ML20150D479
| ML20150D479 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 04/18/1975 |
| From: | Shao L Office of Nuclear Reactor Regulation |
| To: | Jeng D, Knight J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20150D429 | List: |
| References | |
| FOIA-88-19 NUDOCS 8803240295 | |
| Download: ML20150D479 (1) | |
Text
(
(
b
/
/
CM L Distribution:
APR 131975 NRR-Rdg SEB=Rdg CentralFilesL.
b' J. Knight, Chief, Mechanical Engineering Branch. TR D. Jeng, Section Leader, Section A Structural Engineering Branch, TR DIABLO CANYON PRE-AUDIT MEETING Prior to our implementation of the coming seismic design adequacy auditing of the subject plant in San Francisco, there are certain basic positions and technical procedures that require coordination and agreement among our auditing staff.
For this reason I am calling a pre-audit coordination meeting at 9:00 a.m. in ray office (P-1022A) on April 25,1975.
i Your attendance at the meeting is requested.
If you have difficulty on the meeting time I have selected, please contact me.
L. C. Shao, Chief Structural Engineering Branch Division of Technical Review cc:
R. R. Maccary D. Allison N
- ,;,i 1
TR:SEB T~R:SEB 7807 Oh LCShao %
or"
DCJeng:m5 4/ f/75 4l}f}75 Form AEC.)lN (Rev. 9 5 3) AECAE O240 k u. a. eovs anu seet eneaume orrec as s ete.ese.s ee 880324029 Snatt = 5 860107 F0 + GE'-l 9 1,
non w
ww-v
-*ey