f Wisconsin Electnc l

POWER COMPANY

\\

Point Beach Nuclear Ront 6610 Nuclear Rd.. Two Rivers, W154241 (414) 755-2321 PBL 96-0086 April 8,19%

Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION l

Mail Station PI-137 j

Washington,DC 20555 i

Gentlemen:

DOCKETS 50-266 AND 50-301 l

MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of March 1996.

l Sincerely, G.

G.

daxf Id PBNP%

( l mb Attachments cc:

L. L. Smith, PSCW NRC Regional Administrator, Region Ill NRC Resident Inspector l

l i

l 9604180330 960331 i

PDR ADOCK 05000266 1

R PDR 1

C l

s suun,autm,m om carrow

OPERATING DATA REPORT DOCKET NO. 50-266 DATE:

04/04/96 COMPLETED BY:

M.

B.

Koudelka TELEPHONE:

414 755-6480 OPERATING STATUS 1.

UNIT NAME:

POINT BEACH NUC* LEAR PLANT - UNIT 1

. NOTES

2. REPORTING PERIOD: March - 1996 3.

LICENSED THERMAL POWER (MWT):

1518.5

4. NAMEPLATE RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MWE) :

497.0 6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :

509.0.

7. MAXIMUM DEldNDABLE CAPACITY (NET MWE):

485.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA 9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) : NA

10. REASONS FOR RESTRICTIONS, (IF A.NY) :

NA THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744.0 2,184.0 222,672.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 700.8 2,140.8 186,795.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
14. HOURS GENERATOR ON LINE 698.1 2,138.1 183,619.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1056623.0 3240723.0 260456872.0
17. GROSS ELECTRICAL ENERGY GENERATED 361190.0 1105070.0 88011440.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 345606.0 1058508.0 83911592.5
19. UNIT SERVICE FACTOR 93.8%

97.9%

82.5%

20. UNIT AVAILABILITY FACTOR 93.8%

97.9%

82.8%

21. UNIT CAPACITY FACTOR (USING MDC NET) 95.8%

99.9%

77.4%

22. UNIT CAPACITY FACTOR (USING DER NET) 93.5%

97.5%

75.8%

23. UNIT FORCED OUTAGE RATE 0.0%

0.0%

1.5%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :

l 1

NONE I

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

04/23/96 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

POINT BEACH NUCLEAR PLANT DOCKET NO.

50-266 AVERAGE DAILY UNIT POWER LEVEL.

UNIT NAME Point Beach, Unit 1

~

MONTH MARCH-1996 DATE 4/4/96 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

496 11 497 21 499 2

497 12 498 22 499 3

494 13 498 23 498 4

497 14 497 24 499 5

497 15 498 25 497 6

495 16 497 26 497 7

496 17 498 27 498 8

495 18 497 28 498 9

495 19 498 29 489 10 496 20 499 30

-1 31

-10 i

POINT BEACH NUCLEAR PLANT Docket No.

50-266 Unit Name Point Beach. Unit 1 UNIT SIIUTDOWNS AND POWER REDUCTIONS Date April 8.1996 Completed By M. B. Koudelka REPORT MONTH M ARCH - 1996 Telephone No.

414n55-6480 Method of Licensee Event Duration Reactor Repon No.

System Component C.ase and Corrective Action No.

Date Type' (Hours)

Reason

  • Shut Down' Code' Code' To Prevent Recurrence 1

3/30/96 S

45.9 C

1 NA NA NA Scheduled refueling and maintenance (UIR23). Major work items include replacing boric acid / reactor makeup water transmitters; reactor head shield work; Phase 3D of emergency diesel generator tie-in work; replace IMS-2015/2016 atmosphede steam dump valves; replace HP a

turbine exhaust crossunder piping; station service transformers anchorages; septace eight main steam condenser dump valves; and install conta'mment isotauon valve for N2 supply lines to safety injection.

'F: Forced

' Reason:

' Method:

' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced lead F - Admhistrative 6 - Other (explain)

' Exhibit I - Same Source G - Ope ational Error (explain)

H - Other (explain) t l

l PBF4028b j

(03-90)

.. ~. --

4 l

v l

DOCKET NO.

50-266 UNIT NAME Point Beach Unit 1 DATE April 8, 1996 COMPLETED BY M.

B. Koudelka I

TELEPHONE 414/755-6480 i

i i

Unit 1 operated at an average of 465 MWe net for the report period.

1 Safety-related maintenance included:

1.

1CV-142 charging line flow control limit switch adjusted.

l 2.

1DY-01 Red 125 Vdc/120 Vac inverter ac output ammeter replaced and tested and the "in sync" light bulb changed, l

i l

3.

G-01 emergency diesel generator relays were calibrated.

i 4.

P32C service water pump packing adjusted, i

5.

1PT-478 HX-1B steam generator steam pressure transmitter shield repaired and calibrated.

6.

SW-12B HX-12B component cooling heat exchanger outlet temperature control valve replaced.

l t

t, i

l

.m.

-y w

t

--T

OPERATING DATA REPORT DOCKET NO. 50-301 DATE:

04/04/96 COMPLETED BY:

M.

B.

Koudelka TELEPHONE:

414 755-6480 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2

. NOTES

2. REPORTING PERIOD: March - 1996 3.

LICENSED THERMAL POWER (MWT) :

1518.5

4. E4EPLATE RATING (GROSS MWE) :

523.8 5.

DESIGN ELECTRICAL RATING (NET MWE) :

497.0

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :

509.0.

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) :

485.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA 9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) :

Power 90%

10. REASONS FOR RESTRICTIONS, (IF ANY) :

Self-imposed restrictic,n because of SG tube plugging, pending further evaluation.

THIS MONTH YEAR TO DATE CUM'JLATIVE

11. HOURS IN REPORTING PERIOD 744,0 2,184.0 207,457.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,184.0 181,511.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ON LINE 744.0 2,184.0 179,038.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1015450.0 2983413.0 257515566.0
17. GROSS ELECTRICAL ENERGY GENERATED 348240.0 1023460.0 87526720.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 332209.0 976506.0 83441155.5
19. UNIT SERVICE FACTOR 100.0%

100.0%

86.3%

20. UNIT AVAILABILITY FACTOR 100.0%

100.0%

86.4%

21. UNIT CAPACITY FACTOR (USING MDC NET) 92.1%

92.2%

82.4%

22. UNIT CAPACITY FACTOR (USING DER NET) 89.8%

90.0%

80.9%

23. UNIT FORCED OUTAGE RATE 0.0%

0.0%

0.9%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :

Refueling /SGRP, 10/05/96, 70 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

t POINT BEACH NUCLEAR PLANT DOCKET NO.

50-301

~

AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 MONTH MARCH - 1996 DATE 4/4/96 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

446 11 449 21 448 2

449 12 447 22 452 3

446 13 447 23 452 4

448 14 446 24 439 5

450 15 447 25 446 6

447 16 446 26 446 7

448 17 446 27 446 8

447 18 445 28 446 9

448 19 447 29 447 10 433 20 447 30 447 31 445

_.. ~ _. _ _ _ _ _ _ _ - _

I POINT BEACil NUCLEAR PLANT Deket No.

50-266 Unit Name Point Beach. Unit 2 UNIT S11UTIX)WNS AND POWER REDUCTIONS Date April 8.1996 Completed By M. B. Koudelka REPORT MONTil M ARCH - 1996 Telephone No.

414n55-6480 I

Method of Duration Reactor Licensee Event System Cornponent Cause and Conective Action No.

Date Type' (Hours)

Reason' Shut Down' Report No.

Code' Code' To Prevent Recurrence NA NA NA NA NA NA NA NA NA NA i

'F: Forced

' Reason:

' Method:

' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown l

Licensing Exam 5 - Reduced Lead F - Administrative 6 - Other (explain)

Exhibit I - Same Source G - Operational Error (explain)

II - Other (explain)

PBF-CD28b (03-90)

j i

k I

\\

j DOCKET No.

50-301 i

UNIT NAME Point Beach Unit 2 DATE April 8, 1996 COMPLETED BY M.

B.

Koudelka TELEPHONE 414/755-6480 Unit 2 operated at an average of 447 MWe net for the report i

period.

Safety-related maintenance included:

1.

CS-466 HX-1A steam generator feedwater regulator control valve stem rotated and set screws tightened.

2.

2LE-934 T-34B safety injection accumulator level element upper sensing line retubed.

l 3.

2MS-2019 and 2MS-2020 HX-1A&B steam generator header P-29 auxiliary feedwater pump steam supply motor-operated valvea cycled.

4.

2P-2B charging pump oil tubing, Swagelok fitting, seals, 0-rings and plungers replaced.

5.

2P-11A component cooling water pump outboard mechanical seal, shaft sleeve, bearings and oil seals replaced and pump case repaired.

6.

2P-29 GOV-Z auxiliary feedwater turbine-driven pump governor oil changed and air vented.

7.

2SI-860A-O P-14A containment spray pump discharge redundant isolation operator studs and nuts were tightened.

8.

2T-70B P-2B charging pump discharge accumulator repaired and bladder replaced.

- _ _ -