Correction to Amendment No. 218, Technical Specification Page 3.1-12
ML061240377
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/03/2006
From:
Nebraska Public Power District (NPPD)
To:
Office of Nuclear Reactor Regulation
Benney B, NRR/DLPM, 415-3764
Shared Package
ML061240137 List:
References
TAC MC6760
Download: ML061240377 (1)


Text

Control Rod Scram Ti-nes 3.1.4 3.1 REACTIVITY CONTROL SYSTEMS 3.1.4 C:ontrol Rod Scram Times LCO 3.1.4

a.

No more than 10 OPERABLE control rods shall be "slow," in accordance with Table 3.1.4-1; and

b.

No more than 2 OPERABLE control rods that are "slow" shall occupy adjacent locations.

APPLICABILITY:

MODES 1 and 2.

ACTIONS COMPLETION CONDITION REQUIRED ACTION TIME A.

Requirements of the LCO A.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> not met.

SURVEILLANCE REQUIREMENTS NOTE-------------------------------------

During single control rod scram time Surveillances, the control rod drive (CRD) pumps shall be isolated from the associated scram accumulator.

SURVEILLANCE FREQUENCY SR 3.1.4.1 Verify each control rod scram time is within the limits Prior to exceeding of Table 3.1.4-1 with reactor steam dome pressure 40% RTP after

> 800 psig.

each reactor shutdown

> 120 days SR 3.1.4.2 Verify, for a representative sample, each tested 200 days control rod scram time is within the limits of cumulative Table 3.1.4-1 with reactor steam dome pressure operation in

> 800 psig.

MODE 1 I

Cooper 3.1 -1 2 Amendment No. 218