IR 05000309/1986006 | 6 August 1986 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-309/86-06 | |
IR 05000309/1987007 | 9 July 1987 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-309/87-07 | High Radiation Area |
IR 05000309/1987022 | 22 December 1987 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-309/87-22.Violation Re Failure to Follow Procedural Requirements of Procedure 2.50.23 Occurred as Stated | |
IR 05000309/1987028 | 7 June 1988 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-309/87-28.Violation Will Remain as Stated | |
IR 05000309/1987099 | 5 January 1989 | Forwards SALP Rept 50-309/87-99.Overall Assessment Found Effective Mgt Attention Oriented Toward Nuclear Safety in All Functional Areas Evaluated.List of Attendees & Related Ltrs Also Encl | High Radiation Area Missed surveillance Systematic Assessment of Licensee Performance Rod Drop Event |
IR 05000309/1988010 | 27 September 1988 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-309/88-10. Violation Appropriately Categorized at Severity Level III | |
IR 05000309/1988012 | 6 October 1988 | Ack Receipt of Providing Addl Insight Into Causes Re Above Average Personnel Exposure Values Documented in Insp Rept 50-309/88-12.Areas for Improvement Include Source Term Reduction,Use of mock-ups & Improved ALARA Goals | |
IR 05000309/1988022 | 14 February 1989 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-309/88-22.Based on 890202 Telcon NRC Understands That Relevant Procedures Will Be Updated to Describe Administrative Methods | High Radiation Area |
IR 05000309/1988023 | 28 June 1989 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-309/88-23 | |
IR 05000309/1988080 | 26 April 1989 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-309/88-80 | |
IR 05000309/1988200 | 7 June 1989 | Discusses Insp Rept 50-309/88-200 on 880523-27,0606-10 & 0718-22 & Forwards Notice of Violation & Summary of 890329 Enforcement Conference | |
IR 05000309/1989007 | 26 June 1989 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-309/89-07 | |
IR 05000309/1989011 | 19 September 1989 | Forwards Insp Rept 50-309/89-11 on 890801-31.Instances That Need Mgt or Supervisory Attention Noted | |
IR 05000309/1989082 | 30 July 1990 | Advises That Util Actions to Address NRC Bulletin 88-010 Re Nonconforming molded-case Circuit Breakers Complete,Per Insp Rept 50-309/89-82 | |
IR 05000309/1990001 | 5 October 1990 | Discusses Requalification Program Evaluation Rept 50-309/90-01 (OL-RO) on 900312-15 & Forwards Notice of Violation | |
IR 05000309/1990018 | 1 November 1990 | Discusses Enforcement Conference Rept 50-309/90-18 on 901018 Re fitness-for-duty Related Event.Viewgraphs Encl | |
IR 05000309/1990019 | 6 December 1990 | Discusses 901115 Enforcement Conference Held on 901115 to Discuss Violations Noted Insp Rept 50-309/90-19.List of Attendees Also Encl | |
IR 05000309/1992001 | 11 May 1992 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-309/92-01 | Temporary Modification |
IR 05000309/1992009 | 25 January 1993 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-309/92-09 | |
IR 05000309/1992080 | 23 December 1992 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-309/92-80.Actions Re Failure to Perform Review of Mod of Power Supply for App R DG Fuel Oil Day Tank Level Alarm Sensor Will Be Examined | |
IR 05000309/1996012 | 31 July 1997 | Ack Receipt of 970107 & 0425 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-309/96-12 & 50-309/96-14.Security Violation Involving Control of Safeguards Info Discussed | Operability Determination Operability Assessment |
IR 05000309/1997003 | 28 August 1997 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-309/97-03 | |
IR 05000309/1997009 | 15 May 1998 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-309/97-09. Corrective Actions Will Be Examined During Future Insp | |
IR 05000309/1998001 | 20 May 1998 | Forwards Insp Rept 50-309/98-01 on 980308-0502 & Nov. Violation Re Poor Implementation of Spent Fuel Pool Foreign Matl Exclusion Program.Vague Procedure & Poor Worker Training Noted | Foreign Material Exclusion |
IR 05000324/1976008 | 23 April 1976 | Forwards IE Insp Rept 50-324/76-08 on 760322-26 & 0330-0402. Violations Noted.Supporting Documentation Encl | |
IR 05000336/1983017 | 12 June 1986 | Ack Receipt of Informing NRC of Steps Taken to Correct Unresolved Item Noted in Insp Rept 50-336/83-17 | |
IR 05000336/1985025 | 14 August 1985 | Forwards Insp Rept 50-336/85-25 for Consideration.Design Change Problem Identified in Rept Detail 2.f Considered to Have Potential Applicability to Work of Plant Design Change Task Group.W/O Encl | |
IR 05000338/1984039 | 4 April 1985 | Ack Receipt of Informing NRC of Steps Taken to Correct Deviation Noted in Insp Repts 50-338/84-39 & 50-339/84-39 | |
IR 05000352/1984048 | 10 June 1985 | Forwards Insp Rept 50-352/84-48 on 840827-30 at Bechtel Corp in San Francisco,Ca Re Allegations Concerning Structural & Piping Design Activities at Hope Creek,Limerick & Susquehanna.No Allegations Re Hope Creek Substantiated | Earthquake |
IR 05000366/1983023 | 6 January 1984 | Forwards Corrected Page 2 to 831227 Proposed Imposition of Civil Penalties Based on Violations Noted in Insp Rept 50-366/83-23 Re Improper Shutdown.Correction Due to Administrative Oversight | Fire Barrier Liquid penetrant |
IR 05000409/2005031 | 16 July 1985 | Forwards Notice of Violation Issued to Util Based on 850409-0531 Insp | Fire Watch |
IR 05000454/1987032 | 30 October 1987 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-454/87-32, 50-455/87-30 & 50-456/87-28.Assignment of Severity Level IV Appropriate | |
IR 05000482/1984012 | 9 April 1985 | Partially Withheld Ltr Forwarding Insp Repts 50-482/84-12 & 50-482/85-18.Repts Should Address Recipient Concerns of Technical Nature & Re Intimidation.W/O Encl | |
IR 05000482/1984023 | 13 March 1985 | Partially Withheld Ltr Forwarding Insp Rept 50-482/84-23. Section 7,Item 1 Contains Info Re Concerns That Code (ASME III) Pressure Boundary Being Opened by CWPs W/O QC Involvement | |
IR 05000482/1984058 | 9 April 1985 | Partially Withheld Ltr Advising That NRC Investigated Recipient Concerns Re Facility Const.Understands That Recipient Dept of Labor Complaint Settled Out of Court.W/O Insp Rept 50-482/84-58 Encl | |
IR 05000482/1985003 | 13 March 1985 | Partially Withheld Ltr Forwarding Insp Rept 50-482/85-03. Section 3,Item a of Rept Contains Info Re Concerns on Startup & Fire Protection Programs.W/O Encl | Fire Protection Program |
IR 05000482/1985022 | 2 August 1985 | Forwards Insp Rept 50-482/85-22 on 850423-25.No Violations or Deviations Noted.W/O Rept | |
IR 05000483/1984030 | 28 September 1984 | Partially Withheld Ltr Extending Appreciation for Cooperation Re Const Deficiencies.Insp Rept 50-483/84-30 Discussing Technical Concerns Encl.Other Concerns Forwarded to Regions II & IV | |
ML20054E838 | 1 June 1982 | Advises That Revision 10 to Quad Cities Station Security Plan & Revision 11 to Dresden Nuclear Power Station Security Plan Transmitted by Util 810610 & 1027 Ltrs,Respectively, Consistent W/Provisions of 10CFR50.54(p) & Approved | |
ML20054E895 | 7 June 1982 | Approves Request for Withholding Info Per 10CFR2.790 Re Improved Thermal Design Procedures (CAW-82-15) | Affidavit |
ML20054F254 | 10 June 1982 | Requests Util Address Encl Concerns on Loose Parts Monitoring Program in Final Design Rept | |
ML20054F257 | 9 June 1982 | Forwards Refs 1,5,16,20 & 49 from plant-unique Analysis Rept,As Requested.W/O Encl | |
ML20054F494 | 19 May 1982 | Informs That Commission Granted 810209 Exemption Request Re Fire Protection Schedular Requirements of 10CFR50.48(c) & Design Criteria Specified in Section Iii.C of App R to 10CFR50.Evaluation of Exemption Request Encl | Exemption Request |
ML20054F499 | 11 June 1982 | Forwards Evaluation of SEP Topic IX-3, Station Svc & Cooling Water Sys. Licensee Has Not Demonstrated That Adequate Procedures Exist to Ensure Sys Operability | |
ML20054F520 | 10 June 1982 | Advises That Draft Safety Evaluations Submitted 820201 & 08 Re SEP Topics VI-7.A.3 & VI-10.A Will Be Considered Final | |
ML20054G119 | 15 June 1982 | Forwards Final Evaluation of SEP Topic IX-4, Boron Addition Sys. Util Method for Prevention of Boron Precipitation Acceptable.Evaluation to Be Basic Input to Integrated Safety Assessment | |
ML20054G874 | 4 June 1982 | Forwards IE Insp Rept 50-029/82-07 on 820504-07 & Notice of Violation |