HNP-12-028, Realistic LBLOCA Question Response Meeting Handout, Enclosure 3 to HNP-12-028 | 11 January 2012 | Realistic LBLOCA Question Response Meeting Handout, Enclosure 3 to HNP-12-028 | |
IR 05000269/2004013 | 24 September 2004 | EA-04-115 - Final Significance Determination for a White Finding and Notice of Violation (NRC Inspection Report 05000269, 270, 287/2004013, Oconee Nuclear Station | |
IR 05000270/2000287 | 28 November 2011 | 11/16/2011- Summary of Meeting to Discuss the Safety Significance of Two Preliminary Greater Than Green Findings with Two Associated Apparent Violations Documented in Inspection Reports 05000269,05000270, 05000287/2011018 | Mission time Operability Determination |
IR 05000400/2002009 | 13 June 2002 | Final Significance Determination for White Finding & Notice of Violation (NRC Inspection Report 05000400/2002-009) | Significance Determination Process Foreign Material Exclusion Fuel cladding Preliminary White Finding |
M080717, M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection | 17 July 2008 | M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection | Safe Shutdown Fire Barrier Enforcement Discretion Operator Manual Action Multiple Spurious Operation Fire Protection Program |
ML021080063 | 31 January 2002 | Enclosure to EA-00-022, EA-01-310 - Slides/Viewgraphs from Open Regulatory Conference on 01/31/02 | Safe Shutdown Fire Barrier Fire Protection Program |
ML021080211 | 6 March 2002 | March 6, 2002 - RIC 2002 Presentation - W1 William R. Mccollum - Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles | Boric Acid |
ML021090228 | 8 April 2002 | CP & L Handouts, Summary of 03/14/2002 Meeting with Licensee on Potential Long-Term Fire Barrier Corrective Actions | Safe Shutdown Fire Barrier Emergency Lighting |
ML021230057 | 25 April 2002 | Overview | Power Uprate |
ML022140237 | 8 August 2002 | Summary of July 16-18, 2002, Public Meeting with NMC Staff Regarding Inputs for Use in the Pressurized Thermal Shock (PTS) Risk Analysis of Pnp | |
ML030310179 | 28 January 2003 | NRC Management Update Jan. 28, 2003 | |
ML032200274 | 31 July 2003 | Safe Shutdown Validation Fire Protection Project Plan | Hot Short Safe Shutdown Fire Barrier Emergency Lighting Hemyc Fire Protection Program Fire Watch |
ML032730171 | 23 September 2003 | NRC - Region II Presentation - September 23, 2003 | Safe Shutdown Boric Acid VT-2 Downpower |
ML033010295 | 31 July 2003 | Slides for Harris Nuclear Plant Safe Shutdown Validation Fire Protection Project Plan Meeting | Safe Shutdown |
ML033010300 | 10 March 2003 | Slides for Harris Nuclear Plant Fire Protection Meeting | |
ML040350212 | 13 August 2003 | DRS Open Items Status | Safe Shutdown Boric Acid Fire Barrier Hemyc Pressure Boundary Leakage |
ML040350687 | 5 August 2003 | DRS Open Item Status | Safe Shutdown Boric Acid Fire Barrier Hemyc |
ML040350691 | 27 August 2003 | DRS Open Items Status | Safe Shutdown Boric Acid Fire Barrier Hemyc Pressure Boundary Leakage |
ML040750184 | 8 March 2004 | Slide Presentation by Duke Energy Corp. Regarding Reactor Trip Breaker Replacement | |
ML040920125 | 24 March 2004 | NRC Cy 2003 Annual Assessment Meeting | |
ML041120482 | 13 April 2004 | NRC CY2003 Annual Assessment Meeting Oconee Nuclear Station | |
ML041940419 | 29 June 2004 | High Energy Line Break (HELB) Outside Containment Project Update | |
ML042160078 | 28 July 2004 | Presentation of Ngg Nuclear Generation Group | Hot Short Safe Shutdown Fire Barrier License Renewal Fire Protection Program Siren Power Uprate |
ML042930203 | 25 October 2004 | Meeting Handouts, Summary of Meeting with Duke Energy Corporation Potential Flooding in the Auxiliary Building | Safe Shutdown Safe Shutdown Earthquake |
ML042940123 | 4 October 2004 | Regulatory Performance Mtg Presentation | |
ML043210527 | 9 November 2004 | 11/09-10/2004 Meeting Slides for Meeting Between the NRC Staff and the B&Wog Regarding BAW-2374 Rev 2 - Steam Generator Tube Failure Coincident with LBLOCA - Preliminary | |
ML043450171 | 6 December 2004 | Attachment 2, to 11/16/2004 Meeting Summary Regarding Tornado Mitigation Strategy | Boric Acid Tornado Generated Missile TORMIS |
ML050250157 | 6 December 2004 | Meeting Presentation Slides to 12/06/2004 Summary of Meeting with Duke Energy Corporation to Discuss Appendix R Reconstitution and Transition to NFPA 805 | Hot Short Safe Shutdown Fire Barrier Enforcement Discretion Probabilistic Risk Assessment |
ML051090141 | 17 March 2005 | Attachment 2 - Presentation Slides for Oconee Meeting to Discuss Tornado Mitigation Strategy | Safe Shutdown Operability Determination TORMIS Backfit |
ML051100439 | 21 April 2005 | NRC CY2004 Annual Assessment Meeting - Harris - Apex, North Carolina | |
ML051960178 | 30 June 2005 | Enclosure Mtg. Summary with Duke Energy Corp. Licensing Basis for High Energy Line Break (Tac No. MC5457) | Safe Shutdown Shutdown Margin Flow Accelerated Corrosion GOTHIC |
ML051990361 | 27 April 2005 | NRC CY2004 Annual Assessment Meeting, Oconee Nuclear Station | |
ML052080113 | 22 June 2005 | Mtg Summary of 6/22/05, Spring 2005 Steam Generator Inspection Presentation | |
ML052100274 | 21 April 2005 | Meeting Presentation for Harris Nuclear Plant Annual NRC Assessment Meeting | Fire Protection Program Overspeed trip |
ML052220679 | 8 August 2005 | Containment Coatings Work Scope 2EOC21 | Coatings |
ML052360432 | 11 August 2005 | Attachment 3 - Duke Power Slides | Safe Shutdown Enforcement Discretion Fire Protection Program |
ML052360440 | 11 August 2005 | Attachment 4 - Progress Energy Slides | Safe Shutdown Enforcement Discretion Multiple Spurious Operation Fire Protection Program |
ML052560447 | 17 August 2005 | B&W Owners Group Reactor Vessel Working Group Summary of the Plans of the B&Wog Reactor Vessel Integrity Program | |
ML052570005 | 8 September 2005 | Meeting with NRC Management, September 8, 2005 | Hemyc |
ML052650202 | 20 September 2005 | Oconee Nuclear, Regulatory Performance Meeting | |
ML053040158 | 18 October 2005 | Duke Energy Corp, Oconee, Units 1, 2 and 3, Enclosure, Meeting Summary, Design Overview of Digital Reactor Protective System | |
ML053250237 | 1 November 2005 | 11/1/2005, Presentation from Duke Energy Corp, Oconee, Units 1, 2 and 3, Meeting Summary, Part 72-Licensed Casks in Spent Fuel Pools | Unanalyzed Condition |
ML053290020 | 14 November 2005 | Enclosure 1, Meeting Summary High Energy Line Break | Flow Accelerated Corrosion |
ML053290025 | 14 November 2005 | Enclosure 2, Meeting Summary, Tornado Mitigation Methodology | Safe Shutdown Mission time TORMIS |
ML053630166 | 29 December 2005 | Containment Coatings Long Range Plans Presentation on 12/20/2005 | Coatings |
ML060250035 | 7 November 2005 | Duke Power NFPA-805 Transition Pilot Observation Management Kickoff, Oconee, November 07, 2005 - Slide Presentation | |
ML060250038 | 7 November 2005 | Duke Power Appendix R Reconstitution, Oconee, November 7, 2005 - Slide Presentation | Hot Short Safe Shutdown Operator Manual Action |
ML060250040 | 8 November 2005 | Duke Power NFPA 805 Ch 4 Methodology Transition Oconee, November 8, 2005 - Slide Presentation | |
ML060250044 | 10 November 2005 | Duke Power NFPA-805 Transition Pilot Observation Project Status, Oconee, November 10, 2005 | Multiple Spurious Operation |
ML060270349 | 15 November 2005 | Harris Nuclear Plant Security Initiatives Meeting |