. AVERAGE DAILY UNIT POWin Livat

~

DOCKET NO. 50 76n UNIT Turkey Point 3 DATE November 14, 1986 COMPLETED gy N.W. Grant TELEPHONE (305) 694-4432 October, 1986 l MONTH DAY AVERACE DAILY POWER LEVEL (MWe Net) 10/ 1/06 677 10/ 2/86 675 10/ 3/86 677 10/ 4/86 677 10/ 5/86 675 10/ 6/86 672 10/ 7/86 672 10/ 8/86 675 10/ 9/06 676 10/10/86 674 10/11/86 672 10/12/86 673 10/13/86 675 10/14/86 675 10/15/86 674 10/16/86 678 10/17/06 683 10/18/86 690 10/19/86 691 10/20/86 698 10/21/06 695 10/22/86 697 10/23/86 693 10/24/86 695 10/25/86 696

, 10/26/06 693 10/27/06 690 10/28/96 686 10/29/86 685 10/30/86 686 10/31/86 687 l[kI OOCK I & 9 "f 1/t

W L "

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 11/13/86 COMPLETED BY N. W. GRANT.

TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: OCTOBER 1986
3. LICENSED THERMAL POWER (MWT): ______________ 2200
4. NAMEPLATE RATING (GROSS MWE): ______________ 760
5. DESIGN ELECTRICAL RATING (NET MWE): ________ 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___ 700
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____ 666
8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS: ________________________________________

" ~ ~

9. PUUEk~LEVU~L TU~U55bH E55Tk5ETEU ,~5F AU5~ihE5"MUE )~_~_~_~_~_$~~__~_~_~_~_[~_~_~~_~~ _ _ _
10. REASONS FOR RESTRICTIONS, IF ANY: _______________________________________

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: _________________ 745 7296 121905.6
12. NUMBER OF HOURS REACTOR WAS CRITICAL _____ 745 0 5634.5 84712.2
13. REACTOR RESERVE SHUTDOWN HOURS __________ O.0 0.0 844.4
14. HOURS GENERATOR ON-LINE _________________ 745.0 5467.0 83873.8
15. UNIT RESERVE SHUTDOWN HOURS _____________ O O 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) ____ 1643601 11672475 173877996
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _ 533250 3787291 55658836
18. NET ELECTRICAL ENERGY GENERATED (MWH) ___ 508584 3583359 52692940
19. UNIT SERVICE FACTOR _____________________ 100.0 74.9 68.8
20. UNIT AVAILABILITY FACTOR ________________ 100.0 74.9 68.9
21. CAPACITY FACTOR (USING MDC NET) _________ 102.5 73.7 66.4
22. CAPACITY FACTOR (USING DER NET) _________ 98.5 70.9 62.4
23. UNIT FORCED OUTAGE RATE _________________ 0 20.0 8.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS !

REFUELING 3/5/86, 8 WEEKS ______________________________________________

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ________

t DOCKETNO. 50-250 UNIT SHUTDOWNS AND POWER REDUCTIONS ,

  1. UNIT NAME Turkey Po nt Unit #3 DATE November :.4. 1986 I

CORWLETED ay N. W. Grant REPORTMONTH Octohar- 1986 TEI.EPHONE (305) 694-4432 "i -

i i; 3 .} !!Ii Licensee p, b k, cau= a corrective

No. thic E-C

!! ( .a i E Event *T Action to l j f_ s. g.g g Repwt sr A0 jd' Prevent Recurrence

,! 6 b

  • Unit #3 had no shutdowns or J significant power reductions.

I i

I i

! I 2 3 4 i F F.wced Reamm: Method: Exhildt G-Instructions l N Scheduled A-Equepenent Failure (Enplain) I-Manuel for Preparation of Data l B Maintenance of Test 2 Manusi Scrom. Entry Sheets for t.icensee

! C-Refueling 3 Automatic Scram. Event ReporI(LER) File tNUREG.

I D-Regulatory Rest:istion %Oher (Emplain) 016Ii 1 IX)perator Training & Ucense Ezaminathm i

F-Administrative k ~ O'****"'#* 5 i GOperati mal b rue iFiplain) 4- . 4 4. 4 4 ewc.,..,# Eshibit I . Same Source

! t's/77) IIOher iE= plain t 1

1 4

r

SUMMARY

OF OPERATING EXPER.TENCE DOCKET NO. 50-250 UNIT Turkey Point Unit 3 ___

DATE November 14, 1986 COMPLETED BY N. W. Grant TEI,EPHONE (305) 694-4432 REPORT HONTH October, 1986 ,

Unit #3 operated at essentially full power and had no " unit shutdowns or significant power reductions."

l l

i l

l l

1

- -. - . --_ ~ ~ . . - - _ - . _ _ - . _ - _ - _ _ - _ _ . - _ . - _ _ _ - _ . - - - - _ _ _ . . . . - _ _ _ _ _ _ _ - - -

AVER AGE dally UNITPOWE A L EVit Y

DOCKET NO. 50-251 UNIT Turkey Point 4 DATE November 14, 1986 COMPLETED gy N.W.Gran t 11LErilONg (305) 694-4432 October, 1986 MONTH DAY AVER ACE DAILY POWER LEVEL (MWe Net) 10/ 1/86 679 10/ 2/06 677 10/ 3/86 679 10/ 4/06 677 10/ 5/86 675 10/ 6/86 672 10/ 7/86 670 10/ 8/86 675 10/ 9/86 676 10/10/86 673 10/11/86 671 10/12/86 670 10/13/86 675 10/14/86 678 10/15/86 673 10/16/86 678 10/17/86 684 10/18/86 695 10/19/86 693 10/20/86 699 10/21/86 695 10/22/86 654 10/23/06 70 10/24/06 -18 10/25/86 - -17 10/26/86 -18 10/27/86 -16 10/28/86 -16 10/29/86 -17 10/30/86 -18 10/31/86 -11

[

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAMEt TURKEY POINT UNIT 4
2. REPORTING PERIOD OCTOBER 1986
3. LICENSED THERMAL POWER (MWT): ______________ 2200
4. NAMEPLATE RATING (GROSS MWE): ______________ 760
5. DESIGN ELECTRICAL RATING (NET MWE): ________ 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___ 700
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____ 666
8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORTr GIVE REASONSt ________________________________________

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
10. REASONS FOR RESTRICTIONS, IF ANYt _______________________________________

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD! _________________ 745 7296 115637 0
12. NUMBER OF HOURS REACTOR WAS CRITICAL _____ 583.3 1597.7 79232.8
13. REACTOR RESERVE SHUTDOWN HOURS __________ 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE _________________ 536.9 1385 9 -76480 9
15. UNIT RESERVE SHUTDOWN HOURS _____________ 0 0 32 1
16. GROSS THERMAL ENERGY GENERATED (MWH) ____ 1170599 2724643 161762372
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _ 377730 863041 51505613
18. NET ELECTRICAL ENERGY GENERATED (MWH) ___ 356305 788520 48749728
19. UNIT SERVICE FACTOR _____________________ 72 1 19 0 66.1
20. UNIT AVAILABILITY FACTOR ________________ 72 1 19.0 66 2
21. CAPACITY FACTOR (USING MDC NET) _________ 71.8 16.2 64.8
22. CAPACITY FACTOR (USING DER NET) _________ 69.0 15.6 60.8
23. UNIT' FORCED OUTAGE RATE _________________ 27.9 18.0 6.7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS !
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP! ________

s DOCKET NO. 50-251 -

UNIT SNUTDOWNE AND POWER REDUCTIONS Turkey Point Unit 4 UNIT NAME 041E sovember 14. 1986 October, 1986 Cour[sTED sy  ;

. W. Grant REPORT MONTH uuo; ose-4432

. "i -

%- thee

{

1?

H2

'k 4 }in 2

Ei Licensee Ewas E*

IY k

b Cause & Correctig Acti. to

$8 E- j di g Rep'=t

  • A0 jS Prevent Recurrence d

10 861023 F 223.1 H 1 HC HTEXCH The unit was shutdown due to high conductivity in the condenser. flo condenser leak could be found. The investigation of the cause of the chemistry problem is continuing.

Following correction of secondary chemistry the unit returned to power operation. Full power operation was delayed due to secondary chemistry and correction of turbine generator breaker protection circuitry, t

l l

I 2 3 4 l F- Farced itessun Method: Enidbit G. Instructkms N Scheduled A Equepenent Faihne(Emplain) 1.Manuel for seiem of Data B-Maineensace of Test 2-Meneel Screm. Entry is for IAvnsee C-Refuelens 3-Aetomatic Scram. Event Repues ILER) File (NUREG-D Itelulatewy Resericthm $0her (Fmplam) 0161) -

s

[Operseur Training & thense Fmaminatiim ,

F.Adnuaistraceae 5 G Operatiemal F stor (Fsplain) 4. 4 4. Asewr .,J Eshibit I - Same Source l'8177) IIOher IE = plaint

SUE 4ARY OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turkey Point Unit 4 -

DATE November 14, 1986 COMPLETED BY N. W. Grant TELEPHONE (305) 694-4432 October, 1986 REPORT HONTH See the " unit shutdown and power reductions" report.

1

/

4

, , , , , , - - - -_--,-.,n, - . - , . , - , . . - . - ,- --_. -- ,,-., , - , .n--- n------,-,.

l AVEA AGE DAILY UNIT POtf R LEvgL DOCKET NO. 50-11; UNIT St. Lucie Unit 1 DATE November 14, 1986 COMPLETED BY N.W. Grant TELENIONE (305) 694-4432 October, 1986 MONTH DAY AVERACE DAILY POWER LEVEL (MWe Net) 10/ 1/86 844 10/ 2/86 842 10/ 3/86 844 10/ 4/86 845 10/ 5/86 846 10/ 6/86 844 10/ 7/06 836 10/ 8/86 839 10/ 9/86 836 10/10/86 837 10/11/86 839 10/12/86 832 10/13/86 804 10/14/06 764 10/15/86 779 10/16/86 809 10/17/86 847 10/18/86 848 10/19/86 852 10/20/86 853 l 10/21/86 855 l 10/22/86 855 l

10/23/86 853 10/24/86 851 l 10/25/86 850 10/26/86 848 10/27/86 846 10/28/06 847 l 10/29/86 846 10/30/86 844 10/31/86 844 l

1

(

l .

Y i

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS io UNIT NAME! ST. LUCIE UNIT 1

2. REPORTING PERIODt OCTOBER 1986 30 LICENSED THERMAL POWER (MWT)! ______________ 2700 4o NAMEPLATE RATING (GROSS MWE)! ______________ 850
5. DESIGN ELECTRICAL RATING (NET MUE)! ________ 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)! ___ 872 70 MAXIMUM DEPENDABLE CAPACITf (NET MWE)! _____ 839
8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS! ________________________________________

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________

i

10. REASONS FOR RESTRICTIONS, IF ANY! _______________________________________

MONTHLY -YTD- CUMULATIVE l

11. HOURS IN REPORT PERIOD _________________ 745 7296 86440.0 120 NUMBER OF HOURS REACTOR WAS CRITICAL _____ 745.0 6952.7 63108.7 130 REACTOR RESERVE SHUTDOWN HOURS __________ 0.0 0.0 205.3 14o HOURS GENERATOR ON-LINE _________________ 745.0 6889.6 62691.7
15. UNIT RESERVE SHUTDOWN HOURS _____________ 0 0 39.3 160 GROSS THERMAL ENERGY GENERATED (MWH) ____ 1998087 18400074 159292341
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _ 657650 6130430 52186935 180 NET ELECTRICAL ENERGY GENERATED (MWH) ___ 624337 5819335 49253127
19. UNIT SERVICE FACTOR _____________________ 100.0 94.4 72.5
20. UNIT AVAILABILITY FACTOR ________________ 100.0 94.4 72 6
21. CAPACITY FACTOR (USING MDC NET) _________ 99.9 95 1 71.3
22. CAPACITY FACTOR (USING DER NET) _________ 101.0 96.1 69.9
23. UNIT FORCED OUTAGE RATE _________________ 0 13 4.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS !

REFUELING 3/21/86, 8 WEEKS _____________________________________________

l 250 IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt ________

l l

UNIT SNUTDOWNS AND POWER REDUCTIONS DOCKET NO. En 115 UNIT N AME St. Lucie Unit #1 DATE November 14. 1986 REPORT h00 NTH October, 1986 COMPLETED BY N W_ Gra nt TELEFISONE (305) 694-4432 1

i  :.

. a j

th'e 11: 'k j El Licensee P, *a.

g Camer a corrective k 3y 4 2s& Event g7 a.1 AI'" '"

d: 2. jgg Repswa = wi u E g' Prevent Reeverence

\

' Unit #1 had no shutdowns or significant power reductions.

j i

) -

1 2 3 4 F Fawced Reaism: Method: Enhibit G. Instructions s Scheduled A-Equipenent Failuee(Emplain) 1.Manuel for Preparatitm of Data l 8-Maineenmace ce Test 2-Manuel Screm. Entry Sheets for Licensee 1

C-Refueling 3 Automatic Scram. Event Repor ILER) FileINUREG.

j D-Regulatewy liestrictism %Oher(Emplain) 016I1

I
Operator Training a license Fuaminatism

. F-Adnunistrative 5 l G Operati.wial brew (F= plain t g . 4 4. A sewc.,..,# Eshibit I - Same Simree

] t'8/77 ) lleher (Euplaint 1

SUMMARY

OF OPERATINC E.%PER.TENCE DOCKET NO. 50-335 UNIT St. Lucie Unit 1 ___

DATE November 14, 1986 N. . Grant.

COMPLETED BY TELEPHONE REPORT HONTH October, 1986 Unit #1 operated at essentially full power and had no " unit shutdowns or significant power reductions".

In accordance with requirements of Technical Specifications 6.9.1.6, there were no challenges to PORV or safety valves during the report month.

o L

AVER AGE DAILY UNIT POWf 4 LEVEL DOCKET NO. 50-389 UNir St. l ucia nait 2 DATE November 14, 1986 COMPLETED BY N.W. Grant TELEMIONE (305) 694-4432

  • October, 1986 MONTH DAY AVERACE DAILY POWER LEVEL (MWeMt) 10/ 1/06 853 10/ 2/86 853 10/ 3/06 853 10/ 4/06 854 10/ 5/86 850 10/ 6/86 847 10/ 7/06 854 10/ 8/86 853 10/ 9/86 040 10/10/86 821 10/11/86 855 10/12/06 852 10/13/86 854 10/14/86 856 10/15/86 856 10/16/86 853 10/17/86 855 10/18/86 857 10/19/86 859 10/20/86 861 10/21/86 861 10/22/86 861 10/23/86 861 10/24/86 861 10/25/86 858 10/26/06 894 10/27/86 830 10/28/86 798 10/29/06 809 10/30/86 799 10/31/86 833 i

. _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ __ _ _ ~ . _ . _ . _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _

=

d 1

OPERATING DATA REPORT DOCKET NO 50 - 389

  • DATE 11/13/86 COMPLETED EY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS
1. UNIT NAME! ST. LUCIE . UNIT 2
2. REPORTING PERIOD OCTOBER 1986 30 LICENSED THERMAL POWER (MWT)! ______________ 2700 4o NAMEPLATE RATING (GROSS MWE)! ______________ 850 50 DESIGN ELECTRICAL RATING (NET MWE)! ________ 830 60 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)! ___ 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)! _____ 839 Bo IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS! ________________________________________

~ ~

9. PUEEk"LkVEL iU~UU5CU~kESTREbiEUI~EF AU 'iUEi~5EEI~_2~__~_~_~_~_~_~_~_~_~_~_~_~_~_~ _

100 REASONS FOR RESTRICTIONS, IF ANYt _______________________________________

MONTHLY -YTD- CUMULATIVE ilo HOURS IN REPORT PERIOD! _________________ 745 7296 28345 0

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____ 745.0 5862.7 23911.6
13. REACTOR RESERVE SHUTDOWN HOURS __________ 0.0 0.0 0.0 140 HOURS GENERATOR ON-LINE _________________ 745.0 5791 5 23363.8
15. UNIT RESERVE SHUTDOWN HOURS _____________ 0 0 0 160 GROSS THERMAL ENERGY GENERATED (MWH) ____ 1994252 15450637 60097170.

170- GROSS ELECTRICAL ENERGY GERERATED (MWH) _ 665230 5164670 20071350 18o NET ELECTRICAL ENERGY GENERATED (MWH) ___ 631452 4890223 18961266 19e UNIT SERVICE FACTOR _____________________ 100.0 79.4 82.4 200 UNIT AVAILABILITY FACTOR ________________ 100.0 79.4 82.4

21. CAPACITY FACTOR (USING MDC NET) _________ 101 0 79 9 82 4 220 CAPACITY FACTOR (USING DER NET) _________ 102 1 80.8 81.9 230 UNIT FORCED OUTAGE RATE _________________ 0 13 0.6
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS !

25o IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt ________

i l

l

DOCKET NO. 50- 389 UNIT SNUTDOWNS AND POWER REDUCTIONS UNIT NAME St. Lucie Unit #2 DATE November 14, 1986 REPORT 900 NTH October,1986 COneLETEDBY N. W_ Grant i TELEPHONE (305) 694-4432 1 . '~i _

s.; 33,, 1 _!.

a 3 ,

2 5 se L""*"

Event ay 4

a.

C8*** A Corrective Acti,. so i

$E rep'**

  • A0 j

i sE. jdij 6

f'3 Prevent Recurrence l

Unit #2 had no shutdowns or significant power reductions.

l i

1, l

l I  : 3 4 F Fiwced Reassm: Method: Exhibit G-Instructions N Scheduled A-Equipment Failure (Emplain) I-Menual for Preparatism of Data B-Mameensace or Test 2-Manuel Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report iLERI File (NUREG-D.Regulatewy Restrictiim $0her (Emplain1 01611 IEperator Training & Ucense Fuarninatiim F-Adnunestrative Y - C * ** ** " '" 5 G Oreratismal F sei.e iF splainI s _ 4 4. A sewc.,..,# E shibit I - Sanw Source t'8177 ) lieher (E = plain t i

SUMMARY

OF OPERATING E.%PERIENCE DOCKET NO. 50-389 UNIT St. Lucie Unit 2 _ _ _

DATE November 14, 1986 COMPLETED BY N. W. Grant TELEPHONE (305) 694 4432 REPORT HONTH October, 1986 Unit #1 operated at essentially full power and had no " unit shutdowns or significant power reductions".

~

In accordance with requirements of Technical Specifications 6.9.1.6, there were no challenges to PORY or safety valves during the report month.

i

~

. AVERAGE DAILY UNIT POWla Livst

.. DOCKET NO. 50 74n UNIT Turkey Point 3 DATE November 14, 1986 COMPLETED SY N.W. Grant TELEI' HONE (305) 694-4432 October, 1986 MONTH DAY AVERACE DAILY POWER LEVEL IMWe Med 10/ 1/86 677 10/ 2/86 675 '

10/ 3/86 677 10/ 4/86 677 10/ 5/86 675 10/ 6/86 672 10/ 7/86 672 10/ 8/86 675 10/ 9/86 676 10/10/86 674 10/11/86 672 10/12/86 673 10/13/86 675 '

10/14/86 675 10/15/86 674 10/16/86 678 10/17/86 683 ,

10/10/86 690 10/19/86 e91 10/20/86 698 10/21/86 695 10/22/06 697 10/23/06 693 10/24/86 695 10/25/86 696 10/26/86 693 10/27/86 699 10/28/96 686 10/29/86 685 10/30/86 686 10/31/86 687 l

l

'. ~

  • ~

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 11/13/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS '

1. UNIT NAME: TURKEY POINT UNIT 3 -
2. REPORTING PERIOD: OCTOBER 1986
3. LICENSED THERMAL POWER (MWT): ______-_-_____ 2200
4. NAMEPLATE RATING (GROSS MWE): -_____________ 760
5. DESIGN ELECTRICAL RATING (NET MWE): ________ 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___ 700
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____ 666
8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS: ________________________________________

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
10. REASONS FOR RESTRICTIONS, IF ANY: _____________________________1____-_-__

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: _________________ 745 7296 121905.6 ,
12. NUMBER OF HOURS REACTOR WAS CRITICAL _____ 745.0 5634.5 84712.2
13. REACTOR RESERVE SHUTDOWN HOURS __________ O.0 0.0 844.4
14. HOURS GENERATOR ON-LINE _________________ 745.0 5467.0 83873.8
15. UNIT RESERVE SHUTDOWN HOURS ____-________ 0 0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) ___- 1643601 11672475 173877996
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _ 533250 3787291 55658836
18. NET ELECTRICAL ENERGY GENERATED (MWH) ___ 508584 3583359 52692940
19. UNIT SERVICE FACTOR _____________________ 100.0 74.9 68.8
20. UNIT AVAILABILITY FACTOR ________________ 100.0 74.9 68.9
21. CAPACITY FACTOR (USING MDC NET) _________ 102.5 73.7 66.4 j 22. CAPACITY FACTOR (USING DER NET) -________ 98.5 70.9 62.4
23. UNIT FORCED OUTAGE RATE _________________ 0 20.0 8.0

'4. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :

REFUELING 3/5/86, 8 WEEKS _______..______________________________________

l 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ________

I I

l i

, _., _ _ _ _ _ _ _ . _ _ - , _ ,\

I UNIT SHUTDOWN 5 AND POWER REDUCTIONS DOCKET NO. 50-250 l UNIT NAME Turkey Po r t Unit #3 DATE November 3. 1986 N. W. Grant d

COnetKTED ay REPORT RIONTH Octnhor. 1986 TELEP900NE (305) 694-4432

'~i -

3 .: g" e c.

N. 1) ale

~

E j g .g g Licensee h,, ., Cause & Corrective m a - = .E s ac Event u9 Actism to c!I E0 '

al. jdi[ R*P'wt * ['3 Prevent Recurrence c5 I

Unit #3 had no shutdowns or significant power reductions.

l t

I l <

i 1 2 3 4 F Forced Reasim: Method: Emidbet G-Instructions S Scheduled A Equipment Failure (Enplain) 1-Manual for Preparseiem of Dasa B-Maintenance or Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3. Automatic Scram. Event ReporiILER) FileINUREG-D Reguistiny Restrictiem $4) her (Explain) 0161) 1:4)perator Training & l.icense Examinatism F Administrative Y - C *** * " " #

  • 5 G 4)peratiemal F rvor IF splain) s - de de A 49W( ,..,# Eshibit i Same Source 69/77) Il4hher IEmplain)

'. ~

, SU:H4ARY OF OPERATINC EXPERIENCE DOCKET NO. _50c250 UNIT Turkey Point Unit 3 DATE November 14, 1986 COMPLETED BY N. W. Grant TELEPHONE (305) 694-4432 REPORT HONTH October, 1986 .

Unit #3 operated at essentially full power and had no " unit shutdowns or significant power reductions."

e e

8

i P. O. BOX 14000, JUNO BEACH. FL 33408 3,)ll/,

FLORIDA POWER & LIGHT COMPANY NOVEMBER 14 1986 L-86 465 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report

Dear Sir:

Attached are the October 1986 Operating Status Reports and Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit Nos. I and 2.

Very truly yours, C . Woody Gkup Vice President Nuclear Energy COW /NWG/gp Attachment l cc: Dr. J. Nelson Grace, USNRC, Region 11 Harold F. Reis, Esquire l

l M

\

NWGI/005/l PEOPLE. . SERVING PEOPLE

_ __ _. ___ . .