I Duke UEnergy. Oconee Nuclear Site NRC Management Update January 28, 2003 1

~ Duke UEnergya AGENDA

"* Opening Remarks - Ron Jones

"* Oconee Performance Overview - Bruce Hamilton

"* D~sign Basis Projects - Dave Baxter

"* Closing Remarks - Ron Jones 2

Duke Oconee Performance

,Energy.

Indicator Index 120 98.5 100 93.2 89 Current Industry

-Median = 95%

84.2 80 73.1 60 40 20 0 -r -F 1998 1999 2000 2001 2002 Thru November 3

nI

-a (bqm 0o 0** O) 0 0 0 0 78.37 C

-I C):

89.22 dI C) 0r¢ 91.45 0m

-4 85.64 A

I93.03 j

PDuke UEnergyOconee Reactor Scrams Oconee Reactor Scrams 1998 - 2002 6

0 1998 1999 2000 2001 2002 Year 5

P Duke OlEnergy. Oconee Radiation Exposure ONS Dose History 1998 - 2002 700 600 500 400 U Dose PL 300 oDose - Without Head Renair 200 100 0

rozz r rfV 6

PkDuke OEnergy, 2002 Performance Highlights

"*Achieved outstanding INPO Rating

"*Implemented New Emergency Operating Procedures

"*Daily Schedule Effectiveness Routinely >95%

"*Corrective Work Order Inventory <60 and Those Greater Than 180 Days Old <20

"*Human Performance Indicators (MISPOs, Rework, Etc) Trending in Right Direction 7

SIDuke IvEnergy.

Underground Power Path Re lacement 8

I Duke Underground Power U Energy. Path Replacement 9

PkDuke Underground Power UEnergy.

Path Replacement 10

PiDuke Plant Infrastructure OrEnergy.

Upgrade 11

P Duke U Energy. Major Challenges 2003-2004

"*New Reactor Vessel Head Installation

"*New OTSG Installation

"*Keowee Upgrades

"*Modifications to ECCS

"*Caustic Addition System Upgrade 12

PDuke Major Challenges 2003-2004 vEnergy.

M

"*Control Room Outside Air Intake Relocation

"*Upper Surge Tank Mods

"*Addition of 600 Volt Capacity

"*New Digital EHC Controls

  • ISFSJ Phase 5 13

P Duke UEnergy. ONS Design Basis Initiative

"*Mission

- Provide a focused review of the design basis &

implement enhancements to improve design margins and reduce plant risk

"*Sc~ope established based on:

- Key safety systems

- Event mitigation strategies

- Design criteria / Design control

- Risk insights 14

I Duke Completed Initiatives UEnergy.

(as of August 200 1)

"* HPI/LPI SITA "* ECCS Design Study

"* OSRDC

"* QA-5

"* Configuration Management

"* Improved Tech Specs

"* Review of Risk Significant

"* UFSAR Reverification

"* Emergency Power Project Operator Actions

"* EFW Design Study & "* Chapter 15 Accident Submittal Reanalysis

"* Single Failure Analysis - 9

"* Oconee Specific Seal LOCA Key Systems

"* Unit 1 RCP Seal Mod Model 15

I Duke Completed Since Last VEnergy.

Region II Update

  • 600/208 V Load Capacity (Unit 2)
  • Completion of all 164 SQUG modifications
  • LP-19/20 cabling (Units 1 and 2)
  • Issued Two Column EOP
  • LPSW auto-start circuitry (Units 1, 2,
  • AFIS mod (Units 1 and 2)
  • Tornado Licensing Basis Submittal
  • Keowee auxiliary power modification and abnormal procedure
  • Control Room Habitability Submittal
  • Auxiliary Building curbs and sealing "* Generic Letter 96-06 Resolution of pump room penetrations Submittal
  • LP-15/16 QA-1 power (Unit 2) "* Auxiliary Building Flooding Submittal
  • BWST vacuum breaker modification (Unit 2) "* HELB Submittal
  • MS Isolation Valve Replacements "* EFW Inventory Tech Spec Submittal (Units 1, 2, and 3) 16

I Duke UEnergy. Initiatives In Progress

"* SQUG Configuration

  • Auxiliary Building Management Flooding

" EFW

  • Control Room

"*High Energy Line Break Habitability

" Tornado

  • Emergency Power

"*Time Critical Operator

  • MSLB/FWLB in East Actions Penetration Room

"*ECCS Modifications

  • Historical Calculation Enhancement

PDuke

[anergy. Self Assessment

  • Self Assessment completed this summer to identify additional design basis focus areas
  • Independent consultant was used to validate the scope of the assessment and review completed work
  • Conclusion of independent review is that significant progress has been made in improving Oconee's design basis
  • Recommendations from the assessment have been reviewed and prioritized by the Oconee Design Review Board 18

I Duke UEnergy. Future Focus Areas

"* Oconee's self assessment identified the following areas for additional review/initiatives

- Seismic risk

- SSF Reliability

- Appendix R

- Turbine Building flooding

- External flooding

- Containment isolation

- Spent Fuel Pool cooling

"* Lower level issues identified through the assessment are being resolved through the corrective action program 19

SIDuke VEnergy 0

Closing Remarks 20