Duke wnergy Cq 4-W Q-)

4-REACTOR TRIP BREA KER REPLA CEMENT Oconee Nuclear Station March 8, 2004

Duke Energ Ag~endia

  • Introductions
  • CRD Related Modifications
  • RTB Interfaces
  • . RTB replacement
  • Technical Specification Change
  • Closing Remarks 2

WDuke wn ergy 10 CFR 50.59 Application

  • Oconee is undergoing extensive refurbishment to address equipment age and obsolescence issues
  • CRDCS Upgrade is scheduled for implementation during the 3EOC21 RFO which begins October 7, 2004
  • Section 4.1.1 of NEI 96-07, Rev. 1 clarifies that aspects of proposed activities that require a TS change must be made via the license amendment process, while the 50.59 process should be applied to the balance of the modification
    • The aspects of this modification (RTB replacement) directly related to the TS change were submitted to the NRC for review 3

Duke CRD RELA TED Energy MODIFICA TIONS SEENEENINOW- _7 __ __- - - - - . .. z ,

  • RTB
    • DCRDCS

- RPS

  • CRD In-Containment Cables

iDuke TEnergy RTB INTERFACES

  • . Non safety-related
  • CRDCS
  • Generator Trip
    • Safety-related
  • RPS undervoltage trip 5

Duke Energy RTB REPLACEMENT

    • Existing configuration
  • k New configuration
  • .*Why change is acceptable
  • &New RTB configuration similar to what is installed at later vintage B&W plants 6

kDuke EXISTING RTB CONFIGURATION

!Energy A Power B Power Supply Reactor Trip Switch Supply 7

kDuke

!Energy NEW RTB CONFIGURATION A Power B Power Supply Reacitor Trio Switch Supply A _ - - RPS A RPS B IF - --

B I I I

I C - - - RPS C RPS D _4D-4_ - _ D 600 VAC, 30 120 VAC, 60 120 VAC, 60 Control Control I I 8

uke Methods for Dropping

-nergy Control Rods

  • .*RPS Automatic Trip
    • Diverse Scram System Trip
    • Source Interrupt Trip 9

Duke TECH SPECS FOR Energy CURRENT CONFIGURATION

  • VLCO requires the following to be OPERABLE:

71 Two AC CRD trip breakers 71 Four DC CRD trip breakers; 71 Eight electronic trip assembly (ETA) relays 10

Duke PROPOSED TECH SPECS FOR energy NEW CONFIGURATION

  • &ACTION required when LCO not met are the same as existing requirements for AC CRD trip breakers
  • Eliminated requirements for non safety related ETA relay requirements
    • Eliminated requirements for DC CRD trip breakers 11

Duke 0Energy

  • ,*Closing Remarks 12