AVIIE DAILY. UNIT PURER LEVEL
~
DOCKET NO.
50-250 UNIT Turke Point Unit 3 DATE Apri1 15, 1988 CONPLETED BY N.M. Grant TELEPHONE 305 694-4432
- March, 1988 DAY AVERAGE DAILY POWER LEVEL (N Ne-Net) 3/ 1/88 3/ 2/88 3/ 3/88 3/ 4/88 3/ 5/88 3/ 6/88 3/ 7/88 3'/ 8/88 3/ 9/88 3/10/88 3/ii/88 3/12/88 3/13/88 3/14/88 3/15/88 3/16/88 3/17/88 3/18/88 3/19'/88 3/20/88 3/21/88 3/22/88 3/23/88 3/24/88 3/25/88
'/26/88 3/27/88 3/28/88 3/29/88 3/30/88 3/31/88 695 699 696 688 691 691 692 695 697 695 706 705'98 694 701 46
-21
-21
-22
-23
-22
-21 139 226
-14
-15
-15 20
-20 156 536 SS04220074 SS0415 PDR ADOCK 05000250 R
h
OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50 250 DATE 4/14/88 COMPLETED BY Ni Wi GRANT TELEPHONE 305/694/4432 UNIT NAME'URKEY POXNT UNIT 3 2.
REPORTING PERIOD:
MARCH 1988 3+
LICENSED THERMAL POWER (MWT) +
2~00 NAMEPLATE RATING (GROSS MWE):
760 5i DESIGN ELECTRICAL RATING (NET MWE)+
693 6+
MAXIMUM DEPENDABLE CAPACXTY (GROSS MWE):
699 7+
MAXIMUM DEPENDABLE CAPACITY (NET MWE)+
666 8
XF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORTS GIVE REASONS:
9+
POWER LEVEL TO WHICH RESTRICTED~ IF ANY (NET MWE) ie.
REASONS FQR RESTRICTIONS'F ANY:
MONTHLY
-YTD-CUMULATIVE 1 1 +
HOURS IN REPORT PERIOD 3 12+
NUMBER OF HOURS REACTOR WAS CRITICAL 13+
REACTOR RESERVE SHUTDOWN HOURS 14'OURS GENERATOR ON-LINE 15'NXT RESERVE SHUTDOWN HOURS 16'ROSS THERMAL ENERGY GENERATED (MWH) 17+
GROSS ELECTRICAL ENERGY GENERATED (MWH) l,8, NET ELECTRXCAL ENERGY GENERATED (MWH) 19+
UNIT SERVICE FACTOR 28, UNXT AVAILABILITYFACTOR 21o CAPACITY FACTOR (USING MDC NET) 22.
CAPACITY FACTOR (USING DER NET) 23 o UNIT FORCED OUTAGE RATE 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 483i5 OiO 440+9 0
888882 292245 271711 59+3 59.o,3 54' 52 t 7 48'o 7 2184 995i4 OiO 989' 0
1777923 572930 526223 41+7 41+7 36i2 34o8 58+3 134313+6 88971ii 844o4 87745.1 121.8 181582186 58170931 55005009 65i3 65o4 62+9 59+1 ii+4 25'F SHUT DOWN AT END'F -REPORT PERIODs ESTXMATED DATE OF STARTUP>
~5
!k
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH DOCKET NO.
Turkey Point Unit ini3 DATE A ril 15,- 1988 COMPLETED BY TELEPHONE
~ 305) 694-4432 No.
Date Type Duration (Hours)
Reason~
Method of Shutting Down Reactor Ucensee Event Reports System Code4 Component Code5 Cause &Corrective Actionto Prevent Recurrence 03 04 880316 880324 169.5 A
133.6 A
HB HTEXCH HC HTEXCH Following an initial power reduction to investigate excessive noise in the 3D moisture separator reheate (HSR), the unit was shutdown, repairs were implemented on the MSR and the unit began return to power where a hold was experience to adjust nuclear instrumentation.
llhile returning to power the unit was shutdown from approximately 30Ã power due to high secondary condensate conductivity caused by a condenser tube leak.
The leak was repaired and the unit began to return to power where several holds were experienced for secondary chemistry.
F Forced S Scheduled Reason A - Equipment Failure (Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain) 3 Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain)
ExhibitG-Instructions forPreparation ofData EntryScheetsUcensee Event Report(LER) File (NUREG4161)
Exhibit1-Same Source
0 I
~
0
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
UNIT DATE COMPL'ETED BY TELEPHONE 50-250 Turkey Point Unit 83 April 15, 1988'.
W. Grant (305) 694-4432 REPORT MONTH
- March, 1988 See the "Uni't Shutdowns and Power Reductions" report.
iI I
ANEE UAILY UNIT PURER LEVEL DOCKET NO.
50-251 UNIT Turke Point Unit 4'ATE April 15, 1988 CONPLETED.'BY N.W. Grant TELEPHONE HONTH
- March, 1988 DAY AVERAGE DAILY'OMER LEVEL (N Me-Net) 3/ 1/88 3/ 2/88 3/ 3/88 3/ 4/88 3/ 5/88 3/ 6/SS 3/ 7/88 3/ 8/88 3/ 9/88 3/10/88 3/ii/88 3/12/88 3/13/88 3/14/88 3/15/88 3/16/88 3/17/88 3/18/SS 3/19/88 3/20/88 3/21/88 3/22/88, 3/23/88 3/24/88 3/25/88
'/26/88 3/27/88 3/28/88 3/29/88 3/30/88 3/31/88 703 701 699'99 696 695 643'07 303 400 595 700 697 694 701 704 785 703
,700 704 702 701 700 698 697 695 691 686 690 691 692
OPERATING DATA REF'ORT OPERATING STATUS DOCKET NQ 50 251 DATE 4/14/88 COMPLETED BY Ni Hi GR*NT TELEPHONE 305/694/4432 UNIT NAME: TURKEY POINT UNIT 2,
REPORTING PERIOD:
M*RCH 1988 3i LXCENSED THERM*L F'ONER (MHT)+
2~00 NAMEPLATE RATING (GROSS MWE)!
760 5.
DESIGN ELECTRICAL RATING (NET MHE) o 693 6+
MAXIMUM DEPENDABLE CAPACITY (GROSS MME) i 699 7 o MAXIMUM DEPENDABLE CAPACITY (NET MHE) o 666 8+ IF CHANGES OCCUR IN CAF'ACXTY RATINGS
( ITEMS NUMBER 3 THROUGH 7 )
SINCE LAST REPORT r GIVE REASONS'i POWER LEVEL TO WHICH RESTRICTEDr XF *NY (NET MHE) ie.
REASONS FOR R~S~~ICTIONS. IF ANY:
MONTHLY "YTD-CUMULATIVE ii+ HOURS IN REPORT F'ERIODo 12 NUMBER. OF HOURS'EACTOR HAS CRITICAL 13 REACTOR RESERVE SHUTDOHN HOURS 14, HOURS GENERATOR QN-LINE 15'NXT RESERVE SHUTDOWN HOURS 16'ROSS THERMAL ENERGY GENERATED (MHH) 17+
GROSS ELECTRXCAL ENERGY 'GENERATED (MHH) 18.
NET ELECTRICAL ENERGY GENER*TED
( MHH) 19+
UNIT SERVICE FACTOR 20+
UNIT AVAXLABILITYFACTOR 21+
CAPACITY FACTOR (USING MDC NET) 22'APACITY FACTOR (USXNG DER NET) 23'NXT FORCED OUTAGE R*TE 24.
SHUTDOWNS SCHEDULED 'OVER NEXT 6 MONTHS
- 744, 744' 0+0 744oO 0
1557447 513135 48'9459'00+0 1eeiO 98+8
'94' 0
2184 1780+3 0 i 0 1778+5 0
3765807 1243310 1181998 81 il Bii 1 Bii3 78' 18i9 128045+0 86966+8 166+6 83976+6 32+1 177221430 56543074 53500780 65+6 65+6 64 ii 60i3 iiiO 25,, IF SHUT DOWN AT END OF REPORT PERIOD r ESTIMATED DATE OF STARTUP:
0
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH
- March, 1988 DOCKET NO.
50-251 Turkey Point Unit 84
.'ATE April 15, 1988 COMPLETED By " "
Grant TELEPHONE
~305) 694-4432 No.
Date Type Duration (Hours)
Reason~
Method of Shutting Down Reactor Ucensee Event Report i'ystem Code4 Component Codes Cause 8 Corrective Actionto Prevent Recurrence 06 880307 F
0.0 HH PIPEXX Unit 0'4 reduced power to repair a leak in the 4A steam generator feedwater pump suction line.
The unit was then returned to full power operations.
F Forced S Scheduled Reason A - Equipment Failure (Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
ExhibitG-Instructions forPreparation ofData EntryScheetsLicensee Event Report(LER) File (NUREG%161)
Exhibit1-Same Source
0
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-251 Turke Point Unit ¹4 A ril. 15 1988 N.
W. Grant 305 694-4432 REPORT MONTH
- triarch, 1988 See the '"Unit Shutdowns.
and Power Reductions" report.,
II I
AAGE DAILY UNIT PURER LEVEL ~
DOCKET NO.
UNIT DATE I
CONPLETED GABY TELEPHONE 50-335 St.
LUci April 15, 1988 N.W.
Gra t
- March, 1988 DAY AVERAGE DAILY PSKR LEVEL (I Qe-Net) 3/ 1/88 3/ 2/88 3/ 3/88 3/ 4/88 3/ 5/88 3/ 6/88 3/ 7/88
'3/ 8/88 3/ 9/SS 3/le/88 3/11/88 3/12/88 3/13/88 3/14/88 3/15/88 3/16/88 3/17/88 3/1'8/88 3/19/88 3/20/88 3/22/88 3/22/SS 3/23/88 3/24/SS
.3/25/88 3/26/88 3/27/88 3/28/88 3/29/88 3/30/88
'3/32/88 844 794 866 863 862L 864 866 865 864 Shl 862 861 862 848 842 869 869 868 868 S69 868 850 847 866 867 865
'865
-29 432
'860 862
.Qi I
OPERATING DAT* REF'ORT OPERATING STATUS DOCKET NO 50 335 IDATE 4/14/88 COMPLETED BY N>>
H>>
GR*NT TELEF'HONE 305/694/4432 1>>
UNIT NAME>>
ST>>
LUCXE UNIT 2.
REPOR1'ING PERXOD'ARCH 1988 3.
LICENSED THERMAL POWER (MHT)>>
2700 4>>
NAMEPLATE RATING (GROSS MWE)>>
858 5>>
DESIGN ELECTRIC*L R*TXNG (NET MME)i 830 6>>
MAXIMUM DEPENDABLE CAPACX1'Y (GROSS MME)+ '72 7>>
MAXIMUM DEPENDABLE CAPACITY (NET MWE)+
839 8>>
XF CHANGES OCCUR IN CAF'ACXTY RATINGS (ITEMS NUMBER 3 1'HROUGH 7)
SINCE L*ST REPORT)
GIVE REASONS>>
9>>
POHER LEVEL TO HHICH RESTRICTED
XF ANY <NET MHE) 10,'RE*SONS FOR RESTRXCTXONSr XF
- NY'ONTHLY
-YTD-CUMULATIVE ll. HOURS XN REPORT PERIOD:
12 NUMBER OF HOURS REACTOR HAS CRITICAL 13>>
REACTOR RESERVE SHUTDOHN HOURS 14>>
HOURS GENERATOR ON-LINE 15>>
UNIT RESERVE SHUTDOHN HOURS 16>>
GROSS THERMAL ENERGY GENERATED (MHH) 17>>
GROSS ELECTRICAL ENERGY GENERATED
<MHH) 18>>
NET ELECTRIC*L ENERGY GENERATED (MHH) 19>>
UNIT SERVXCE FACTOR ZO>>
UNIT AVAILABILITYFACTOR 21>>
CAPACITY FACTOR (USING MDC NET) 22>>
CAF'*CITY FACTOR
( USING DER NET )
23>>
UNIT FORCED OUTAGE RATE 24>>
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
'744 723>> 1 0>>0 717>>0 8
1903649 640430 607535 96>>4 96>>4 97>>3 98.>> 4 3>>6 2184 2163>>1 0>>0 2157>>0 0
5787911 1949430 1851795 98>>8 98>>8 101>>1 102>> 2 1>>2 98856>>0 73707>>4 205>>3 73126>> 9 39>>3 187135581 61473015 58052962 74>>8 74>>0 73>>4 72>>0 3>>9
- 25. IF SHUT DOHN AT END OF REF'ORT PERXODr ESTXMATED DATE OF STARTUP:
IQ'
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH DOCKET NO.
UNiTNAMESt.
Lucie Unit 0'1 DATE April 15, 1988 COMPLETED BY N.
W. Grant TELEPHONE (305)694-4432 Date Type'uration (Kours)
Reason~
Method of Shutting Down Reactor Ucensee Event Report¹ System Code4 Component Codes Cause 8 Corrective Actionto Prevent Recurrence 880328 27.0 not assigned CH VALVEX Hanual control of the feedwater regulating valves was taken when control room personnel noted increas-ing steam generator level on a steam generator.
This manual control result ed in a decreasing level and personne were unable to recover level prior to a reactor trip on low steam gen-erator level.
The problem was resolve and the unit returned to full power operation.
F Forced S Scheduled Reason A - Equipment Failure (Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain)
ExhibitG-Instructions forPreparation ofData EntryScheets Ucensee Event Report(LER) File (NUREG%161)
Exhibit1-Same Source
O.
C
,I
AllelGE VAILY VNIT PONER
'LEVEL
~
DOCKET NO.
50-389 UNIT St.
Lucie Unit 2 DATE APri1 15, 1988 COMPLETED BY N.ll. Grant TELEPHONE
- 305 694-4432 t1arch, 1988 DAY,AVERAGE DAILY POMER LEVEL (N ice-Net) 3/ 1/88 3/ 2/88 3/ 3/88
'3/
4/SS'3/5/88 3/ 6/$ 8 3/ 7/88 3/ 8/88 3/ 9/SS 3/10/88 3/1'1/S8 3/12/88 3/13/88 3/14/88 3/15/88'/ih/88 3/17/88 3/18/88 3/19/88'/20/88'/21/88 3/22/88 3/23/88 3/24/88 3/25/88 3/26/88 3/27/88 3/28/88 3/29/88 3/30/88 3/31/88 867 868 868 864 864 865 86'6 866 S65
'864 864 864 864 865 864 863 865 865 864 864 846 824 864
'864 864 863 8'62 862 862 862 862
!5
e'F'ERATXNG STATUS OPERATING DATA REF'ORT DQCl(ET NO 50 389 DATE 4/14/88 COMPLETED BY Ni W+
GRANT TELEPHONE 305/694/4432 ii UNIT NAMEo STi LUCIE UNIT 2 2i REPORTING PERIOD+
MARCH 1988 3+
LICENSED THERMAL POWER (MWT) +
2700 4i NAMEPLATE RATXNG (GROSS MWE):
850 5,
DESIGN ELECTRICAL RATING (NET MWE):
830 6MAXIMUMDEF'ENDABLE CAPACITY (GROSS MWE):
882 7i MAXXMUM DEPENDABLE CAPACITY (NET MWE) i 839 8
IF CHANGES OCCUR XN CAF'ACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT r GTVE REASONS i POWER LEVEL TQ WHICH RESTRICTED~ IF ANY (NET MWE) 10, REASONS 'FOR RESTRICTIONS XF ANY; MONTHLY
-YTD-CUMULATIVE ii+ HOURS IN'EPORT PERIOD:
l.2+
NUMBER OF HOURS REACTOR WAS CRITICAL 13+
REACTOR RESERVE SHUTDOWN HOURS 14+
HOURS GENERATOR ON-LINE 15.
UNIT RESERVE SHUTDOWN HOURS 16 GROSS THERMAL ENERGY GENERATED (MWH) 17+
GROSS ELECTRICAL ENERGY GENERATED (MWH) 18.
NET ELECTRICAL ENERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR 20, UNIT AVAILABXLITYFACTOR Zii CAPACITY FACTOR (USING MDC NET) 22 C'APACITY FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 24+
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 744+8 eie 744ie 0
2005459 675480 641508 188+8 ieeoe 182o8 183o9 0
2184 2184ie e,e 2184+8 0
5887264 1985020 1885687 188+8 188+0 182i9 184ie 0
48753oe 34942+8 8 i 8 34221 i 6 0
88833904 29673680 28053475 84+0.
84+8 84i5 84'i 1 6i8 5,
XF SHUT DOWN AT END OF REPORT PERIOD~
ESTXMATED DATE OF STARTUP:
0
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH March:1988 DOCKET NO.
I tjNiTNAMF St. Lucie Unit ¹2 1
DATE A ril 15, 1988 COMPLETED BY H.
W. Grant
\\
TELEPHONE 305 694-4432 v
Date Type'uration (Hours)
Reason~
Method of Shutting Down Reactor Ucensee Event Report¹ System Code4 Component Codes Cause &Corrective Actionto PreventRecurrence Unit ¹2 had no shutdowns or signific power reductions.
F Forced S Scheduled Reason A - Equipment Failure (Explain)
B - Maintenanceor Test C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
ExhibitG-Instructions forPreparation ofData EntryScheets Ucensee Event Report(LER) File (NURE&0161)
Exhibit1-Same Source
T.
'l
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE.
50-389 St.
Lucie Unit 82 April,'5, 1988 N.
W. Grant (305)694-4432 REPORT MONTH.
- March, 1988 Unit 82 operated at essentially full power and had no "Unit shutdowns or significant power reductions."
In accordance with requirements of'echnical Specifications 6.9. 1.6, there were.no challenges to PORV or safety valves during the report month.