Text

.

RAGE DAILY UNIT-POMER LEVEL DOCKET NO.

50-250 UNIT Turke Point. Unit 3 DATE December 15 1987 CONPLETED BY N.W. Grant TELEPHONE 305 '94-4432

November, 1987 DAY AVERAGE DAILY POMER LEVEL (N Ih-Net) 11/ 1/87 11/ 2/87 11/ 3/87 11/ 4/87 11/ 5/87 11/ 6/87 11/ 7/87 11/ 8/87 1'1/ 9/87 11/10/87 11/11/87 11/12/87 11/13/87 11/14/87 11/15/87 11/16/87 11/17/87 11/18/87 11/19/87 11/20/87 11/21/87 il/22/87 11/23/87 11/24/87 11/25/87 11/26/87 11/27/87 11/28/87 11/29/87 11/30/87

-9

-9

-9

-10

-6

-5

-5 C

5

-5

-6

-6

-6 C'5

-5

-5

-6

-6

-6

-6

-6

-6

-6

-6

-6

-6

-6

-6 8712280093 871215 PDR ADOCK 05000250

,R

......=...DCD

I~

I

OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50 258 DATE 12/14/87 CQHPLETED BY N,

H, GRANT TEI EPHONE 305/694/4432 1+

UNXT NAKE:

TURV(EY POINT UNIT 3 2.

REPQRT1NG PERIOD: NOVEMBER 1987 3.

LXCLNSED THERMAL PQHEP>>

(NHT):

2200 NAHEPLATE RATXNG (GROSS HHE):

760 5.

DESIGN ELECTRICAL RATXNG (NET HHE):

693 6+

MAXIMUM DEPENDABLE CAPACITY (GROSS NHE) +

699 7.

HAXIHUN DEPENDABLE CAPACITY (NET HHE):

666

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHS NUHBER 3 THROUGH 7)

SINCE LAST REPORT r GIVE REASONS i 9.

PQHER LEVEL TO MHICH RESTRICTED)

XF ANY (NET HNE) 10'EASONS FOR RESTRICT'IONS v XF ANY o NQNTHLY

-YTD-CUHULATIVE 11+

HOURS IN REPORT PERIOD:

12'UHBER OF HOURS REACTOR HAS CRITICAL 13.

'REACTOR RESERVE SHUTDOWN'OURS HOURS GENERATOR ON-LINE 15.

UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GENERATED (NHH) 17.

GROSS ELECTRICAL ENERGY GERERATED (HHH) 18.

NET ELECTRICAL ENERGY GENERATED (HAH) 19 i UNIT SERVXCE FACTOR 20.

UNXT AVAILABILITYFACTOR 21.

CAPACITY FACTOR (USING HDC. NET) 22.

CAPACXTY FACTOR, (USING'"DER NET) 23.

UNIT FORCED OUTAGE RATE 24@

SHUTDOHNS SCHEDULED OVER'EXT 6 HQNTHS o

720 OoO OoO 0.0 0

'0 0

-5074 8.0 0+0 O.e 0..0 1 ee. 0 8016 1747.4 0.0 1426o5 e

2831092 928210 833099 17.8 17.8 15>6 15ie 62o9 131385.6 87813.2 844+4 86693.9 121 '

179676499 57563061 54455739 66+0 66oi 63i6 59.8 10+1

25. IF SHUT DOWN *T END OF REPORT PERIOD ~

ESTIHATED 'DATE OF STARTUP l 12/17/87

0 I

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH

November, 1987 DOCKET NO.

Turkey Point Unit 83..

DATE December 15, 1987'OMPLETED BY TELEPHONE No.

Date Type Duration (Hours)

Reason2 Method of Shutting Down Reactor Ucensee Event Report¹ System Code4 Component Codes Cause &Corrective Actionto PreventRecurrence 08 870925 720.0 A

1 250-87-30 CF PUHPXX Unit 83 remained shutdown to repair various items including cabling for the 3A RHR pump motor and containmen purge valve.

A design modification to the RHR pump recirculating lines was also performed to correct a

potential inadequacyrin the common minimum recirculation piping design.

F Forced S Scheduled Reason A - Equipment Failure (Explain)

B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain) 3 Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)

ExhibitG-instructions forPreparation ofData Entry Scheets Ucensee Event Report(LER) File (NUREG4161)

Exhibit1-Same Source

0

~

~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT

'DATE.

COMPLETED BY TELEPHONE'0-250 Turkey Point Unit 83 December 15, 1987 N.W. Grant (305)i 694-4432 REPORT MONTH November 1987'ee the "Unit Shutdowns and Power Reductions" report.

!~

A f,

b

~

K ~

OERA6E DAILY UNIT PONER LEVEL '

DOCKET NQ.

50-251 UNIT Turke Point Unit 4

DATE, CON? LETED!BY TELEPHONE December 15, 1987 N.W.

Grant'ovember, 1987 DAY AVERAGE DAILY POMER LEVEL (N Me-Net) 1 1'/ 1/87 1'1/ 2/87 11/ 3/87 11/ 4/87 11/ 5/87 11/ 6/87 11/ 7/87 11/ 8/87 11/ 9/87 11/10/87 11/11/87 11/12/87 11/13/87 11/14/87 11/15/87 11/16/87

.1'1/17/87 11/18/87 11/19/87 11/20/87 11/21/87 11/22/87 11/23/87 11/24/87 11/25/87'1/26/87

'11/27/87 11/28/87 11/29/87 11/30/87

-3

-3

-3

-2

-2

-3

-4'4

-4

-4

-3

-2 2

-2

-2

-2

-2

-3

-3

-4

-5

-5

-5

-3

-2

'7

-5

-17

QPERATXNG STATUS OPERATING D*TA REPORT DOCKET NO 58 251 DATE 12/14/87 CONF'LETED BY No Ho GRANT TELEF'HONE 305/694/4432 1

UNXT NAME: TURI"EY POIHT UNXT 2.

REPORTXNG F'ERIQD: NOVEMBER 1987 3.

LICENSED THERMAL POHER (MHT):

2200 NANEPLATE RATING (GROSS NHE) +

760 5.

DESIGN ELECTRICAL RATING (NET MHE) f 693 6,

NAXXMUM.DEF'EHDABLE CAPACITY (GROSS MWE>:

699 7,

MAXIMUM DEF'ENDABLE C*PACITY (NET MHE):

666 8.

XF CI-IANGES OCCUR IN CAPACITY RATXHGS (XTEMS NUMBER 3 THRQUGH 7)

SXHCE LAST REPORT r GIVE REASONS:

9i POHER LEVEL TO HHXCH.RESTRICTEDr XF AHY (HET MME) 10 i REASONS FOR RESTRICTXOHS r IF AHYi MONTHLY

-YTD-CUMULATIVE HOURS IN REPORT PERIOD l 12, HUMBER QF HOURS REACTOR HAS CRITICAL 13.

REACTOR RESERVE SHUTDOWN HOURS 14.

HOURS GENERATOR ON-LINE 15.

UHXT RESERVE SHUTDOWN HOURS lb'ROSS THERMAL ENERGY GEHER*TED (MHH) 17.

GROSS ELECTRICAL ENERGY GERERATED (MHH) 18.

NET ELECTRICAL ENERGY GENERATED (MHH) 19".

UHXT SERVICE FACTOR O.

UNIT AVAILABILITYFACTOR 21 CAPACXTY FACTOR (USING MDC NET) 22'APACITY F*CTOR (USING DER NET) 23+

UNIT FORCED OUTAGE RATE 24, SHUTDOHNS SCHEDULED OVER'EXT 6 MONTHS 720 0.0 8i8 8i8 0

8 0

3353 0.0 8o8 8i8 0.0 188i8 8016 3809.8 8o8 3654i8 0

7328088 2366350 2210826 45ib 45ob 41.4 39.$

54.4 125117+8 84493+1 ibbob 81541.1 3201 172091676 54851198 51892738 65 i 2 65+2 63.6 59.8 18+8

25. IF SHUT DQHN AT EHD OF REPORT PERIOD ESTIMATED DATE QF STARTUP; 12/4/87

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH November 1987 DOCKET No 50-251 UNiTNAME Tur key Point Unit ¹4 DATE December 15, 1987 COMPLETED BY TELEPHONE No.

Date Type'uration (Hours)

Reason2 Method of Shutting Down Reactor Licensee Event Reports System Code4 Component Codes Cause &Corrective Actionto Prevent Recurrence 05 871012 720.0 H

1 XX VALVEX Unit ¹4 was shutdown for repairs of miscellaneous items including a leaking PORV, the C accumulator Isolation Valve, and the RHR heat exchanger bypass flow control valve.

A design modificatiori to the RHR pump recirculating lines was also performed to correct a potential inadequacy in the common minimum recirculation piping design.

F Forced S Scheduled Reason A - Equipment Failure(Explain)

B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other(Explain)

Method 1 - Manual 2-ManualScram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)

ExhibitG-Instructions forPreparation ofData EntryScheets Ucensee Event Report(LER) File (NUREG-0161)

Exhibit1-Same Source

7

'I a

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

'UNIT DATE COMPLETED BY TELEPHONE 50-251 Turkey Point Unct II4 December 15, 1987 N.

W. Grant (305) 694-4432 REPORT MONTH November 1987 See the "Unit Shutdowns and Power Reductions" report.

~

~

ERAGE DAILY UNIT POQER LEVEL DOCKET. NO.

50-335 UNIT

- St.

Luci DATE December 15, 1987 CONPLETED BY, N.u.

Gr TELEPHONE NONTH

November, 1987 DAY AVERAGE DAILY. POMER LEVEL (N ve-Net) 11/ 1/87 11/ 2/87 11/ 3/87 11/ 4/87 ii/ 5/87 ii/ 6/87 11/ 7/87.

11/ 8/87 11/ 9/87 11/10/87 11/ii/87 ii/12/87 11/13/87, 11/14/87 11/15/87 11/16/87 1'1/17/87 ii/18/87 ii/19/87 ii/20/87 11/21/87 11/22/87 ii/23/87 11/24/87 11/25/87 11/26/87 11/27/87 11/28/87 ji/29/87 11/30/87 859 860 858 860

'858 859 858 861 860 859 854 857 857 857 855 848 849 847 847 819 787 863 862 861 868 s61 859 858 859 861

0

OPERATING STATIJS OPERATING DATA REPORT DOCI<ET NO 58 335 DATE 12/14/87 COHPLETED BY N.

W.

GRAHT TELEPHONE 385/694/4432 l.

UHXT NANE:

ST+

LUCXE UNIT 1

2.

REPORTIHG PERIOD: NOVEMBER 1987 3,

LICENSED rHERVAL POVER

<VWT):

2700 HANEPLATE RATING

<GROSS NHE) o 850 5,

DESIGN ELECTRICAI RATING (NET ~wE):

83e 6.

HAXIHUH DEPENDABLE CAF'ACITY <GROSS HHE):

872 7i HAXIHUN DEPFHDABLE CAPACITY (NET MHE)!

839 8.

XF CHANGES OCCUR IH CAPACXTY RATINGS (ITEHS NUNE'ER 3 THROUGH 7)

$ 1NCE LAST REI='ORT ~

GIVE REASONS:

POHER LEVEL TO HHICH RESTRXCTED XF ANY (HET HHE) 10.

REASOHS FQR RESTRICTIONS r IF AHY:

HQNTHLY

-YTD-CUNULATIVE lli 12'3 t

14p

] I 16 ~

17.

18.

19.

20.

21'I 3 i 24.

HOURS IN RFPORT 'PERIOD o NUHE'ER OF HOURS REACTOR HAS CRXTXCAL REACTOR RESERVE SHIJTDQHN HOURS I-IOURS GENERATOR QN-LINE UNIT RESERVE SHUTDQHN HOURS GROSS THERHAL ENERGY GENERATED (HHH)

GROSS ELECTRICAL ENERGY GERFRATED (HHH)

HET FLECTRICAL ENERGY GENERATED

( HHH )

IJNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR CAPACITY FACTOR (USING NDC NET)

CAPAC1TY FACTOR (USING DER HET.)

UNXT FORCED OUTAGE RATE'.

SHUTDOWNS SCHEDULED OVER. NEXT 6 MONTHS 720 728>8 0 ~ 0 e

~ e 0

1937198 647140 614715 leeie leeie 101.8 102i9 0

8016 6233.7 0.0 6079.0 8

16155399 5377928 5888109 75.i 8 75.8 7517 76.5 5i 1 95928 i 8 78886i4 285i3 78234.6 39+3 17937459e 58863065 55573932 73i2 7343 7212 78' 4+1

25. IF SHUT DOHH AT EHD OF I'EPORT PERIOD ESTIHAT'ED DATE OF STARTUP:

i 0

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH November 1987 DOCKET NO.

UNITNAME St. Lucie Unit ¹1 DATE Oecembe r 15, 1 987 COMPLETED Bp N

W. Grant TELEPHONE (305) 694-4432 Date Type'uration (Hours)

Reason~

Method of Shutting Down Reactor Ucensee Event Reports System Code4 Component Codes Cause &Corrective Actionto ProventRecurrence Unit ¹1 had no "shutdowns or significant power reductions".

F Forced S Scheduled Reason A - Equipment Failure (Explain)

B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain) 3 Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain) 4 ExhibitG-Instructions forPreparation ofData Entry Scheets Ucensee Event Report(LER) File (NUREG4161) 5 Exhibit1-Same Source

ii 4

4 4

I 1.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT DATE COMPL'ETED BY TELEPHONE 50-335 St.

Lucie Unit 1

~a

~

1987 305 694-4432 REPORT MONTH Unit 4'1 operated at essentially full,power and had no "Unit Shutdowns or significant Power Reductions;"

In accordance with requirements of Technical Specifications 6.9. 1.6, there were no challenges to PORV or safety valves, during the report month.

ii I

I A

A

OIERAGE DAILY UNIT PDMER LEVEL '

DOCKET NO.

UNIT

'DATE CONPLETED BY TELEPHONE 50-389 St.

Lucie Unit 2 December 15, 1987 N.H. Grant 305 694-'432

,HONTH

November,

'1987 DAY AVERAGE, DAILY POMER LEVEL (ll Qe-Net) 11/ 1/87 ii/ 2/87 11/ 3/87 11/ 4/87 11/ 5/87 11/ 6/87 11/ 7/87-11/ 8/87 1'1/ 9/87 11/10/87 11/11/87

.11/12/87 11/13/87 11/14/87 1'1/15/87 11/16/87 11/17/87 11/18/87 11/19/87

'1 1./20/87'1/21/87 11/22/87 11/23/87 11/24/87 11/25/87 11/26/87 11/27/87 11/28/87 11/29/87 11/30/87

-4

-4

-4

-4

-3

-3

-3

-3

-3

-3 5

-6

-7

-7

-8 7

-6

-17

-27

-31

-27

-31 83 366

-26

-16

-21

-27

-25

QPER*TXNG STATUS

.OPERATING DATA REPORT DOCKET NO 50 389 DATE 12/14/87 COMPLETED BY N.

He GRANT TELEPHONE 305/694/4432 UNXT NAME:

ST.

LUCXE UNXT 2 2 i REPORTING PERIOD: NOVEMBER 1987 3.

LICENSED THERMAL PQHER

< MAT) +

2700'i NAMEPLATE RATXNG (GROSS MME)i 850

'5i DESXGN LLECTRIC*L RATING (NET MME) i 830 6+

MAXXMUM DEPENDABLE CAPACITY (GROSS MME)o 882 7.

MAXIMUM DEPENDABLE CAPACITY (NET MME):

839

8. IF CHANGES OCCUR IN CAPACITY RATXNGS

<XTEMS NUMBER 3 THROUGH'7)

SXNCE I AST REPORT x GIVE REASONS o

9i-POHER LEVEL TO HHICH RESTRICTEDr XF ANY (NET MHE) 10.

RE*SONS FOR RESTRXCTIONS IF ANY:

MONTHLY

-YTD-CUMULATXVE 11.

121 13'4.

15.

16

'7+

18

'9.

20

'1.

22.

23+

24

'OURS IN REPORT PERIOD l NUMBER QF HOURS REACTOR WAS CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENER*TOR ON-LINE UNIT RESERVE SHUTDQHN HOURS GROSS THERMAL ENERGY GENERATED (MHH)

GROSS ELECTRICAL ENERGY GERERATED (MHH)

NET ELECTRICAL ENERGY GENERATED (MHH)

UNIT SERVICE FACTOR UNXT AVAILABILITYFACTOR CAP*CITY FACTOR.

( USXNG, MDC NET )

CAPACITY FACTOR, (,USING-DER NET)

UNXT FORCED OUTAGERATE SHUTDOWNS SCHEDULED OVER"NEXT 6 MONTHS 720 104.4 OeO 44+9 e

440 1'9 12610 2005 6.2 6i2 0.3 8.3 93i8 8016 6640+9 OiO 6477+9 0

17046286 5652230 5341510 80i8 80.8 79' 88.3 11.2 37825+0 32016.5 0 '

31305+7 e

81084187 27046388 5559114 82i8 82o8 82i6 82o4 8.8 25 i IF SHUT DOHN AT END OF REPORT PERIOD r ESTIMAT'ED DATE OF STARTUP i 12/3/87

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH November-1987 DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE

~

~

~

No.

Date Type Duration (Hours)

Reason~

Method of Shutting Down Reactor ucensee Event Report¹ System Code4 Component Codes Cause 8 Corrective Actionto Prevent Recurrence 10 871002 S

ll 871123 F

12 871125 F

543. 1 9.5 120.5 RC FUELXX HA GENERA HA GENERA Unit 2 was shutdown for refueling and scheduled maintenance.

The turbine tripped due to high back pressure, and generator off line due to field breaker problems, repairs were made and the Unit returned to power.

The Unit tripped on loss of load due to Primary generator lockout resulting from loss of excitation.

The /f9 bearing failed which resulted in damage to the permanent magnet generator.

Repairs were made and the Unit returned to power.

F Forced S Scheduled Reason A - Equipment Failure(Explain)

B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method 1 - Manual 2-Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)

ExhibitG-Instructions forPreparation ofData Entry Scheets Ucensee Event Report(LER) File (NUREG4161)

Exhibit1-Same Source

i) 1 1

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT

'DATE COMPLETED BY TELEPHONE 50-389 St.

Luci e Unit b'2 December 15, 1987 N.

W. Grant (305) '694-4432 REPORT MONTH November 1987 See the unit "Shutdown and Power Reductions" report.

In accordance with requirements of Technical Specifications 6.9. 1.6, there were no challenges to PORV'r safety valves during the report month.

Oi i

'1

-I

&4 d