MONTHYEARML0721800072007-08-0909 August 2007 Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac No. MD4653) Project stage: Other ML0721800082007-08-0909 August 2007 Revised Pages of Facility Operating License No. DPR-46 Project stage: Other ML0728401972007-10-16016 October 2007 Regulatory Commitment Regarding Mitigation Strategies Project stage: Other 2007-10-16
[Table View] |
|
---|
Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21040A3002021-03-29029 March 2021 Issuance of Amendment No. 269 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML20314A2352020-12-0202 December 2020 Issuance of Amendment No. 268 Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, Using the Consolidated Line Item Improvement Process ML20282A1762020-10-22022 October 2020 Issuance of Amendment No. 267 Regarding Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules ML20212J1762020-08-24024 August 2020 Temporary Exemption from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Section VI (EPID L 2020-LLE-0110 (Covid 19)) ML19352G1942020-01-28028 January 2020 Issuance of Amendment No. 264 Elimination of Technical Specification Requirements for Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process ML19238A0072019-10-30030 October 2019 Issuance of Amendment No. 263 Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML18348B1032019-02-21021 February 2019 Issuance of Amendment No. 262 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML18218A4832018-09-0606 September 2018 Issuance of Amendment No. 261 Safety Limit Minimum Critical Power Ratio ML18186A5492018-08-0101 August 2018 Issuance of Amendment No.260 Revision to Technical Specifications to Adopt (TSTF) Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MG0138; EPID L-2017-LLA-0290) ML17144A0822017-06-20020 June 2017 Issuance of Amendment No. 259 Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17061A0502017-03-31031 March 2017 Issuance of Amendment No. 258 Adoption of TSTF-425, Revision 3, ML16272A1372016-10-17017 October 2016 Issuance of Amendment No. 257 Revision of Technical Specifications - Safety Limit Minimum Critical Power Ratio ML16146A7492016-07-25025 July 2016 Issuance of Amendment No. 255 Replacement of Technical Specification Figure 4.1-1 with Text ML16119A4332016-07-25025 July 2016 Issuance of Amendment No. 254 Adoption of Technical Specification Task Force Change Traveler TSFT-535, Revision 0 ML16158A0222016-07-25025 July 2016 Issuance of Amendment No. 256 to Relocate the Pressure-Temperature Curves to a Pressure-Temperature Limits Report ML15343A3012016-01-22022 January 2016 Issuance of Amendment No. 253 to Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML15216A2592015-08-27027 August 2015 Issuance of Amendment No. 252, Revise Technical Specification 3.5.2, ECCS - Shutdown, to Delete Condensate Storage Tank as Alternate Source of Makeup Water ML15168A1712015-07-14014 July 2015 Issuance of Amendment No. 251, Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications ML15135A0052015-05-29029 May 2015 Issuance of Amendment No. 250, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-413, Elimination of Requirements for a Post Accident Sampling System (PASS) ML14323A6442014-12-12012 December 2014 Issuance of Amendment No. 249, Request to Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14055A0232014-04-29029 April 2014 Issuance of Amendment No. 248, Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML13191A1052013-09-12012 September 2013 Issuance of Amendment No. 247, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report ML13148A2252013-06-26026 June 2013 Issuance of Amendment No. 246, Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML13032A5262013-02-22022 February 2013 Issuance of Amendment No. 245, Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML12341A1112012-12-31031 December 2012 Correction to Safety Evaluation Pages Issued with Amendment No. 243 Dated 11/9/2012, Revise TS 2.0, Safety Limits, to Revise Safety Limit Minimum Critical Power Ratio Values of a Cycle-Specific Calculation ML12318A1602012-12-13013 December 2012 Issuance of Amendment No. 244, Revise Physical Protection License Condition Related to Cyber Security Plan Implementation Schedule Milestone 6 ML12299A0922012-11-0909 November 2012 Issuance of Amendment No. 243, Revise Technical Specification 2.0, Safety Limits, to Revise Safety Limit Minimum Critical Power Ratio Values of a Cycle-Specific Calculation ML12251A0982012-09-28028 September 2012 Issuance of Amendment No. 242, Revise Technical Specifications to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4, Option a ML1201302052012-02-16016 February 2012 Issuance of Amendment No. 241, Editorial Changes to Several Technical Specifications (Tss) and Revise TS 5.5.6 to Remove Expired One-Time Exception to 5-Year Test Frequency for a Safety Valve ML1136302582012-01-31031 January 2012 Issuance of Amendment No. 240, Revise Technical Specification 3.4.3, Safety/Relief Valves (Srvs) and Safety Valves (Svs), to Reduce Number of Required SRVs for Overpressure Protection ML1128502652011-10-28028 October 2011 Issuance of Amendment No. 239, Correction of Non-Conservative Values in Battery Terminal Voltage and Specific Gravity Values in Technical Specification Surveillance Requirements ML1118010812011-07-27027 July 2011 License Amendment, Issuance of Amendment No. 238, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1103401602011-02-28028 February 2011 License Amendment, Issuance of Amendment 237, Revising Technical Specification Surveillance Requirement 3.8.1.9, Diesel Generator Load Test, in TS Section 3.8.1 to Correct Non-Conservative Power Factor Value ML0815402802008-06-30030 June 2008 Issuance of Amendment Measurement Uncertainty Recapture Power Uprate ML0814200582008-06-10010 June 2008 Correction to Amendment No. 230 Control Room Envelope Habitability License Pages 4 & 5 and SE Pages 3, 4, 8, and 9 ML0812202812008-05-12012 May 2008 Issuance of Amendment No. 230 Control Room Habitability, TSTF-448 ML0730600362007-12-0404 December 2007 Issuance of Amendment No. 228, Revise TS 5.5.6, Inservice Testing Program, to Allow a One-Time Extension of the 5-yr Frequency Requirement for Setpoint Testing of Safety Valve MS-RV-70ARV ML0721300232007-09-0606 September 2007 License Amendment, Issuance of Amendment No. 227 Onsite Spent Fuel Storage Expansion ML0721800082007-08-0909 August 2007 Revised Pages of Facility Operating License No. DPR-46 ML0625400892006-10-31031 October 2006 Issuance of Amendment 226 MSIV Leakage Exemption from 10 CFR 50, Appendix J ML0625400242006-10-0303 October 2006 Issuance of Amendment Additional Extension of Appendix J, Type a Integrated Leakage Rate Test Interval ML0614400492006-09-0606 September 2006 License Amendment, Technical Specification (TS) Changes Associated with Inservice Testing Program, Section 5.5.6, Under TS Programs and Manuals, MD0335 ML0622602392006-09-0505 September 2006 License Amendment, Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences and Related Technical Specification Changes, MC8566 ML0612300512006-05-0303 May 2006 Correction to Amendment No. 218 2024-07-17
[Table view] |
Text
ENCLOSURE 1 REVISED PAGES OF FACILITY OPERATING LICENSE NO. DPR-46 COOPER NUCLEAR STATION DOCKET NO. 50-298 Replace the following pages of the Facility Operating License No. DPR-46. The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change.
Facility Operating License REMOVE INSERT Page 3 Page 3 Page 4 Page 4
(5) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2381 megawatts (thermal).
(2) Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 226, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3) Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Cooper Nuclear Station Safeguards Plan," submitted by letter dated May 17, 2006.
(4) Fire Protection l l
The licensee shall implement and maintain in effect all provisions of the l approved fire protection program as described in the Cooper Nuclear l Station (CNS) Updated Safety Analysis Report and as approved in the l Safety Evaluations dated November 29, 1977; May 23, 1979; l November 21, 1980; April 29, 1983; April 16, 1984; June 1, 1984; l January 3, 1985; August 21, 1985; April 10, 1986; September 9, 1986; l November 7, 1988; February 3, 1989; August 15, 1995; and July 31, l 1998, subject to the following provision: l l
The licensee may make changes to the approved fire protection program l without prior approval of the Commission only if those changes would not l adversely affect the ability to achieve and maintain safe shutdown in the l event of a fire. l Revised by letter dated August 9, 2007 3 of 5
(5) Additional Conditions l The Additional Conditions contained in Appendix C, as revised through Amendment No. 178, are hereby incorporated into this license. Nebraska Public Power District shall operate the facility in accordance with the Additional Conditions.
(6) Deleted l (7) Mitigation Strategy License Condition l l
Develop and maintain strategies for addressing large fires and explosions l and that include the following key areas: l l
(a) Fire fighting response strategy with the following elements: l
- 1. Pre-defined coordinated fire response strategy and l guidance l
- 2. Assessment of mutual aid fire fighting assets l
- 3. Designated staging areas for equipment and materials l
- 4. Command and control l
- 5. Training of response personnel l l
(b) Operations to mitigate fuel damage considering the following: l
- 1. Protection and use of personnel assets l
- 2. Communications l
- 3. Minimizing fire spread l
- 4. Procedures for implementing integrated fire response l strategy l
- 5. Identification of readily-available pre-staged equipment l
- 6. Training on integrated fire response strategy l
- 7. Spent fuel pool mitigation measures l l
(c) Actions to minimize release to include consideration of: l
- 1. Water spray scrubbing l
- 2. Dose to onsite responders l l
(8) The licensee shall implement and maintain all Actions required by l Attachment 2 to NRC Order EA-06-137, issued June 20, 2006, except the l last action that requires incorporation of the strategies into the site l security plan, contingency plan, emergency plan and/or guard training l and qualification plan, as appropriate. l D. (Not Used)
Revised by letter dated August 9, 2007 4 of 5