ML20056E227

From kanterella
Revision as of 09:11, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards ISI Repts Conducted During Mid-Cycle Outage 9 & Refueling Outage 9.Repts Encompass Time Period of Oct 1992 & May 1993
ML20056E227
Person / Time
Site: Pilgrim
Issue date: 08/13/1993
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20056E228 List:
References
BECO-93-099, BECO-93-99, NUDOCS 9308230007
Download: ML20056E227 (2)


Text

J ;O'

, BOSTON EDISON eiignm Nucrar row stat'on 10CFR50.55(g)(5)

Rocky Hel hoed P!vmoe, Massat% set:s 02360 E. T. Boulette, PhD August 13, 1993 Senior Vice Presdent- Nucieat BECo 93-099 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 License DPR-35 Docket 50-293 Report of Inservice Inspections Conducted During Mid-Cycle Outage (MCO) 9 and Refuelino Outage (RFO) 9 The enclosed reports provide results of the inservice inspections conducted during MCO-9 and RFO-9. The reports encompass the time period of October 1992

, and May 1993. This submittal fulfills the requirements,of the ASME Boiler and Pressure Vessel Code Section X1, Paragraph IWA-6230 and is in compliance with 10CFR50.55(g)(5) requirements.

i f

(

-( &,/Juuk &,

~

1 E. T. Boulette, PhD WGL/nas/RF091NSP l

Enclosures:

1) Inservice Inspection, Mid-Cycle Outage 9, October-November 1992,  ;

by Stone and Webster Engineering Corporation.

2) Inservice Inspection Summary Report for Refuel Outage 9, Pilgrim Nuclear Power Station, dated August, 1993
3) Inservice Inspection Refueling Outage 9, March-May 1993 by ABB AMDATA Inc. (5 volumes)
4) Preservice Examination of Reactor Water Clean-up System piping, ninth Refueling and Inspection outage, by General Electric Company, July 1993.

cc: see next page l

..- / ",

./

I

) U '

t 9308230007 930813 +

/

PDR ADOCK 05000293 8 G PDR t-

' BOSTON EDISON COMPANY U. S. Nuclear Regulatofy Commission Page 2 cc: Mr. R. Eaton, Project Manager Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Mail Stop: 14D1 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Senior NRC Resident Inspector Pilgrim Nuclear Power Station Mr. Richard T. Feeney Supervising District Engineering Inspector Division of Inspection Department of Public Safety 1 Ashburton Place Room 1301 Boston, MA 02108 l

Authorized Nuclear Inservice Inspector (ANII)

Mr. V. Iyer .

Pilgrim Nuclear Power Station  !

i I

\

)

'f i

I

- . . - - _ _ -. . - - . . . , _ . . - . - . - - , - _ . -, .-