Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000329/2004025 | 17 May 1985 | Notice of Violation from Insp on 850329-0425 | |
IR 05000525/2006025 | 16 July 1985 | Notice of Violation from Insp on 850525-0625 | Hydrostatic |
IR 05000626/2007026 | 14 August 1985 | Notice of Violation from Insp on 850626-0726 | |
IR 05000727/2008016 | 29 August 1985 | Notice of Violation from Insp on 850727-0816 | Grab sample |
IR 05000926/2010023 | 21 November 1985 | Notice of Violation from Insp on 850926-1023 | |
IR 07100010/2011012 | 1 December 1987 | Notice of Violation from Insp on 871010-1112.Violation Noted:Procedure CP-118 Not Implemented in That Combustibles Not Protected,Floor & Wall Openings Not Protected & Fire Watch Not Assigned to Watch for Sparks in Lower Floor Areas | Fire Watch |
ML20054H062 | 23 April 1982 | Notice of Violation from Insp on 820304-26 | |
ML20054K289 | 14 April 1982 | Notice of Violation from Insp on 820316-19 | |
ML20054K358 | 22 February 1982 | Corrected Notice of Violation from Insp on 811024-1202 | |
ML20054K362 | 29 January 1982 | Notice of Violation from Insp on 811024-1202 | |
ML20056E986 | 9 August 1993 | Notice of Violation from Insp on 930606-0710.Violation Noted:Mut Hydrogen Regulator Adjusted W/O Required Safety Evaluation Being Performed | |
ML20057B420 | 10 September 1993 | Notice of Violation from Insp on 930628-0730.Violation Noted:Design Control Measures Had Not Assured Design Bases Were Properly Translated Into Min Terminal Voltage Specified by Battery Svc Test Surveillance Procedure SP-523,Rev 28 | |
ML20057C323 | 9 September 1993 | Notice of Violation from Insp on 930711-0814.Violation Noted:Measure Did Not Assure Corrective Actions Preclude Repetition of Reactor Coolant Sys Overcooling Event of 930305 | |
ML20058P678 | 3 December 1993 | Notice of Violation from Insp on 931101-19.Violation Noted: Facility Licensee Physician Made Determination That Two Operators Eyesight No Longer Met Min Stds Required by 10CFR55.33(a)(1) | |
ML20059C079 | 10 December 1993 | Notice of Violation from Insp on 931108-12.Violations Noted: Surveillance Procedure SP-182,rev 10, Reactor Bldg Structural Integrity Surveillance Program Not Implemented as Described | |
ML20059G600 | 31 August 1990 | Notice of Violation from Insp on 900707-0810.Violation Noted:Valve Realignment Sequence Violated in That Air Dryer Bypass Valve Closed First Instead of Last While Releasing Work Request 90-07-036 | |
ML20062C595 | 29 September 1978 | Notice of Violation from Inspec on 780814-18 | |
ML20062D945 | 7 November 1990 | Notice of Violation from Insp on 900918-1005.Violation Noted:On 900918,containment Integrity for Unit Not Maintained While in Mode 1 in That Valve Dhv 43 Did Not Fully Shut After Performing Cycling & Disabling Evolution | Stroke time |
ML20062F910 | 9 November 1978 | Notice of Violation from Inspec on 781016-19 | |
ML20062G513 | 15 November 1978 | Notice of Violation from Inspec on 781018-19 | |
ML20062J312 | 28 May 1982 | Notice of Violation from Insp on 820327-0426 | |
ML20126F188 | 11 December 1992 | Notice of Violation from Insp on 921018-1114.Violation Noted:Dg Inoperable for Two H During Performance of Surveillance procedure,SP-907B.Required Breaker Alignment & Power Availability Verifications Not Performed | |
ML20126M400 | 17 May 1985 | Notice of Violation from Insp on 850325-29 | Condition Adverse to Quality |
ML20127F456 | 2 May 1985 | Notice of Violation from Insp on 850408-12 | Earthquake |
ML20127G369 | 19 April 1985 | Notice of Violation from Insp on 850318-22 | |
ML20127G759 | 8 April 1985 | Notice of Violation from Insp on 850211-15 | |
ML20127G811 | 18 April 1985 | Notice of Violation from Insp on 850325-28 | Scaffolding |
ML20127J586 | 23 April 1985 | Notice of Violation from Insp on 850301-29 | |
ML20127J618 | 2 May 1985 | Notice of Violation from Insp on 850408-12 | |
ML20127L285 | 11 April 1985 | Notice of Violation from Insp on 850201-28 | |
ML20127N501 | 24 May 1985 | Notice of Violation from Insp on 850325-29 | |
ML20128K280 | 6 June 1985 | Notice of Violation from Insp on 850513-17 | |
ML20128K343 | 21 June 1985 | Notice of Violation from Insp on 850426-0524 | |
ML20129A156 | 4 October 1996 | Notice of Violation from Insp on 960811-0907.Violation Noted:Technician Failed to Follow Requirements of PT-366, Resulting in Inadvertent Initiation of Control Room Emergency Ventilation Sys & Escort Lost Contact W/Visitor | |
ML20129H726 | 30 October 1996 | Notice of Violation from Insp on 960908-1005.Violation Noted:Failure of Clearance for Work Request Nu 0337713 to Require Tripping Fuel Racks Prior to Opening Air Supply Isolation Valve Resulted in Inadvertent Start of Generator | |
ML20132C799 | 5 December 1996 | Notice of Violation from DOL Recommended Decision & Order, & Investigation by NRC OI Completed on 960924. Violation Noted:Licensee Discriminated Against Ta James, Former Security Escort & Firewatch | |
ML20132F786 | 31 January 1985 | Notice of Violation from Insp on 841110-1220 | |
ML20133P287 | 24 July 1985 | Notice of Violation from Insp on 850617-21 | |
ML20133Q383 | 15 October 1985 | Notice of Violation from Insp on 850826-30 | |
ML20134C309 | 12 September 1996 | Notice of Violation from Insp on 960714-0810.Violation Noted:Failure to Take Prompt Corrective Actions to Address Discrepancies Identified in Feb 1995 During make-up Sys Audit | |
ML20134P395 | 5 February 1997 | Notice of Violation from Insp on 961201-970111.Violations Noted:Rcs Cooldown Rate Allowed to Exceed Limits Specified in PTLR for Approximately One Hour,During Unit Cooldown | |
ML20135C392 | 27 November 1996 | Notice of Violations from Insp on 961006-1102.Violations Noted:No Licensee Sp Included Channel Check for Motor Driven Emergency Feedwater Pump Discharge Pressure Gauge | Post Accident Monitoring |
ML20135C707 | 21 February 1997 | Notice of Violation from Insp on 960805-09.Violation Noted: Fuel Handling Event Involving Fuel Assembly N8C6 Was Not Recorded in Operating Logs or Refueling Log & Main Fuel Handling Bridge Was Not Verified for Indexing | |
ML20137E444 | 28 February 1997 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violation Noted:Procedures Were Not Implemented & Maintained to Detailed Requirements Necessary to Implement Security Plan for Plant Operations | |
ML20137E529 | 12 March 1997 | Notice of Violation from Insp on 961206.Violation Noted: in April 96 Licensee Made Change to Facility Described in Fsar,Which Involved Three USQ W/O Prior Commission Approval | Ultimate heat sink Condition Adverse to Quality |
ML20137T031 | 24 March 1997 | Notice of Violation from Insp on 970112-0222.Violations Noted:Licensee Failed to Prescribe Quality Related Clearance Tagging Activities Into Appropriate Procedure That Compliance Procedure 115 Nuclear Plant Tags | |
ML20137U244 | 12 February 1986 | Notice of Violation from Insp on 851126-860117 | |
ML20138A355 | 7 March 1986 | Notice of Violation from Insp on 860106-10 | |
ML20138C403 | 25 March 1986 | Notice of Violation from Insp on 860127-31 | High Radiation Area |
ML20138C683 | 27 March 1986 | Notice of Violation from Insp on 860208-0307 |