Text
.
APPENDIX A NOTICE OF VIOLATION 4
_ Florida Power Corporation License No. DPR-72
~
Based on the results of the NRC inspection conducted on August 14-18, 1978, it appears that certain of your activities were not conducted in full com-pliance with NRC requirements as indicated below.
These items have been categorized as described in our correspondence to you dated December 31, 1974.
Techrical Specification 6.8.1 requires that written procedures be estar.!ished, implemented and maintained for activities recommended in Appendix "A" of Regulatory Guide 1.33, November 1972, which includes general procedures for the control of maintenance.
CP-116, Standard Cleanliness Specifications, provides controls for general
/
area cleanliness in Sections 8.1.3-8.1.5 and specifically states:
" Accumulation of dirt, debris, construction materials, etc., from shift to shift shall be prohibited."
L:ntr.u to the above, debris were allowed to accumulate along the cege.: the fuel transfer canal as observed by the inspectors during the week of August 14-18, 1978. Some of these debris fell onto the reacter vessel plenum, necessitating action by the licensee to retrieve them.
This is an infraction.
i l
I 78111006 %