ML20137H532

From kanterella
Revision as of 17:08, 17 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amend to License DPR-34,revising Tech Specs to Include Phase II of Inservice Insp & Testing Program
ML20137H532
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/26/1985
From: Lee O, Odonnell B, Thompson R
KELLY, STANSFIELD & O'DONNELL, PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20137H505 List:
References
TAC-53417, NUDOCS 8512020416
Download: ML20137H532 (10)


Text

.

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of the Facility Operating License)

)

of )

)

PUBLIC SERVICE COMPANY OF COLORADO )

Application for Amencment to Appendix A of Facility Operating License License No. DPR-34 0F THE PUBLIC SERVICE COMPANY OF COLORADO FOR THE FORT ST. VRAIN NUCLEAR GENERATING STATION This application for Amencment to Appendix A of Facility Operating License, License No. OPR-34, is submitted for NRC review and approval.

Respectfully submitted, PUBLIC SERVICE COMPANY OF COLORADO By O. R. Lee, Vice President KELLY, STANSFIELD & 0'DONNELL Bryant O'Donnell Robert E. Tnompson Public Service Company Building Denver, Colorado 80202 Attorneys for Applicant 8512O20416 851127 7 PDR ADOCK 050 P

O O

PustK SERVKE COMPANY OF (0l0 RAD 0 23.ino2a ocTE November 25. 1985 FORT SAINT VRAIN IntroWest Banks

,m .a *T DE m ..CmO..DO V 05114 PAY "" One Hundred and Fifty Dollars and no/100----------------DOLLARS s --150.00--

VOIO AFTER 90 DAYS PUBLIC SERVICE COMPANY OF COLOR ADO Div!SiON ACCOUNT U.S. Nuclear Regulatory Comission '

df// /k w/n

'" o $'o'f RE N ECESS A R Y IF $)h C R uSSi-,

Washington, D.C. 20555 a'OOOOO O 5 L L Lii' i: LO 20000 LBI: 6 4 3 9 G 7 Lii' REVITTANCE ADVICE. PLE ASE DETACH FOR YOUR RECORDS T EA.OveC ECx,S,~ ,AvoENT , ORT e ,0<<O ,NO.TEoS.

V 05114 iN v 0"i E O%D A ACCOUNT NO. lOraer ' Code l OESCRI, TION i' "u^SE v'~ AMOUNT  !

4500-67-15 , I Technical Soecification Fees 150.00 i

,, . i i cer attached letter P-85444 i

! ,  ! , i ,  !

, I, I i

, I i ,

i i , ,  ! , i l i i i i i  : i i ,

,. i I . I I I

! i. , ,

I i I , I l 1  ! l .

1 I  ! t  !

! I i i I i i I , i l i I , i

!  ! i i  !

., , I ,

I I

i  ! l

! l ,

I ,  !  !

l  ;

i

, I l , I i

!  ! l . I i  ! i i  !

! l  ! , I i

i i I , i ,  !

l l l I

! i  ! , i  !  !

,, i I , I l ri . I i  !

PUBLIC SERVICE COMPANY OF COLORADO

4 4

ATTACHMENT 1

SUMMARY

OF PROPOSED CHANGES i

j

s Section 5.0 - Surveillance Reaufrements Added. the in-service inspection (ISI) surveillance requirements implementation criteria E, F, and G.

Section 5.2 - Applicacility Editorial change to indicate that the surveillance requiremer.ts in Section 5.2 of the Technical Specifications also apply to the reactor auxiliary systems.

SR 5.2.7 - Water Turoine Drive Surveillance a) Modified to provide operational flexibility until the next scheculed plant shutcown proviced the surveillance interval coes not exceed 13 months.

b) Modified to provide operational flexibility until the next scheduled plant shutdown proviced the surveillance interval

! does not exceed la months, i '

c) Editorial changes only.

d) Unchanged SR 5.2.8 - Bearing Water Pump and Makeuo Pumo Surveillance Title modified to reflect new scope.

a) Editorial change b) Editorial change c) Unchanged 4

d) New requirements to test the bearing water pumps and associated instruments and controls.

Basis -

Expanded to address pump performance capability.

Editorial changes to reflect modified surveillance requirements.

i SR 5.2.9 - Helium Circulator Bearino Water Accumulator Surveillance Functional test frecuency mecifiec from monthly to every 92 days.

I Basis - Editorial cnanges to reflect mccified surveillance requirements.

4

SR 5.2.10 -

Fire Water System / Fire Suop-ession Water System

, Surveillance a) Unchanged b) Uncnanged b.2) Uncnanged b.3) Unchanged b.4a) Unchanged b.4b).Mihimum firewater pumo performance cacability codified to allow for acceptacle degradation in service.

b.4d) Uncnanged

. b.5) Unchanged i

Basis - Unchanged SR 5.2.16 - Closure Leakace Surveillance Reautrements 4

a) Unchanged b) Unchanged

c) Unchanged l d) Unchanged l e) Unchanged f) Unchanged
g) New surveillance requirements .for testing and monitoring confinement capability associated with the helium j

purification system.

Basis - Expandec to adcress the new surveillance requirements.

, SR 5.2.21 -

ACM Transfer Switches. Valves and Instruments

  • Surveiliance-Changed title to reflect modified scope of surveillance requirements.

-a) Scope expanded to includ' e partial stroking of the valves.

Modified to provide operational flexibility until the next

{- scheduled plant shutdown provided the surveillance interval does not exceed 18 months.

l-

4-T b) New requirements for ACM instrument calibration.

4 Basis -

Changed- to reflect the modified surveillance requirements.

1 SR 5.2.24 - Reactor Auxiliary Cooling Water Systems Surveillance Changed title to refl. t modified scope of surveillance recuirements.

a) Unchanged

. b) Changed the frequency cf circulating water makeup puna i

functional test from weekly to ;onthly. Nes recuirements for ver+fication of pump serformance capaoility and mechanical concition, c) Unchanged j d) New require ents for examination of the circulating water makeup ponds.

1 e) New requirements- for testing the service water pumps and associated instruments and controls.

f) New requirements for testing the reactor plant cooling water pumps and associated instruments and controls.

g) New requirements for testing the purification cooling water pumps and associated instruments and controls.

h) New requirements for testing the automatic isolation capability of cooling water-systen instruments and valves for confinement of reactor coolant.

Basis -

Changed to reflect the modified surveillance requirements.

SR 5.3.4 - Safe Snutcown Cooling Valves Surveillance Editorial changes to clarify tne surveillance reautrements.

New requirements for testing valves (including normally power ocerated valves) :nat must be manually positioned for actuation of the safe snutccwn cooling noce of operatien.

Basis - Editorial change to indicate that proper valve operation can be cetermined from observation of valve stem movement.

1 l

t

. .- - =_ . . . -

_4_

6 SR 5.3.9 - Safety Valve Surveillance Modified to include ASME Section XI recuirements.

Basis -

Changed to reflect tne modified scope of safety val,e testing.

, SR 5.4.4 - C C Rt! Ccoline Water Systen Terceratu-e :nstruments Survefl'ance Changed title for accuracy.

Editorial changes to reorgani a SR 5.4.4.

a) Changed to verify scanner reacings by coroarison of system water inlet temperature to ccrrespon0:ng temperature indicators.

b) Added requirement for scanner calibration and for inlet and outlet header terperature indicatcr calibration.

c) Changed thermocouple calibration interval to 5 years and calibration scheduling within the interval.

t Basis - Changed to reflect modified surveillance requirements.

SR 5.4.5 - PCRV Cooline Water System Flow Instruments Surveillance Changed title for accuracy.

Modified to provide operational flexibility until the next i

scheduled plant shutdown, provided the surveillance interval does not exceed la months.

1 Basis - Editorial change only.

SR 5.5.3 - Reactor Buildino Exhaust System Surveillance Cnangea title to reflect modifiec scoce of surveillance requirements.

, a) Unchange:

I b) Unchangea c) Unchanged d) Unchanged e) Standard Technical Specification testing requirements added.

f) New requirements for testing the reactor plant ventilation

. exhaust fans. Modi fied surveillance ' interval .

< y m.- a w , - -

,, < --w - ,---w.c----n-- -- r-.,-r ,w

g) New requirements for calibration of instruments associated with the reactor plant ventilation exhaust fans anc filters.

Basis - Expanced to address tre new surveillance recairements.

SR 5.7.2 - Fuel Sterage Facility Surveillance Modified entire surveillance recuirement per the TSUP comments.

Basis - Expanded to address ne new surveillance re;uirements.

l 1

l l

l

l Pace Substitutien In order to incorporate this submittal into the existing Technical Specifications, the folicwing page substitutions will be necessary:

Remove Page No. Reolace with Pace No.

5.0-2 Amenc. 36 10/13/53 5.0-2 5.2-1 Amend. 33 3/8/33 5.2-1 '

5.2-15 Amend. 33 3/S/53 5.2-15 5.2-16 Amend. 33 3/8/S3 5.2-16 5.2-17 Amend. 33 3/3/33 5.2-17

,' 5.2-18 Amend. 33 3/8/83 5.2-18 5.2-19 Amend. 33 3/8/33 5.2-19 5.2-20 Amend. 33 3/3/53 5.2-20, 5.2-20a 5.2-25 Amend. 33 3/2.<53 5.2-26 5.2-27 Amend. 33 3/3/33 5.2-27, 5-2.27a 5.2-31 Amend. 33 3/S/33 5.2-31 5.2-32 Amend. 33 3/8/53 5.2-32, 5.2.32a 5.2-34 Amend. 33 3/3/33 5.2-34, 5.2-34a, 5.2-3 b, 5.2-34c, 5.2-34d 5.2-35 Amend. 33 3/8/S3 5.2-35 5.3-5 Amend. 33 3/8/83 5.3-5 5.3-6 Amend. 33 3/8/83 5.3-6, 5.3-6a 5.3-7 Amend. 33 3/8/83 5.3-7 5.3-18 Amend. 39 1/25/84 5.3-18, 5.3-18a 5.4-13 Orig. Issue 1/24/74 5.4-13, 5.4-13a, 5.4-13b i 5.4-14 Orig. Issue 1/24/74 5.4-14 5.5-3 Amend. 25 3/2/82 5.5-3 5.5-4 Amend. 25 3/2/82 5.5-4 5.5-5 Amend. 25 3/2/82 5.5-5 5.5-6 Amend. 25 3 /2/82 5.5-6, 5.5-7' 5.7-1 Orig. Issue 1/24/74 5.7-1 5.7-2 Orig. Issue 1/24/74 5.7-2, 5.7-3, 5.7-4, 5.7-5 f

,. - ~ , - - , . . , , , .- - . , . . . - - - , -, -. - , .. ,, , ,