Slide Presentation by Duke Energy Corp. Regarding Reactor Trip Breaker Replacement
ML040750184
Person / Time
Site: Oconee  
(DPR-038, DPR-047, DPR-055)
Issue date: 03/08/2004
From:
Duke Energy Corp
To:
Office of Nuclear Reactor Regulation
Shared Package
ML040720190 List:
References
Download: ML040750184 (12)


Text

Duke wnergy Cq 4-W Q-)

4-REACTOR TRIP BREA KER REPLA CEMENT Oconee Nuclear Station March 8, 2004

Duke Energ Ag~endia

  • Introductions
  • 10CFR 50.59 Application
  • CRD Related Modifications
  • RTB Interfaces
  • . RTB replacement
  • Technical Specification Change
  • Closing Remarks 2

WDuke wn ergy 10 CFR 50.59 Application

  • Oconee is undergoing extensive refurbishment to address equipment age and obsolescence issues
  • CRDCS Upgrade is scheduled for implementation during the 3EOC21 RFO which begins October 7, 2004
  • The 10CFR 50.59 rule is applied to all Oconee changes. RG 1.187 endorses NEI 96-07 which provides guidance in implementing the rule

proposed activities that require a the license amendment process, should be applied to the balance 1 clarifies that aspects of TS change must be made via while the 50.59 process of the modification

    • The aspects of this modification (RTB replacement) directly related to the TS change were submitted to the NRC for review 3

Duke Energy CRD RELA TED MODIFICA TIONS SEENEENINOW-

_7 __ __ - -

z

  • RTB
    • DCRDCS

- RPS

  • CRD In-Containment Cables

i Duke TEnergy RTB INTERFACES

  • . Non safety-related
  • CRDCS
  • Generator Trip
    • Safety-related

Duke Energy RTB REPLACEMENT

    • Existing configuration
  • k New configuration
  • .* Why change is acceptable
  • & New RTB configuration similar to what is installed at later vintage B&W plants 6

k Duke

!Energy EXISTING RTB CONFIGURATION A Power B Power Supply Reactor Trip Switch Supply 7

k Duke

!Energy NEW RTB CONFIGURATION B Power tor Trio Switch Supply A Power Supply Reaci A

RPS A I

I I

C RPS C RPS B IF I

RPS D

_4D-4_

600 VAC, 30 120 VAC, 60 Control I

I B

D 120 VAC, 60 Control 8

uke

-n ergy Methods for Dropping Control Rods

  • .* RPS Automatic Trip
    • Diverse Scram System Trip
    • Source Interrupt Trip 9

Duke TECH SPECS FOR Energy CURRENT CONFIGURATION

  • V LCO requires the following to be OPERABLE:

71 Two AC CRD trip breakers 71 Four DC CRD trip breakers; 71 Eight electronic trip assembly (ETA) relays 10

Duke PROPOSED TECH SPECS FOR energy NEW CONFIGURATION

  • & ACTION required when LCO not met are the same as existing requirements for AC CRD trip breakers
  • Eliminated requirements for non safety related ETA relay requirements
    • Eliminated requirements for DC CRD trip breakers 11

Duke 0Energy

  • ,* Closing Remarks 12