L-86-424, Monthly Operating Repts for Sept 1986
| ML20207F589 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 09/30/1986 |
| From: | Grant N, Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| L-86-424, NUDOCS 8701060143 | |
| Download: ML20207F589 (20) | |
Text
.~
AVERAGE DAILY UNIT POWER LEvst DOCKET NO.
50-ygn UNIT Turkey Point 3 DATE October 15. 1986 COMPLETED BY N.W. Grant TELEPilONE (305) 694-4432 MONTH 9 +n=har 10M 7
DAY AVERAGE DAILY POWER LEVEL (MWe Net) 9/ 1/86 674 9/ 2/86 673 9/ 3/86 673 9/ 4/86 670 9/ 5/86 670 9/ 6/86 673 9/ 7/B6 671 9/ 8/86 672 9/ 9/86 675 9/10/86 672 9/11/86 676 9/12/86 676 9/13/86 673 9/14/86 672 9/15/86 674 9/16/86 674 9/17/86 673 9/18/86 679 9/19/86 682 9/20/86 679 9/21/86 228 9/22/86 211 9/23/86 551 9/24/86 680 9/25/86 677 9/26/86 681 9/27/86 676 9/28/86 681 9/29/86 681 9/30/86 681 hhf1060hk$Q30 R
' *DO
} 'l Dk
9
..o OPERATING. DATA REPORT DOCKET NO 50 - 250 DATE 10/14/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432
-OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD SETEMBER 1986
- 3. LICENSED THERMAL POWER (MWT):
2200
- 4. NAMEPLATE RATING (GROSS MWE):
760
- 5. DESIGN ELECTRICAL RATING (NET MWE):
693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___
700
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
666
- 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
720 6551 121160.6
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____
707.7 4889.5 83967.2
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 844.4 14.. HOURS GENERATOR ON-LINE _________________
705.5 4722.0 83128.8
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
121 8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1512236 10028875 172234396
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 485021 3254041 55125586
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 461455 3074775 52184356
- 19. UNIT SERVICE FACTOR _____________________
98.0 72.1 68.6
- 20. UNIT AVAILABILITY FACTOR ________________
98.0 72.1 68.7
- 21. CAPACITY FACTOR (USING MDC NET) 96.2 70 5 66.2
- 22. CAPACITY FACTOR (USING DER NET) 92 5 67.7 62.2
- 23. UNIT FORCED OUTAGE RATE _________________
2.0 22.4 8.0
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
UNIT $NUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-750 UNITNAME Turienv pnint iloit #3 l
DATE Octobbr 15. 1986 i
REPORTMONTH SeDtember CORWLETED BY N !J Grant TERRHONE (3n5) 644-4437 j
l
=
g,;-
,3,'
1
$E )
. E~h Lic'****
"L cause & correctiw 2
2 3 ac Event u?
Action to a
=
x 58 E.
jiR l Repart *
'50 f
Prevent Recurrence d
13 860921 F
14.5 G
3 250-86-34 HA TURBIN A reactor trip resulted 'from a turbine trip which occurred during 1
periodic testing. Operator error resulted in a spring loaded trip test handle moving from the test position.
Return to full power i
i operation was delayed for secondary i
system chemistry and for axial flux l
limitations.
i i
i I
2 3
4 F Finced Reasim:
Method:
Exhibit G. Instructions
% Scheduled A-Egmponent Failme(Emplain)
I-Manual for Preparatitm of Data B-Maintenance or Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Autosnatic Scram.
Event Repor (LER) File (NUREG-D-Regulatory Restriction
$4)ther (Explain) 0161)
E-Operator Training & License Examinatism F Administrative 9,
5 GOperatismal I seur (Fiplain t
- 4. 4 4.
Asew.w.d Exhibit I.Sanw Simree t'8/77 )
llother (Euplain g
\\
r
SUMMARY
OF OPERATINC E.'<PERIENCE DOCKET NO-En_9;n l
UNIT Turkey Point Unit 3 i
DATE October 15, 1986 COMPLETED BY N. W. Grant-TELEPHONE (305) 694-4432 REPORT HONTH September, 1986 See the " unit shutdowns and power reductions" report.
avgA AGE DAILY UNITPOWEA LIVfL DOCKET NO. 50-251 UNIT Turkey Point 4 October 15, 1986 DATE N.W. Grant COMPLETED gy (305) 694-4432 11LErilONE MONTH September, 1986 DAY AVERAGE DAILY POWER LEVEL (MWe Net) 9/ 1/86 78 9/ 2/86 131 9/ 3/86 94 9/ 4/86 25 9/ 5/86 124 9/ 6/86 35 9/ 7/86 54 9/ 8/86 181 9/ 9/06 420 9/10/86 479 9/11/86 598 9/12/86 624 9/13/86 647 9/14/86 663 9/15/86 662 9/16/86 305 9/17/86
-10 9/18/86 311 9/19/86 667 9/20/86 667 9/21/86 669 l
9/22/86 673 9/23/86 675 9/24/06 671 9/25/86 669 9/26/86 680 9/27/86 679 i
9/28/06 679 9/29/86 679 9/30/86 682
n.
OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 10/14/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS
- 1. UNIT NAME! TURKEY POINT UNIT 4 20 REPORTING PERIOD SETEMBER 1986
- 3. LICENSED THERMAL POWER (MWT)! ______________ 2200
- 4. NAMEPLATE. RATING (GROSS MWE):
760
- 5. DESIGN ELECTRICAL RATING (NET MWE);
693 60 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)!
700
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) 666 Bo IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONSI ________________________________________
90 PUUEk~LEUkL iU~UEEUU~RES5REUYEbr~ F AUE~iUEi~5U55(($$$~[~((~_[~_[~_((~_((((~_[
~
~
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE ilo HOURS IN REPORT PERIOD!
720 6551 114892.0 120' NUMBER OF HOURS REACTOR WAS CRITICAL _____
682.5 1014.5 78649.6 130 REACTOR RESERVE SHUTDOWN HOURS __________
0.0 0.0 166.6
- 14. HOURS GENERATOR ON-LINE _________________
623.8 849 0 75944.1 150 UNIT RESERVE SHUTDOWN HOURS _____________
0 0
32.1
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1113877 1554044 160591773 170 GROSS ELECTRICAL ENERGY GERERATED (MWH) 346076 485311 51127883
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 324249 432215 48393423
- 19. UNIT SERVICE FACTOR _____________________
86.6 13.0 66.1
- 20. UNIT AVAILABILITY FACTOR ________________
86.6 13.0 66.1 210 CAPACITY FACTOR (USING MDC NET) 67.6 99 64.7 220 CAPACITY FACTOR (USING DER NET) 65.0 9.5 60.8
- 23. UNIT FORCED OUTAGE RATE _________________
13.4 10.2 6.5
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS !
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP!
I cf 3 unit ssRnoowns AND FOWER REDUCDONs DOCKET NO. 50-251 UNITMARIE Turkov Pnint linit #4 1
DATE Octobbr 15. 19R6 REPORT RIONTH SeDtember ET U U "" #
TELEFIOONE I,inen, Aoa_ AA19
'k
}i2 Ii Licensee E*
- L Cause & Correctiw 2 li 3
Ih
E y
j i
g Ewat g?
g}
um to I
g4g Repews 8 mO Prevent Reeverence o_
ac.
d I
l 02 860110 S
6.3 C
4 RC FUELXX Unit #4 remained shutdown for re-fueling and schedule maintenance.
Return to full power operation was delayed for secondary chemistry i
control.
l 03 860903 F
9.4 8
1 HA TURBIN The unit was shutdown :for steam 1
turbine balancing and subsequent repair of a turbine oil pump.
04 860904 F
11.2 B
1 HA TURBIN The unit was shutdown for steam turbine balancing: Return to full l
power operation was delayed for secondary chemistry control and
-l required flux mapping.
I l
I i
i 3
4
^
T Fewced Reamm:
Method:
EnhlMe G. Instructions j
% Scheduled A-Ealasponent Failese(Explain) 1-Meneel for Preparstiam of Deta B-N or Test 2-Menmal Scram.
Entry Sheets for IAensee i
C Refueling 3 Aetonistic Scram.
Event Report ILER) File INUREG-D-Regulatory Restrictism
$0her(Explain) 0161)
I: Operator Training & lienne Fnaminarism F Adeninistrative M" O'**'*""#*
5 j
GI)peratismalI rew(Fiplain)
- 4. /.e Aa AEDut.,..,#
Eshibit I Same Simrce l
t's/77 )
IlOher IEuplaint i
l E
2 of 3 i
UNIT SNUTDOWNS AND POWER REDUCTIONS NT NO.
M-N j
UNIT NAME Turkev Point finit #4 DATE netnhor 1 c; j
REPORT MONTH _ September m sy mi u em-+, 1Q86
-(m ggg_'adv 3
IE 3
$ Eli Licensee E*
Cause & Corrective g{g*,
No.
t h'e k
32 4
.3 s &
Event p
Actiim to i
$8 E,
j di g Repswt*
in U
]
Prevent Recurrence 6
1 j
05 860905 F
8.6 H
1 HA TURBIN The unit was shutdown due to smolder-ing/ burning lagging on high pressure turbine. The damage was to the lagging only and was promptly repaired.
Return to full power operation was delayed for secondary chemistry control.
l 06 860906 F
25.9 A
3 251-86-19 IA INSTRU A reactor trip occurred on steam generator low level following the automatic trip of the operating feed pump. The feed pump trip resulted from a short in the feed-water isolation signal.
l I
I 2
3 4
i F Fawced Ressam Method:
Enhibit G. Instructkms s Scheduled A-Equipment FailmeIExplain) 1 Meneel for Preparatitm of Dasa B-Meineensace of Test 2-Menmel Screm.
Entry Sheets for IAensee C-Refueling 3 Automatic Scram.
Event ReporiILER) File INUREG-D-Reguistiwy Restriction
%OherIExplaint Ol6l)
I~.4kerator Training & thense Examination F-Administrative Y ~ O '** '* ""#*
5 i
G Operatiimal brur IF= plain) c. 4 4.
44ewc Exhibit I - Same Simree t'8/77 )
IIOher (Emplaint i
l
-e 3 of 3 UNITSNUTBOWIS AND FOWER REN DOCKETNO. 50-250 UpeTNAbsE Turkmy Pnint Ilqjt M W. Grant _ 46 "e+^har 1E 10 DATE REPORT M San %,.
CORWIKTED gy I
isamssoNE f 305) 694-4432
.Ili
}
{j Liansee "L
Camm a corseceive 3;
,,, e g
=2 2 3 og Event u4 1
Ac,6am e.
m c5I e'l jgg Rep.ni=
e#0
[
ree,ene Recw,m, d
07 860907 S
.8 B
9 HA INSTRU The overspeed test of the main turbine generator was conducted.
The reactor stayed critical.
Re-turn to higher power operation was delayed for secondary chemistry control and flux mapping.
08 860910 F
0.0 H
5 HH PUMPXX Power was reduced. due to minor fire in the lagging of the 4A feedwater pump. The minor damage was repaired and following a hold for secondary chemistry control, the unit achieved full power operation.
09 860916 F
34.1 A
1 251-86-21 RB INSTRU The unit shutdown to repair a line voltage regulator in the Rod Position Indicator System. Return to full power operation was delayed for secondary chemistry control.
I 2
3 4
0 Fewced Reamm teetteed:
Enlilbie G-Instructkms S Scheduled A-Engespeen Fathne(Emplain)
I-teeneel for ation of Desa B-Remineenmace of Test 2 teenesi Scram.
Entry sforIAvnsee C-Refueling 3.Ameummeic Scram.
Event Repos:(LER)FileINUREG.
D-Regulasswy Resericekm
$0her(Eaplain) 01611 I:4perator Traininga thense Emananatism F-Adneinistrative M ~ O '** "'"
5 GIhieratismal brew (F= plain t c _ 4. a mm.,7 Exhibit I Same Source l'8/77)
II O heriE aplaint f
1
SUbiMARY OF OPERATING EXPERIENCE l
DOCKET NO.
50-251 UNIT Turkev Point Unit 4 DATE October 15, 1986 COMPLETED BY N. W. Grant TELEPHONE g loa _aaqs REPORT tiONTH Sentomber. 1986 See the " unit shutdown and power reductions" report.
\\
\\
l l
r l
t
AVElt AGE DAILY UNIT POttR LEvgL DOCKETNO.
50-119 UNIT St. Lucie Unit 1 DATE October 15. 1986 COMPLETED BY N.W. Grant (305)694-4432 TELENIONE MONTH September,1986 DAY AVERACE DAILY POWER LEVEL (MWe Neo 9/ 1/86 850 9/ 2/86 847 9/ 3/86 845 9/ 4/86 645 9/ 5/86 51 9/ 6/86
-19 9/ 7/86 680 9/ 8/86 845 9/ 9/86 846 9/10/86 846 9/11/86 848 9/12/86 809 9/13/86 826 9/14/86 846 9/15/86 845 9/16/86 844 9/17/86 845 9/18/86 847 l
9/19/86 508 9/20/86 166 9/21/86 813 9/22/86 845 9/23/86 844 9/24/86 843 9/25/86 844 9/26/86 848 9/27/86 847 9/28/86 843 9/29/06 842 9/30/86 845
4
.r L
OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 10/14/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432
! OPERATING STATUS t.
- 1. UNIT NAME:
ST. LUCIE UNIT 1
- 2. REPORTING PERIOD:SETEMBER 1986
- 3. LICENSED THERMAL POWER (MWT):
2700
- 4. NAMEPLATE RATING (GROSS MWE):
850 S. DESIGN ELECTRICAL RATING (NET MWE):
830
- 6. MAXIM'JM DEPENDADLE CAPACITY (GROSS MWE): ___
872
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
839 a8.' IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
FOR ITEM 7, MDC RAISED 9/29/86.DUE TO 9
INCREASED EFFICIENCY.
9.
POWER LEVEL.TO WHICH RESTRICTED,.IF ANY (NET MWE)________________________
a(.. *10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
729 6551 85703.0
- 12. NUM9ER OF HOURS REACTOR WAS CRITICAL _____
703.7 6215.0 62371.0
- 13. REACTOR RESERVE SHUTDOWN HOURS __________
O.0 0.0 205.3 14.' HOURS GENERATOR ON-LINE ____...____________
664.8 6144.6 61946.7
- 15. UNIT RESERVE SHUTDOWN HOURS _____________
0 0
39.3
- 16. GROSS THERMAL ENERGY GENERATED (MWH) ____
1722036 16401987 257294254
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _
564480 5472780 51529285
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 533532 5194998 48628790
- 19. UNIT SERVICE FACTOR _____________________
92.3 93.8 72.3
- 20. UNIT AVAILABILITY FACTOR ________________
92.3 93.8 72.3
- 21. CAPACITY FACTOR (USING MDC NET) 89.5 95.9 71.1
-22. CAPACITY FACTOR (USING DER NET) 89.3 95.5 69.6
- 23. UNIT FORCED OUTAGE RATE _________________
7.7 1.5 4.1 2,4." SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
1
,ly
'" 25. IF SHUT DOWN AT END OF REPORT PERIODe ESTIHATED DATE OF STARTUP:
l l
i 1 of 2 DOCKETNO. 50-335 UNIT SNUTDOWN5 AND POWER REDUCTIONS UNIT NAME St _I icie linit di DATE Octo )er 15.1986 i
CORWETED gy N_hl Grant REPORT MONT16 Rontomha,.
TELEFNONE h n8il fiGA da"U Ei Licensee Eg k
)gi jg Cause & Corrective 5,
k Na'.
Ihte
{.
it l
Acthe to 2
Event A v?
ju u
jf al, jgg Repme
- Prevent Recurrence d
i j
05 860904 F
34.3 A
1 HB PIPEXX Following appoximately 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> of reduced power at 25%, the unit was 1 l
shutdown to repair an extraction steam line leak.
i 06 860919 F
5.1 A
2 335-86-009 HA GENERA The unit was manually tripped 1
following observation of smoke from
)
connecting wires of ISO-phase duct banks. The wires were repaired I
and the unit returned to power j
operation.
I 07 860919 F
15.8 H
3 335-86 -009 CH HTEXCH The reactor tripped while rehrning l
to full power from the previous item due to low level in.the 1A steam generator.
The unit then returned to full power operation.
i I
2 3
4 r F wced Reason:
Method:
Exhibit G Instrections 5 Scheduled A. Equipment Failem(Emplain) 1 Manuel for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for ucensee C-Refueling 3-Automatic Scram.
Event ReoriII.ER) File lNUREG-D-Regulatory Restriction
$0her(Explain 1 0161) i
[4)perator Training & Ucense Examination F Administrative M - C *** ** "* 8*
5
]
G-Operatiemal bror (Fsplein) g. /..a. Asewe.,..d Exhibit I - Sanw Source j
l'#/77)
IlOher (Euplain) 4 i
s s
2 of 2 UNIT SHU1 DOWNS AND POWER REDUCTIONS DOCKET NO. 50-335 UPAT NAME St.Iucip linit #1 DATE netnhor 1R, lor 6 REFORT MONTH September COMFt21ED sy yu emt
[ *3n c \\ CnA AASO "i
~
'k
'a
] 5 s7g Ei Lkenne P,
1 Ihese h
ca.= a cweecia.e l
N. i.
3 N
$ @2 2
Event E 1F Actiam to al.
j di g Repe=t
- E0 j
Prevent Reewrence 6
i i
t 08 860920 F
0.0 A
5 CH PUMPXX Power was reduced to approximately i
45% to repair a leaking relief valve on the 18 main feedwater pump. The unit then returned to full I
power operation.
(
I i
j j
l l
4
)
I 2
3 4
]
F: Forced Ressun:
Method:
EnhlMt G Inserections S Scheduled A-Esluspment Failme(Emplain) 1-Manuel for Preparasiim of Dasa
.i 8 Maintenance or Test 2 Manual Scram.
Entry Sheets fw Lkensee C-Refueling 3-Autosnatic Scram.
Event Repwt (LERI File INUREG-4 D-Regelseory Restriction
$4hher(Emplain) 01611 E4)perator Training a license Examinathm F Administrative M ~ C *** "
- 8 8 5
i G-Operatiimal Frvor (Fsplain t W ". /.e A s A 4 D wC;,..,1 Exhibit I - Sanw Simrce j
19/77)
Il4hher (Eaplain) i
SUI 1 MARY OF OPERATING EXPERIENCE DOCKET HO, 50-$35 UNIT St. Lucie Unit 1 DATE October 15, 1986 COMPLETED BY N. W. -Grant TELEPHONE (305) 694-4432 REPORT HONTH September, 1986 See the " unit shutdowns and power reductions" report.
In accordance with requirements of Technical Specifications 6.9.1.6, there were no challenges to PORV or safety valves during the report month.
~
AVER AGE DAILY UNIT POWF4 LEVIL DOCKET NO, 50-389 UNIT St.1 "ria fini t 2 DATE nr+nho-ic ta86 COMPLETED BY N.W. Grant TELEMIONE (305) 694-4432 MONTH SeDtember, 1986 DAY AVERACE DAILY POWER LEVEL (MWe Net) 9/ 1/86 843 9/ 2/86 857 9/ 3/86 855 9/ 4/86 855 9/ 5/86 857 9/ 6/86 856 9/ 7/86 856 9/ 8/86 855 9/ 9/86 852 9/10/86 854 9/11/86 855 9/12/86 856 9/13/86 854 9/14/86 854 9/15/86 14 9/16/86 770 9/17/86 836 9/18/86 839 9/19/86 841 9/20/86 853 9/21/86 851 9/22/86 852 9/23/86 850 9/24/86 850 9/25/86 833 9/26/86 787 9/27/86 812 9/28/86 851 9/29/86 851 9/30/86 851 l
i
OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 10/14/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS
- 1. UNIT NAME:
ST. LUCIE UNIT 2
- 2. REPORTING PERIOD:SETEMBER 1986
- 3. LICENSED THERMAL POWER (MWT):
2700
- 4. NAMEPLATE RATING (GROSS MWE): ______________
850 5.
DESIGN ELECTRICAL RATING (NET MWE):
830
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___
882
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____
839
- 8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS
- FOR ITEM 7, MDC RAISED 9/29/86 DUE TO INCREASED EFFICIENCY.
- 9. POWER-LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY
-YTD-CUMULATIVE
- 11. HOURS IN REPORT PERIOD:
720 6551 27600.0
- 12. NUMDER OF HOURS REACTOR WAS CRITICAL-____
712.4 5117.7 23166.6
- 13. REACTOR RESERVE' SHUTDOWN HOURS __________
O.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE ___________-_____
698.4 5046.5 22618.8
- 15. UNIT RESERVE SHUTDOWN HOURS ___________-_
0 0
0
- 16. GROFS THERMAL ENERGY GENERATED (MWH) ____
1870405 13456385 58102918
- 17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _
620240 4499440 19406120
- 18. I?IY ELECTRICAL ENERGY GENERATED (MWH) ___
587987 4258771 18329814
- 19. UNIT SERVICE FACTOR -____________________
97.0 77.0 82.0
- 20. UNIT AVAILABILITY FACTOR _____
97.0 77.0 82.0
- 21. CAPACITY FACTOR (USING MDC NET; 97.6 77.7 81.9
- 22. CAPACITY FACTOR (USING DER NET) 98.4 78.3 81.4 23, UNIT FORCED OUTAGE RATE _________________
3.0 1.5 8.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
- 25. IF SHUT DOWN AT END OF REPORT PERIODr ESTIMATED DATE OF STARTUP: ________
UNIT SHUTDOWNS AND POWEP REDUCTIONS DOCKETNO. M M UNIT NAME C + r"r4a "4+
83 DATE Od W 6r'1 E 'IQAo C00NLETED BY N u crant REPORT MONTH Sentomber TELEPHONE (305) 694-4432 "i
. III Licensee b.
Can= a correcieve
}gE IE "k
No.
Ihte
{
3m g
j Event uT Actiem to
$E E.
j di g Report
- E0 j
Prevent Recurrence 4
d 05 860915 F
21.6 A
3 389-86-13 HA GENERA The reacto-tripped due to a turbine trip caused by low auto stop oil pressure trip. Specific cause for low auto oil pressure was not deterqined.
I i
1 I
2 3
4 f Fenced Reason:
Method:
Exhibit G-Instructions S Scheduled A Equipment Failure (Explain) 1-Manual for Preparatite of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LERI FileINUREG.
l D-Regulatiwy Restriction
$0her(Explain) 016I) 1:-Operator Training & tiense Examiniatism F Administrative M ~ O '** ""#*
5 GOperatiemal hear IFsplaini
- 4. /.e 4. Asove.,..,#
Eshibit I Same Source (9/77)
Il-Other (E mplain t
SUMMARY
OF OPERATINC EXPERIENCE DOCKET NO.
50-389 UNIT St. Lucie Unit 2 October 15, 1986 DATE COMPLETED BY N. W.-Grant TELEPHONE (305) 694-4432 REPORT MONTH September. 1986 See the " unit shutdowns and power reductions" report.
In accordance with requirements of Technical Specifications 6.9.1.6, there were na challenges to PORV or safety valves during the report month.
l l
l I
i l
l I
l l
4 P. o. BOX 14000. JUNO BEACH. FL 33408 bN FLORID /. POWER & LIGHT COMPANY OCTOBER 10 1986' L-86-424 Director, Otsice of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Monthly Operatino Report
Dear Sir:
Attached are the September 1986 Operating Status Reports and Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit Nos. I and 2.
The submittal of this report was delayed one day to correct data. This delay was discussed with the Region 11 Staff on October 15,1986.
Very truly yours,
. O. Woody roup Vice President Nuclear Energy COW /NWG/gp Attachment cc:
Dr. J. Nelson Grace, USNRC, Region II Harold F. Reis, Esquire i
I 6
g 1I l
NWGI/001/
PEOPLE.. SERVING PEOPLE
-_