NRC CY2003 Annual Assessment Meeting Oconee Nuclear Station
ML041120482
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/13/2004
From:
NRC/RGN-II
To:
References
Download: ML041120482 (25)


Text

NRC CY2003 Annual Assessment Meeting Oconee Nuclear Station Seneca, South Carolina April 13, 2004

Purpose of Todays Meeting l A public forum for discussion of the licensees performance l NRC will address the licensee performance issues identified in the annual assessment letter l Licensee will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance

Agenda l Introduction l Review of Reactor Oversight Process l National Summary of Plant Performance l Discussion of Plant Performance Results l Licensee Response and Remarks l NRC Closing Remarks l Break l NRC available to address public questions

Region II Organization Luis Reyes Regional Administrator Loren Plisco Deputy Regional Administrator Victor McCree Charles Casto Director Division of Reactor Projects Director Division of Reactor Safety Len Wert Harold Christensen Deputy Director Deputy Director Robert Haag Branch Chief Oconee Resident Inspectors Project Engineers Mel Shannon Robert Carroll George Hutto Michael Pribish Eric Riggs

NRC Performance Goals l Maintain safety and protect the environment l Enhance public confidence l Improve effectiveness, efficiency, and realism of processes and decision making l Reduce unnecessary regulatory burden

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response

Examples of Baseline Inspections l Equipment Alignment ~92 hrs/yr l Triennial Fire Protection ~200 hrs every 3 yrs l Operator Response ~125 hrs/yr l Emergency Preparedness ~80 hrs/yr l Rad Release Controls ~100 hrs every 2 yrs l Worker Radiation Protection ~100 hrs/yr l Corrective Action Program ~200 hrs every 2 yrs l Corrective Action Case Reviews ~60 hrs/yr

Oconee Nuclear Station 5100 Hours of Inspection Related Activities (Jan 1 - Dec 31, 2003) l Supplemental Inspection (95001 - HPI cable) l Special Inspection (main steam ADVs) l Engineering Inspections l Emergency Preparedness Inspection l Initial Operator Exam and Requalification Inspection l Reactor Vessel Head/Steam Generator Replacement and Lower Head Inspections l Radiation Protection and Security Inspections l Problem Identification and Resolution Inspections l ISFSI Inspection

Significance Threshold Performance Indicators Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very Low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue

Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

National Summary of Plant Performance Status at End of CY 2003 Licensee Response 75 Regulatory Response 22 Degraded Cornerstone 2 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total 102*

  • Davis-Besse is under a special restart inspection process (IMC 0350)

Oconee Nuclear Station Assessment Results For CY 2003 l All Performance Indicators Were Green Requiring No Additional NRC Inspection l One White Inspection Finding

Ø Inadequate SSF Pressurizer Heater Capacity:

Affected All Three units l Two White Inspection Findings Carried Over From CY2002

Ø Containment Integrity During Reduced Inventory:

Unit 1 for 1st Qtr of 2003

Ø Degraded Connector for HPI Pump Emergency Power Supply Cable: Unit 3 for first three Qtr of 2003

Oconee Nuclear Station Assessment Results l Unit 1 - Regulatory Response Column of Action Matrix for lst, 3rd, & 4th Qtr of 2003 l Unit 2 - Regulatory Response Column of Action Matrix for 3rd & 4th Qtr of 2003 l Unit 3 - Regulatory Response Column of Action Matrix for lst, 2nd, & 4th Qtr of 2003 and Degraded Cornerstone Column 3rd Qtr of 2003

Ø Degraded Cornerstone due to Two White Mitigating Systems Findings Occurring During the Same Quarter: SSF Pressurizer Heater Capacity and HPI Pump Emergency Power Supply Cable Connector

Application of Action Matrix Cornerstone Issue 1st Qtr03 2nd Qtr03 3rd Qtr03 4th Qtr03 U1-RgRsp U1-LiRsp U1-RgRsp U1RgRsp Barrier Integrity White Finding - Unit 1 Only Unit 1 Reduced Inventory AOP Containment Integrity (contd from 2nd Qtr02)

U2-LiRsp U2-LiRsp U2-RgRsp U2-RgRsp Mitigating Systems White Units 1,2,3 Units 1,2,3 Finding - Units 1, 2, 3Inadequate SSF PZR Heater Capacity (identified 3rd Qtr03)

U3-RgRsp U3-RgRsp U3-DCstn U3-RgRsp Mitigating Systems White Unit 3 only Unit 3 only Unit 3 only Finding - Unit 3 HPI Pump Aux Swgr Emergency Power Cable (contd from 4th Qtr02)

Oconee Nuclear Station Annual Assessment Summary (Jan 1 - Dec 31, 2003) l Duke Energy operated Oconee Nuclear Station in a manner that preserved public health and safety l All cornerstone objectives were met

Oconee Nuclear Station Planned Inspection Activities (Jan 1 - Dec 31, 2004) l Baseline Inspections l Supplemental Inspection (95002 - Unit 3 Degraded Cornerstone Performance 3rd Qtr03) l Reactor Containment Sump Blockage Inspection l Spent Fuel Material Control and Accountability Inspection l Reactor Vessel Head/Steam Generator Replacement and Lower Head Inspections l ISFSI Inspection

Licensee Response and Remarks Contacting the NRC l Report an emergency (301) 816-5100 (call collect) l Report a safety concern:

(800) 695-7403 Allegation@nrc.gov l General information or questions www.nrc.gov Select What We Do for Public Affairs

Reference Sources l Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html l Public Electronic Reading Room http://www.nrc.gov/reading-rm.html l Public Document Room 1-800-397-4209 (Toll Free)

Oconee 1 2003 Performance Summary (4th Quarter)

Oconee 1 2003 Performance Summary Oconee 2 2003 Performance Summary (4th Quarter)

Oconee 2 2003 Performance Summary Oconee 3 2003 Performance Summary (4th Quarter)

Oconee 3 2003 Performance Summary