Other: 3F0112-11, Corrections to the Extended Power Uprate LAR 309 Vendor Affidavit and Technical Report, 3F0113-08, Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Re, 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip., 3F0912-01, ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C, 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip, 3F1112-02, 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 250, ML11259A012, ML11300A226, ML11342A195, ML12031A032, ML12053A231, ML12107A068, ML12202A734, ML12205A357, ML12205A358, ML12240A119, ML12255A409, ML12262A385, ML12314A391, ML12314A392, ML12314A393, ML13032A540
|
MONTHYEAR3F0811-04, Response to Request for Additional Information to Support NRC Probabilistic Risk Assessment Licensing Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-11011 August 2011 Response to Request for Additional Information to Support NRC Probabilistic Risk Assessment Licensing Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-02, Response to Request for Additional Information to Support NRC Balance of Plant Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-11011 August 2011 Response to Request for Additional Information to Support NRC Balance of Plant Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-01, Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-18018 August 2011 Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-03, Response to Request for Additional Information to Support NRC Mechanical and Civil Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-25025 August 2011 Response to Request for Additional Information to Support NRC Mechanical and Civil Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11259A0122011-09-14014 September 2011 NRR E-mail Capture - Clarification for August 25 Emcb RAI Acceptance Review Letter Project stage: Other ML11286A0922011-10-11011 October 2011 Response to Request for Additional Information to Support NRC Reactor Systems Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11300A2262011-10-25025 October 2011 Feedwater Line Break Overpressure Protection Analysis to Support NRC Reactor Systems Branch Acceptance Review of the CR-3 Extended Power Update LAR and LAR Approval Schedule Project stage: Other 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip2011-10-25025 October 2011 ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip Project stage: Other ML11326A2312011-12-0707 December 2011 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12205A3572011-12-15015 December 2011 Attachment a to 3F0712-03, CR-3 LOCA Summary Report - EPU/ROTSG/Mark-B-HTP, Revision 4 Project stage: Other 3F1211-05, Response to Request for Additional Information to Support NRC Health Physics and Human Performance Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-15015 December 2011 Response to Request for Additional Information to Support NRC Health Physics and Human Performance Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F1211-06, Response to Request for Additional Information to Support NRC Vessels and Internals Integrity Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-15015 December 2011 Response to Request for Additional Information to Support NRC Vessels and Internals Integrity Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F1211-10, Response to Request for Additional Information to Support NRC Fire Protection Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-21021 December 2011 Response to Request for Additional Information to Support NRC Fire Protection Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-04, Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12030A2092012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Instrumentation and Control Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11342A1952012-01-0606 January 2012 Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-safeguards Information Project stage: Other ML12024A3002012-01-19019 January 2012 Response to Request for Additional Information to Support NRC Component Performance and Testing Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-06, Response to Request for Additional Information to Support NRC Piping and NDE Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-19019 January 2012 Response to Request for Additional Information to Support NRC Piping and NDE Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-11, Corrections to the Extended Power Uprate LAR 309 Vendor Affidavit and Technical Report2012-01-31031 January 2012 Corrections to the Extended Power Uprate LAR #309 Vendor Affidavit and Technical Report Project stage: Other ML12003A2172012-02-0808 February 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12052A1302012-03-0202 March 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12053A2312012-03-0202 March 2012 Request for Withholding Proprietary Information from Public Disclosure Related Extended Power Uprate Technical Report Project stage: Other 3F0312-02, Response to Second Request for Additional Information to Support NRC Instrumentation and Controls Branch (Eicb) Technical Review of the CR-3 Extended Power Uprate LAR2012-03-19019 March 2012 Response to Second Request for Additional Information to Support NRC Instrumentation and Controls Branch (Eicb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0312-01, Response to Request for Additional Information to Support NRC PRA Licensing Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-03-22022 March 2012 Response to Request for Additional Information to Support NRC PRA Licensing Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12031A0322012-03-26026 March 2012 Request for Withholding Proprietary Information from Public Disclosure Related to Extended Power Uprate Technical Report Project stage: Other ML12107A0682012-04-0404 April 2012 NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (Eptb) Project stage: Other 3F0412-05, Response to Second Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-0404 April 2012 Response to Second Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0412-04, Response to Request for Additional Information to Support NRC Mechanical and Civil Engineering Branch (Emcb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-0404 April 2012 Response to Request for Additional Information to Support NRC Mechanical and Civil Engineering Branch (Emcb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-07, Response to Request for Additional Information to Support NRC Containment and Ventilation Branch (Scvb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-12012 April 2012 Response to Request for Additional Information to Support NRC Containment and Ventilation Branch (Scvb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-06, Response to Request for Additional Information to Support NRC Electrical Systems Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-16016 April 2012 Response to Request for Additional Information to Support NRC Electrical Systems Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-09, Response to Request for Additional Information to Support NRC Accident Dose Branch (Aadb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-26026 April 2012 Response to Request for Additional Information to Support NRC Accident Dose Branch (Aadb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12102A0442012-05-0404 May 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12314A3912012-05-31031 May 2012 17877-0002-100, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment 2 Project stage: Other ML12205A3582012-05-31031 May 2012 Attachment D to 3F0712-03, Technical Report, ANP-3114(NP), Rev. 0, CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies. Project stage: Other 3F0612-05, Response to Request for Additional Information to Support NRC Nuclear Performance and Code Review Branch (Snpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-06-18018 June 2012 Response to Request for Additional Information to Support NRC Nuclear Performance and Code Review Branch (Snpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip.2012-06-30030 June 2012 Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip. Project stage: Other ML12184A3442012-07-0202 July 2012 NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Discussion/Clarification of Emcb Draft RAIs Project stage: Draft Other ML12174A2922012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12171A3472012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12205A3562012-07-17017 July 2012 Supplement to the Extended Power Uprate License Amendment Request #309 Project stage: Supplement 3F0712-06, Response to Second Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch (Esgb) Technical Review of the CR-3 Extended Power Uprate LAR2012-07-17017 July 2012 Response to Second Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch (Esgb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request ML12194A4172012-07-17017 July 2012 Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI 3F0712-07, Response to Third Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-07-31031 July 2012 Response to Third Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0712-08, Response to Second Request for Additional Information to Support NRC PRA Licensing Branch (Apla) Technical Review of the CR-3 Extended Power Uprate LAR2012-07-31031 July 2012 Response to Second Request for Additional Information to Support NRC PRA Licensing Branch (Apla) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request ML12125A1622012-08-0101 August 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12202A7342012-08-0101 August 2012 Request for Withholding Proprietary Information from Public Disclosure Related to Extended Power Uprate Technical Report Project stage: Other ML12202A0602012-08-0202 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12213A3032012-08-0303 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request (Srxb) Project stage: RAI ML12219A1912012-08-16016 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI 3F0812-02, Response to Second Request for Additional Information to Support NRC Electrical Engineering Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR2012-08-21021 August 2012 Response to Second Request for Additional Information to Support NRC Electrical Engineering Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 2012-03-26
[Table View] |
|
---|
Category:Letter
MONTHYEARML23342A0942024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23354A0632023-12-22022 December 2023 Cover Letter - Crystal River License Termination Plan Request for Additional Information ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML23320A2592023-11-17017 November 2023 STC-23 077 Notification of the Crystal River Unit 3 Generating Plant License Termination Plan Public Meeting and Federal Register Notice ML23313A1322023-11-15015 November 2023 Request for Additional Information for the Environmental Assessment of the License Termination Plan for Crystal River Unit 3 Nuclear Generating Plant ML23310A0712023-11-0707 November 2023 Audit Plan Cover Letter - Crystal River Unit 3 Nuclear Generating Plant LTP ML23187A1112023-07-25025 July 2023 Acceptance of Requested Licensing Action License Request to Add License Condition to Include License Termination Plan Requirements ML23107A2722023-06-13013 June 2023 Letter Transmitting NRC Survey Results for East Settling Pond ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 IR 05000302/20220032023-05-25025 May 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2022003 ML23103A1902023-04-19019 April 2023 Request for Supplemental Information Cover Letter ML23058A2532023-03-22022 March 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River, Unit 3 - NRC Inspection Report No. 05000302/2022003 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22265A0192022-09-26026 September 2022 Nuclear Generating Plant - U.S. Nuclear Regulatory Commission'S Analysis of ADP CR3, Llc'S Decommissioning Funding Status Report (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20220022022-08-0909 August 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022002 IR 05000302/20220012022-05-0303 May 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022001 ML22116A1752022-04-27027 April 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3- Independent Spent Fuel Storage Installation Security Inspection Report 07201035/2022401 ML22105A3992022-04-18018 April 2022 Nuclear Generating Plant - Change in NRC Project Manager ML22011A1362022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan IR 05000302/20210042022-01-24024 January 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2021004 ML22024A2142022-01-24024 January 2022 Nuclear Generating Plant - NMFS NRC Letter - Crystal River Energy Complex Biological Opinion Status (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21351A0052021-12-20020 December 2021 NRC Analysis of ADP CR3, LLC Decommissioning Funding Status Report for the Crystal River Unit 3 Nuclear Generating Plant (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21322A2702021-11-24024 November 2021 Nuclear Generating Plant - Issuance of Amendment No. 260 Approving the Independent Spent Fuel Storage Installation Only Security Plan, Rev 3 IR 05000302/20210032021-11-0909 November 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021003 and 07201035/2021001 ML21288A4292021-10-18018 October 2021 Letter - Crystal River Unit 3 Nuclear Generating Plant - Correction to Safety Evaluation Related to the Issuance of Amendment No. 259 Approving the Independent Spent Fuel Storage Installation Only Emergency Plan ML21238A0952021-10-13013 October 2021 Issuance of Amendment No. 259 Approving the ISFSI-Only Emergency Plan, Revision Draft a IR 05000302/20210012021-08-12012 August 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021001 and 05000302/2021002 ML21182A1032021-07-0606 July 2021 Request for Additional Information (RAI) Related to the ISFSI-Only Emergency Plan ML21159A0422021-06-28028 June 2021 VY and CR Indirect License Transfer Package ML21060B4142021-04-12012 April 2021 U.S. Nuclear Regulatory Commission Analysis of Duke Energy Florida, Llc'S Initial Decommissioning Funding Plan for the Crystal River Independent Spent Fuel Storage Installation ML21028A5912021-03-0202 March 2021 Letter to Reid Forwarding Exemption from 10 CFR Part 20, Appendix G, Section Iii.E ML21055A7832021-02-25025 February 2021 Letter to Reid, Change in NRC Staff Project Management for Crystal River Unit 3 Nuclear Generating Plant ML21012A3142021-01-13013 January 2021 Independent Spent Fuel Storage Installation Security Inspection Plan IR 05000302/20200012020-11-19019 November 2020 NRC Inspection Report No. 05000302/2020001, Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3, Crystal River, Florida ML20269A2922020-10-0707 October 2020 NRC Form 311 QA Program Approval Revision 10 Related to Crystal River 3 ML20101G5822020-04-10010 April 2020 CR-3 License Transfer SE Corrected Cover Letter ML20069A0232020-04-0101 April 2020 Order Approving Transfer of Licensed Authority from Duke Energy Florida, LLC, to ADP CR3, LLC, and Draft Conforming Administrative License Amendment ML20050D0142020-02-19019 February 2020 NRC Independent Spent Fuel Storage Installation Inspection Report No. 07201035/2020001, Duke Energy Florida, LLC, Crystal River Unit 3, Crystal River, Florida ML20050F7702020-02-14014 February 2020 30-Day Notice of Payment from the City of Tallahassee Trust Fund Non-Qualified Nuclear Decommissioning Trust Fund for Crystal River Unit 3 ML20015A5672020-01-15015 January 2020 Independent Spent Fuel Storage Installation Security Inspection Plan ML20009D0432020-01-10010 January 2020 Letter to Hobbs, Crystal River Unit 3 Nuclear Generating Plant - Corrected Safety Evaluation for Approval of Partial Site Release for Facility Operating License No. DPR-72 ML19339G5092020-01-0202 January 2020 Letter to Hobbs, Crystal River Unit 3 Nuclear Generating Plant - Approval of Partial Site Release for Facility Operating License No. DPR-72 ML19343A8252019-12-0606 December 2019 Letter from Erika Bailey, Oak Ridge Institute for Science and Education, to John Hickman, NRC, Forwarding Independent Confirmatory Survey Summary and Results for the 3,854-Acre Area Partial Site Release at the Crystal River Energy Complex IR 05000302/20190022019-11-20020 November 2019 NRC Inspection Report No. 05000302/2019002 and Independent Spent Fuel Storage Installation Inspection Report No. 07201035/2019002, Duke Energy Florida, LLC, Crystal River Unit 3, Crystal River, Florida ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19261A0702019-09-19019 September 2019 VEGP U3 Proficiency Watches Prior to Fuel Load ML19177A0802019-06-26026 June 2019 Nuclear Generating Plant (CR-3) - Notification of Revised Post-Shutdown Decommissioning Activities Report (Revised PSDAR) ML19170A1942019-06-14014 June 2019 Application for Order Consenting to Direct Transfer of Control of Licenses and Approving Conforming License Amendment ML19129A1402019-05-15015 May 2019 Letter to Hobbs, Correction to Amendment No. 257 Approving Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Revision 1 2024-01-09
[Table view] |
Text
Progress EnergyCrystal River Nuclear PlantDocket No. 50-302Operating License No. DPR-72July 31, 20123F0712-07U.S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington, DC 20555-0001Subject: Crystal River Unit 3 -Response to Third Request for Additional Information to SupportNRC Health Physics and Human Performance Branch (AHPB) Technical Review of theCR-3 Extended Power Uprate LAR (TAC No. ME6527)References: 1. CR-3 to NRC letter dated June 15, 2011, "Crystal River Unit 3 -LicenseAmendment Request #309, Revision 0, Extended Power Uprate" (ADAMSAccession No. MLI 12070659)2. Email from S. Lingam (NRC) to D. Westcott (CR-3) dated May 14, 2012, "RE:Crystal River EPU LAR (ME6527) -Health Physics Draft RAI"3. NRC to CR-3 letter dated July 5, 2012, "Crystal River Unit 3 Nuclear GeneratingPlant -Request For Additional Information For Extended Power Uprate LicenseAmendment Request (TAC No. ME6527)" (ADAMS Accession No. ML12171A347)Dear Sir:By letter dated June 15, 2011, Florida Power Corporation (FPC) requested a license amendment toincrease the rated thermal power level of Crystal River Unit 3 (CR-3) from 2609 megawatts (MWt) to3014 MWt (Reference 1). On May 14, 2012, via electronic mail, the NRC provided a draft request foradditional information (RAI) related to radiation protection needed to support the AHPB technical reviewof the CR-3 Extended Power Uprate (EPU) License Amendment Request (LAR) (Reference 2) followinga teleconference on May 9, 2012 with FPC to confirm an understanding of the information provided in theCR-3 EPU LAR. On July 5, 2012, the NRC provided a formal RAI required to complete its evaluation ofthe CR-3 EPU LAR (Reference 3).The attachment, "Response to Third Request for Additional Information -Health Physics and HumanPerformance Branch Technical Review of the CR-3 EPU LAR," provides the CR-3 formal response to theRAI.*This correspondence contains no new regulatory commitments.If you have any questions regarding this submittal, please contact Mr. Dan Westcott, Superintendent,Licensing and Regulatory Programs at (352) 563-4796.Jon .FrankeV* e President/(rystal River Nuclear PlantJAF/gweAttachment: Response to Third Request for Additional Information -Health Physics and HumanPerformance Branch Technical Review of the CR-3 EPU LARxc: NRR Project ManagerRegional Administrator, Region IISenior Resident InspectorState Contact 0oCrystal River Nuclear Plant AOO15760 W. Powerline Street mCrystal River, FL 34428 U.S. Nuclear Regulatory Commission3F0712-07Page 2 of 2STATE OF FLORIDACOUNTY OF CITRUSJon A. Franke states that he is the Vice President, Crystal River Nuclear Plant for FloridaPower Corporation; that he is authorized on the part of said company to sign and file with theNuclear Regulatory Commission the information attached hereto; and that all such statementsmade and matters set forth therein are true and correct to the best of his knowledge, information,and belief.Jon .FrankeiVce President/ Crystal River Nuclear Plant/"The foregoing document was acknowledged before me this ,, day ofeC ha ,2012, by Jon A. Franke.Signature of Notary PublicCAROLYN E. PORTMANN ICommission # DD 937553NExpires March 1, 2014Boded Wm Trmy Fain Insm'an800.385.7019_ If(Print, type, or stamp CommissionedName of Notary Public)PersonallyKnown _____ProducedOR- Identification FLORIDA POWER CORPORATIONCRYSTAL RIVER UNIT 3DOCKET NUMBER 50-302 / LICENSE NUMBER DPR-72ATTACHMENTRESPONSE TO THIRD REQUEST FOR ADDITIONALINFORMATION -HEALTH PHYSICS AND HUMANPERFORMANCE BRANCH TECHNICAL REVIEW OF THECR-3 EPU LAR U.S. Nuclear Regulatory Commission Attachment3F0712-07 Page 1 of 3RESPONSE TO THIRD REQUEST FOR ADDITIONAL INFORMATION-HEALTH PHYSICS AND HUMAN PERFORMANCE BRANCHTECHNICAL REVIEW OF THE CR-3 EPU LARBy letter dated June 15, 2011, Florida Power Corporation (FPC) requested a license amendmentto increase the rated thermal power level of Crystal River Unit 3 (CR-3) from 2609 megawatts(MWt) to 3014 MWt (Reference 1). On May 14, 2012, via electronic mail, the NRC provided adraft request for additional information (RAI) related to radiation protection needed to supportthe AHPB technical review of the CR-3 Extended Power Uprate (EPU) License AmendmentRequest (LAR) following a teleconference on May 9, 2012 with FPC to confirm anunderstanding of the information provided in the CR-3 EPU LAR. On July 5, 2012, the NRCprovided a formal RAI required to complete its evaluation of the CR-3 EPU LAR. Thefollowing provides the CR-3 formal response to the RAI needed to support the AHPB technicalreview of the CR-3 EPU LAR. For tracking purposes, each item related to this RAI is uniquelyidentified as AHPB X-Y, with X indicating the RAI set and Y indicating the sequential itemnumber.AHPB RAIAHPB 3-1On page 2.10.1-2 of Attachment 5 to the original LAR dated June 15, 2011, the licensee statesthat the zone criteria established for the general accessible areas in the containment was < 25millirem per hour. It acknowledges that during the design of the plant, this was accomplished bydesigning the shields at an assumed power level of 2544 MWt to ensure dose rates at variouslocations were less than the specified zone criteria. The licensee evaluates the impact of the EPUby using actual operating data and providing the total person-rem for containment entries atpower as well as the maximum dose to any individual working at the plant. While it may be truethat the change in dose rates in accessible areas is not expected to increase significantly after theEPU and therefore, cumulative doses can be kept as low as reasonably achievable and individualdoses below Title 10 of the Code of Federal Regulations, Part 20 occupational dose limits, thedose information does not demonstrate that the original dose rates established in the originalshield design will not increase beyond their original design values. Provide justification thatdemonstrates that the dose rates are not expected to increase beyond the dose rates establishedunder the original shielding design analysis performed at an assumed power level of 2544 MWt.Response:The intent of the statement related to the zone criteria established for the general accessible areasin the containment on page 2.10.1-2 of the CR-3 EPU Technical Report (TR) (Reference 1,Attachments 5 and 7) was to acknowledge the historic basis for the plant shielding design asdescribed in Section 11.3, "Radiation Shielding," of the CR-3 Final Safety Analysis Report(FSAR). FSAR Section 11.3 provides a list of radiation occupancy zones; Zones 0 to IV. Asindicated in FSAR Section 11.3, the zones not designed as restricted access (i.e., > 100 mrem/hr)were originally intended to be < 25 mrem/hr. However, there are limited access areas within thereactor building (RB) (i.e., containment), outside the secondary shield, where radiation levelscurrently exceed the historical FSAR Section 11.3 value of 25 mrem/hr excluding considerationof the impact associated with operation at EPU conditions.
U.S. Nuclear Regulatory Commission Attachment3F0712-07 Page 2 of 3The current areas in Zone III that exceed 25 mrem/hr include: the area near a portion of theletdown line that bypasses the RB secondary shield; and the RB sump area. At existing fullpower conditions, the radiation levels in these areas at 30 cm may exceed 100 mrem/hr, but areless than 1000 mrem/hr. Therefore, access at power is restricted by maintaining the RB lockedexcept during periods when RB access is required. Access to both of these areas are controlledby the CR-3 Radiological Protection Program (RPP) in accordance with 10 CFR 20.1601(a) orCR-3 Improved Technical Specifications 5.8.1, "High Radiation Area." FPC has initiated anFSAR Change Request to revise the zone figures in Section 11.3 to identify these areas asrestricted access areas (i.e., Zone IV).The original CR-3 plant shielding design is considered conservative based upon a fission productsource term assumption of 1% failed fuel at full power operation conditions. This is consideredconservative for the following reasons:* 1% failed fuel is equivalent to a Dose Equivalent Iodine-131 (1-131) activity ofapproximately 4.5 [tCi/gm, which is 4.5 times the original operating Dose Equivalent 1-131activity limit of 1.0 ýtCi/gm; and* 1% failed fuel is 4 times greater than the fission product source criterion of 0.25% failed fuelfor plant shielding design provided in Regulatory Position 2.C of Regulatory Guide 8.8,"Information Relevant To Ensuring That Occupational Radiation Exposures At NuclearPower Stations Will Be As Low As Is Reasonably Achievable," (Reference 2).The Dose Equivalent 1-131 limit is being further reduced for EPU operation from 1.0 PCi/gm to0.25 ýXCi/gm resulting in limiting fission product sources to approximately 5.5% of that assumedfor the original plant shielding design.Thus, it is reasonable to conclude that, at EPU conditions, the existing plant shielding design cancontinue to limit radiation dose rates from fission product sources to within the rates establishedunder the original shielding design analysis. It is also reasonable to conclude, based on theconservative CR-3 plant shielding design and the Dose Equivalent 1-131 operational limitreduction from 1.0 ýtCi/gm to 0.25 pCi/gm, that operation at EPU conditions will not result inany accessible RB area radiation level exceeding 1000 mremi/hr; and therefore, will not result inany current accessible area in the CR-3 containment being restricted as a locked high radiationarea.Also, current radiation occupancy and routine personnel access is controlled by the CR-3 RPPand based on plant radiation surveys, which ensures compliance with 10 CFR 20 individual doserequirements and maintains cumulative dose as low as reasonably achievable irrespective of theradiation zones identified in FSAR Chapter 11.Finally, as indicated in Table 2.12.1-3, "Comparison of Proposed EPU Tests to FSAR Chapter13 Initial Startup Testing," of the CR-3 EPU TR, a biological shield survey will be conductedduring power ascension testing at various power levels, up to 100% of the EPU power level, toconfirm the adequacy of the plant radiation shielding.
U.S. Nuclear Regulatory Commission Attachment3F0712-07 Page 3 of 3References1. FPC to NRC letter dated June 15, 2011, "Crystal River Unit 3 -License AmendmentRequest #309, Revision 0, Extended Power Uprate." (ADAMS Accession No.ML1 12070659)2. NRC Regulatory Guide 8.8, "Information Relevant To Ensuring That OccupationalRadiation Exposures At Nuclear Power Stations Will Be As Low As Is ReasonablyAchievable," Revision 3, July 1978. (ADAMS Accession No. ML003739549)