Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20136B369 | 31 August 1982 | Provides Rationale for Consideration of Independent Sampling of QA Programs | |
ML20136B395 | 9 September 1982 | Provides Rev & Description of Scope & Responsibilities of Region V Insp Activities Re Plant Design Verification Program | |
ML20136B417 | 1 October 1982 | Forwards Comments on Adjunct Program for Evaluation of Const QA, Per 820914 Request.General Approach & Scope Appropriate & Consistent W/Previous Recommendations | |
ML20136B616 | 23 December 1983 | Forwards Compendium on Experience of Plant Personnel.No Licensed Operator Has Relevant Commercial Licensed Experience.Any Ascension to Power Should Be Gradual & Each Stage Subj to Formal Evaluations.Related Info Encl | Boric Acid Operating Basis Earthquake Finite Element Analysis Systematic Assessment of Licensee Performance Earthquake |
ML20136C103 | 6 March 1997 | Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR | |
ML20136D691 | 21 March 1985 | Informs That Pollution Control Certificate Cannot Be Interpreted as NRC Approval for Fuel Pool Expansion.Util Has Not Applied for Expansion | |
ML20136E236 | 29 March 1982 | Requests Review of All Rf Reedy QA Audit Repts by 820402. Repts Could Have Important Bearing on Scope of Work Required of Util | |
ML20136E544 | 24 October 1983 | Discusses Logistics for Proceeding,Touching on Areas of Lodging,Transportation & Hearing Testimony | |
ML20136E550 | 12 October 1983 | Forwards Revised Testimony for Facility Design QA Hearing to Conform to Std Format Requirements | |
ML20136F441 | 25 October 1984 | Comments on Mods to Notice of Proposed Rulemaking on Emergency Planning Which Would Codify Commission Decisions on Plants Re Need for Consideration of Earthquakes.No Objections Indicated Except for Listed Proposed Deletion | Earthquake |
ML20136J094 | 3 January 1986 | Summarizes Allegation Review Board 860103 Meeting Re Case Q5-85-077,Allegations 0091,1015 & 1149 Concerning Worker Transferred for Raising Safety Concerns on Spring Can Bracket.Inquiry & Allegations Closed | |
ML20137D562 | 22 April 1977 | Requests Assistance in Seismic Reevaluation for Facilities. Effort Should Focus on Actions to Bring Plants to Hot Standby & Then Cold Shutdown in Event of Sse.W/O Stated Encl | Safe Shutdown |
ML20137E290 | 26 February 1985 | Informs of ACRS Subcommittees on Extreme External Phenomena, Structural Engineering & Diablo Canyon 850321-22 Meetings on Util long-term Seismic Program Plan & NRC Seismic Design Margin Programs.J Richardson/J Knight Encl | |
ML20138M791 | 26 June 1984 | Summarizes ACRS 219th Meeting on 840614-16 W/Nrc,Util & USGS to Review Proposed License Condition That Would Require Util to Perform Seismic Study to Reassess Facility Design Bases | |
ML20140A680 | 11 July 1980 | Advises of Diablo Canyon Hearing Reopening & San Onofre Review Status.Hearing Reopening Will Depend on Answers to Nine ASLB Questions.Review Schedule Estimate Encl | |
ML20140F197 | 26 March 1984 | Forwards Subcommittee on Energy & Environ Revised List of Comments Re Facility.Supporting Documentation Encl | |
ML20141G946 | 20 February 1985 | Forwards Documentation on San Onofre & Diablo Canyon Sites Re Consideration of Earthquakes in Emergency Planning,In Response to ACRS 298th Meeting Request | Earthquake |
ML20141G968 | 12 June 1985 | Recommends That NRC Proceed W/Proposed Amend to 10CFR50.47 & 10CFR50,App E, Consideration of Earthquakes in Context of Emergency Preparedness. Basis for Recommendation Listed. Voting Sheets Encl | Earthquake |
ML20141H012 | 2 May 1985 | Forwards Listed Info Re Consideration of Earthquakes in Emergency Planning | Safe Shutdown Earthquake Earthquake |
ML20141H066 | 13 June 1985 | Informs That Subcommittee on Energy Conservation & Power Will Hold Oversight Hearing on 850627 Re NRC Handling of Possible Complicating Effects of Earthquakes on Emergency Planning for Facility.Draft Proposed Amend to 10CFR50 Encl | Earthquake |
ML20141H071 | 13 June 1985 | Provides Narrative Outline for Questions in Oeld Area of Review Responsibility,In Response to Congressman Markey | Earthquake |
ML20141H087 | 8 July 1985 | Forwards Nj Palladino Prepared Testimony Submitted to Subcommittee on Energy Conservation & Power,Committee on Energy & Commerce on Facility Licensing Process | |
ML20141H125 | 14 July 1978 | Summarizes ACRS 219th Meeting on 780706-08 Re Util Application for Ol.Subj to Satisfactory Completion of Const, Mods & Preoperational Testing,Facility Can Be Operated at Power Levels Up to 3,338 & 3,411 Mwt for Units 1 & 2 | Safe Shutdown Post Accident Monitoring Operating Basis Earthquake Earthquake |
ML20141H137 | 5 July 1985 | Informs of Progress & Direction in Preparation of Final Rulemaking Package Re Consideration of Potential Complicating Effects of Earthquakes on Emergency Planning. Package Will Be Submitted by Early Aug 1985 | Safe Shutdown Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Design basis earthquake Earthquake |
ML20147E002 | 28 February 1986 | Intervention Request by Mothers for Peace.* Forwards Mothers for Peace 860207 Petition for Leave to Intervene.Encl Document Has Not Been Received by ASLB & Docketing & Svc Branch.Served on 860303 | |
ML20147E897 | 6 January 1985 | Repts on NRC 851118-22 Observation of INPO Accreditation Team Evaluation of Util Training Programs for Reactor Operators,Senior Reactor Operators,Nonlicensed Operators & Shift Technical Advisors | Backfit |
ML20148D826 | 27 October 1978 | References Comments in Matter of cross-examination of Consultants to ACRS at Licensing Proc Be Decided as Soon as Possible.Comm Will Consider the Matter on a Generic Basis Since Bd Agrees That It Is a top-level Policy Question | |
ML20148D949 | 15 March 1988 | Discusses 880315 Operating Reactors Events Meeting 88-11. List of Attendees,Events Discussed & Tabulation of long-term Followup Assignments Detailed in Encls | Boric Acid Pressure Boundary Leakage |
ML20148D981 | 25 October 1978 | Notice of Addition of E J Sullivan to List of Staff Witnesses Provided in Sept 1978 Davis Ltr Re Radiological Health & Safety Hearings | |
ML20148G228 | 22 March 1988 | Advises That Time for Commission to Review Naslap Decision (ALAB-880) Expired.Commission Declined Review.Decision Became Final Agency Action on 880318.Served on 880323 | |
ML20148H964 | 21 March 1984 | Summarizes 840319 Meeting Re Allegation RV-84-A-0043 Concerning Circumvention of QC Procedures & Intimidation & Threats.Ltr to Allegers Discussing Panel Actions Recommended | |
ML20149E061 | 6 October 1983 | Requests That Ofc of Investigation Followup on Allegation of Falsification of Welder Certifications at Plant.Arrangements for Standin Alleged to Be Made Through R Berry.No Details Available from C Nieberger at Present | |
ML20149H128 | 22 March 1984 | Forwards Documents Re Audit Performed by Nuclear Svcs Corp on Piping Installation Work at Plant in Response to H Myers Request.W/O Encls | |
ML20149M463 | 13 October 1983 | Partially Withheld Memo Forwarding M Mendonca 831006 Hand Written Note Re Allegation of Falsified Welder Qualifications.Ofc of Investigations Should Take Lead Responsibility | |
ML20149M469 | 9 November 1983 | Partially Withheld Ltr Re Concerns Expressed in 831108 Telcon Related to Negligence in Providing Adequate Response to Flooding in Pipe Tunnel at Unit 1.Allegation Data Forms, Special Insp Summaries & Problem Statements Encl | |
ML20149M649 | 29 May 1987 | Forwards Proposed 10CFR50.54(f) Ltr Currently Being Reviewed for Transmittal to CRGR on 870602.Comments,if Necessary, Requested by 870601 | Unanalyzed Condition |
ML20150D479 | 18 April 1975 | Notifies of 750425 Meeting Re Plant Seismic Design Adequacy Audit | |
ML20150D502 | 23 April 1975 | Provides List of Electric Equipment Items Chosen for Seismic Audit & Format of Audit.Requests Transmittance of Info to PG&E | Safe Shutdown Earthquake |
ML20151B345 | 6 October 1980 | Forwards Overview of Geosciences Branch Workload,W/Priority Indicated.Requests Assistance W/Scheduling ACRS & Hearings | Earthquake |
ML20151D427 | 24 March 1988 | Submits Summary of Actions Discussed at ACRS 335th Meeting on 880310-12 in Washington,Dc,Including ACRS Repts/ Recommendations,Other Actions,Agreements,Assignments & Requests & Future Agenda | Fitness for Duty |
ML20151G823 | 24 March 1975 | Forwards List of Plant Open Items Resulting from ACRS Subcommittee 750218 & 19 Meetings & List of Actions Requested from Review Branches for Used in Preparing SER Suppl Prior to Next ACRS Meeting | Safe Shutdown Finite Element Analysis Design basis earthquake Earthquake |
ML20151H121 | 13 November 1981 | Forwards 10CFR50.54 Ltr for Transmittal to Util.Ltr Revised to Reflect Discussions at Commission 811109 Meeting | |
ML20151H128 | 19 November 1981 | Forwards Revised Draft Ltr to PG&E Re Seismic Issues.Ltr Revised to Reflect Discussions of 811118 Commission Meeting | |
ML20151H179 | 20 January 1982 | Board Notification 82-04 Forwarding Info Re Pressurized Thermal Shock | |
ML20151H487 | 4 May 1983 | Board Notification 83-057:forwards Differing Prof Opinions Re Sys Interaction & Safety Classification.Info Relates to Board Notifications 83-17 & 83-44 Re Unresolved Safety Issue A-17 | Probabilistic Risk Assessment |
ML20151L621 | 6 December 1985 | Summarizes Facility Allegation Review Board 851206 Meeting Re Exam & Disposition of Listed Category I & II Allegations. Categories III & IV Will Be Examined Later.Categories Assigned Per R Meeks to J Martin | |
ML20151P198 | 26 January 1984 | Partially Deleted Memo Re 840120 Allegation of Drug Use at Plant.Writer Received Telephone Call Stating That Two Individuals Bragged About Shooting Up W/Heroine in Blue Room at Plant | |
ML20151W807 | 20 January 1967 | Forwards Licensee Transmitting License Application for Plant & Vols I & II, Psar. W/O Encl | |
ML20151X057 | 15 June 1967 | Reports on Completion of Review of Application by Util for Authorization to Construct Plant & Informs That ACRS Believes That Proposed Reactor Can Be Constructed W/ Reasonable Assurance of Operation W/O Risk to Public Safety | |
ML20151X097 | 1 September 1967 | Forwards Comments by Environ Science Svc Admin on PSAR Per 670725,0818,11 & 17 Requests |