Issue date | Title | Topic | |
---|---|---|---|
ML19259C825 | 3 July 1979 | Confirms 790628 Telcon Re New Info About Util Motion for Summary Disposition & Prefiled Written Testimony Re Tornado Missiles.Large Missiles Could Not Strike Fuel Elements | Tornado Generated Missile |
ML19282B887 | 19 February 1979 | Expresses Concern Re Replacement of Radioactive Steam Generators & Possible Radiation Exposure Dangers.Requests Public Hearings | |
ML19331A678 | 25 March 1977 | Discusses Nuclear Power Plant Const Delays Caused by NRC Inefficiency & Indifference.Requests President Carter to Take Positive & Constructive Action Re Voter Supported Nuclear Energy.Certificate of Svc Encl | |
ML20009H262 | 8 July 1981 | Informs of 810703 Facility Oil Spill.On 810703,station Transformer Ruptured & Caught Fire.Unknown Quantity of Oil Washed to Lake Anna Via Discharge Storm Sewer.Cleanup Continued Until 810705.No Environ Impact Cited | |
ML20029A001 | 25 January 1991 | Denies That Abnormal Events Re Water Releases to Lake Anna Should Be Classified as Unusual Discharges,Per 910121 & 23 Telcons.Discharges Contained No Pollutants | |
ML20045G403 | 7 July 1993 | Responds to State 930607 Ltr Re Findings Noted in RCRA Insps on 930518.Licensee Has Demonstrated That No Violations W/Respect to Unmarked Drum & Accumulation Time & Annual Rept & Contingency Plan Occurred | |
ML20055D298 | 28 June 1990 | Informs of Change in Location of Discharge of Reject Water from Plant Reverse Osmosis Water Purification Sys.Effective 900626,discharge Directed to Discharge Tunnel at Intake Structure Per State Recommendation | |
ML20055H839 | 23 July 1990 | Requests Publication of Encl Public Notice of Reissuance of Vpdes Permit for Plant.Certification of Public Notice Issue Date Also Requested | |
ML20055H840 | 23 July 1990 | Requests Publication of Encl Public Notice of Reissuance of Vpdes Permit for Plant.Certification of Public Notice Issue Date Requested | |
ML20056B458 | 21 August 1990 | Advises That Legal Notices Re Reissuances of NPDES Permit for Plant Have Been Published in Richmond-Times Dispatch & Central Virginian on 900804 & 11 & 0726 & 0802,respectively, as Requested.Confirmation from Newspapers Encl | |
ML20056G409 | 20 August 1993 | Responds to Util Rebutting Violations of Virginia Hazardous Waste Mgt Regulations Cited in 930607 | |
ML20057A986 | 8 September 1993 | Documents Understanding That,Due to Current Workloads at Agency,Recipient Will Not Be Available for Meeting Until After End of Sept,Per in Ref to Contested Findings of 930518 RCRA Insp at Plant | |
ML20058D590 | 19 November 1993 | Submits Annual Statement Verifying That Each Spillway Gate Operated at Least Once During Twelve Months Preceding Annual Insp Conducted by FERC on 930921,per 18CFR12.44(b)(2) | |
ML20058F881 | 2 December 1993 | Submits Plan & Schedule for Development & Submittal of Annual Repts of Embankment Instrumentation & Survey Data,As Result of Annual Insp of North Anna Hydroelectric Facility | |
ML20059E166 | 29 August 1990 | Submits Addl Comments on Toxics Monitoring Program.Util Sent Request to K Roller to Allow Licensee to Use Alternate Detection Limits for Chemical Analyses in Subj Program.Ltr Containing Request Encl | |
ML20062D772 | 17 August 1990 | Informs of Identification of Deficiencies Occurred During North Anna REP Exercise of 900808 | |
ML20062E016 | 14 November 1990 | Documents Correction of Deficiencies Noted Insp of Lab Received on 901022.W/o Stated Ltr Explaining Causes of Unacceptable Results Obtained for Total Residual Chlorine & Suspended Solids Analyses | |
ML20065F276 | 5 April 1994 | Proposes to Discontinue Survey Between North Anna Main Dam Ref Monuments & Us Coast & Geological Survey Monuments Performed Once Every 10 Yrs to Verify Locations of Ref Monuments | |
ML20065R359 | 2 May 1994 | Forwards Caterpillar 940210 Memo Addressing Issues Re Emission Limits in Permit Issued on 931020 Which Differ from Limits Requested in 930830 Application for Permit to Install Emergency Standby diesel-powered Generator at Plant | Grab sample |
ML20069K258 | 9 June 1994 | Responds to Insp Rept & Deficiency Notice Received at Plant Following 940322 Insp.Since No Prior Notice of Changes to Std Methods Rule Given,Impacted Permittees Should Be Allowed Reasonable Time to Come Into Compliance W/Any Changes | |
ML20071H576 | 13 July 1994 | Notifies That Station Blackout Generator at Util Scheduled for Startup on or Around 940820 | |
ML20071L628 | 28 July 1994 | Ack Receipt of Detailed Response to NPDES Insp Rept | |
ML20077C248 | 22 November 1994 | Discusses Licensee Request for Relief from Ph Limitations in Plant Current Vpdes Permit at Outfalls 003 & 004 | |
ML20078E125 | 25 January 1995 | Submits Notification Re Stationary Source Permit to Construct & Operate an EDG | |
ML20078G842 | 9 November 1994 | Submits Response to Violations Noted in Insp Repts 50-338/94-10 & 50-339/94-10.Corrective Actions:Upset Conditions Corrected & Facility Performance Inproved | |
ML20078H071 | 30 January 1995 | Discusses Conditions Affecting Safety of Project That Documents Problem Encounter W/Spillway EDG at Plant Main Dam & Informs on 950103 Spillway EDG Failed to auto-start During Performance of Monthly Periodic Test | |
ML20078M148 | 8 February 1995 | Discusses Series of Problems at Sewage Treatment Plant Re Exceedance in Bod | |
ML20080C138 | 30 November 1994 | Responds to Issues Identified in Repts for Technical & Lab Insps on 941018 & 20.Corrective Actions:Corrected DMR Forms Completed & Submitted to Dept of Environ Quality & TSS Worksheet Form Revised | |
ML20080J918 | 22 February 1995 | Submits Annual Statement Verifying That Each Spillway Gate Has Been Operated at Least Once During Twelve Months Preceeding Annual Insp by FERC Regional Engineer | |
ML20080K856 | 22 February 1995 | Submits Notification for Spillway EDG Corrective Maint & Start Failure for Plant Hydroelectric Project | |
ML20081C210 | 1 March 1984 | Advises That 11.6% Permit Responsibility Transferred to Old Dominion Electric Cooperative on 831221,per . Requests NPDES Permit & 401 Certificate Be Modified to Reflect Transfer.W/O Stated Encl | |
ML20083K718 | 4 May 1995 | Forwards Application for Reissuance of Vpdes Permit for North Anna Power Station W/Addl Data Requested by | Boric Acid Grab sample Biofouling |
ML20086G585 | 29 December 1983 | Informs of 831228 Oil Sheen Discovered on Lake Anna.Caused by Rain Washing Oil Off Waste Oil Drums.Oil Boom & Absorbent Pads Used to Contain & Clean Up Spill.Oil Drum Storage Facility Const in Progress | |
ML20086N473 | 16 December 1991 | Confirms 911211 Telcon Notification Made by D James Re Failure of Sewage Lift Station at Plant.Failure Due to Electrical Malfunction of Turbine Bldg Sewage Lift Station. Sewage Flow Immediately Stopped & Repairs Made to Lift | |
ML20087G315 | 7 March 1984 | Forwards Completed Oil Spill Questionnaire VA-84-093 for 840215 Occurrence | Time of Discovery |
ML20087L341 | 21 August 1995 | Notifies of Minor Change in Discharge or Mgt of Pollutants at Plant | |
ML20087M061 | 22 September 1983 | Forwards Preliminary Results of Natural Circulation Analyses for 811111 Transient at McGuire & 800605 Natural Circulation Low Power Test at North Anna | |
ML20091C774 | 2 August 1991 | Forwards Completed Spill Questionnaire for 910704 Incident, Involving Discharged Oil or Hazardous Matls from Facility in Quantities That May Be Harmful | Time of Discovery |
ML20092C869 | 13 June 1984 | Forwards Completed Oil Spill Questionnaire VA-84-156 Re 840518 Spill in Condenser Cooling Water Discharge Canal. Cause Unidentified.Oil Contained by Absorbent Boom | Time of Discovery |
ML20092K557 | 20 June 1984 | Submits Addl Info Re 840616 Possible Oil Spill Previously Reported by Telephone.Util Unable to Confirm or Deny Original Rept of Spill.Level Control Sys for Unit 1 Turbine Sump Tested & Found Operating Satisfactorily | |
ML20094P174 | 1 April 1992 | Forwards Completed Oil Questionnaire Re 920226 Oil Spill Into Stormwater Pipe.Caused by Broken Fuel Oil Pump Strainer.Pipe Flushed & Pump Strainer Repaired | |
ML20095J204 | 20 August 1984 | Informs of Oil Spill on 840816.Two Gallons of Oil Discovered Near First Storm Drain at Discharge Canal.Oil Contained in Area & Cleaned Up by Use of Absorbent Pads & Fiber Pearl. Caused by Separator Left Running | |
ML20097H705 | 5 September 1984 | Forwards Oil Spill Questionnaire VA-84-231 Addressing 840816 Spill | Time of Discovery |
ML20099A857 | 23 July 1992 | Advises That Settlement Offer,Described in , Acceptable to Util.Item 3 of Proposal Re Employee Environ Awareness Video Awarded to Echo Films,Inc.Site Barriers Constructed to Cover Entrances to Security Blockhouse | |
ML20100B906 | 24 January 1996 | Submits Annual Statement Verifying That Each Spillway Gate Operated at Least Once During Twelve Months Preceding Annual Insp by Ferc,Per 18CFR12.44(b)(2).Main Dam'S Five Spillway Gates Satisfactorily Tested as Specified on Attached Form | |
ML20101J051 | 21 March 1996 | Provides Notice of Intent to Increase Amount of Reverse Osmosis Reject Water Discharged at Outfall 020 | |
ML20101R252 | 10 April 1996 | Responds to Unacceptable Results Noted in Discharge Monitoring rept-QA Rept for North Anna Power Station (Permit VA0052451) & Yorktown Power Station (Permit VA0004103) | |
ML20101S618 | 9 July 1992 | Forwards NPDES Discharge Monitoring Rept for June 1992 for North Anna Power Station. High Ph Problems in Turbine Bldg Sumps May Be Due to Residual Effects of Earlier Hydrazine Spill | |
ML20105A973 | 9 September 1992 | Responds to Telcon & Re Method of Compliance W/ Dates for Training in Fire Extinguisher Use.Under Proposed Procedure,Util Will Need to Maintain Internal Record Available for Review by State of VA for Min of 12 Months | Fire Watch |
ML20106F999 | 15 October 1984 | Forwards Completed 841004 Questionnaire VA-273 Re 840927 Oil Spill | Time of Discovery High winds |