'J AN 2 51933 Docket No. 50-309 Mr. Charles D. Frizzle President Maine Yankee Atomic Power Company 83 Edison Drive Augusta, Maine 04336
Dear Mr. Frizzie:
SUBJECT: REPLY LETTER FOR INSPECTION REPORT NO. 50-309/92-09 This letter refers to your January 7,1993, correspondence, in respanse to our May 15, 1992, letter.
Thank you for informing us of the delay until April 30,1993, of the installation of a wet-pipe sprinkler system in the Drumming Area of the Fuel Building. We note that the installation of this sprinkler system was identified as a corrective action in your June 15,1992, letter that responded to the Notice of Violation associated with Fire Protection Procedures in our letter dated May 15, 1992. Your compensatory measure, to not store contaminated RCP Lube Oil in the Drumming Area until such time as the fixed suppression system is operable, appears appropriate. These actions will be examined in more detail during a future inspection of your licensed program.
..
Your cooperation with us is appreciated.
Sincerely,
, a U.
Lee H. Bettenhausen, Chief Operations Branch Division of Reactor Safety 9302010155 930125 OFFICIAL RECORD COPY G:MYRESP.LTR PDR ADOCK 05000309 G
PDR i
'
60l I
_
_ __ _ _ - _____-
__
___ _ -
Y Mr. Charles D. Frizzle
cc:
P. L. Anderson, Project Manager (Yankee Atomic Electric Company)
R. W. Blackmore, Plant Manager J. A. Ritsher, Attorney (Ropes and Gray)
P. Dostic, State Nuclear Safety Inspector Peter Brann, Assistant Attorney General U. Vanags, Maine State Planning Office -
C. Brinkman, Combustion Engineering, Inc.
First Selectmen of Wiscasset Maine State Planning Officer Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2) (w/ copy of letter dtd 1/7/93)
NRC Resident inspector State of Maine, SLO Designee (2) (w/ copy ofletter dtd 1/7/93)
OFFICIAL RECORD COPY G:MYRESP.LTR
-
. _.
-.
.
._. _ =
.
-
i i
j Mr. Charles D. Frizzle
cc:
P. L, Anderson, Project Manager (Yankee Atomic Electric Company)
R. W. Blackmore, Plant Manager J. A. Ritsher, Attorney (Ropes and Gray)
P. Dostie, State Nuclear Safety Inspector Peter Brann, Assistant Attorney General U. Vanags, Maine State Planning Office C. Brinkman, Combustion Engineering, Inc.
First Selectmen of Wiscasset Maine State Planning Officer Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2) (w/ copy of letter dtd 1/7/93)
NRC Resident Inspector State of Maine, SLO Designee (2) (w/ copy ofletter dtd 1/7/93)
bec:
Region I Docket Room (with concurrences)
DRS/EB SALP Coordinator J. Linville, DRP
.
W, Lazarus, DRP C. Marschall, SRI - Maine Yankee (w/ concurrences)
H. Eichenholz, SRI - Vermont Yankee V. McCree, OEDO E. Trottier, LPM, NRR W. Butler, NRR L. Bettenhausen, DRS N. Blumberg, DRS F. Bower, DRS -
DRS File (1)
RI:DRS RI:DRS RI:DRS hausen gerg Bower /
14:/9.
1/2h93 1/2/93 OFFICIAL RECORD COPY G:MYRESP.LTR
.
-
.
..
.
.
-
MaineYankee:
'
"
TCERDi:E M i k M NCEl ?!2 EDtSON DRIVE e AUGUSTA. MAINE 04330 * 1207) 622 4868 January 7, 1993 MN-93-03 JRH-93-05 UNITED STATES NUCLEAR REGULATORY COMMISSION Attention: Document Control Desk Washington, DC 20555
.
References:
(a)
License No. DPR-36 (Docket No.-50-309)
(b) USNRC Letter to MYAPCo dated thy.-15,1992 - Notice of Violation 50-309/92-09 (c) MYAPCo Letter to USNRC dateJ June 15,1992(MN-92-61)-Response to Notice -of Violation Associated with Fire Protection Procedures Subject:
Concrete Fill (Drumming) Room Fire Protection System Gentlemen:
Maine Yankee currently plans to use the area in the Fuel Building'(known as the.
Drumming _ Area) for transient storage of bulk' Class III combustible wastes-(contaminated RCP Lube.0il) awaiting final movement into the Mixed Waste Building.
The installation of a wet-pipe sprinkler system in this area to mitigate the effects of a-fire -in this material was noted as a corrective action-in Maine Yankee's response (Reference-(c)) to ths Notice of Violation associated with Fire Protection.
-Procedures (Reference (b)).
,
Maine Yankee is currently preparing a design change package for' installation of L
this system.
In_ light of unanticipated delays in the preparation of_this. design-change package, a Edelay in the completion date to April 30, 1993,_ is necessary.
Maine Yankee has implemented compensatory measures._ in lieu of the wet-pipe suppression system. Bulk Class III liquid combustibles (contaminated RCP Lube 011)
will not:be stored _in the area until such. time as the fixed suppression system is-operable.
Please contact me should you have any further questions.
Very truly yours, AM
[
James R. Hebert, Manager Licensing & Engineering Support Department JRH/ jag
,,
,
_
, M Thomas i.5Nartin??
c:
Mr. Charles S. Marschall Mr. E. H. Trottier Mr. Patrick J. Dostie
gg ou,nn..u,,,m.n, rt<
&
.