Notice of Violation from Insp on 900707-0810.Violation Noted:Valve Realignment Sequence Violated in That Air Dryer Bypass Valve Closed First Instead of Last While Releasing Work Request 90-07-036
ML20059G600
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/31/1990
From: Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20059G597 List:
References
50-302-90-24, NUDOCS 9009130032
Download: ML20059G600 (1)


Text

_

b i

  • i ENCLOSURE 1 i

NOTICE OF VIOLATION l Florida Power Corporation Docket No. 50-302 Crystal River Unit 3 License No. OPR-72 DuringtheNuclearRegulatoryCommission(NRC)inspectionconductedonJuly7-August 10, 1990, a violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement J Actions," 10 CFR Part 2 Appendix C (1990), the violation is listed below: l E

Technical Specification 6.8.1 requires that written procedures ' be established, implemented, and maintained for those activities reconsnended. 'I in Appendix "A" of Regulatory Guide 1.33, November-1972 Section 9.e(1), t obtaining pemission and clearance to perfom work.

Compliance Procedure (CP) 115. " Nuclear Plant Clearance Orders", section ) '

4.8.3, requires that when a clearance is released, that the tags be removed and the system be restored in the reverse order in which the tags {

were hung.

Contrary to the above, on July 10, 1990 at approximately .7 a.m. while -

releasing Work Request 90-07-036, the valve realignment sequence was violated in that the am J.?er bypast, valve was closed first instead of last. This caused a partia' icss of instrument air.

This is a Severity Level IV Violation (Supplement 1).

Pursuant to the provisions of 10 CFR 2.201, Florida Power Corporation is hereby '

i-required to submit a written statement or explanation to the Nuclear Regulatory l

Commission, ATTN: Document Control Desk, Washington, DC 20555, with a copy to ,

+he Regional Administrator, Region II, and a copy to the NRC Resident ,

l

'spector, Crystal River 3, within 30 days of the date of the letter  ;

l

.nsmitting .this Notice. This reply should be clearly marked as a " Reply to a l Notice of Violation" and should include for each violation: (1)admissionor denial of the alleged violation, (2) the reason for.the violation if admitted.

(3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) '

the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time. If an adequate ,

reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or l

revoked or why such other action es may be proper should not be taken.

FOR THE NUCLEAR REGULATORY COMMISSION etWW .6 d Marvin V. Sinkule, Chief Reactor Projects Branch 2 Division of Reactor Projects -