MONTHYEARIR 05000298/20240032024-11-0505 November 2024 Integrated Inspection Report 05000298/2024003 ML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24227A0822024-09-0303 September 2024 Summary of Regulatory Audit in Support of License Amendment Request to Modify the High Pressure Coolant Injection Low Flow Value IR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding IR 05000298/20243012024-07-12012 July 2024 NRC Examination Report 05000298/2024301 ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments 05000298/LER-2023-002-01, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2024-06-0606 June 2024 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow 05000298/LER-2024-005, High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical2024-05-13013 May 2024 High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical. 05000298/LER-2024-004, Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications2024-05-0909 May 2024 Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 05000298/LER-2024-003, High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications2024-04-22022 April 2024 High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 ML24033A3092024-02-12012 February 2024 Summary of Regulatory Audit Regarding the Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A1122023-11-0909 November 2023 Project Manager Assignment IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 2024-09-03
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21040A3002021-03-29029 March 2021 Issuance of Amendment No. 269 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML20314A2352020-12-0202 December 2020 Issuance of Amendment No. 268 Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, Using the Consolidated Line Item Improvement Process ML20282A1762020-10-22022 October 2020 Issuance of Amendment No. 267 Regarding Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules ML20212J1762020-08-24024 August 2020 Temporary Exemption from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Section VI (EPID L 2020-LLE-0110 (Covid 19)) ML19352G1942020-01-28028 January 2020 Issuance of Amendment No. 264 Elimination of Technical Specification Requirements for Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process ML19238A0072019-10-30030 October 2019 Issuance of Amendment No. 263 Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML18348B1032019-02-21021 February 2019 Issuance of Amendment No. 262 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML18218A4832018-09-0606 September 2018 Issuance of Amendment No. 261 Safety Limit Minimum Critical Power Ratio ML18186A5492018-08-0101 August 2018 Issuance of Amendment No.260 Revision to Technical Specifications to Adopt (TSTF) Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MG0138; EPID L-2017-LLA-0290) ML17144A0822017-06-20020 June 2017 Issuance of Amendment No. 259 Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17061A0502017-03-31031 March 2017 Issuance of Amendment No. 258 Adoption of TSTF-425, Revision 3, ML16272A1372016-10-17017 October 2016 Issuance of Amendment No. 257 Revision of Technical Specifications - Safety Limit Minimum Critical Power Ratio ML16146A7492016-07-25025 July 2016 Issuance of Amendment No. 255 Replacement of Technical Specification Figure 4.1-1 with Text ML16119A4332016-07-25025 July 2016 Issuance of Amendment No. 254 Adoption of Technical Specification Task Force Change Traveler TSFT-535, Revision 0 ML16158A0222016-07-25025 July 2016 Issuance of Amendment No. 256 to Relocate the Pressure-Temperature Curves to a Pressure-Temperature Limits Report ML15343A3012016-01-22022 January 2016 Issuance of Amendment No. 253 to Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML15216A2592015-08-27027 August 2015 Issuance of Amendment No. 252, Revise Technical Specification 3.5.2, ECCS - Shutdown, to Delete Condensate Storage Tank as Alternate Source of Makeup Water ML15168A1712015-07-14014 July 2015 Issuance of Amendment No. 251, Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications ML15135A0052015-05-29029 May 2015 Issuance of Amendment No. 250, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-413, Elimination of Requirements for a Post Accident Sampling System (PASS) ML14323A6442014-12-12012 December 2014 Issuance of Amendment No. 249, Request to Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14055A0232014-04-29029 April 2014 Issuance of Amendment No. 248, Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML13191A1052013-09-12012 September 2013 Issuance of Amendment No. 247, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report ML13148A2252013-06-26026 June 2013 Issuance of Amendment No. 246, Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML13032A5262013-02-22022 February 2013 Issuance of Amendment No. 245, Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML12341A1112012-12-31031 December 2012 Correction to Safety Evaluation Pages Issued with Amendment No. 243 Dated 11/9/2012, Revise TS 2.0, Safety Limits, to Revise Safety Limit Minimum Critical Power Ratio Values of a Cycle-Specific Calculation ML12318A1602012-12-13013 December 2012 Issuance of Amendment No. 244, Revise Physical Protection License Condition Related to Cyber Security Plan Implementation Schedule Milestone 6 ML12299A0922012-11-0909 November 2012 Issuance of Amendment No. 243, Revise Technical Specification 2.0, Safety Limits, to Revise Safety Limit Minimum Critical Power Ratio Values of a Cycle-Specific Calculation ML12251A0982012-09-28028 September 2012 Issuance of Amendment No. 242, Revise Technical Specifications to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4, Option a ML1201302052012-02-16016 February 2012 Issuance of Amendment No. 241, Editorial Changes to Several Technical Specifications (Tss) and Revise TS 5.5.6 to Remove Expired One-Time Exception to 5-Year Test Frequency for a Safety Valve ML1136302582012-01-31031 January 2012 Issuance of Amendment No. 240, Revise Technical Specification 3.4.3, Safety/Relief Valves (Srvs) and Safety Valves (Svs), to Reduce Number of Required SRVs for Overpressure Protection ML1128502652011-10-28028 October 2011 Issuance of Amendment No. 239, Correction of Non-Conservative Values in Battery Terminal Voltage and Specific Gravity Values in Technical Specification Surveillance Requirements ML1118010812011-07-27027 July 2011 License Amendment, Issuance of Amendment No. 238, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1103401602011-02-28028 February 2011 License Amendment, Issuance of Amendment 237, Revising Technical Specification Surveillance Requirement 3.8.1.9, Diesel Generator Load Test, in TS Section 3.8.1 to Correct Non-Conservative Power Factor Value ML0815402802008-06-30030 June 2008 Issuance of Amendment Measurement Uncertainty Recapture Power Uprate ML0814200582008-06-10010 June 2008 Correction to Amendment No. 230 Control Room Envelope Habitability License Pages 4 & 5 and SE Pages 3, 4, 8, and 9 ML0812202812008-05-12012 May 2008 Issuance of Amendment No. 230 Control Room Habitability, TSTF-448 ML0730600362007-12-0404 December 2007 Issuance of Amendment No. 228, Revise TS 5.5.6, Inservice Testing Program, to Allow a One-Time Extension of the 5-yr Frequency Requirement for Setpoint Testing of Safety Valve MS-RV-70ARV ML0721300232007-09-0606 September 2007 License Amendment, Issuance of Amendment No. 227 Onsite Spent Fuel Storage Expansion ML0721800082007-08-0909 August 2007 Revised Pages of Facility Operating License No. DPR-46 ML0625400892006-10-31031 October 2006 Issuance of Amendment 226 MSIV Leakage Exemption from 10 CFR 50, Appendix J ML0625400242006-10-0303 October 2006 Issuance of Amendment Additional Extension of Appendix J, Type a Integrated Leakage Rate Test Interval ML0614400492006-09-0606 September 2006 License Amendment, Technical Specification (TS) Changes Associated with Inservice Testing Program, Section 5.5.6, Under TS Programs and Manuals, MD0335 ML0622602392006-09-0505 September 2006 License Amendment, Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences and Related Technical Specification Changes, MC8566 ML0612300512006-05-0303 May 2006 Correction to Amendment No. 218 2024-07-17
[Table view] Category:Safety Evaluation
MONTHYEARML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24117A2482024-05-0707 May 2024 Authorization and Safety Evaluation for Relief Request No. RC3-02 ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML22200A2772022-07-21021 July 2022 Correction to Proposed Inservice Testing Alternative RS-01, Revision of Error in Safety Evaluation ML22152A1232022-07-18018 July 2022 Issuance of Amendment No. 271 Request for Exception from Certain Primary Containment Leak Rate Testing Requirements ML22140A1612022-06-0808 June 2022 Proposed Inservice Inspection Alternative RR5-01 Revision 1 ML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 ML22045A0012022-03-31031 March 2022 Proposed Inservice Inspection Alternative RI5- 02 Revision 3 ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements ML21040A3002021-03-29029 March 2021 Issuance of Amendment No. 269 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML20314A2352020-12-0202 December 2020 Issuance of Amendment No. 268 Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, Using the Consolidated Line Item Improvement Process ML20282A1762020-10-22022 October 2020 Issuance of Amendment No. 267 Regarding Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules ML20255A2172020-09-15015 September 2020 Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML20077L3392020-03-19019 March 2020 Proposed Inservice Inspection Alternatives RP5-02 and RI5-02 ML19352G1942020-01-28028 January 2020 Issuance of Amendment No. 264 Elimination of Technical Specification Requirements for Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process ML19238A0072019-10-30030 October 2019 Issuance of Amendment No. 263 Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML19079A0702019-05-0707 May 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4384; EPID No. L-2014-JLD-0046) ML19092A1402019-04-29029 April 2019 Proposed Inservice Inspection Alternative PR5-02 ML18348B1032019-02-21021 February 2019 Issuance of Amendment No. 262 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML18218A4832018-09-0606 September 2018 Issuance of Amendment No. 261 Safety Limit Minimum Critical Power Ratio ML18186A5492018-08-0101 August 2018 Issuance of Amendment No.260 Revision to Technical Specifications to Adopt (TSTF) Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MG0138; EPID L-2017-LLA-0290) ML18183A3252018-07-31031 July 2018 Requests for Relief Associated with - the Fifth 10-year Inservice Inspection Interval Program (CAC Nos. MG0175 Through MG0179; Epids L-2017-LLR-0062 Through L-2017-LLR-0066) ML18064A1022018-03-22022 March 2018 Request No. RI-21, Revision 1 - Request for Relief Concerning Examinations for the Fourth 10-Year Inservice Inspection Interval (CAC No. MF9623; EPID L-2017-LLR-0026) ML17226A0322017-09-20020 September 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17144A0822017-06-20020 June 2017 Issuance of Amendment No. 259 Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17061A0502017-03-31031 March 2017 Issuance of Amendment No. 258 Adoption of TSTF-425, Revision 3, ML16272A1372016-10-17017 October 2016 Issuance of Amendment No. 257 Revision of Technical Specifications - Safety Limit Minimum Critical Power Ratio ML16146A7492016-07-25025 July 2016 Issuance of Amendment No. 255 Replacement of Technical Specification Figure 4.1-1 with Text ML16119A4332016-07-25025 July 2016 Issuance of Amendment No. 254 Adoption of Technical Specification Task Force Change Traveler TSFT-535, Revision 0 ML16158A0222016-07-25025 July 2016 Issuance of Amendment No. 256 to Relocate the Pressure-Temperature Curves to a Pressure-Temperature Limits Report ML16048A3402016-02-24024 February 2016 Request for Inservice Inspection Program Alternative RP5-01 for Implementation of Code Case N-795 ML16042A3262016-02-24024 February 2016 Request for Relief RR5-01, Alternative Weld Overlay Repair for a Dissimilar Metal Weld Joining Nozzle to Control Rod Drive End Cap in Lieu of Specific ASME Boiler and Pressure Vessel Code Requirements ML16034A4792016-02-17017 February 2016 Request for Relief RI5-02, Alternative to Use Boiling Water Reactor Vessel and Internals Project Guidelines in Lieu of Specific ASME Code Requirements ML16034A3032016-02-12012 February 2016 Request for Relief RC3-01 for Alignment of Inservice Inspection and Containment Inservice Inspection (CAC No. MF6333 ML16014A1742016-02-12012 February 2016 Request for Relief RP-01 Through RP-09, RV-01 Through RV-05, and RG-01 Alternative to ASME OM Code Requirements for Inservice Testing for the Fifth Ten-Year Program Interval (CAC Nos. MF5911, MF5913, MF5914, MF5915, MF5916, Etc.) ML15343A3012016-01-22022 January 2016 Issuance of Amendment No. 253 to Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML15216A2592015-08-27027 August 2015 Issuance of Amendment No. 252, Revise Technical Specification 3.5.2, ECCS - Shutdown, to Delete Condensate Storage Tank as Alternate Source of Makeup Water ML15168A1712015-07-14014 July 2015 Issuance of Amendment No. 251, Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications ML15135A0052015-05-29029 May 2015 Issuance of Amendment No. 250, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-413, Elimination of Requirements for a Post Accident Sampling System (PASS) ML15134A2422015-05-20020 May 2015 Relief Request RI-08, Revision 0, Relief from Reactor Vessel Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections, for the Fourth 10-Year Inservice Inspection Interval ML14365A0932015-01-13013 January 2015 Correction to Safety Evaluation Dated December 12, 2014, Regarding Amendment No. 249, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14323A6442014-12-12012 December 2014 Issuance of Amendment No. 249, Request to Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14190A0042014-07-25025 July 2014 Redacted, Review of License Renewal Commitment Review Related to Core Plate Hold Down Bolt Inspection Plan and Analysis (TAC Nos. ME9550 and MF3557) ML14055A0232014-04-29029 April 2014 Issuance of Amendment No. 248, Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML13263A1532013-10-0707 October 2013 Correction to Amendment No. 247 Issued 9/12/13, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report 2024-07-03
[Table view] Category:Technical Specifications
MONTHYEARNLS2024025, License Amendment Request to Revise Technical Specifications Table 3.3.2.1-1, Control Rod Block Instrumentation2024-05-0909 May 2024 License Amendment Request to Revise Technical Specifications Table 3.3.2.1-1, Control Rod Block Instrumentation ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) NLS2024027, Response to NRC Request for Additional Information Regarding Application for the Emergency License Amendment Request to Revise Technical Specifications 3 .3 .1.1, Reactor Protection (RPS) Instrumentation2024-04-0303 April 2024 Response to NRC Request for Additional Information Regarding Application for the Emergency License Amendment Request to Revise Technical Specifications 3 .3 .1.1, Reactor Protection (RPS) Instrumentation NLS2024024, Emergency License Amendment Request to Revise Technical Specifications 3.3.1.1, Reactor Protection (RPS) Instrumentation2024-04-0101 April 2024 Emergency License Amendment Request to Revise Technical Specifications 3.3.1.1, Reactor Protection (RPS) Instrumentation ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2021041, Request for Exception from Leak Testing Requirement of the Primary Containment Leakage Rate Testing Program2021-07-20020 July 2021 Request for Exception from Leak Testing Requirement of the Primary Containment Leakage Rate Testing Program ML20314A2352020-12-0202 December 2020 Issuance of Amendment No. 268 Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, Using the Consolidated Line Item Improvement Process ML19238A0072019-10-30030 October 2019 Issuance of Amendment No. 263 Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML18218A4832018-09-0606 September 2018 Issuance of Amendment No. 261 Safety Limit Minimum Critical Power Ratio ML18137A2102018-05-10010 May 2018 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio NLS2016010, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2016-03-22022 March 2016 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML15343A3012016-01-22022 January 2016 Issuance of Amendment No. 253 to Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML16021A3222016-01-12012 January 2016 Correction to License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML15216A2592015-08-27027 August 2015 Issuance of Amendment No. 252, Revise Technical Specification 3.5.2, ECCS - Shutdown, to Delete Condensate Storage Tank as Alternate Source of Makeup Water ML15168A1712015-07-14014 July 2015 Issuance of Amendment No. 251, Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications ML15135A0052015-05-29029 May 2015 Issuance of Amendment No. 250, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-413, Elimination of Requirements for a Post Accident Sampling System (PASS) NLS2014087, License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function2015-01-15015 January 2015 License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML14055A0232014-04-29029 April 2014 Issuance of Amendment No. 248, Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML13191A1052013-09-12012 September 2013 Issuance of Amendment No. 247, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report ML13085A0962013-03-29029 March 2013 Corrected Technical Specification (TS) and Safety Evaluation Pages for Amendment No. 245, Revise TS 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML12157A2062012-05-30030 May 2012 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio ML1136302582012-01-31031 January 2012 Issuance of Amendment No. 240, Revise Technical Specification 3.4.3, Safety/Relief Valves (Srvs) and Safety Valves (Svs), to Reduce Number of Required SRVs for Overpressure Protection NLS2011086, Supplement to License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves2011-10-0606 October 2011 Supplement to License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves NLS2011071, License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a2011-09-16016 September 2011 License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a ML1101002912011-01-0505 January 2011 Cooper - License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves NLS2009034, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2009-06-0202 June 2009 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process ML0906207232009-02-26026 February 2009 Corrected Technical Specification Pages Regarding Reactor Equipment Cooling System Margin Amendment ML0815402852008-06-30030 June 2008 Technical Specifications, Measurement Uncertainty Recapture Power Uprate ML0812202892008-05-12012 May 2008 Technical Specification Pages for Issuance of Amendment No. 230 Control Room Habitability, TSTF-448 NLS2008046, Response to Request for Additional Information for License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate2008-05-0909 May 2008 Response to Request for Additional Information for License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate NLS2007079, Corrected Technical Specification Pages2007-11-0505 November 2007 Corrected Technical Specification Pages NLS2007048, License Amendment Request for a One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve2007-08-16016 August 2007 License Amendment Request for a One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve ML0630405382006-10-31031 October 2006 Tech Spec Pages for Amendment 226 Regarding MSIV Leakage Exemption from 10 CFR Part 50, Appendix J ML0629602942006-10-23023 October 2006 Technical Specification, Revised Limiting Condition for Operation (LCO) 3.10.1, Scram Time Testing Activities ML0627700902006-10-0303 October 2006 Technical Specification Pgs Amd #224 - Issuance of Amendment Additional Extension of Appendix J, Type a Integrated Leakage Rate Test Interval ML0625003012006-09-0606 September 2006 Technical Specifications, Technical Specification (TS) Changes Associated with Inservice Testing Program, Section 5.5.6, Under TS Programs and Manuals, MD0335 ML0624900372006-09-0505 September 2006 Technical Specifications, Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences and Related Technical Specification Changes, MC8566 NLS2006042, License Amendment Request for Revision of Technical Specification 3.10.1, Inservice Leak and Hydrostatic Testing Operation2006-06-16016 June 2006 License Amendment Request for Revision of Technical Specification 3.10.1, Inservice Leak and Hydrostatic Testing Operation ML0612403772006-05-0303 May 2006 Correction to Amendment No. 218, Technical Specification Page 3.1-12 ML0612304692006-05-0202 May 2006 Technical Specifications, Changes to TS Leakage Limit for the Main Stream Isolation Valves ML0611802442006-04-27027 April 2006 Technical Specifications, Revised Pressure Vessel Fluence and Pressure Temp Curve Applicability to 30 Effective Full-Power Years of Operation ML0611001622006-04-18018 April 2006 Corrected Technical Specification Page 3.9-1 Re Refueling Operations NLS2006039, Corrected Technical Specification Page from Amendment No. 2182006-04-17017 April 2006 Corrected Technical Specification Page from Amendment No. 218 ML0609004412006-03-30030 March 2006 Technical Specification Pages, Change Request for Various Sections ML0628404572006-03-10010 March 2006 Tech Spec Pages for Amendment 217 Regarding Revise Technical Specifications Instrumentation Definitions NLS2006013, License Amendment Request to Update the American Society of Mechanical Engineers Code Referenced in TS Section 5.5.6, Inservice Testing Program2006-03-0707 March 2006 License Amendment Request to Update the American Society of Mechanical Engineers Code Referenced in TS Section 5.5.6, Inservice Testing Program NLS2006001, Application for TS Change to Add LCO 3.0.8 on Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2006-01-30030 January 2006 Application for TS Change to Add LCO 3.0.8 on Inoperability of Snubbers Using the Consolidated Line Item Improvement Process NLS2006002, License Amendment Request for a One-Time Extension of Containment Integrated Leakage Rate Test Interval2006-01-30030 January 2006 License Amendment Request for a One-Time Extension of Containment Integrated Leakage Rate Test Interval ML0602002922006-01-16016 January 2006 Cooper Nuclear Station - Revised and Supplemental Pages to License Amendment Request for Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences 2024-05-09
[Table view] |
Text
December 2, 2020 Mr. John Dent, Jr.
Vice President and Chief Nuclear Officer Nebraska Public Power District 72676 648A Avenue P.O. Box 98 Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - ISSUANCE OF AMENDMENT NO. 268 RE: REVISION TO TECHNICAL SPECIFICATIONS TO ADOPT TECHNICAL SPECIFICATONS TASK FORCE (TSTF) TRAVELER TSTF-566, REVISE ACTIONS FOR INOPERABLE RHR SHUTDOWN COOLING SUBSYSTEMS, USING THE CONSOLIDATED LINE ITEM IMPROVEMENT PROCESS (EPID L-2020-LLA-0074)
Dear Mr. Dent:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 268 to Renewed Facility Operating License No. DPR-46 for Cooper Nuclear Station. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated April 1, 2020.
The amendment revises TS actions for inoperable residual heat removal (RHR) shutdown cooling subsystems in the RHR shutdown cooling system limiting conditions for operation. The proposed changes are based on Technical Specifications Task Force (TSTF) Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, dated January 19, 2018, using the consolidated line item improvement process.
J. Dent, Jr. A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions monthly Federal Register notice.
Sincerely,
/RA/
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298
Enclosures:
- 1. Amendment No. 268 to DPR-46
- 2. Safety Evaluation cc: Listserv
NEBRASKA PUBLIC POWER DISTRICT DOCKET NO. 50-298 COOPER NUCLEAR STATION AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 268 Renewed License No. DPR-46
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Nebraska Public Power District (the licensee),
dated April 1, 2020, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-46 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 268, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 60 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by Jennifer Jennifer L. L. Dixon-Herrity Date: 2020.12.02 12:51:47 Dixon-Herrity -05'00' Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License No. DPR-46 and the Technical Specifications Date of Issuance: December 2, 2020
ATTACHMENT TO LICENSE AMENDMENT NO. 268 RENEWED FACILITY OPERATING LICENSE NO. DPR-46 COOPER NUCLEAR STATION DOCKET NO. 50-298 Replace the following pages of Renewed Facility Operating License No. DPR-46 and the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Renewed Facility Operating License REMOVE INSERT Technical Specifications REMOVE INSERT 3.4-15 3.4-15 3.4-16 3.4-16 3.4-18 3.4-18 3.4-19 3.4-19
(5) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2419 megawatts (thermal).
(2) Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 268, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3) Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: Cooper Nuclear Station Safeguards Plan, submitted by letter dated May 17, 2006.
NPPD shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The NPPD CSP was approved by License Amendment No. 238 as supplemented by changes approved by License Amendments 244 and 249.
(4) Fire Protection NPPD shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the license amendment request dated April 24, 2012 (and supplements dated July 12, 2012, January 14, 2013, February 12, 2013, March 13, 2013, June 13, 2013, December 12, 2013, January 17, 2014, February 18, 2014, and April 11, 2014), and as approved in the safety evaluation dated April 29, 2014.
Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c), and provided no other regulation, technical specification, license condition or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if Amendment No. 268
RHR Shutdown Cooling System - Hot Shutdown 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS)
. 3.4. 7 Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown LCO 3.4.7 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.
NOTES-------------------------------------------
- 1. Both RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
- 2. One RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for the performance of Surveillances.
APPLICABILITY: MODE 3, with reactor steam dome pressure less than the shutdown cooling permissive pressure.
ACTIONS
NOTE------------------------------------------------------------
Separate Condition entry is allowed for each RHR shutdown cooling subsystem.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or two RHR shutdown A.1 Verify an alternate method 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> cooling subsystems of decay heat removal is inoperable. available for each inoperable RHR shutdown cooling subsystem. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter (continued)
Cooper 3.4-15 Amendment No. 268
RHR Shutdown Cooling System - Hot Shutdown 3.4.7 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and B.1 Initiate action to restore Immediately associated Completion Time RHR shutdown cooling of Condition A not met. subsystem(s) to OPERABLE status.
C. No RHR shutdown cooling C.1 Initiate action to restore Immediately subsystem in operation. one RHR shutdown cooling subsystem or one AND recirculation pump to operation.
No recirculation pump in operation. AND C.2 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from circulation by an alternate discovery of no method. reactor coolant circulation AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND C.3 Monitor reactor coolant Once per hour temperature and pressure.
Cooper 3.4-16 Amendment No. 268
RHR Shutdown Cooling System - Cold Shutdown 3.4.8 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown LCO 3.4.8 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.
NOTES-------------------------------------------
- 1. Both RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
- 2. One RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for the performance of Surveillances.
APPLICABILITY: MODE 4.
ACTIONS
*----------------------NOTE-----------------------------------------------------------
Separate Condition entry is allowed for each shutdown cooling subsystem.
CONDITION REQUIRED ACTION COMPLETION TIME A One or two RHR shutdown A.1 Verify.an alternate method 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> cooling subsystems of decay heat removal is inoperable. available for each AND inoperable RHR shutdown cooling subsystem. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter B. Required Action and 8.1 Initiate action to restore
(continued)
Cooper 3.4-18 Amendment No. 268
RHR Shutdown Cooling System - Cold Shutdown 3.4.8 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. No RHR shutdown cooling C. 1 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from subsystem in operation. circulating by an alternate discovery of no method. reactor AND coolant circulation No recirculation pump in AND operation.
Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND C.2 Monitor reactor coolant Once per hour temperature.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.8.1 Verify one RHR shutdown cooling subsystem or In accordance with recirculation pump is operating. the Surveillance Frequency Control Program Cooper 3.4-19 Amendment No. 268
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 268 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-46 NEBRASKA PUBLIC POWER DISTRICT COOPER NUCLEAR STATION DOCKET NO. 50-298
1.0 INTRODUCTION
By application dated April 1, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20101H298), Nebraska Public Power District (the licensee) submitted a license amendment request (LAR) for Cooper Nuclear Station (Cooper). The amendment would revise technical specification (TS) actions for inoperable residual heat removal (RHR) shutdown cooling subsystems in the RHR shutdown cooling system limiting conditions for operation.
The proposed changes are based on Technical Specifications Task Force (TSTF) Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, dated January 19, 2018 (ADAMS Accession No. ML18019B187). The U.S. Nuclear Regulatory Commission (NRC, the Commission) issued a final safety evaluation approving TSTF-566, Revision 0, on February 21, 2019 (ADAMS Accession No. ML19028A287), using the consolidated line item improvement process.
The licensee has proposed variations from the TS changes described in TSTF-566, Revision 0.
The variations are described in Section 2.2.3 and evaluated in Section 3.3 of this safety evaluation.
2.0 REGULATORY EVALUATION
2.1 Description of Residual Heat Removal Shutdown Cooling System Irradiated fuel in the shutdown reactor core generates heat during the decay of fission products and increases the temperature of the reactor coolant. This decay heat must be removed to reduce the temperature of the reactor coolant to less than or equal to 200 degrees Fahrenheit.
This decay heat is removed by the RHR shutdown cooling system in preparation for performing refueling or maintenance operations, or for keeping the reactor in the hot shutdown condition or cold shutdown condition.
Enclosure 2
The two redundant, manually controlled shutdown cooling subsystems of the RHR system provide decay heat removal. Each of the two shutdown cooling subsystems of the RHR system can provide the required decay heat removal. Each RHR shutdown cooling subsystem consists of one or two motor-driven pumps, a heat exchanger, and associated piping and valves. The RHR heat exchangers transfer heat to the service water system. Some piping and heat exchangers that are passive components may be common to both subsystems.
Cooper TS 3.4.7, Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown, is applicable in Mode 3, with the reactor steam dome pressure less than the shutdown cooling permissive pressure. Cooper TS 3.4.8, Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown, is applicable in Mode 4. They both require two operable RHR shutdown cooling subsystems and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem in operation.
2.2 Proposed Changes to the Technical Specifications The licensee proposed to revise TS actions for inoperable RHR shutdown cooling subsystems in the RHR shutdown cooling system limiting conditions for operation, consistent with TSTF-566, Revision 0.
The proposed changes would revise TSs 3.4.7 and 3.4.8 for Cooper. The proposed changes are described below.
2.2.1 Proposed Changes to Cooper TS 3.4.7 Required actions for one or two RHR shutdown cooling subsystems inoperable (Condition A) of Cooper TS 3.4.7, require the operators to initiate action to restore RHR shutdown cooling subsystem(s) to operable status (Required Action A.1) immediately, verify an alternate method of decay heat removal is available for each inoperable RHR shutdown cooling subsystem (Required Action A.2) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and be in Mode 4 (Required Action A.3) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
The licensees proposed changes to Cooper TS 3.4.7 move Required Action A.1 to new Condition B (as Required Action B.1) and delete Required Action A.3. The licensee proposed to add a recurring completion time (CT) to current Required Action A.2 of once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter. The licensees proposed changes renumber current Required Action A.2 as A.1 since Required Actions A.1 and A.3 are removed from Condition A.
The licensees proposed changes add a new Condition B for when the required action and associated CT of Condition A are not met. New Condition B, Required Action B.1 would be moved from current Required Action A.1, which requires operators to initiate action to restore RHR shutdown cooling subsystems(s) to operable status immediately.
Current Condition B and its required actions would be renamed C, C.1, C.2, and C.3, respectively, since a new Condition B is added.
2.2.2 Proposed Changes to Cooper TS 3.4.8 Required actions for one or two RHR shutdown cooling subsystems inoperable (Condition A) of Cooper TS 3.4.8, require the operators to verify that an alternate method of decay heat removal
is available for each inoperable RHR shutdown cooling subsystem (Required Action A.1) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter.
The licensees proposed changes to Cooper TS 3.4.8 would add a new Condition B for when the required action and associated CT of Condition A are not met, which has a required action (new Required Action B.1) for operators to initiate action to restore RHR shutdown cooling subsystem(s) to operable status immediately.
Current Condition B and its required actions would be renamed C, C.1, and C.2, respectively, since a new Condition B is added.
2.2.3 Variations from TSTF-566 The Cooper TSs utilize different numbering than the Standard Technical Specifications (STSs) in NUREG-1433,1 on which TSTF-566 is based. Specifically, STS 3.4.8, Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown is TS 3.4.7 in the Cooper TSs and STS 3.4.9, Residual Heat Removal (RHR) Shutdown Cooling System -Cold Shutdown is TS 3.4.8 in the Cooper TSs. These differences are editorial and do not affect the applicability of TSTF-566 to the proposed LAR.
2.3 Applicable Regulatory Requirement and Guidance Title 10 of the Code of Federal Regulations (10 CFR) Section 50.36(a)(1) requires each applicant for a license authorizing operation of a utilization facility to include in the application the proposed TSs.
The regulation in 10 CFR 50.36(b) states, in part:
Each license authorizing operation of a . . utilization facility . . will include technical specifications. The technical specifications will be derived from the analyses and evaluation included in the safety analysis report, and amendments thereto, submitted pursuant to [10 CFR] 50.34 [Contents of applications; technical information]. The Commission may include such additional technical specifications as the Commission finds appropriate.
The regulation in 10 CFR 50.40(a) states, in part, that the TSs shall provide reasonable assurance that the health and safety of the public will not be endangered.
The NRC staffs guidance for the review of TSs is in Chapter 16.0, Technical Specifications, of NUREG-0800, Revision 3, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR [Light-Water Reactor] Edition (SRP), dated March 2010 (ADAMS Accession No. ML100351425). As described therein, as part of the regulatory standardization effort, the NRC staff has prepared STSs for each of the LWR nuclear designs. Accordingly, the NRC staffs review includes consideration of whether the proposed changes are consistent with the applicable reference STS (i.e., the current STS), as modified by NRC-approved travelers.
1 NUREG-1433, Standard Technical Specifications, General Electric BWR [Boiling Water Reactor]/4 Plants, Volume 1, Specifications, and Volume 2, Bases, Revision 4.0, dated April 2012 (ADAMS Accession Nos. ML12104A192 and ML12104A193, respectively),
3.0 TECHNICAL EVALUATION
3.1 Proposed Changes to Cooper TS 3.4.7 In the LAR, the licensee proposed changes to revise Cooper TS 3.4.7. The NRC staffs evaluation of the licensees changes to Cooper TS 3.4.7 is described below.
3.1.1 Evaluation of Changes to Condition A The licensees proposed changes would add a recurring CT to current Required Action A.2 of once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter, to Cooper TS 3.4.7, Condition A. Current Required Action A.2 requires verification that an alternate method of decay heat removal is available for each inoperable RHR shutdown cooling subsystem within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The NRC staff finds this change is acceptable, since it requires continuous verification of alternate methods of decay heat removal every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and provides assurance of continued heat removal capability.
The licensee also proposed to delete current Required Action A.3, which requires the plant to be in Mode 4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when one or two RHR shutdown cooling subsystems are inoperable.
Current Required Action A.3 requires operators to reduce the reactor coolant system temperature to the point where Mode 4 is entered, due to the potentially reduced reliability of the alternate methods of decay heat removal. However, if there is no operable RHR shutdown cooling subsystem and the plant is in a period of high decay heat load, it may not be possible to reduce the reactor coolant system temperature to the Mode 4 entry condition (typically less than 200 degrees Fahrenheit) within the CT. In addition, in a typical BWR design, the RHR shutdown cooling system has a heat rejection capability many times greater than alternate methods available. Therefore, for periods in which there is high decay heat load, the BWR design does not include any system which can satisfy Required Action A.3. The NRC staff finds the deletion of current Required Action A.3 is acceptable because, at below the RHR cut in permissive pressure, the remaining required action will continue to transfer fission product decay heat and other residual heat from the reactor core at a rate such that specified acceptable fuel design limits and the design conditions of the reactor coolant pressure boundary are not exceeded.
Current Required Action A.2 would be renumbered as A.1, since Required Actions A.1 and A.3 are removed from Condition A. The NRC staff finds this change is acceptable since it provides the correct number sequence.
3.1.2 Evaluation of New Condition B The licensee proposed a new Condition B for when the required action and associated CT of Condition A is not met. New Condition Bs Required Action B.1, would be moved from current Required Action A.1 and would require operators to initiate action to restore RHR shutdown cooling subsystems(s) to operable status immediately. The NRC staff finds that relocating the required action from A.1 to new Required Action B.1 is acceptable because other ways of removing decay heat are available, such as natural circulation, the spent fuel pool cooling system, the reactor water cleanup system and an inoperable, but functional, RHR shutdown cooling subsystem.
If an alternate method cannot be established (Condition A), new Condition B requires the licensee to immediately initiate action to restore the inoperable RHR shutdown cooling subsystem(s) to operable status. The CT immediately is defined in Section 1.3 of the Cooper
TSs as, the Required Action should be pursued without delay and in a controlled manner.
New Required Action B.1 continues to apply until the inoperable RHR shutdown cooling subsystems are restored to operable status, an alternate decay heat removal method is established, or the specification is exited.
The NRC staff finds this change is acceptable because new Condition B, with its Required Action B.1, provides an appropriate terminal action for when an alternate method cannot be established within the CT. In addition, new Required Action B.1 will restore redundant decay heat removal paths and the immediate CT reflects the importance of maintaining the availability of two paths for heat removal.
3.1.3 Evaluation of Changes to Existing Condition B Current Required Action A.2 would be renumbered as A.1, since Required Actions A.1 and A.3 are deleted. Current Condition B and its required actions would be renamed C, C.1, C.2, and C.3, respectively, since new Condition B is added. The NRC staff finds these changes are acceptable since it provides the correct number sequence.
3.1.4 Conclusion of Proposed Changes to Cooper TS 3.4.7 The NRC staff concludes that the proposed changes are acceptable since the TSs continue to meet the requirements of 10 CFR 50.40(a) because they provide reasonable assurance that the health and safety of the public will not be endangered.
3.2 Proposed Changes to Cooper TS 3.4.8 In the LAR, the licensee proposed changes to revise Cooper TS 3.4.8. The NRC staffs evaluation of the licensees changes to Cooper TS 3.4.8 is described in the following sections.
3.2.1 Evaluation of New Condition B The licensee proposed a new Condition B to Cooper TS 3.4.8 for when the required action and associated CT of Condition A is not met which has a required action (new Required Action B.1) for operators to initiate action to restore RHR shutdown cooling subsystems(s) to operable status immediately.
If an alternate method cannot be established (Condition A), new Condition B requires the licensee to immediately initiate action to restore the inoperable RHR shutdown cooling subsystem(s) to operable status. The CT immediately is defined in Section 1.3 of the TSs as, the Required Action should be pursued without delay and in a controlled manner. New Required Action B.1 continues to apply until the inoperable RHR shutdown cooling subsystems are restored to operable status, an alternate decay heat removal method is established, or the specification is exited.
The NRC staff finds that this change is acceptable because new Condition B with its Required Action B.1 provide an appropriate terminal action for when an alternate method cannot be established within the CT. In addition, new Required Action B.1 will restore redundant decay heat removal paths and the immediate CT reflects the importance of maintaining the availability of two paths for heat removal.
3.2.2 Evaluation of Changes to Existing Condition B Current Condition B and its required actions would be renamed C, C.1, and C.2, respectively, since new Condition B is added. The NRC staff finds this change is acceptable because it provides the correct number sequence.
3.2.3 Conclusion of Proposed Changes to Cooper TS 3.4.8 The NRC staff concludes that the proposed changes are acceptable since the TS continues to meet the requirements of 10 CFR 50.40(a) because it provides reasonable assurance that the health and safety of the public will not be endangered.
3.3 Variations from TSTF-566 The Cooper TSs utilize different numbering than the STSs in NUREG-1433 on which TSTF-566 is based. The NRC staff determined that these differences are editorial and do not affect the applicability of TSTF-566 to the proposed LAR.
4.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Nebraska State official was notified of the proposed issuance of the amendment on November 6, 2020. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes requirements with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration published in the Federal Register on June 30, 2020 (85 FR 39222), and there has been no public comment on such finding. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: J. Wilson, NRR Date: December 2, 2020
ML20314A235 *by e-mail **by memorandum OFFICE NRR/DORL/LPL4/PM* NRR/DORL/LPL4/LA* NRR/DSS/STSB/BC**
NAME TWengert PBlechman VCusumano DATE 11/16/2020 11/10/2020 10/20/2020 OFFICE OGC* NLO NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM*
NAME CCarson JDixon-Herrity TWengert DATE 11/24/2020 12/1/2020 12/2/2020