ML20136E550
| ML20136E550 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon, 05000000 |
| Issue date: | 10/12/1983 |
| From: | Haass W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Knight J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20136B092 | List:
|
| References | |
| FOIA-84-293 NUDOCS 8311030366 | |
| Download: ML20136E550 (1) | |
Text
.
OCT 121953 y
MEMORANDUM FOR:
James P. Knight, Afs'i'stirit'Ui' rector Components and Structures Engineering Division of En'gineering, NRR FROM:
Walter P. Haass, Deputy Chief Quality Assurance Branch Division of Quality Assurance, W
Safeguards, and Inspection Programs, IE
SUBJECT:
. REVISED TESTIMONY FOR DESIGN QA HEARING -
l-DIABLO CANYON 5
Enclosed is my revised testimony for the Diablo Canyon Design QA hearing
~
to conform to your standard format requirements.
Walter P. Haass, Deputy Chief Quality Assurance Branch Division of Quality Assurance, Safeguards, and Inspection Programs Office of Inspection and Enforcement
Enclosure:
Revised Testimony Distribution:
E. L. Jordan, IE M Partlow, IE W. P. Haass, IE IE Files IE Reading
~
QASIP Reading QUAB Reading WPHaass Reading DC[p' IP:IE W444.1 s
]E pog-t4-293
/83 ""
l
/
__a y I
,