NRC CY2003 Annual Assessment Meeting Oconee Nuclear Station
ML041120482
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/13/2004
From:
NRC/RGN-II
To:
References
Download: ML041120482 (25)


Text

NRC CY2003 NRC CY2003 Annual Assessment Meeting Annual Assessment Meeting Oconee Oconee Nuclear Station Nuclear Station Seneca, South Carolina Seneca, South Carolina April 13, 2004 April 13, 2004

Purpose of Todays Meeting

 A public forum for discussion of the licensees performance

 NRC will address the licensee performance issues identified in the annual assessment letter

 Licensee will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance

Agenda

 Introduction

 Review of Reactor Oversight Process

 National Summary of Plant Performance

 Discussion of Plant Performance Results

 Licensee Response and Remarks

 NRC Closing Remarks

 Break

 NRC available to address public questions

Region II Organization Luis Reyes Regional Administrator Loren Plisco Deputy Regional Administrator Victor McCree Director Division of Reactor Projects Len Wert Deputy Director Charles Casto Director Division of Reactor Safety Harold Christensen Deputy Director Robert Haag Branch Chief Oconee Resident Inspectors Mel Shannon George Hutto Eric Riggs Project Engineers Robert Carroll Michael Pribish

NRC Performance Goals

 Maintain safety and protect the environment

 Enhance public confidence

 Improve effectiveness, efficiency, and realism of processes and decision making

 Reduce unnecessary regulatory burden

Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas

Examples of Baseline Inspections

 Equipment Alignment

~92 hrs/yr

 Triennial Fire Protection

~200 hrs every 3 yrs

 Operator Response

~125 hrs/yr

 Emergency Preparedness

~80 hrs/yr

 Rad Release Controls

~100 hrs every 2 yrs

 Worker Radiation Protection ~100 hrs/yr

 Corrective Action Program

~200 hrs every 2 yrs

 Corrective Action Case Reviews ~60 hrs/yr

Oconee Nuclear Station 5100 Hours of Inspection Related Activities (Jan 1 - Dec 31, 2003)

 Supplemental Inspection (95001 - HPI cable)

 Special Inspection (main steam ADVs)

 Engineering Inspections

 Emergency Preparedness Inspection

 Initial Operator Exam and Requalification Inspection

 Reactor Vessel Head/Steam Generator Replacement and Lower Head Inspections

 Radiation Protection and Security Inspections

 Problem Identification and Resolution Inspections

 ISFSI Inspection

Significance Threshold Performance Indicators Green:

Only Baseline Inspection White:

May increase NRC oversight Yellow:

Requires more NRC oversight Red:

Requires more NRC oversight Inspection Findings Green:

Very Low safety issue White:

Low to moderate safety issue Yellow:

Substantial safety issue Red:

High safety issue

Action Matrix Concept Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

National Summary of Plant Performance Status at End of CY 2003 Licensee Response 75 Regulatory Response 22 Degraded Cornerstone 2

Multiple/Repetitive Degraded Cornerstone 3

Unacceptable 0

Total 102*

  • Davis-Besse is under a special restart inspection process (IMC 0350)

Oconee Nuclear Station Assessment Results For CY 2003

 All Performance Indicators Were Green Requiring No Additional NRC Inspection

 One White Inspection Finding

Inadequate SSF Pressurizer Heater Capacity:

Affected All Three units

 Two White Inspection Findings Carried Over From CY2002

Containment Integrity During Reduced Inventory:

Unit 1 for 1st Qtr of 2003

Degraded Connector for HPI Pump Emergency Power Supply Cable: Unit 3 for first three Qtr of 2003

Oconee Nuclear Station Assessment Results

 Unit 1 - Regulatory Response Column of Action Matrix for lst, 3rd, & 4th Qtr of 2003

 Unit 2 - Regulatory Response Column of Action Matrix for 3rd & 4th Qtr of 2003

 Unit 3 - Regulatory Response Column of Action Matrix for lst, 2nd, & 4th Qtr of 2003 and Degraded Cornerstone Column 3rd Qtr of 2003

Degraded Cornerstone due to Two White Mitigating Systems Findings Occurring During the Same Quarter: SSF Pressurizer Heater Capacity and HPI Pump Emergency Power Supply Cable Connector

Unit 3 only Unit 3 only Unit 3 only Mitigating Systems White Finding - Unit 3 HPI Pump Aux Swgr Emergency Power Cable (contd from 4th Qtr02)

U3-RgRsp U3-DCstn U3-RgRsp U3-RgRsp Units 1,2,3 Units 1,2,3 Mitigating Systems White Finding - Units 1, 2, 3Inadequate SSF PZR Heater Capacity (identified 3rd Qtr03)

U2-RgRsp U2-RgRsp U2-LiRsp U2-LiRsp Unit 1 Only Barrier Integrity White Finding -

Unit 1 Reduced Inventory AOP Containment Integrity (contd from 2nd Qtr02)

U1RgRsp U1-RgRsp U1-LiRsp U1-RgRsp 4th Qtr03 3rd Qtr03 2nd Qtr03 1st Qtr03 Cornerstone Issue Application of Action Matrix

Oconee Nuclear Station Annual Assessment Summary (Jan 1 - Dec 31, 2003)

 Duke Energy operated Oconee Nuclear Station in a manner that preserved public health and safety

 All cornerstone objectives were met

Oconee Nuclear Station Planned Inspection Activities (Jan 1 - Dec 31, 2004)

 Baseline Inspections

 Supplemental Inspection (95002 - Unit 3 Degraded Cornerstone Performance 3rd Qtr03)

 Reactor Containment Sump Blockage Inspection

 Spent Fuel Material Control and Accountability Inspection

 Reactor Vessel Head/Steam Generator Replacement and Lower Head Inspections

 ISFSI Inspection

Licensee Response and Remarks

Contacting the NRC

 Report an emergency (301) 816-5100 (call collect)

 Report a safety concern:

(800) 695-7403 Allegation@nrc.gov

 General information or questions www.nrc.gov Select What We Do for Public Affairs

Reference Sources

 Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html

 Public Electronic Reading Room http://www.nrc.gov/reading-rm.html

 Public Document Room 1-800-397-4209 (Toll Free)

Oconee 1 2003 Performance Summary (4th Quarter)

Oconee 1 2003 Performance Summary

Oconee 2 2003 Performance Summary (4th Quarter)

Oconee 2 2003 Performance Summary

Oconee 3 2003 Performance Summary (4th Quarter)

Oconee 3 2003 Performance Summary