ML20150D479

From kanterella
Jump to navigation Jump to search
Notifies of 750425 Meeting Re Plant Seismic Design Adequacy Audit
ML20150D479
Person / Time
Site: Diablo Canyon  
Issue date: 04/18/1975
From: Shao L
Office of Nuclear Reactor Regulation
To: Jeng D, Knight J
Office of Nuclear Reactor Regulation
Shared Package
ML20150D429 List:
References
FOIA-88-19 NUDOCS 8803240295
Download: ML20150D479 (1)


Text

(

(

b

/

/

CM L Distribution:

APR 131975 NRR-Rdg SEB=Rdg CentralFilesL.

b' J. Knight, Chief, Mechanical Engineering Branch. TR D. Jeng, Section Leader, Section A Structural Engineering Branch, TR DIABLO CANYON PRE-AUDIT MEETING Prior to our implementation of the coming seismic design adequacy auditing of the subject plant in San Francisco, there are certain basic positions and technical procedures that require coordination and agreement among our auditing staff.

For this reason I am calling a pre-audit coordination meeting at 9:00 a.m. in ray office (P-1022A) on April 25,1975.

i Your attendance at the meeting is requested.

If you have difficulty on the meeting time I have selected, please contact me.

L. C. Shao, Chief Structural Engineering Branch Division of Technical Review cc:

R. R. Maccary D. Allison N

,;,i 1

TR:SEB T~R:SEB 7807 Oh LCShao %

or"

DCJeng:m5 4/ f/75 4l}f}75 Form AEC.)lN (Rev. 9 5 3) AECAE O240 k u. a. eovs anu seet eneaume orrec as s ete.ese.s ee 880324029 Snatt = 5 860107 F0 + GE'-l 9 1,

non w

ww-v

-*ey