Letter Sequence Request |
|---|
|
|
MONTHYEARML20076G8671983-06-0101 June 1983 Outlines Plan to Complete Review & Update Tech Spec Requirements for Inservice Insp & Testing Pertaining to Other Reactor Auxiliary & Support Sys That Perform Safety Function for Postulated Design Basis Events Project stage: Other ML20023D9071983-06-0101 June 1983 Requests Fr Publication of Notice of Consideration Amending License DPR-34 Re Radiological Effluents & Proposed No Significant Hazards Consideration Determination & Opportunity for Hearing Project stage: Request ML20079M0521983-12-30030 December 1983 Forwards Application for Amend to License DPR-34,consisting of Tech Spec Changes Re Inservice Insp & Testing Requirements Project stage: Request ML20079M0591983-12-30030 December 1983 Application for Amend to License DPR-34,consisting of Tech Spec Changes Re Inservice Insp & Testing Requirements. Summary of Proposed Changes to Inservice Insp Requirements Encl Project stage: Request ML20079M0701983-12-30030 December 1983 Proposed Tech Spec Changes Re Inservice Insp Requirements Project stage: Other ML20244D3821985-06-28028 June 1985 Forwards Draft Evaluation of Util 831230 Proposed Changes to Tech Specs for Inservice Insp & Testing,Per Region IV Mar 1985 Request.Items Requiring Addl Info Will Be Resolved at Site Visit Scheduled for Wk of 850722 Project stage: Draft Other ML20244D5201985-08-22022 August 1985 Forwards Tp Speis 850812 Memo Transmitting PM Williams 850628 Memo & Draft Evaluation of Tech Spec Changes for Inservice Insp & Testing,Per Task Initiation Action 85-01, Task 3.Encl Should Be Transmitted to Util for Response Project stage: Draft Other ML20134M1841985-08-27027 August 1985 Forwards Evaluation of 831230 Application for Proposed Changes to Inservice Insp & Testing Requirements.Application Does Not Complete Surveillance Program Committed to by Licensee Project stage: Other ML20137H5321985-11-26026 November 1985 Application for Amend to License DPR-34,revising Tech Specs to Include Phase II of Inservice Insp & Testing Program Project stage: Request ML20137H4991985-11-27027 November 1985 Forwards Application to Amend License DPR-34,revising Tech Specs to Include Phase II of Inservice Insp & Testing Program Project stage: Request ML20137H5661985-11-27027 November 1985 Proposed Tech Specs Re Inclusion of Phase II of Inservice Insp & Testing Program Project stage: Other ML20211B8551986-05-30030 May 1986 Draft SER Supporting Util 851127 Proposed Tech Spec Changes for Category I & II Inservice Insp & Testing,Per ASME Code Section Xi,Div 2, Rules for Insp & Testing of Components of Gas Cooled Reactors Project stage: Draft Approval ML20211B8331986-05-30030 May 1986 Forwards Draft SER Supporting Util 851127 Proposed Tech Spec Changes for Category I & II Inservice Insp & Testing & marked-up Tech Spec Pages.Incorporation of Recommendations & Resubmittal of Tech Spec Change Requested within 45 Days Project stage: Draft Approval ML20207J6281986-07-24024 July 1986 Responds to 860718 Telcons W/Nrc Re 851127 Tech Spec Amend Application for Phase II Inservice Insp & Testing.Revised Application Will Be Submitted on 860901 Project stage: Request ML20214M7841986-09-0404 September 1986 Proposed Tech Specs Incorporating Phase II of Inservice Insp Program Project stage: Other ML20214M7741986-09-0404 September 1986 Application to Amend License DPR-34,changing Tech Specs to Include Phase II of Util Inservice Insp Program.Summary of Proposed Changes Also Encl Project stage: Request ML20212M7431987-03-0909 March 1987 Requests Fr Publication of Notice of Issuance of Amend 51 to License DPR-34,revising Tech Specs to Comprise Phase II of Facility Inservice Insp Program Project stage: Approval 1985-08-22
[Table View] |
Text
-
O Public Service ~
2 ;.;&,
P.O. Box 840 November 27, 1985 cenver, co 80201- 0840 Fort St. Vrain Unit No. 1 OSCAR R. LEE P-85444 VICE PRESIDENT Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attn: Mr. H. N. Berkow,. Project Director Special and Standardization Project Directorate Docket No. 50-267
SUBJECT:
Proposed Technical Specification Changes - Inservice Inspection and Testing Requirements
REFERENCES:
- 1) PSC Letter, Lee to Collins, dated December 30, 1983 (P-83416)
- 2) NRC Letter, Hunter to Lee, dated August 27, 1985 (G-85361)
Dear Mr. Berkow:
This letter is to propose changes to the Fort St. Vrain Technical Specifications to include Phase II of PSC's Inservice Inspection and Testing Program (ISIT).
These changes are based on an earlier license amendment application (Reference 1) and reflect NRC comments that were addressed to PSC in Reference 2.
A summary of the proposed changes is provided in Attachment 1,
and the proposed changes themselves are provided in Attachment 2.
Please note that Attachment 2 includes only those pages that have been revised. contains the Significant Hazards Consideration for the proposed changes. This report concludes that since the proposed changes do not result from modifications to plant equipment nor involve reductions in the margins of safety, no unreviewed safety question is raised.
Therefore, the proposed changes involve no significant hazards consideration.
8512O20407 851127 6
fDR ADOCK 0500 7
h h Y k
l
a s contains an itemized response to the comments and additional information which the NRC requested in Reference 2.
Reference 2
comments regarding the Surveillance Requirements contained in the Technical Specification Upgrade Program (TSUP) are not included in Attachment 4, and will be addressed separately as part of the TSUP.
In accordance with the provisions of 10 CFR 170, an application fee of $150.00 is enclosed.
If you have any questions or comments concerning the enclosed information, please call Mr. M. H. Holmes at (303) 480-6960.
Very truly yours, 0.R. Lee Vice President Electric Production ORL/MRS/ljb Attachments i
1 L
)
e UNITED STATES OF AMERICA NUCLEAR REGULATORY COPNISSION In the Matter
)
)
Public Service Company of Colorado
)
Docket No. 50-267 Fort St. Vrain Unit No. 1
)
AFFIDAVIT O.
R. Lee, being duly sworn, hereby deposes and says that he is Vice President of Electric Production of Public Service Company of Colorado, the Licensee herein; that he has read the foregoing Application for Amendment to Appendix A of Facility Operating License and knows the contents thereof, and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.
i O. R. Lee Vice President STATE OF MM
)
)
COUNTY OF
/f2& w
)
Subscribed and sworn to before me, a Notary Public on this 244 day of %A
, 1985.
b
' Notary Public y o n c. // JAM M< < o fe el My commission expires
/f
,1982
-.-