MONTHYEARML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22130A0102022-04-28028 April 2022 Duke Presentation for April 28, 2022 Public Meeting - Containment Liner ML22130A0092022-04-28028 April 2022 Duke Presentation for April 28, 2022 Public Meeting - Bolting Integrity ML22067A1992022-03-0303 March 2022 Annual Assessment Meeting Presentation ML22063A1142022-01-17017 January 2022 Duke Presentation for Public Meeting on February 17, 2022 ML21235A0452021-08-25025 August 2021 August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Presentation ML21102A0632021-04-14014 April 2021 ONS Slides for Pre-Application Meeting to Discuss Proposed Relief Request Related to Code Case N-853 ML21089A1732021-03-30030 March 2021 EOC Slides Final ML21081A1242021-03-22022 March 2021 EOC Slides Final ML20300A0902020-10-27027 October 2020 Subsequent License Renewal Environmental Pre-Application Meeting - NRC Presentation ML20300A0872020-10-27027 October 2020 Subsequent License Renewal Application NRC Environmental Pre-Application Meeting - Duke Energy Presentation ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19302E0512019-11-0606 November 2019 High Energy Line Break License Amendment Public Meeting ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML19207A0172019-07-30030 July 2019 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding High Energy Line Break Licensing Basis ML18227B3212018-09-0505 September 2018 Tornado License Amendment Pre-Application Meeting Slides ML18134A2292018-05-14014 May 2018 Summary of April 26, 2018, Public Teleconference with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment and 3 Regarding Technical Specification 3.8.1 ML17258A0122017-09-26026 September 2017 Presentation Slide Regarding Committee to Review Generic Requirements Meeting on Oconee Nuclear Station Cable Separation TIA ML15348A2032015-12-14014 December 2015 Duke Energy Presentation in Support of December 15, 2015, Public Meeting with NRC Staff Cable Testing Discussion for Proposed 50.55a Alternative Request ML15343A1142015-12-0808 December 2015 NRC Questions to Duke Energy Regarding Cable Testing in Support of Public Meeting on 12/15/15 ML15321A1782015-11-17017 November 2015 Presentation Material in Support of November 18, 2015 Pre-Application Meeting Between NRC and Duke 50.55a(z) Alternative to Code and Standards Requirements ML15286A0762015-10-13013 October 2015 Duke Energy Presentation in Support of October 13, 2015, Public Meeting with NRC Staff Pre-Application Meeting for LAR to Support Khu Stator Replacement. (Revised) ML15282A0722015-10-0909 October 2015 Duke Energy Presentation in Support of October 13, 2015, Public Meeting with NRC Staff Pre-Application Meeting for LAR to Support Khu Stator Replacement ML15148A2632015-05-27027 May 2015 Meeting Slides from the May 27, 2015 Oconee Major Projects Between Duke Energy and NRC ML15113A6262015-04-23023 April 2015 April 14, 2015 Summary of Public Meeting on Oconee Nuclear Station, Units 1, 2 and 3 to Discuss the Annual Assessment ML14356A0062014-12-0303 December 2014 Presentation at December 3, 2014, Category 1 Public Meeting with Duke Energy Carolinas, LLC to Discuss NTTF Recommendation 2.1, Flooding Response ML14211A2162014-07-31031 July 2014 NRC Meeting Slides 7-31-14 Reg Conference ML14211A2132014-07-31031 July 2014 Duke Energy Presentation for 2014-07-31 Meeting ML14147A3652014-05-27027 May 2014 Annual Assessment Public Meeting Summary Memo ML14058A0772014-02-0404 February 2014 Slides on Oconee Ssf Flood Barrier Breach SDP Lessons Learned ML14058A0742014-02-0404 February 2014 Slides on Oconee Ssf Flood Barrier Breach SDP - Lessons Learned ML14058A0482014-02-0404 February 2014 NRR Briefing on Oconee Flood Protection (Nrr/Dra) ML13336A5452013-11-13013 November 2013 Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Keowee Hydro Unit Generator Field Pole Rewind Project - License Amendment Request ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13275A2692013-10-0303 October 2013 10/3/13 Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Protected Service Water Alternate Cooling ML13275A2252013-09-24024 September 2013 9/24/13 Meeting Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Jocassee Dam Seismic Analysis ML13239A3372013-08-27027 August 2013 NRC Meeting Slides, Oconee Major Project Meeting - August 28, 2013 ML13239A3402013-08-27027 August 2013 Presentation for NRC Projects ML13099A4472013-04-10010 April 2013 Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Milestones for Corrective Actions for an Apparent Violation of a License Condition on Fire Protection ML13095A2132013-04-0909 April 2013 Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, External Flood Reevaluation ML13123A2042013-03-25025 March 2013 Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Concerning the Flooding Hazard Reevaluation Report ML13064A1022013-03-0505 March 2013 Slides from Predecisional Enforcement Conference with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Apparent Violation of a License Condition on Fire Protection ML13056A1042013-02-0606 February 2013 Briefing Slides on the Fliod Scenario Rupture of Jocassee Dam ML13056A1032013-02-0606 February 2013 Briefing on Draft Information Notice - Potential Nonconservative Screening Value for Dam Failure Frequency in Probabilistic Risk Assessments. ML13052A7822013-02-0606 February 2013 Slides on Oconee Ssf Flood Barrier Breach SDP - Lessons Learned ML13056A0992013-02-0606 February 2013 Meeting Slides on Oconee Ssf Flood Barrier Breach Sdsp - Lessons Learned ML13056A1022013-02-0606 February 2013 Meeting Slides on Oconee Flood Issue Jocassee Dam Failure Frequency ML13035A2332013-01-30030 January 2013 Projects Meeting - Licensee'S Public Meeting Slides 2024-04-09
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML23087A2972023-04-17017 April 2023 Annual Assessment Meeting Presentation ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22130A0102022-04-28028 April 2022 Duke Presentation for April 28, 2022 Public Meeting - Containment Liner ML22130A0092022-04-28028 April 2022 Duke Presentation for April 28, 2022 Public Meeting - Bolting Integrity ML22109A2122022-04-20020 April 2022 Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation ML22075A2012022-03-0707 March 2022 Duke 03/07/2022 Presentation - Bolting Integrity ML22067A1992022-03-0303 March 2022 Annual Assessment Meeting Presentation ML22301A1672022-02-0505 February 2022 Presentation 5 - Oconee Trip and Notification of Unusual Event on February 5, 2022 ML22063A1142022-01-17017 January 2022 Duke Presentation for Public Meeting on February 17, 2022 ML21322A3262021-11-29029 November 2021 Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request ML21235A0452021-08-25025 August 2021 August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Presentation ML21102A0632021-04-14014 April 2021 ONS Slides for Pre-Application Meeting to Discuss Proposed Relief Request Related to Code Case N-853 ML21089A1732021-03-30030 March 2021 EOC Slides Final ML21081A1242021-03-22022 March 2021 EOC Slides Final ML21034A5552021-01-26026 January 2021 SLRA - NRC Presubmittal Meeting Slides ML21034A5562021-01-26026 January 2021 SLRA - Duke Presubmittal Meeting Slides ML20300A0872020-10-27027 October 2020 Subsequent License Renewal Application NRC Environmental Pre-Application Meeting - Duke Energy Presentation ML20300A0902020-10-27027 October 2020 Subsequent License Renewal Environmental Pre-Application Meeting - NRC Presentation ML20134J0052020-05-13013 May 2020 EOC Slides (2) ML20125A2312020-05-0404 May 2020 EOC Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19302E0512019-11-0606 November 2019 High Energy Line Break License Amendment Public Meeting ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML18086A7742018-02-21021 February 2018 LOR Program Biennial Inspection 71111.11B Exam Overlap Issues ML17296A1462017-10-24024 October 2017 Duke Energy Presentation to CRGR - Oconee Nuclear Station ML17258A0122017-09-26026 September 2017 Presentation Slide Regarding Committee to Review Generic Requirements Meeting on Oconee Nuclear Station Cable Separation TIA ML15348A2032015-12-14014 December 2015 Duke Energy Presentation in Support of December 15, 2015, Public Meeting with NRC Staff Cable Testing Discussion for Proposed 50.55a Alternative Request ML15282A0722015-10-0909 October 2015 Duke Energy Presentation in Support of October 13, 2015, Public Meeting with NRC Staff Pre-Application Meeting for LAR to Support Khu Stator Replacement ML15148A2632015-05-27027 May 2015 Meeting Slides from the May 27, 2015 Oconee Major Projects Between Duke Energy and NRC ML15113A6262015-04-23023 April 2015 April 14, 2015 Summary of Public Meeting on Oconee Nuclear Station, Units 1, 2 and 3 to Discuss the Annual Assessment ML14356A0062014-12-0303 December 2014 Presentation at December 3, 2014, Category 1 Public Meeting with Duke Energy Carolinas, LLC to Discuss NTTF Recommendation 2.1, Flooding Response ML14211A2162014-07-31031 July 2014 NRC Meeting Slides 7-31-14 Reg Conference ML14211A2132014-07-31031 July 2014 Duke Energy Presentation for 2014-07-31 Meeting ML14147A3652014-05-27027 May 2014 Annual Assessment Public Meeting Summary Memo ML14058A0772014-02-0404 February 2014 Slides on Oconee Ssf Flood Barrier Breach SDP Lessons Learned ML14058A0742014-02-0404 February 2014 Slides on Oconee Ssf Flood Barrier Breach SDP - Lessons Learned ML14055A4102014-02-0404 February 2014 Meeting Slides on Standby Shutdown Facility Flood Barrier Breach Violation Informal Reassessment ML14058A0352014-02-0404 February 2014 Meeting Slides on Oconee Flood Protection and the 10 CFR 50.54(f) Response ML14058A0512014-02-0404 February 2014 Slides on Oconee Nuclear Station - Standby Shutdown Facility (Ssf) Flood Barrier Breach Violation SDP Assessment ML13336A5452013-11-13013 November 2013 Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Keowee Hydro Unit Generator Field Pole Rewind Project - License Amendment Request ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13275A2692013-10-0303 October 2013 10/3/13 Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Protected Service Water Alternate Cooling ML13275A2252013-09-24024 September 2013 9/24/13 Meeting Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Jocassee Dam Seismic Analysis ML13239A3402013-08-27027 August 2013 Presentation for NRC Projects ML13239A3372013-08-27027 August 2013 NRC Meeting Slides, Oconee Major Project Meeting - August 28, 2013 ML13226A2662013-05-0303 May 2013 E-mail from J. Boska, NRR to S. Hicks, Ois FW: Change in Public Availability of Slide Package ML13226A2592013-04-23023 April 2013 E-mail from D. Hubbard, Duke to J. Boska, NRR on Non-Security Sensitive Version of March 25th Presentation ML13226A2652013-04-23023 April 2013 E-mail from D. Hubbard, Duke to J. Boska, NRR on Security Sensitive Version 2024-04-09
[Table view] |
Text
Oconee Nuclear Station High Energy Line Break Outside Containment Summary of East Penetration Room Activities NRC Update November 14, 2005
Agenda Main Feedwater Piping Inspections Electrical Penetrations Inspections and Repairs Status of East Penetration Room (EPR)
Flood Prevention Modifications 2
MFDW Piping Inspections Unit 2 East Penetration Room FAC Insp. Girth Butt Area (typ.) Weld (typ.)
Elect.
Pen.
Area Attachment Weld (typ.)
3
MFDW Piping Inspections Q Depending on the unit, there are between 13 to 16 girth butt welds and between 3 to 5 attachment weld locations currently in the elective ISI category. The girth butt welds are inspected by UT.
Q Attachment weld locations include the attachment welds at the rupture restraints (8 attachment welds per rupture restraint).
These welds are visually inspected as well as receiving either a MT or PT.
Q Each unit has four locations inspected as part of the Flow Accelerated Corrosion (FAC) Program. The base metal at these locations is inspected by UT.
4
MFDW Piping Inspections Previous Inspections:
Elective inspections of girth butt welds began in 2003.
To date 3 girth butt welds in Unit 1 and 5 girth butt welds in Unit 3 have been inspected.
During the current 2EOC21 outage, 11 girth butt welds will be inspected. In addition, a limited amount of base metal adjacent to these welds will be inspected. 3 attachment weld locations will also be inspected (including the 8 attachment welds at each rupture restraint).
All four FAC locations in Unit 1 were inspected in 2003. Two of the four FAC locations in Unit 2 were inspected in 2004. All four FAC locations in Unit 3 were inspected in 2003.
UT inspection data collected to date shows that no weld or piping component location has a thickness less than code minimum
(.986).
5
MFDW Piping Inspections Future Inspections:
All girth butt welds and attachment welds in all units will be inspected by the Spring of 2008. Afterwards, all welds will be inspected once during a given ISI interval.
Additional locations will be added to the FAC inspection program.
Piping base metal downstream of the isolation valves not enclosed by the guard pipe will receive, at a minimum, a UT inspection every ten years.
Attachment welds at the terminal end (inside the guard pipe) will be visually inspected every ten years.
6
Electrical Penetrations Configuration of electrical penetration enclosures has not been maintained.
Initiated inspection and repair program to restore the enclosures to correct configuration.
Inspections performed on selected Unit 2 EPR electrical penetrations consisting of all HELB mitigation related (4) and 6 other penetrations with missing covers.
No degradation of terminal boards or connections was noted. Some minor rusting of enclosure interior bottom and minor debris was found.
Inspection and restoration of other units penetrations are planned for the upcoming Unit 3 (Spring 2006) and the Unit 1 (Fall 2006) outages.
7
Electrical Penetrations /
cont.
8
Electrical Penetrations /
cont.
9
Electrical Penetrations /
cont.
10
Electrical Penetrations /
cont.
11
Electrical Penetrations /
cont.
QActivities are underway to create a Preventative Maintenance Program.
QProgram will ensure that the electrical penetrations cover boxes will be free from debris and corrosion.
12
EPR Flood Prevention Modification Conceptual design of flood outlet device will be completed by 11/21/05. Detailed design will be completed by 1/15/06. First units installation package will be completed by 2/8/06. Remaining units packages will be completed by 3/1/06. Implementation will begin with the Spring 2006 Unit 3 outage.
Design of impoundment modifications will begin in the first quarter of 2006. Design completion is expected by the third quarter of 2006.
Flood outlet device and wall/door modifications will be designed to mitigate both the full guillotine break and the 1/2 D x 1/2 t crack scenario defined in the Giambusso letter.
Modifications will ensure that the resulting water level in the EPR will not cover critical instrumentation.
13
Summary Q Inspection of MFDW piping welds and base metal is underway. These inspections will give greater confidence of the structural integrity of the MFDW piping. All welds are to be inspected by Spring 2008.
Q Inspection and Repair of Electrical Penetrations is underway.
Q A Preventative Maintenance Program for the Electrical Penetrations is under development.
Q Design work has begun on the EPR flood prevention modification.
14