ML20141G968

From kanterella
Jump to navigation Jump to search
Recommends That NRC Proceed W/Proposed Amend to 10CFR50.47 & 10CFR50,App E, Consideration of Earthquakes in Context of Emergency Preparedness. Basis for Recommendation Listed. Voting Sheets Encl
ML20141G968
Person / Time
Site: Diablo Canyon, San Onofre, 05000000
Issue date: 06/12/1985
From: Minogue R
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20140C992 List:
References
FOIA-85-653 NUDOCS 8601130244
Download: ML20141G968 (7)


Text

c;J#** % UNITED STATES t NUCLEAR REGULATORY COMMtsSION WASHINGTON, D.C. 20555 JUN 121985 MEMORANDUM FOR: William J. Dircks Executive Director For Operations FROM: Robert B. Minogue, Director Office of Nuclear Regulatory Research

SUBJECT:

CONTROL OF NRC RULEMAKING: RES REVIEW OF ONG0ING RES SPONSORED RULEMAXING Based on our review of the ongoing RES-sponsored proposed amendment to 10 CFR 50.47 and 10 CFR Part 50, Appendix E--Consideration of Earthquakes in the Context of Emergency Preparedness, RES recommends that the NRC should proceed with this specific rulemaking. This recomendation in draft form has been

~

coordinated with IE. The basis for our recomendation is as follows.

In the Diablo Canyon full power license decision the Comission stated that it would initiate rulemaking "to address whether the potential for seismic impacts on emergency planning is a significant enough concern for large portions of the nation to warrant the amendment of the regulations to specifically consider those impacts."

This rulemaking is the staff's response to the above Commission decision. The proposed rule was published in the Federal Register on December 21, 1984 and requested public coment on the merits of three possible alternatives:

o Adoption of the proposed rule codifying San Onofre and Diablo Canyon o Leaving the issue open for adjudication on a case-by-case basis o Requiring by rule that emergency plans specifically address the impact of earthquakes.

As a result of public coment the staff is now considering another alternative which would require that the emergency plans include a limited assessment of the complicating effects of severe, low frequency natural phenomena.

The staff is now preparing to recomend to the Comission, based on a thorough i 8601130244 851125 PDR FOIA BELL 85-653 PDR l

I l

William J. Dircks 2 JUN 121985 -

public coment analysis, a final rule which would embrace one of the four ,

alternatives -mentioned.

The complete RES review package has been .sent to OEDO (Attention: DEDROGR) and to the Director IE.

~

Y

  • Robert B. Minogue, Dir or Office of Nuclear Regulatory Research a

e Y

4 9

e RES REVIEW PACKAGE I

RES' INDEPENDENT REVIEW BOARD VOTING SHEET TO: F. P. GILLESPIE, CHAIRMAN, RIRB FROM:

K. R. Goller, Member, RIRB TITLE OF RULEMAKING: Lo usthec oM. a .G- he Ng%kes w we 6kW o 4- E = r g - g b e p r= 6 4 IRB

/ AGREE WITH RECO MENDATIONS IN RES RULEMAKING REVIEW PACKAGE MODIFY RECOMENDATIONS IN NOT PARTICIPATING.

RES RULEMAKING REVIEW PACKAGE AS INDICATED BELOW COMENTS AND SUGGESTIONS:

MkMBk'R, fb C/4/95~

DATE

'l m 31125 RES INDEPENDENT REVIEW BOARD j 1 c 8 ,

V0 TING SHEET TO: F. P. GILLESPIE, CHAIRMAN, RIRB FROM: W. M. Morrison, Member, _ RIRB TITLE OF RULEMAKING:(.ows;&<r \.oa e G- 5.cN vA s(  %=.C-o& d-o4 v =ecgem3 % eeq=c =& =sa REQUEST RIRB AGREE WITH RECOPMENDATIONS MEETING.

IN RES RULEMAKING REVIEW PACKAGE MODIFY RECOMMENDATIONS IN NOT PARTICIPATING

  • RES RULEMAKING REVIEW PACKAGE AS INDICATED BELOW COMMENTS AND SUGGESTIONS:

F WHf# &

W. M. Morrison MEMBER, RIRB y/)c'kJ DATE

' * ~

RES INDEPENDEN1 REVIEW BOARD VOTING SHEET TO: F. P. GILLESPIE, CHAIRMAN, RIRB FROM: G. A. Arlotto, Member, RIRB TITLE OF RULEMAKING: < oasibetak.e.a ro e Each .y,, la we 4.kA

l. 0 % V n a.c g m x \ c e p s k ers REQUEST RIRB AGREE WITH RECO MENDATIONS MEETING.

Ill RES RULEMAKING REVIEW PACKAGE MODIFY RECOMMENDATIONS IN NOT PARTICIPATING

  • RES RULEMAKING REVIEW PACKAGE AS INDICATED BELOW COMENTS AND SUGGESTIONS:

G. A. Arlotto HEMBER, RIRB p

V 10l r DATE

'C

T .. ..

1 .

~

Receipt acknowledged. Concur with coments.

Receipt acknowledged. Concur with comments as follows:

l#

h1

~

h ei l

/

_ w xd.~

JW s

dward L. Jordan,- irector

- f Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement

. 0

.