Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
L-87-344, Monthly Operating Repts for Jul 198731 July 1987Monthly Operating Repts for Jul 1987
L-87-382, Monthly Operating Repts for Aug 198731 August 1987Monthly Operating Repts for Aug 1987
L-87-421, Monthly Operating Repts for Sept 198730 September 1987Monthly Operating Repts for Sept 1987
L-87-475, Monthly Operating Repts for Oct 198731 October 1987Monthly Operating Repts for Oct 1987
L-94-030, Monthly Operating Repts for Sept 1994 for Point Beach Nuclear Plant30 September 1994Monthly Operating Repts for Sept 1994 for Point Beach Nuclear Plant
L-95-000, Monthly Operating Repts for Dec 1994 for Point Beach Nuclear Plant Units 1 & 231 December 1994Monthly Operating Repts for Dec 1994 for Point Beach Nuclear Plant Units 1 & 2Boric Acid
L-95-007, Monthly Operating Repts for Feb 1995 for Point Beach Nuclear Plant Units 1 & 228 February 1995Monthly Operating Repts for Feb 1995 for Point Beach Nuclear Plant Units 1 & 2
L-95-009, Monthly Operating Repts for Mar 1995 for Point Beach Nuclear Plant,Units 1 & 231 March 1995Monthly Operating Repts for Mar 1995 for Point Beach Nuclear Plant,Units 1 & 2
L-95-016, Monthly Operating Repts for June 1995 for Point Beach Units 1 & 230 June 1995Monthly Operating Repts for June 1995 for Point Beach Units 1 & 2
L-95-021, Monthly Operating Repts for Aug 1995 for Point Beach Nuclear Plant31 August 1995Monthly Operating Repts for Aug 1995 for Point Beach Nuclear Plant
L-95-024, Monthly Operating Repts for Oct 1995 for Point Beach Nuclear Plant,Units 1 & 231 October 1995Monthly Operating Repts for Oct 1995 for Point Beach Nuclear Plant,Units 1 & 2Boric Acid
L-95-029, Monthly Operating Repts for Nov 1995 for Point Beach Nuclear Plant Units 1 & 230 November 1995Monthly Operating Repts for Nov 1995 for Point Beach Nuclear Plant Units 1 & 2
L-96-004, Monthly Operating Repts for Feb 1996 for Point Beach Nuclear Plant,Units 1 & 229 February 1996Monthly Operating Repts for Feb 1996 for Point Beach Nuclear Plant,Units 1 & 2Safe Shutdown
L-96-008, Monthly Operating Repts for March 1996 for Pbnp31 March 1996Monthly Operating Repts for March 1996 for PbnpBoric Acid
L-96-016, Monthly Operating Repts for Jul 1996 for Point Beach Nuclear Plant Units 1 & 231 July 1996Monthly Operating Repts for Jul 1996 for Point Beach Nuclear Plant Units 1 & 2Boric Acid
L-96-245, Monthly Operating Repts for Oct 1996 for Point Beach Nuclear Plant,Unit 1 & 231 October 1996Monthly Operating Repts for Oct 1996 for Point Beach Nuclear Plant,Unit 1 & 2
L-97-006, 1996 Annual Results & Data Rept for Pbnp,Units 1 & 231 December 19961996 Annual Results & Data Rept for Pbnp,Units 1 & 2Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Fire Barrier
Hydrostatic
Temporary Modification
Foreign Material Exclusion
Earthquake
Fuel cladding
Scaffolding
GOTHIC
LD-84-063, Part 21 Rept Re Evaluation & Corrective Action for Excessive Setpoint Drift in Some Potentiometers in Auxiliary Feedwater Actuation Sys Cabinet at St Lucie Unit 2 & Plant Protection Sys Cabinets at Palo Verde26 October 1984Part 21 Rept Re Evaluation & Corrective Action for Excessive Setpoint Drift in Some Potentiometers in Auxiliary Feedwater Actuation Sys Cabinet at St Lucie Unit 2 & Plant Protection Sys Cabinets at Palo Verde
LD-97-031, Part 21 Rept Re Incorrect Nut & Washer Plate Matl for ECCS Suction Strainer Bolted Connections.Nut Plates & Washer Plates Fabricated from Incorrect Matl & Delivered to Peach Bottom Unit 3 Site.Nut & Washer Plates Never Installed30 October 1997Part 21 Rept Re Incorrect Nut & Washer Plate Matl for ECCS Suction Strainer Bolted Connections.Nut Plates & Washer Plates Fabricated from Incorrect Matl & Delivered to Peach Bottom Unit 3 Site.Nut & Washer Plates Never Installed
ML17053D16727 May 1982Annual Financial Rept 1981High winds
ML17053D1691 March 1982Annual Financial Rept 1981
ML17223A74526 January 1990Part 21 Rept Re Backup Rings Furnished in Spare Parts Seal Kits & in 25 Gpm 4 Way Valves as Part of Actuators Made of Incorrect Matl.Rings Should Be Viton & Have Been Identified as Buna N
ML17251A48128 February 1989Ultrasonic Indication Sizing Technique Development. Related Info EnclHydrostatic
ML17261A53018 June 1987Part 21 Rept Re Potential Util Failure to Comply W/Component Containment Isolation Licensing Commitment If Proposed Mods to Component Cooling Water Sys Instituted.Utils Advised to Evaluate Containment Isolation Sys
ML17264A11831 July 1995Response to Part (1) of GL 92-01,Rev 1,Suppl 1.
ML17279A1917 April 1987Comparision of Electrical Design of Wye Pattern Globe Valve Actuator W/Ball Valve,Hanford 2 & River Bend Design. Five Oversize Drawings Encl
ML17298B53930 November 1984Summary Rept on Design Basis of Shutdown Cooling Sys Relief Valves for Cessar Sys 80.Hydrostatic
ML17298B54030 November 1984Summary Rept on Operability of Shutdown Cooling Sys Relief Valves for Palo Verde Units 1,2 & 3.
ML17340A9854 April 1981Monthly Operating Repts for Mar 1981
ML17341B2427 May 1982QA Manual.Safe Shutdown
Coatings
Nondestructive Examination
Condition Adverse to Quality
Control of Heavy Loads
Backfit
ML17342A20610 June 1985Revised Rev 8 to Topical QA Rept.Safe Shutdown
Non-Destructive Examination
Fire Barrier
Coatings
Nondestructive Examination
Control of Heavy Loads
Early Warning Fire Detection
Backfit
ML17342B04630 November 1987Monthly Operating Repts for Nov 1987
ML17342B05131 October 1987Corrected Monthly Operating Repts for Oct 1987,consisting of Revised Outage Duration Hours
ML17342B08930 November 1987Corrected Monthly Operating Rept for Nov 1987
ML17342B17131 January 1988Monthly Operating Repts for Jan 1988
ML17342B17230 April 1987Corrected Operating Data Repts for Apr 1987
ML17342B17331 May 1987Corrected Operating Data Repts for May 1987
ML17342B17430 June 1987Corrected Operating Data Repts for June 1987
ML17342B17531 July 1987Corrected Operating Data Repts for Jul 1987
ML17342B17631 August 1987Corrected Operating Data Repts for Aug 1987
ML17342B17730 September 1987Corrected Data Operating Repts for Sept 1987
ML17342B17831 October 1987Corrected Operating Data Repts for Oct 1987
ML17342B17930 November 1987Corrected Operating Data Repts for Nov 1987
ML17342B18031 December 1987Corrected Operating Data Repts for Dec 1987
ML17342B18130 September 1987Corrected Operating Data Rept for Sept 1987
ML17342B18231 October 1987Corrected Operating Data Rept for Oct 1987
ML17342B18330 November 1987Corrected Operating Data Rept for Nov 1987
ML17342B18431 December 1987Corrected Operating Data Rept for Dec 1987
ML17342B28631 March 1988Monthly Operating Repts for Mar 1988
ML17342B28929 February 1988Revised Rept of Unit Shutdowns & Power Reductions for Feb 1988