|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20210P0291999-08-10010 August 1999 Discusses 990809 Telcon Between NRC Staff Members & Staff of VEPCO Re in-structure Response Spectra Used for USI A-46 Program Implementation at Plant,Units 2 & 2 ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public ML20195K0101999-06-16016 June 1999 Notification of 990624 Meeting with Util in Rockville,Md to Discuss Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit ML20206U4231999-05-18018 May 1999 Notification of 990602 Meeting with Duke Energy Corp,Vepco & Others in Rockville,Md to Discuss Technical,Regulatory & Licensing Issues Related to Proposed Future Use of Mixed Oxide Fuel at Catawba,Mcguire & North Anna Nuclear Stations DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205J2811999-04-0606 April 1999 Notification of 990422 Meeting for Dockets 7200026 & 7200027 with PG&E in Rockville,Md to Dicuss PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20205B6111999-03-26026 March 1999 Notification of 990419 Meeting with Util in Rockville,Md to Discuss Licensing Issues at Plant,Including Racking of Cask Pit for Storage of Spent Fuel ML20205B2301999-03-25025 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28 IR 05000275/19993011999-03-25025 March 1999 Forwards NRC Operator Licensing Exam Repts 50-275/99-301 & 50-323/99-301 for Tests Administered on 990125-28 ML20207M3401999-03-0202 March 1999 Notification of Canceled Meeting Scheduled for 990309 Re 7200026 & 7200027 for PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon IR 05000338/19983011999-01-28028 January 1999 Forwards NRC Operator Licensing Exam Repts 50-338/98-301 & 50-339/98-301 (Including Completed & Graded Tests) for Test Administered on 990817-21 & 31-0903 ML20202D9191999-01-28028 January 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980817-21,980831-0903 at North Anna Power Station ML20155H9051998-11-0303 November 1998 Notification of 981117 Meeting for Dockets 7200026 & 7200027 with Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage ML20155J6821998-10-0909 October 1998 Forwards Staff First Monthly Update to Plan of short- & long-term Actions to Respond to Selected Issues Raised During 980730 Hearing Before Senante Subcommittee on Clean Air,Wetlands,Private Property & Nuclear Safety ML20153F7981998-09-23023 September 1998 Forwards NRC Operator Licensing Exam Rept 50-346/98-301OL, (Including Completed & Graded Tests) for Tests Administered on 980803-07 ML20153F8291998-09-23023 September 1998 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered During Wk of 980803 ML20155J7001998-08-13013 August 1998 Requests That EDO Due Date for Green Ticket G980483 Be Extended from 980818 to 980828 ML20236F3581998-06-26026 June 1998 Forwards NRC Insp Mc 0350, Staff Guidelines for Restart Approval, for Oversight Activities for Davis Besse Station ML20236N8641998-06-11011 June 1998 Discusses TS Interpretation on Application of Davis Besse TS 3.6.5.1 & 3.6.5.2.TB Branch Recommends That Davis Besse Consider Converting TS to Improved Standard TS ML20248K4451998-06-0202 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage.Meeting Agenda Encl ML20216F3291998-04-13013 April 1998 Accepts 980406 Licensee Request for Approval to Install machine-welded SG Tube Plugs in Accordance W/Provisions of Paragraph IWB-4230, Tube or Tubesheet Hole Plugging by Fusion Welding, of Section XI ML20247G9081998-04-0707 April 1998 Discusses Experts Needed for Plant Life Extension Cases,Per 980403 Discussion ML20202E6241997-11-26026 November 1997 Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Quality Assurance Program at Davis-Besse ML20202B6981997-11-26026 November 1997 Notification of 971217 Meeting W/Vepco in Rockville,Md to Discuss Status of Review of Util'S Application for 10CFR72 License for North Anna Isfsi.Meeting Agenda,Encl ML20211Q4711997-10-16016 October 1997 Notification of 971113 Meeting W/Toledo Edison Co in Rockville,Md to Discuss Ultimate Heat Sink at Davis-Besse ML20211B5561997-09-23023 September 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970707-11 ML20211C5091997-09-23023 September 1997 Forwards NRC Operator Licensing Exam Rept 50-346/97-308OL (Including as-given Writtem Exam) for Tests Administered on 970707-10 ML20210P6771997-08-20020 August 1997 Discusses 970724-25 Severe Accident Mgt Implementation Demonstration at North Anna Power Station in Mineral,Va. Purpose of Demonstration,To Provide NRC & Visiting Utility, Info on Implementation of Severe Accident Mgt ML20149E7411997-07-16016 July 1997 Notification of 970821 Meeting W/Util in Rockville,Md to Discuss Instrument Drift Study IR 05000338/19970031997-06-10010 June 1997 Forwards Insp Repts 50-338/97-03 & 50-339/97-03 on 970406-0517.NRR Requested to Perform Generically Applicable Technical Review Re Turbine Governor Valve Testing Requirements ML20141B5931997-05-0909 May 1997 Discusses Util 951212 Request for Exemption from Requirements of Section III.G.2.f of App R to 10CFR50 for Thermo-Lag Radiant Energy Heat Shields Inside Containment. Encl Response, ,received from Util.W/O Encl ML20137U2051997-04-14014 April 1997 Informs That Davis-Besse Nuclear Power Station Nuclear Assurance Dept Will Be Reorganized Into Two Separate Dept; DB Nuclear Assurance & DB Nuclear Support Svc,Effective, 970414 ML20136F9491997-03-13013 March 1997 Notification of 970403 Meeting W/Util in Rockville,Md to Discuss Progress on Thermo-Lag Issue Resolution ML20137A1441997-03-12012 March 1997 Forwards Settlement Data Info Requested During Nrc/Ferc Insp Exit Mtg on 970212 ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20147B7511997-01-24024 January 1997 Forwards NRC Approved Operator Licensing Retake Exam Facility Outline & Initial Exam Submittal for Test Administered on 961218 IR 05000338/19963001997-01-24024 January 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 960126-0201 for Repts 50-338/96-300 & 50-339/96-300 ML20134P9011996-11-26026 November 1996 Notification of 961204 Meeting W/Clei & Teco in Rockville,Md to Discuss Potential Submittals Concerning Proposed Merger of Centerior Energy Co & Oec ML20134P8711996-11-21021 November 1996 Forwards 961105 FEMA Ltr Which Forwards 960723-25 & 0801-15 Final Rept Re Full Participation Plume & Ingestion Exercise at Plant ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129A1231996-10-17017 October 1996 Notification of 961029 Meeting W/Util in Rockville,Md to Discuss Proposed Amend Re Use of Four Lead Test Assemblies at Plant ML20137L3031996-08-30030 August 1996 Informs That Changes Contained in Re Rev 29 to Radiological Emergency Plan for St Lucie,Consistent W/Provisions of 10CFR50.54(q),10CFR50.47(b) & 10CFR50,App E ML20136C8201995-10-10010 October 1995 Provides Summary of Discussion & Staff Actions Re 950921 Plant Performance Review.List of Participants,Changes to Mip & Matrix Trend Charts Encl ML20137R9521995-03-22022 March 1995 Informs That Plant Performance Review of Listed Plants Was Held on 950316 ML20149E8161994-08-0202 August 1994 Forwards Fr Notice of License Amend Requests Proposed Merger of Toledo Edison Co & Cleveland Electric Illumianting Co Antitrust Determination NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20210P0291999-08-10010 August 1999 Discusses 990809 Telcon Between NRC Staff Members & Staff of VEPCO Re in-structure Response Spectra Used for USI A-46 Program Implementation at Plant,Units 2 & 2 ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public ML20195K0101999-06-16016 June 1999 Notification of 990624 Meeting with Util in Rockville,Md to Discuss Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit ML20206U4231999-05-18018 May 1999 Notification of 990602 Meeting with Duke Energy Corp,Vepco & Others in Rockville,Md to Discuss Technical,Regulatory & Licensing Issues Related to Proposed Future Use of Mixed Oxide Fuel at Catawba,Mcguire & North Anna Nuclear Stations DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205J2811999-04-0606 April 1999 Notification of 990422 Meeting for Dockets 7200026 & 7200027 with PG&E in Rockville,Md to Dicuss PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20205B6111999-03-26026 March 1999 Notification of 990419 Meeting with Util in Rockville,Md to Discuss Licensing Issues at Plant,Including Racking of Cask Pit for Storage of Spent Fuel ML20205B2301999-03-25025 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28 IR 05000275/19993011999-03-25025 March 1999 Forwards NRC Operator Licensing Exam Repts 50-275/99-301 & 50-323/99-301 for Tests Administered on 990125-28 ML20207M3401999-03-0202 March 1999 Notification of Canceled Meeting Scheduled for 990309 Re 7200026 & 7200027 for PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20202D9191999-01-28028 January 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980817-21,980831-0903 at North Anna Power Station IR 05000338/19983011999-01-28028 January 1999 Forwards NRC Operator Licensing Exam Repts 50-338/98-301 & 50-339/98-301 (Including Completed & Graded Tests) for Test Administered on 990817-21 & 31-0903 ML20155H9051998-11-0303 November 1998 Notification of 981117 Meeting for Dockets 7200026 & 7200027 with Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage ML20155J6821998-10-0909 October 1998 Forwards Staff First Monthly Update to Plan of short- & long-term Actions to Respond to Selected Issues Raised During 980730 Hearing Before Senante Subcommittee on Clean Air,Wetlands,Private Property & Nuclear Safety ML20153F7981998-09-23023 September 1998 Forwards NRC Operator Licensing Exam Rept 50-346/98-301OL, (Including Completed & Graded Tests) for Tests Administered on 980803-07 ML20153F8291998-09-23023 September 1998 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered During Wk of 980803 ML20155J7001998-08-13013 August 1998 Requests That EDO Due Date for Green Ticket G980483 Be Extended from 980818 to 980828 ML20236F3581998-06-26026 June 1998 Forwards NRC Insp Mc 0350, Staff Guidelines for Restart Approval, for Oversight Activities for Davis Besse Station ML20236N8641998-06-11011 June 1998 Discusses TS Interpretation on Application of Davis Besse TS 3.6.5.1 & 3.6.5.2.TB Branch Recommends That Davis Besse Consider Converting TS to Improved Standard TS ML20248K4451998-06-0202 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage.Meeting Agenda Encl ML20216F3291998-04-13013 April 1998 Accepts 980406 Licensee Request for Approval to Install machine-welded SG Tube Plugs in Accordance W/Provisions of Paragraph IWB-4230, Tube or Tubesheet Hole Plugging by Fusion Welding, of Section XI ML20247G9081998-04-0707 April 1998 Discusses Experts Needed for Plant Life Extension Cases,Per 980403 Discussion ML20202B6981997-11-26026 November 1997 Notification of 971217 Meeting W/Vepco in Rockville,Md to Discuss Status of Review of Util'S Application for 10CFR72 License for North Anna Isfsi.Meeting Agenda,Encl ML20202E6241997-11-26026 November 1997 Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Quality Assurance Program at Davis-Besse ML20211Q4711997-10-16016 October 1997 Notification of 971113 Meeting W/Toledo Edison Co in Rockville,Md to Discuss Ultimate Heat Sink at Davis-Besse ML20211B5561997-09-23023 September 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970707-11 ML20211C5091997-09-23023 September 1997 Forwards NRC Operator Licensing Exam Rept 50-346/97-308OL (Including as-given Writtem Exam) for Tests Administered on 970707-10 ML20210P6771997-08-20020 August 1997 Discusses 970724-25 Severe Accident Mgt Implementation Demonstration at North Anna Power Station in Mineral,Va. Purpose of Demonstration,To Provide NRC & Visiting Utility, Info on Implementation of Severe Accident Mgt ML20149E7411997-07-16016 July 1997 Notification of 970821 Meeting W/Util in Rockville,Md to Discuss Instrument Drift Study IR 05000338/19970031997-06-10010 June 1997 Forwards Insp Repts 50-338/97-03 & 50-339/97-03 on 970406-0517.NRR Requested to Perform Generically Applicable Technical Review Re Turbine Governor Valve Testing Requirements ML20141B5931997-05-0909 May 1997 Discusses Util 951212 Request for Exemption from Requirements of Section III.G.2.f of App R to 10CFR50 for Thermo-Lag Radiant Energy Heat Shields Inside Containment. Encl Response, ,received from Util.W/O Encl ML20137U2051997-04-14014 April 1997 Informs That Davis-Besse Nuclear Power Station Nuclear Assurance Dept Will Be Reorganized Into Two Separate Dept; DB Nuclear Assurance & DB Nuclear Support Svc,Effective, 970414 ML20136F9491997-03-13013 March 1997 Notification of 970403 Meeting W/Util in Rockville,Md to Discuss Progress on Thermo-Lag Issue Resolution ML20137A1441997-03-12012 March 1997 Forwards Settlement Data Info Requested During Nrc/Ferc Insp Exit Mtg on 970212 ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel IR 05000338/19963001997-01-24024 January 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 960126-0201 for Repts 50-338/96-300 & 50-339/96-300 ML20147B7511997-01-24024 January 1997 Forwards NRC Approved Operator Licensing Retake Exam Facility Outline & Initial Exam Submittal for Test Administered on 961218 ML20134P9011996-11-26026 November 1996 Notification of 961204 Meeting W/Clei & Teco in Rockville,Md to Discuss Potential Submittals Concerning Proposed Merger of Centerior Energy Co & Oec ML20134P8711996-11-21021 November 1996 Forwards 961105 FEMA Ltr Which Forwards 960723-25 & 0801-15 Final Rept Re Full Participation Plume & Ingestion Exercise at Plant ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129A1231996-10-17017 October 1996 Notification of 961029 Meeting W/Util in Rockville,Md to Discuss Proposed Amend Re Use of Four Lead Test Assemblies at Plant ML20137L3031996-08-30030 August 1996 Informs That Changes Contained in Re Rev 29 to Radiological Emergency Plan for St Lucie,Consistent W/Provisions of 10CFR50.54(q),10CFR50.47(b) & 10CFR50,App E ML20136C8201995-10-10010 October 1995 Provides Summary of Discussion & Staff Actions Re 950921 Plant Performance Review.List of Participants,Changes to Mip & Matrix Trend Charts Encl ML20137R9521995-03-22022 March 1995 Informs That Plant Performance Review of Listed Plants Was Held on 950316 ML20149E8161994-08-0202 August 1994 Forwards Fr Notice of License Amend Requests Proposed Merger of Toledo Edison Co & Cleveland Electric Illumianting Co Antitrust Determination NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted 1999-08-27
[Table view] |
Text
. ., a;, .7 %.t ,9V P " W?.P.o't'P #S #9.. J t >,-, '. +, ,J,D. ? ; G. T._ r, ; ; 1; .' 2 i .< ' ~ M ?. m b. ,
.%g.7,,_L e;
. < - m '- --
-='.-- -
s V.*. .
.w.
N, . .J
. b.
g,.-
j3.$
i April 22, 1977 '
1 W{n R. Tesdsco, Assistant Director (
MEMORAMDUM I'00 Ior Plant Syaeens, *'S $ . w D. Ross, ,ssistant Director '
for Reactor Safaty,
's
. S S ,
J. P. F.n i gh t , Assistaat Director - 0 TROM: for Engineerin:, DSS i f
SUBJECT:
TCISMIC RE '2V ALU50ATIO!': -338, JWS NORT2 4 M~ ANNA. DAVIS-3ISSr.'f, ..
AllD DIA51.0 C A!IT O S
.'.n na Un i t s !!o . I and 2 and Davi s- ?'l The ACRS letters tus ;;c r thdiscovery of the Lloscri fault "
Bessa Unic No. 1 and the sear Diablo Canyon Units No. 1 and 2 have lead to a acionic ,[
. 4'.
re-evaluation for each of encse facilities. speak to '$
,?
lhe ACKS letters written on North Anna and Davis-3esseaccouplish
- f a detailed review of those systens necessary to renoval". '! e
" safe shutdown and continued shutdovn heat initial phase of $.),
plan to use a consistent approach for the l.*
the Diablo Canyon evaluation. ,
,11
~. :
that must
'In order to proceed further we need the guidance pi 4 be devnloped throu;;h a sys tens evaluation that vill 3,7 r.
produen the fo11oving information: .
assuning an SSC has taken place, to bring [
4 (a) A scenario, standby and finally cold shutdovu. '-
- the plant to hot for:n a scenario developed by lj
,e have attached in draftfor Diablo Canyou.,(Euclosura 1) ,
the applicant .
- t 'a n t nust operate to (b) Identification of the s y s t e..s i schicve hot standby under this scenario. .
(c) Idantificacian of the systens that nust operate to achieve cold shutdown undet this reviev. f 0500220515 050722 Contact ((kggab63 ^
biablo Canyon -
l', .
Chen pon
.soreh Anns - I.. tesai ,
Davis 9 3 se ..- - --
WEx' \'. 27535
. \ _. . . . . . . . . . . . . . . .
,r-m ._
.t- in ._. +r -
lt April 22, 1977 2-
- 3. Tedesco ' .
D, 7.oss * .
trace available to and positively Peta 11ed drawings are*or to vill end be point
- f o ce :
cach systen from sourcesuch as block valves, branch '
identify.conponents operato or have no required linen that either nust function.
i tio'n of the Assumin; a loss of offsite power (hours)identif vs. long ca term (d) terr. respect to the 11stind of significance (days) of shortloss of offolte power vich developed in (b) and (c).
equipment complation of the a enjor milestono in the I know that This effort licensing cetion foralready is each ofstretched these planco. the linita but I
, are to this item as priority your resourcesyour consideration of nust request
/
6.atter.
a draft detailedremoval listing of equipmentproposed that was
..lso attached is and heat (Cnclosura 2)for and a ,
required for shutdownfor Diablo Canyonthe by Wootinghouse list prepared by applicant as a Horch starting f general system 3) , perhaps these ofcan the serve syste=s and the Anna (Enclosure De vill need bo th, a list for cach plant in
. point. in thoso systens fuuctional components ,
order to proceed. effort I hope th a t we can a significant Since this will be of contact in the appropriate review coamsystons being establish a point the me=bors of the recourso throughout branches established, to which in Engineering any have ,
this task.
' J. P. Knir.ht, 3.s s is t an t Direct Lu db a ur e s : for Engineering Safety
.As stated .
Division of Systens 5'
ccav/ encl.
R. Heinecan, iSS y
- r. Schroedar, DSS .
V. nenaroy a *, DSS T . ;.ov sk , .SS T. Ippolico. LSS P. Ross, .iS S 4
- 1. Sihweil, DSS ** _
R. ,osnak, DSS i
l --
w --
(.
(DrsI\/ ...-._....... . . . . . .
-1 _______.......- _l I
'...j......
n.
Mu i.';~,7 Ukl.Y. 3$,N,$'[i[,
.' ,$' .,7'"'M...y*I@EMP.IE.7,7.' .IQ$Y7N.$ '
~. ,. .
.. -... .~p .
- . a _7. . . . . .:..--
s .., -. a :. a
- , p ,
_n.---- - _= - -
t-
,l;', .. '
- }
o?6 -)j - :
Qi -
T::eUi -
6(p'j! ,
p,
.- s i
m April 22, 1977 t
?
'1 2..
, . {
c r-
'k)
}k
/Y }tElf0RA!: DUP. I'OR: R. Tendsco, Assistant Director '
for Plant Systens, USS 2l'2J4 h4 D. Ross, ,.s c is c an t Director e
'for Reactor Sainty, 's S S M..! ,
i V[ '
" TRO)!: . J. P. Eu l t.h t , Assistant Director - -
I for Engineerin;;, DSS I '
SEISMIC RE-2VALUATIOl* : NORT*d ANNA. DAVIS-BESSE f SU15J ECT :
A!!D DI AM.0 CA!n'ON 50-538, J % 4;"Y l
. The ACRS icttern f or iiorth Anna t'n i t s !! o . I and 2 and Davi s-3 conc Unit No. 1 and the d i s c o ,r c r y of the !!o c S r i fault I, near Diablo Canyon Units No. 1 and 2 have lead to a aciscic re-evaluation for each of these facilitics.
I
,i b *1 h c ACKS inttern vritten on :lorth Anna and Davis-3 conc speak to !
4 a detailed reviev of thouc systens neccesary to accomplish
'fe "safo chutdown and continued shutdovn heat renoval" t
S inn to une a concistcut approach for the initial phanc of
), the Diablo Canyon evaluation, ,
'In' order to proccad further vc need the guidance that nust
]
a be developed throu;;h n r.yntean evaluation that' vill
.; produce tho following information: .
.o* . p (a) A scenario, aonuning an SGC han tahen place, to bring J4 '
the pinnt to hot neandby and finally cold ethutdown. . ;
lej t'c have r. t t a ch e d in draft form a scenario developed by [
the applicant for Diablo Canyon. (Encic nure 1)
'h(e l
(b) Identificition of the cyste.n that nunt operate to y achicyc hot ntandby under this scenario.
fi ,
S *
!! Identification of the n y c t e a r, that nurt operate to f 3 (c) '
W, achieve cold shutdown under this reviev. ,
@Z , ;
'j
Contact:
blablo Cnnyon - l* . Chen i 8
l
- ior t h Aana - P. . icaal . i' ,.1. s ' r - r ,
T. ,f]-.___ --
'1 8 9't
- r. ' ~ ~ -
g N ?' 1
~
"'YL J A j& % ' t fWY?WE l ,Q l W "."!M ?f? _'* .
,,v, ff. .~~ W=
Lf '
.- V t.
'" Tedesco ' April 22, 1977 D. '.*. o r. c -
available to trace Note:
Petailed drawings. from arc ~ortovill source end bepoint and positively cach sy n t ert identifythne components such as block valves, branch -
lines either nust operate or hava no requirec,.
function.
of offsite power identification of the
. (d) Ancuning a loco of short teri (hours) vs. long ter significance (days) loco of offaite po cr with respect to the listing of l equipuent developed in (b) and (c)..
in the completion of the i
for each of th ese planto . I know that This effort in a major milestonc licensing cetion are already stretchedthic iten an a priorit/
to the linic but I your nunt reneurecoyour request cencideration of j
natter.
3 detailed listing of equipnent proposed
..lso attached in a draft required for chutdown and heat renoval that v a r.
for Diablo Canyon (Enclocurc 2) and a
,f' ,
by Wcutinghounc prepared by the a p p i. ic an t for North a starting general systen list Perhaps checeofcan serve th e systens and the as
> Annn (Enclosure will need3). *ooth, a lia Mc 6 functional componento in thone systens for each plant'in
, point.
order to proceed,
y effort I hope that we can a oignificar.t v
f' Since thin will be of contact in the appropriate nyatenc cotablich a point 8
branches to which the r:enborn of the revicuchroughout teon boing Enginocring nity havc recourse
' I established.in . ,
.pf[" f this tank.
.c
'5 Lu do o ur e s : - J . P . Kn i gh t , .'.a s i s t an t Dire 9' .An neated for Engineering Safety g .
Division of Systens g.
pi cc:v/nnel. ii S S
- n. Heincuan, l'" F. Schroeder, DSS V. I.cn ar oy a , DSS T. ..ovah, .SS
9 P. Ronn, .s S S .
'I 1. Sihucil, USS **
R. onnah, DSS _ , _
( _>
1 y'"- --
D*1 m .-- ml . ;
' r WS '. TA l m ..
..