S Scheduled A Equipment Failure (Enplain) 1-Manual for Preparseiem of Dasa B-Maintenance or Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling
- 3. Automatic Scram.
Event ReporiILER) FileINUREG-D Reguistiny Restrictiem
$4) her (Explain) 0161) 1:4)perator Training & l.icense Examinatism F Administrative Y - C *** * " " #
- 5 G 4)peratiemal F rvor IF splain) s - de de A 49W(,..,#
Eshibit i Same Source 69/77)
Il4hher IEmplain)
~
SU:H4ARY OF OPERATINC EXPERIENCE DOCKET NO.
_50c250 UNIT Turkey Point Unit 3 DATE November 14, 1986 COMPLETED BY N. W. Grant TELEPHONE (305) 694-4432 REPORT HONTH October, 1986 Unit #3 operated at essentially full power and had no " unit shutdowns or significant power reductions."
e e
8
i P. O. BOX 14000, JUNO BEACH. FL 33408 3,)ll/,
FLORIDA POWER & LIGHT COMPANY NOVEMBER 14 1986 L-86 465 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report
Dear Sir:
Attached are the October 1986 Operating Status Reports and Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit Nos. I and 2.
Very truly yours, C
. Woody Gkup Vice President Nuclear Energy COW /NWG/gp Attachment l
cc:
Dr. J. Nelson Grace, USNRC, Region 11 Harold F. Reis, Esquire l
l M
\\
NWGI/005/l PEOPLE.. SERVING PEOPLE
.