NLS2006039, Corrected Technical Specification Page from Amendment No. 218

From kanterella
Jump to navigation Jump to search
Corrected Technical Specification Page from Amendment No. 218
ML061100126
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/17/2006
From: Fleming P
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2006039
Download: ML061100126 (5)


Text

N Nebraska Public Power District Always there when you need us NL'S2006039 April 17, 2006 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Corrected Technical Specification Page from Amendment No. 218 Cooper Nuclear Station, Docket 50-298, DPR-46

References:

1. Letter from Randall K. Edington, Nebraska Public Power District, to U.S. Nuclear Regulatory Commission, dated April 13, 2005, "License Amendment Request to Adopt Generic Changes to Standard Technical Specifications"
2. Letter from Brian Benney, U.S. Nuclear Regulatory Commission, to Randall K. Edington, Nebraska Public Power District, dated March 30, 2006, "Cooper Nuclear Station - Issuance of Amendment Re: Technical Specification Change Request for Various Sections."

The purpose of this letter is to provide a corrected page for the Cooper Nuclear Station (CNS) Technical Specification (TS) as revised by Amendment No. 218.

By Reference 1 Nebraska Public Power District (NPPD) submitted a license amendment request with markup and final typed TS pages. The logical connectors in Condition A Required Action of TS Section 3.9.1 were correctly aligned on the markup of TS page 3.9-1 but were incorrectly aligned on the final typed page. The U.S. Nuclear Regulatory Commission issued Amendment No. 218 by Reference 2 with the incorrect TS page.

The incorrect page issued with Amendment 218 was discussed with the NRC Project Manager for CNS. The project manager requested that NPPD provide the corrected page by formal letter. The corrected TS page 3.9-1 is attached. It is requested that this corrected page be issued to NPPD no later than May 10, 2006, in order to allow adequate time to implement the amendment.

COOPERNUCLEARSTATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com

NLES2006039 Page 2 of 2 Should you have any questions regarding this submittal, please contact Paul Fleming, Liccnsing Manager, at (402) 825-2774.

Sincerely, 6~4 Paul V'7 Fleming Licensing Manager

/rr Attachment cc: Regional Administrator w/ Attachment USNRC - Region IV Cooper Project Manager w/ Attachment USNRC - NRR Project Directorate IV-I Senior Resident Inspector w/ Attachment CNS - USNRC NPG Distribution w/o Attachment CNS Records w/ Attachment

NLS2006039 Attachment Page l of 2 Corrected Technical Specification Page 3.9-1 Cooper Nuclear Station, NRC Docket 50-298, DPR46

Refueling Equipment Interlocks 3.9.1 3.9 REFUELING OPERATIONS 3.9.1 Refueling Equipment Interlocks LCO 3.9.1 The refueling equipment interlocks associated with the reactor mode switch refuel position shall be OPERABLE.

APPLICABILITY: During in-vessel fuel movement with equipment associated with the interlocks when the reactor mode switch is in the refuel position.

ACTIONSC E CONDITION REQUIRED ACTION TIME A. One or more required A.1 Suspend in-vessel fuel Immediately refueling equipment movement with equipment interlocks inoperable. associated with the inoperable interlocks(s).

OR A.2.1 Insert a control rod Immediately withdrawal block AND A.2.2 Verify all control rods Immediately are fully inserted Cooper 3.9-1 Amendment No. 218

ATTACHMENT 3 LIST OF REGULATORY COMMITMENTSl Correspondence Number: NLS2006039 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITMENT COMMITTED DATE COMMITMENT NUMBER OR OUTAGE None I.

4 4 4 4 4 4 4 4 PROCEDURE 0.42 l REVISION 19 l PAGE 20 OF 27