I Duke U Energy. Oconee Nuclear Site NRC Management Update January 28, 2003 1
~ Duke UEnergya AGENDA
"* Opening Remarks - Ron Jones
"* Oconee Performance Overview - Bruce Hamilton
"* D~sign Basis Projects - Dave Baxter
"* Closing Remarks - Ron Jones 2
Duke
,Energy.
Oconee Performance Indicator Index Current Industry
-Median = 95%
2002 Thru November 73.1 93.2 84.2 120 100 80 60 40 20 0
89 98.5 1998
-r 1999 2000
-F 2001 3
0o 0**
O)
0 0
-a 0
0 78.37
-I dI 89.22 91.45
-4 A
85.64 I93.03 j
nI
(bqm C) 0m C
C):
0r¢
PDuke UEnergyOconee Reactor Scrams 5
Oconee Reactor Scrams 1998 - 2002 6
0 1998 1999 2000 2001 2002 Year
P Duke OlEnergy. Oconee Radiation Exposure ONS Dose History 1998 - 2002 U Dose o
Dose - Without Head Renair rozz r
rfV 6
PL 700 600 500 400 300 200 100 0
PkDuke O Energy, 2002 Performance Highlights
"* Achieved outstanding INPO Rating
"* Implemented New Emergency Operating Procedures
"* Daily Schedule Effectiveness Routinely >95%
"* Corrective Work Order Inventory <60 and Those Greater Than 180 Days Old <20
"* Human Performance Indicators (MISPOs, Rework, Etc) Trending in Right Direction 7
SIDuke IvEnergy. Underground Power Path Re lacement 8
I Duke U Energy. Underground Power Path Replacement 9
PkDuke UEnergy. Underground Power Path Replacement 10
PiDuke OrEnergy. Plant Infrastructure Upgrade 11
P Duke U Energy. Major Challenges 2003-2004
"* New Reactor Vessel Head Installation
"* New OTSG Installation
"* Keowee Upgrades
"* Modifications to ECCS
"* Caustic Addition System Upgrade 12
PDuke vEnergy. Major Challenges 2003-2004
"* Control Room Outside Air Intake Relocation
"* Upper Surge Tank Mods
"* Addition of 600 Volt Capacity
"* New Digital EHC Controls
- ISFSJ Phase 5 13 M
P Duke UEnergy. ONS Design Basis Initiative
"* Mission
- Provide a focused review of the design basis &
implement enhancements to improve design margins and reduce plant risk
"* Sc~ope established based on:
- Key safety systems
- Event mitigation strategies
- Design criteria / Design control
- Risk insights 14
I Duke U Energy.
Completed Initiatives (as of August 200 1)
"* HPI/LPI SITA
"* OSRDC
- Service Water Project
"* Improved Tech Specs
"* UFSAR Reverification
"* Emergency Power Project
"* EFW Design Study &
Submittal
"* Single Failure Analysis - 9 Key Systems
"* Unit 1 RCP Seal Mod
"* ECCS Design Study
"* QA-5
"* Configuration Management
"* Review of Risk Significant Operator Actions
"* Chapter 15 Accident Reanalysis
"* Oconee Specific Seal LOCA Model 15
I Duke VEnergy. Completed Since Last Region II Update
- Completion of all 164 SQUG modifications
- Issued Two Column EOP
- AFIS mod (Units 1 and 2)
Keowee auxiliary power modification and abnormal procedure
- Auxiliary Building curbs and sealing of pump room penetrations
- LP-15/16 QA-1 power (Unit 2)
- BWST vacuum breaker modification (Unit 2)
- MS Isolation Valve Replacements (Units 1, 2, and 3)
- 600/208 V Load Capacity (Unit 2)
- LP-19/20 cabling (Units 1 and 2)
- LPSW auto-start circuitry (Units 1, 2, and 3)
- Tornado Licensing Basis Submittal
- Control Room Habitability Submittal
"* Generic Letter 96-06 Resolution Submittal
"* Auxiliary Building Flooding Submittal
"* HELB Submittal
"* EFW Inventory Tech Spec Submittal 16
I Duke U Energy. Initiatives In Progress
"* SQUG Configuration Management
" EFW
" Tornado
"* Time Critical Operator Actions
"* ECCS Modifications
- Auxiliary Building Flooding
- Emergency Power
- MSLB/FWLB in East Penetration Room
- Historical Calculation Enhancement 17
PDuke
[anergy.
Self Assessment
- Self Assessment completed this summer to identify additional design basis focus areas
- Independent consultant was used to validate the scope of the assessment and review completed work
- Conclusion of independent review is that significant progress has been made in improving Oconee's design basis
- Recommendations from the assessment have been reviewed and prioritized by the Oconee Design Review Board 18
I Duke U Energy. Future Focus Areas
"* Oconee's self assessment identified the following areas for additional review/initiatives
- Seismic risk
- SSF Reliability
- Appendix R
- Turbine Building flooding
- External flooding
- Containment isolation
- Spent Fuel Pool cooling
"* Lower level issues identified through the assessment are being resolved through the corrective action program 19
Closing Remarks SIDuke VEnergy 0