ML20137H499

From kanterella
Jump to navigation Jump to search

Forwards Application to Amend License DPR-34,revising Tech Specs to Include Phase II of Inservice Insp & Testing Program
ML20137H499
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/27/1985
From: Lee O
PUBLIC SERVICE CO. OF COLORADO
To: Berkow H
Office of Nuclear Reactor Regulation
Shared Package
ML20137H505 List:
References
P-85444, TAC-53417, NUDOCS 8512020407
Download: ML20137H499 (3)


Text

- -

2 ;.;&,

O Public Service ~

November 27, 1985 P.O. Box 840 cenver, co 80201- 0840 Fort St. Vrain Unit No. 1 OSCAR R. LEE P-85444 VICE PRESIDENT Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Mr. H. N. Berkow,. Project Director Special and Standardization Project Directorate Docket No. 50-267

SUBJECT:

Proposed Technical Specification Changes - Inservice Inspection and Testing Requirements

REFERENCES:

1) PSC Letter, Lee to Collins, dated December 30, 1983 (P-83416)
2) NRC Letter, Hunter to Lee, dated August 27, 1985 (G-85361)

Dear Mr. Berkow:

This letter is to propose changes to the Fort St. Vrain Technical Specifications to include Phase II of PSC's Inservice Inspection and Testing Program (ISIT). These changes are based on an earlier license amendment application (Reference 1) and reflect NRC comments that were addressed to PSC in Reference 2. A summary of the proposed changes is provided in Attachment 1, and the proposed changes themselves are provided in Attachment 2. Please note that Attachment 2 includes only those pages that have been revised.

Attachment 3 contains the Significant Hazards Consideration for the proposed changes. This report concludes that since the proposed changes do not result from modifications to plant equipment nor involve reductions in the margins of safety, no unreviewed safety question is raised. Therefore, the proposed changes involve no significant hazards consideration.

8512O20407 851127 6 fDR ADOCK 0500 7 h l

hY k

a s

Attachment 4 contains an itemized response to the comments and additional information which the NRC requested in Reference 2.

Reference 2 comments regarding the Surveillance Requirements contained in the Technical Specification Upgrade Program (TSUP) are not included in Attachment 4, and will be addressed separately as part of the TSUP.

In accordance with the provisions of 10 CFR 170, an application fee of $150.00 is enclosed.

If you have any questions or comments concerning the enclosed information, please call Mr. M. H. Holmes at (303) 480-6960.

Very truly yours, 0.R. Lee Vice President Electric Production ORL/MRS/ljb Attachments i

1 L )

e UNITED STATES OF AMERICA NUCLEAR REGULATORY COPNISSION In the Matter )

)

Public Service Company of Colorado ) Docket No. 50-267 Fort St. Vrain Unit No. 1 )

AFFIDAVIT O. R. Lee, being duly sworn, hereby deposes and says that he is Vice President of Electric Production of Public Service Company of Colorado, the Licensee herein; that he has read the foregoing Application for Amendment to Appendix A of Facility Operating License and knows the contents thereof, and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

i O. R. Lee

! Vice President STATE OF MM )

)

COUNTY OF /f2& w )

Subscribed and sworn to before me, a Notary Public on this 244 day of %A , 1985.

b

' Notary Public y o n c. // JAM M< < o fe el My commission expires /f ,1982

- . - - . . . - - . - - - -- - . - . - .-