I Duke U Energy. Oconee Nuclear Site NRC Management Update January 28, 2003 1

~ Duke UEnergya AGENDA

"* Opening Remarks - Ron Jones

"* Oconee Performance Overview - Bruce Hamilton

"* D~sign Basis Projects - Dave Baxter

"* Closing Remarks - Ron Jones 2

Duke

,Energy.

Oconee Performance Indicator Index Current Industry

-Median = 95%

2002 Thru November 73.1 93.2 84.2 120 100 80 60 40 20 0

89 98.5 1998

-r 1999 2000

-F 2001 3

0o 0**

O)

0 0

-a 0

0 78.37

-I dI 89.22 91.45

-4 A

85.64 I93.03 j

nI

(bqm C) 0m C

C):

0r¢

PDuke UEnergyOconee Reactor Scrams 5

Oconee Reactor Scrams 1998 - 2002 6

0 1998 1999 2000 2001 2002 Year

P Duke OlEnergy. Oconee Radiation Exposure ONS Dose History 1998 - 2002 U Dose o

Dose - Without Head Renair rozz r

rfV 6

PL 700 600 500 400 300 200 100 0

PkDuke O Energy, 2002 Performance Highlights

"* Achieved outstanding INPO Rating

"* Implemented New Emergency Operating Procedures

"* Daily Schedule Effectiveness Routinely >95%

"* Corrective Work Order Inventory <60 and Those Greater Than 180 Days Old <20

"* Human Performance Indicators (MISPOs, Rework, Etc) Trending in Right Direction 7

SIDuke IvEnergy. Underground Power Path Re lacement 8

I Duke U Energy. Underground Power Path Replacement 9

PkDuke UEnergy. Underground Power Path Replacement 10

PiDuke OrEnergy. Plant Infrastructure Upgrade 11

P Duke U Energy. Major Challenges 2003-2004

"* New Reactor Vessel Head Installation

"* New OTSG Installation

"* Keowee Upgrades

"* Modifications to ECCS

"* Caustic Addition System Upgrade 12

PDuke vEnergy. Major Challenges 2003-2004

"* Control Room Outside Air Intake Relocation

"* Upper Surge Tank Mods

"* Addition of 600 Volt Capacity

"* New Digital EHC Controls

  • ISFSJ Phase 5 13 M

P Duke UEnergy. ONS Design Basis Initiative

"* Mission

- Provide a focused review of the design basis &

implement enhancements to improve design margins and reduce plant risk

"* Sc~ope established based on:

- Key safety systems

- Event mitigation strategies

- Design criteria / Design control

- Risk insights 14

I Duke U Energy.

Completed Initiatives (as of August 200 1)

"* HPI/LPI SITA

"* OSRDC

"* Improved Tech Specs

"* UFSAR Reverification

"* Emergency Power Project

"* EFW Design Study &

Submittal

"* Single Failure Analysis - 9 Key Systems

"* Unit 1 RCP Seal Mod

"* ECCS Design Study

"* QA-5

"* Configuration Management

"* Review of Risk Significant Operator Actions

"* Chapter 15 Accident Reanalysis

"* Oconee Specific Seal LOCA Model 15

I Duke VEnergy. Completed Since Last Region II Update

  • Completion of all 164 SQUG modifications
  • Issued Two Column EOP
  • AFIS mod (Units 1 and 2)

Keowee auxiliary power modification and abnormal procedure

  • Auxiliary Building curbs and sealing of pump room penetrations
  • LP-15/16 QA-1 power (Unit 2)
  • BWST vacuum breaker modification (Unit 2)
  • MS Isolation Valve Replacements (Units 1, 2, and 3)
  • 600/208 V Load Capacity (Unit 2)
  • LP-19/20 cabling (Units 1 and 2)
  • LPSW auto-start circuitry (Units 1, 2, and 3)
  • Tornado Licensing Basis Submittal

"* Generic Letter 96-06 Resolution Submittal

"* Auxiliary Building Flooding Submittal

"* HELB Submittal

"* EFW Inventory Tech Spec Submittal 16

I Duke U Energy. Initiatives In Progress

"* SQUG Configuration Management

" EFW

"* High Energy Line Break

" Tornado

"* Time Critical Operator Actions

"* ECCS Modifications

  • Auxiliary Building Flooding
  • Emergency Power
  • Historical Calculation Enhancement 17

PDuke

[anergy.

Self Assessment

  • Self Assessment completed this summer to identify additional design basis focus areas
  • Independent consultant was used to validate the scope of the assessment and review completed work
  • Conclusion of independent review is that significant progress has been made in improving Oconee's design basis
  • Recommendations from the assessment have been reviewed and prioritized by the Oconee Design Review Board 18

I Duke U Energy. Future Focus Areas

"* Oconee's self assessment identified the following areas for additional review/initiatives

- Seismic risk

- SSF Reliability

- Appendix R

- Turbine Building flooding

- External flooding

- Containment isolation

- Spent Fuel Pool cooling

"* Lower level issues identified through the assessment are being resolved through the corrective action program 19

Closing Remarks SIDuke VEnergy 0