AVERAGE DAILY UNIT POWER LEvst DOCKET NO.

50-ygn UNIT Turkey Point 3 DATE October 15. 1986 COMPLETED BY N.W. Grant TELEPilONE (305) 694-4432 MONTH 9 +n=har 10M 7

DAY AVERAGE DAILY POWER LEVEL (MWe Net) 9/ 1/86 674 9/ 2/86 673 9/ 3/86 673 9/ 4/86 670 9/ 5/86 670 9/ 6/86 673 9/ 7/B6 671 9/ 8/86 672 9/ 9/86 675 9/10/86 672 9/11/86 676 9/12/86 676 9/13/86 673 9/14/86 672 9/15/86 674 9/16/86 674 9/17/86 673 9/18/86 679 9/19/86 682 9/20/86 679 9/21/86 228 9/22/86 211 9/23/86 551 9/24/86 680 9/25/86 677 9/26/86 681 9/27/86 676 9/28/86 681 9/29/86 681 9/30/86 681 hhf1060hk$Q30 R

' *DO

} 'l Dk

9

..o OPERATING. DATA REPORT DOCKET NO 50 - 250 DATE 10/14/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432

-OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD SETEMBER 1986
3. LICENSED THERMAL POWER (MWT):

2200

4. NAMEPLATE RATING (GROSS MWE):

760

5. DESIGN ELECTRICAL RATING (NET MWE):

693

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___

700

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

666

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

720 6551 121160.6

12. NUMBER OF HOURS REACTOR WAS CRITICAL _____

707.7 4889.5 83967.2

13. REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 844.4 14.. HOURS GENERATOR ON-LINE _________________

705.5 4722.0 83128.8

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

121 8

16. GROSS THERMAL ENERGY GENERATED (MWH) 1512236 10028875 172234396
17. GROSS ELECTRICAL ENERGY GERERATED (MWH) 485021 3254041 55125586
18. NET ELECTRICAL ENERGY GENERATED (MWH) 461455 3074775 52184356
19. UNIT SERVICE FACTOR _____________________

98.0 72.1 68.6

20. UNIT AVAILABILITY FACTOR ________________

98.0 72.1 68.7

21. CAPACITY FACTOR (USING MDC NET) 96.2 70 5 66.2
22. CAPACITY FACTOR (USING DER NET) 92 5 67.7 62.2
23. UNIT FORCED OUTAGE RATE _________________

2.0 22.4 8.0

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT $NUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-750 UNITNAME Turienv pnint iloit #3 l

DATE Octobbr 15. 1986 i

REPORTMONTH SeDtember CORWLETED BY N !J Grant TERRHONE (3n5) 644-4437 j

l

=

g,;-

,3,'

1

$E )

. E~h Lic'****

"L cause & correctiw 2

2 3 ac Event u?

Action to a

=

x 58 E.

jiR l Repart *

'50 f

Prevent Recurrence d

13 860921 F

14.5 G

3 250-86-34 HA TURBIN A reactor trip resulted 'from a turbine trip which occurred during 1

periodic testing. Operator error resulted in a spring loaded trip test handle moving from the test position.

Return to full power i

i operation was delayed for secondary i

system chemistry and for axial flux l

limitations.

i i

i I

2 3

4 F Finced Reasim:

Method:

Exhibit G. Instructions

% Scheduled A-Egmponent Failme(Emplain)

I-Manual for Preparatitm of Data B-Maintenance or Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Autosnatic Scram.

Event Repor (LER) File (NUREG-D-Regulatory Restriction

$4)ther (Explain) 0161)

E-Operator Training & License Examinatism F Administrative 9,

5 GOperatismal I seur (Fiplain t

4. 4 4.

Asew.w.d Exhibit I.Sanw Simree t'8/77 )

llother (Euplain g

\\

r

SUMMARY

OF OPERATINC E.'<PERIENCE DOCKET NO-En_9;n l

UNIT Turkey Point Unit 3 i

DATE October 15, 1986 COMPLETED BY N. W. Grant-TELEPHONE (305) 694-4432 REPORT HONTH September, 1986 See the " unit shutdowns and power reductions" report.

avgA AGE DAILY UNITPOWEA LIVfL DOCKET NO. 50-251 UNIT Turkey Point 4 October 15, 1986 DATE N.W. Grant COMPLETED gy (305) 694-4432 11LErilONE MONTH September, 1986 DAY AVERAGE DAILY POWER LEVEL (MWe Net) 9/ 1/86 78 9/ 2/86 131 9/ 3/86 94 9/ 4/86 25 9/ 5/86 124 9/ 6/86 35 9/ 7/86 54 9/ 8/86 181 9/ 9/06 420 9/10/86 479 9/11/86 598 9/12/86 624 9/13/86 647 9/14/86 663 9/15/86 662 9/16/86 305 9/17/86

-10 9/18/86 311 9/19/86 667 9/20/86 667 9/21/86 669 l

9/22/86 673 9/23/86 675 9/24/06 671 9/25/86 669 9/26/86 680 9/27/86 679 i

9/28/06 679 9/29/86 679 9/30/86 682

n.

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 10/14/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAME! TURKEY POINT UNIT 4 20 REPORTING PERIOD SETEMBER 1986
3. LICENSED THERMAL POWER (MWT)! ______________ 2200
4. NAMEPLATE. RATING (GROSS MWE):

760

5. DESIGN ELECTRICAL RATING (NET MWE);

693 60 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)!

700

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) 666 Bo IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONSI ________________________________________

90 PUUEk~LEUkL iU~UEEUU~RES5REUYEbr~ F AUE~iUEi~5U55(($$$~[~((~_[~_[~_((~_((((~_[

~

~

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE ilo HOURS IN REPORT PERIOD!

720 6551 114892.0 120' NUMBER OF HOURS REACTOR WAS CRITICAL _____

682.5 1014.5 78649.6 130 REACTOR RESERVE SHUTDOWN HOURS __________

0.0 0.0 166.6

14. HOURS GENERATOR ON-LINE _________________

623.8 849 0 75944.1 150 UNIT RESERVE SHUTDOWN HOURS _____________

0 0

32.1

16. GROSS THERMAL ENERGY GENERATED (MWH) 1113877 1554044 160591773 170 GROSS ELECTRICAL ENERGY GERERATED (MWH) 346076 485311 51127883
18. NET ELECTRICAL ENERGY GENERATED (MWH) 324249 432215 48393423
19. UNIT SERVICE FACTOR _____________________

86.6 13.0 66.1

20. UNIT AVAILABILITY FACTOR ________________

86.6 13.0 66.1 210 CAPACITY FACTOR (USING MDC NET) 67.6 99 64.7 220 CAPACITY FACTOR (USING DER NET) 65.0 9.5 60.8

23. UNIT FORCED OUTAGE RATE _________________

13.4 10.2 6.5

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS !
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP!

I cf 3 unit ssRnoowns AND FOWER REDUCDONs DOCKET NO. 50-251 UNITMARIE Turkov Pnint linit #4 1

DATE Octobbr 15. 19R6 REPORT RIONTH SeDtember ET U U "" #

TELEFIOONE I,inen, Aoa_ AA19

'k

}i2 Ii Licensee E*

  • L Cause & Correctiw 2 li 3

Ih

E y

j i

g Ewat g?

g}

um to I

g4g Repews 8 mO Prevent Reeverence o_

ac.

d I

l 02 860110 S

6.3 C

4 RC FUELXX Unit #4 remained shutdown for re-fueling and schedule maintenance.

Return to full power operation was delayed for secondary chemistry i

control.

l 03 860903 F

9.4 8

1 HA TURBIN The unit was shutdown :for steam 1

turbine balancing and subsequent repair of a turbine oil pump.

04 860904 F

11.2 B

1 HA TURBIN The unit was shutdown for steam turbine balancing: Return to full l

power operation was delayed for secondary chemistry control and

-l required flux mapping.

I l

I i

i 3

4

^

T Fewced Reamm:

Method:

EnhlMe G. Instructions j

% Scheduled A-Ealasponent Failese(Explain) 1-Meneel for Preparstiam of Deta B-N or Test 2-Menmal Scram.

Entry Sheets for IAensee i

C Refueling 3 Aetonistic Scram.

Event Report ILER) File INUREG-D-Regulatory Restrictism

$0her(Explain) 0161)

I: Operator Training & lienne Fnaminarism F Adeninistrative M" O'**'*""#*

5 j

GI)peratismalI rew(Fiplain)

4. /.e Aa AEDut.,..,#

Eshibit I Same Simrce l

t's/77 )

IlOher IEuplaint i

l E

2 of 3 i

UNIT SNUTDOWNS AND POWER REDUCTIONS NT NO.

M-N j

UNIT NAME Turkev Point finit #4 DATE netnhor 1 c; j

REPORT MONTH _ September m sy mi u em-+, 1Q86

-(m ggg_'adv 3

IE 3

$ Eli Licensee E*

Cause & Corrective g{g*,

No.

t h'e k

32 4

.3 s &

Event p

Actiim to i

$8 E,

j di g Repswt*

in U

]

Prevent Recurrence 6

1 j

05 860905 F

8.6 H

1 HA TURBIN The unit was shutdown due to smolder-ing/ burning lagging on high pressure turbine. The damage was to the lagging only and was promptly repaired.

Return to full power operation was delayed for secondary chemistry control.

l 06 860906 F

25.9 A

3 251-86-19 IA INSTRU A reactor trip occurred on steam generator low level following the automatic trip of the operating feed pump. The feed pump trip resulted from a short in the feed-water isolation signal.

l I

I 2

3 4

i F Fawced Ressam Method:

Enhibit G. Instructkms s Scheduled A-Equipment FailmeIExplain) 1 Meneel for Preparatitm of Dasa B-Meineensace of Test 2-Menmel Screm.

Entry Sheets for IAensee C-Refueling 3 Automatic Scram.

Event ReporiILER) File INUREG-D-Reguistiwy Restriction

%OherIExplaint Ol6l)

I~.4kerator Training & thense Examination F-Administrative Y ~ O '** '* ""#*

5 i

G Operatiimal brur IF= plain) c. 4 4.

44ewc Exhibit I - Same Simree t'8/77 )

IIOher (Emplaint i

l

-e 3 of 3 UNITSNUTBOWIS AND FOWER REN DOCKETNO. 50-250 UpeTNAbsE Turkmy Pnint Ilqjt M W. Grant _ 46 "e+^har 1E 10 DATE REPORT M San %,.

CORWIKTED gy I

isamssoNE f 305) 694-4432

.Ili

}

{j Liansee "L

Camm a corseceive 3;

,,, e g

=2 2 3 og Event u4 1

Ac,6am e.

m c5I e'l jgg Rep.ni=

e#0

[

ree,ene Recw,m, d

07 860907 S

.8 B

9 HA INSTRU The overspeed test of the main turbine generator was conducted.

The reactor stayed critical.

Re-turn to higher power operation was delayed for secondary chemistry control and flux mapping.

08 860910 F

0.0 H

5 HH PUMPXX Power was reduced. due to minor fire in the lagging of the 4A feedwater pump. The minor damage was repaired and following a hold for secondary chemistry control, the unit achieved full power operation.

09 860916 F

34.1 A

1 251-86-21 RB INSTRU The unit shutdown to repair a line voltage regulator in the Rod Position Indicator System. Return to full power operation was delayed for secondary chemistry control.

I 2

3 4

0 Fewced Reamm teetteed:

Enlilbie G-Instructkms S Scheduled A-Engespeen Fathne(Emplain)

I-teeneel for ation of Desa B-Remineenmace of Test 2 teenesi Scram.

Entry sforIAvnsee C-Refueling 3.Ameummeic Scram.

Event Repos:(LER)FileINUREG.

D-Regulasswy Resericekm

$0her(Eaplain) 01611 I:4perator Traininga thense Emananatism F-Adneinistrative M ~ O '** "'"

5 GIhieratismal brew (F= plain t c _ 4. a mm.,7 Exhibit I Same Source l'8/77)

II O heriE aplaint f

1

SUbiMARY OF OPERATING EXPERIENCE l

DOCKET NO.

50-251 UNIT Turkev Point Unit 4 DATE October 15, 1986 COMPLETED BY N. W. Grant TELEPHONE g loa _aaqs REPORT tiONTH Sentomber. 1986 See the " unit shutdown and power reductions" report.

\\

\\

l l

r l

t

AVElt AGE DAILY UNIT POttR LEvgL DOCKETNO.

50-119 UNIT St. Lucie Unit 1 DATE October 15. 1986 COMPLETED BY N.W. Grant (305)694-4432 TELENIONE MONTH September,1986 DAY AVERACE DAILY POWER LEVEL (MWe Neo 9/ 1/86 850 9/ 2/86 847 9/ 3/86 845 9/ 4/86 645 9/ 5/86 51 9/ 6/86

-19 9/ 7/86 680 9/ 8/86 845 9/ 9/86 846 9/10/86 846 9/11/86 848 9/12/86 809 9/13/86 826 9/14/86 846 9/15/86 845 9/16/86 844 9/17/86 845 9/18/86 847 l

9/19/86 508 9/20/86 166 9/21/86 813 9/22/86 845 9/23/86 844 9/24/86 843 9/25/86 844 9/26/86 848 9/27/86 847 9/28/86 843 9/29/06 842 9/30/86 845

4

.r L

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 10/14/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432

! OPERATING STATUS t.

1. UNIT NAME:

ST. LUCIE UNIT 1

2. REPORTING PERIOD:SETEMBER 1986
3. LICENSED THERMAL POWER (MWT):

2700

4. NAMEPLATE RATING (GROSS MWE):

850 S. DESIGN ELECTRICAL RATING (NET MWE):

830

6. MAXIM'JM DEPENDADLE CAPACITY (GROSS MWE): ___

872

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

839 a8.' IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

FOR ITEM 7, MDC RAISED 9/29/86.DUE TO 9

INCREASED EFFICIENCY.

9.

POWER LEVEL.TO WHICH RESTRICTED,.IF ANY (NET MWE)________________________

a(.. *10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

729 6551 85703.0

12. NUM9ER OF HOURS REACTOR WAS CRITICAL _____

703.7 6215.0 62371.0

13. REACTOR RESERVE SHUTDOWN HOURS __________

O.0 0.0 205.3 14.' HOURS GENERATOR ON-LINE ____...____________

664.8 6144.6 61946.7

15. UNIT RESERVE SHUTDOWN HOURS _____________

0 0

39.3

16. GROSS THERMAL ENERGY GENERATED (MWH) ____

1722036 16401987 257294254

17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _

564480 5472780 51529285

18. NET ELECTRICAL ENERGY GENERATED (MWH) 533532 5194998 48628790
19. UNIT SERVICE FACTOR _____________________

92.3 93.8 72.3

20. UNIT AVAILABILITY FACTOR ________________

92.3 93.8 72.3

21. CAPACITY FACTOR (USING MDC NET) 89.5 95.9 71.1

-22. CAPACITY FACTOR (USING DER NET) 89.3 95.5 69.6

23. UNIT FORCED OUTAGE RATE _________________

7.7 1.5 4.1 2,4." SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :

1

,ly

'" 25. IF SHUT DOWN AT END OF REPORT PERIODe ESTIHATED DATE OF STARTUP:

l l

i 1 of 2 DOCKETNO. 50-335 UNIT SNUTDOWN5 AND POWER REDUCTIONS UNIT NAME St _I icie linit di DATE Octo )er 15.1986 i

CORWETED gy N_hl Grant REPORT MONT16 Rontomha,.

TELEFNONE h n8il fiGA da"U Ei Licensee Eg k

)gi jg Cause & Corrective 5,

k Na'.

Ihte

{.

it l

Acthe to 2

Event A v?

ju u

jf al, jgg Repme

  • Prevent Recurrence d

i j

05 860904 F

34.3 A

1 HB PIPEXX Following appoximately 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> of reduced power at 25%, the unit was 1 l

shutdown to repair an extraction steam line leak.

i 06 860919 F

5.1 A

2 335-86-009 HA GENERA The unit was manually tripped 1

following observation of smoke from

)

connecting wires of ISO-phase duct banks. The wires were repaired I

and the unit returned to power j

operation.

I 07 860919 F

15.8 H

3 335-86 -009 CH HTEXCH The reactor tripped while rehrning l

to full power from the previous item due to low level in.the 1A steam generator.

The unit then returned to full power operation.

i I

2 3

4 r F wced Reason:

Method:

Exhibit G Instrections 5 Scheduled A. Equipment Failem(Emplain) 1 Manuel for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for ucensee C-Refueling 3-Automatic Scram.

Event ReoriII.ER) File lNUREG-D-Regulatory Restriction

$0her(Explain 1 0161) i

[4)perator Training & Ucense Examination F Administrative M - C *** ** "* 8*

5

]

G-Operatiemal bror (Fsplein) g. /..a. Asewe.,..d Exhibit I - Sanw Source j

l'#/77)

IlOher (Euplain) 4 i

s s

2 of 2 UNIT SHU1 DOWNS AND POWER REDUCTIONS DOCKET NO. 50-335 UPAT NAME St.Iucip linit #1 DATE netnhor 1R, lor 6 REFORT MONTH September COMFt21ED sy yu emt

[ *3n c \\ CnA AASO "i

~

IE

'k

'a

] 5 s7g Ei Lkenne P,

1 Ihese h

ca.= a cweecia.e l

N. i.

3 N

$ @2 2

Event E 1F Actiam to al.

j di g Repe=t

  • E0 j

Prevent Reewrence 6

i i

t 08 860920 F

0.0 A

5 CH PUMPXX Power was reduced to approximately i

45% to repair a leaking relief valve on the 18 main feedwater pump. The unit then returned to full I

power operation.

(

I i

j j

l l

4

)

I 2

3 4

]

F: Forced Ressun:

Method:

EnhlMt G Inserections S Scheduled A-Esluspment Failme(Emplain) 1-Manuel for Preparasiim of Dasa

.i 8 Maintenance or Test 2 Manual Scram.

Entry Sheets fw Lkensee C-Refueling 3-Autosnatic Scram.

Event Repwt (LERI File INUREG-4 D-Regelseory Restriction

$4hher(Emplain) 01611 E4)perator Training a license Examinathm F Administrative M ~ C *** "

  • 8 8 5

i G-Operatiimal Frvor (Fsplain t W ". /.e A s A 4 D wC;,..,1 Exhibit I - Sanw Simrce j

19/77)

Il4hher (Eaplain) i

SUI 1 MARY OF OPERATING EXPERIENCE DOCKET HO, 50-$35 UNIT St. Lucie Unit 1 DATE October 15, 1986 COMPLETED BY N. W. -Grant TELEPHONE (305) 694-4432 REPORT HONTH September, 1986 See the " unit shutdowns and power reductions" report.

In accordance with requirements of Technical Specifications 6.9.1.6, there were no challenges to PORV or safety valves during the report month.

~

AVER AGE DAILY UNIT POWF4 LEVIL DOCKET NO, 50-389 UNIT St.1 "ria fini t 2 DATE nr+nho-ic ta86 COMPLETED BY N.W. Grant TELEMIONE (305) 694-4432 MONTH SeDtember, 1986 DAY AVERACE DAILY POWER LEVEL (MWe Net) 9/ 1/86 843 9/ 2/86 857 9/ 3/86 855 9/ 4/86 855 9/ 5/86 857 9/ 6/86 856 9/ 7/86 856 9/ 8/86 855 9/ 9/86 852 9/10/86 854 9/11/86 855 9/12/86 856 9/13/86 854 9/14/86 854 9/15/86 14 9/16/86 770 9/17/86 836 9/18/86 839 9/19/86 841 9/20/86 853 9/21/86 851 9/22/86 852 9/23/86 850 9/24/86 850 9/25/86 833 9/26/86 787 9/27/86 812 9/28/86 851 9/29/86 851 9/30/86 851 l

i

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 10/14/86 COMPLETED BY N. W. GRANT TELEPHONE 305/694/4432 OPERATING STATUS

1. UNIT NAME:

ST. LUCIE UNIT 2

2. REPORTING PERIOD:SETEMBER 1986
3. LICENSED THERMAL POWER (MWT):

2700

4. NAMEPLATE RATING (GROSS MWE): ______________

850 5.

DESIGN ELECTRICAL RATING (NET MWE):

830

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___

882

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____

839

8. IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS

  • FOR ITEM 7, MDC RAISED 9/29/86 DUE TO INCREASED EFFICIENCY.
9. POWER-LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)________________________
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE

11. HOURS IN REPORT PERIOD:

720 6551 27600.0

12. NUMDER OF HOURS REACTOR WAS CRITICAL-____

712.4 5117.7 23166.6

13. REACTOR RESERVE' SHUTDOWN HOURS __________

O.0 0.0 0.0

14. HOURS GENERATOR ON-LINE ___________-_____

698.4 5046.5 22618.8

15. UNIT RESERVE SHUTDOWN HOURS ___________-_

0 0

0

16. GROFS THERMAL ENERGY GENERATED (MWH) ____

1870405 13456385 58102918

17. GROSS ELECTRICAL ENERGY GERERATED (MWH) _

620240 4499440 19406120

18. I?IY ELECTRICAL ENERGY GENERATED (MWH) ___

587987 4258771 18329814

19. UNIT SERVICE FACTOR -____________________

97.0 77.0 82.0

20. UNIT AVAILABILITY FACTOR _____

97.0 77.0 82.0

21. CAPACITY FACTOR (USING MDC NET; 97.6 77.7 81.9
22. CAPACITY FACTOR (USING DER NET) 98.4 78.3 81.4 23, UNIT FORCED OUTAGE RATE _________________

3.0 1.5 8.9

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
25. IF SHUT DOWN AT END OF REPORT PERIODr ESTIMATED DATE OF STARTUP: ________

UNIT SHUTDOWNS AND POWEP REDUCTIONS DOCKETNO. M M UNIT NAME C + r"r4a "4+

83 DATE Od W 6r'1 E 'IQAo C00NLETED BY N u crant REPORT MONTH Sentomber TELEPHONE (305) 694-4432 "i

. III Licensee b.

Can= a correcieve

}gE IE "k

No.

Ihte

{

3m g

j Event uT Actiem to

$E E.

j di g Report

  • E0 j

Prevent Recurrence 4

d 05 860915 F

21.6 A

3 389-86-13 HA GENERA The reacto-tripped due to a turbine trip caused by low auto stop oil pressure trip. Specific cause for low auto oil pressure was not deterqined.

I i

1 I

2 3

4 f Fenced Reason:

Method:

Exhibit G-Instructions S Scheduled A Equipment Failure (Explain) 1-Manual for Preparatite of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LERI FileINUREG.

l D-Regulatiwy Restriction

$0her(Explain) 016I) 1:-Operator Training & tiense Examiniatism F Administrative M ~ O '** ""#*

5 GOperatiemal hear IFsplaini

4. /.e 4. Asove.,..,#

Eshibit I Same Source (9/77)

Il-Other (E mplain t

SUMMARY

OF OPERATINC EXPERIENCE DOCKET NO.

50-389 UNIT St. Lucie Unit 2 October 15, 1986 DATE COMPLETED BY N. W.-Grant TELEPHONE (305) 694-4432 REPORT MONTH September. 1986 See the " unit shutdowns and power reductions" report.

In accordance with requirements of Technical Specifications 6.9.1.6, there were na challenges to PORV or safety valves during the report month.

l l

l I

i l

l I

l l

4 P. o. BOX 14000. JUNO BEACH. FL 33408 bN FLORID /. POWER & LIGHT COMPANY OCTOBER 10 1986' L-86-424 Director, Otsice of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Monthly Operatino Report

Dear Sir:

Attached are the September 1986 Operating Status Reports and Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit Nos. I and 2.

The submittal of this report was delayed one day to correct data. This delay was discussed with the Region 11 Staff on October 15,1986.

Very truly yours,

. O. Woody roup Vice President Nuclear Energy COW /NWG/gp Attachment cc:

Dr. J. Nelson Grace, USNRC, Region II Harold F. Reis, Esquire i

I 6

g 1I l

NWGI/001/

PEOPLE.. SERVING PEOPLE

-_