Category:Letter type:NLS
MONTHYEARNLS2024006, Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-022024-01-25025 January 2024 Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-02 NLS2024007, Emergency Plan Implementing Procedure 5.7.1, Revision 732024-01-16016 January 2024 Emergency Plan Implementing Procedure 5.7.1, Revision 73 NLS2024003, 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector2024-01-15015 January 2024 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector NLS2024004, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20232024-01-10010 January 2024 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2023 NLS2023053, ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-30030 November 2023 ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023050, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023045, Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2023-11-15015 November 2023 Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2023051, Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-10-10010 October 2023 Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2023047, Licensee Guarantees of Payment of Deferred Premiums2023-07-26026 July 2023 Licensee Guarantees of Payment of Deferred Premiums NLS2023033, 10 CFR 50.55a Relief Request RC3-022023-06-27027 June 2023 10 CFR 50.55a Relief Request RC3-02 NLS2023039, Preparation and Scheduling of Operator Licensing Examinations2023-06-0101 June 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2023038, Nebraska Public Power District 2022 Financial Report2023-05-22022 May 2023 Nebraska Public Power District 2022 Financial Report NLS2023031, Annual Radiological Environmental Report2023-05-11011 May 2023 Annual Radiological Environmental Report NLS2023017, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023018, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2023030, Annual Radioactive Effluent Release Report2023-04-27027 April 2023 Annual Radioactive Effluent Release Report NLS2023007, Technical Specification Bases Changes2023-04-17017 April 2023 Technical Specification Bases Changes NLS2023027, Annual Report of Individual Exposure Monitoring2023-04-13013 April 2023 Annual Report of Individual Exposure Monitoring NLS2023021, Quality Assurance Program Changes2023-04-10010 April 2023 Quality Assurance Program Changes NLS2023020, Decommissioning Funding2023-03-29029 March 2023 Decommissioning Funding NLS2023019, Property Insurance Coverage2023-03-23023 March 2023 Property Insurance Coverage NLS2023010, Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station2023-02-0909 February 2023 Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station NLS2023005, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20222023-01-19019 January 2023 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2022 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2022055, Emergency Plan, Revision 812023-01-0404 January 2023 Emergency Plan, Revision 81 NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal NLS2022050, Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library2022-11-0909 November 2022 Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library NLS2022048, Management Change and Correspondence Update2022-11-0101 November 2022 Management Change and Correspondence Update NLS2022047, Core Operating Limits Report, Cycle 33, Revision 02022-10-14014 October 2022 Core Operating Limits Report, Cycle 33, Revision 0 NLS2022042, 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report2022-10-0707 October 2022 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report NLS2022037, Emergency Plan, Revision 80, Summary of 50.54(q) Analyses2022-08-18018 August 2022 Emergency Plan, Revision 80, Summary of 50.54(q) Analyses NLS2022035, Evacuation Time Estimate Report for Cooper Nuclear Station2022-08-16016 August 2022 Evacuation Time Estimate Report for Cooper Nuclear Station NLS2022031, Licensee Guarantees of Payment of Deferred Premiums2022-07-19019 July 2022 Licensee Guarantees of Payment of Deferred Premiums NLS2022005, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-06-16016 June 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements NLS2022025, Nebraska Public Power District Letter (NLS2022010) to U.S. Nuclear Regulatory Commission Dated April 5, 2022, Annual Report of Individual Exposure Monitoring2022-06-0606 June 2022 Nebraska Public Power District Letter (NLS2022010) to U.S. Nuclear Regulatory Commission Dated April 5, 2022, Annual Report of Individual Exposure Monitoring NLS2022016, Annual Radiological Environmental Report2022-05-10010 May 2022 Annual Radiological Environmental Report NLS2022020, Nebraska Public Power District, Cooper Nuclear Station, 2021 Financial Report2022-05-0202 May 2022 Nebraska Public Power District, Cooper Nuclear Station, 2021 Financial Report NLS2022014, Annual Radioactive Effluent Release Report2022-04-27027 April 2022 Annual Radioactive Effluent Release Report NLS2022010, Annual Report of Individual Exposure Monitoring2022-04-0505 April 2022 Annual Report of Individual Exposure Monitoring NLS2022009, Property Insurance Coverage2022-03-23023 March 2022 Property Insurance Coverage NLS2022011, Preparation and Scheduling of Operator Licensing Examinations2022-03-18018 March 2022 Preparation and Scheduling of Operator Licensing Examinations NLS2022004, Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Relief Request RR5-01, Revision 12022-02-0707 February 2022 Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Relief Request RR5-01, Revision 1 NLS2022003, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20212022-01-20020 January 2022 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2021 NLS2021067, ISFSI - Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-16016 December 2021 ISFSI - Independent Spent Fuel Storage Installation Decommissioning Funding Plan NLS2021069, Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-12-15015 December 2021 Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2021066, Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Alternative Request RI5-02, Revision 32021-12-10010 December 2021 Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Alternative Request RI5-02, Revision 3 NLS2021065, Clarification of Response to Nuclear Regulatory Commission'S Request for Additional Information for Alternative Request RS-012021-12-0606 December 2021 Clarification of Response to Nuclear Regulatory Commission'S Request for Additional Information for Alternative Request RS-01 NLS2021056, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-11-16016 November 2021 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements 2024-01-25
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARNLS2023045, Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2023-11-15015 November 2023 Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2023017, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023007, Technical Specification Bases Changes2023-04-17017 April 2023 Technical Specification Bases Changes ML21350A0582021-12-21021 December 2021 Withdrawal of an Amendment Request ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements NLS2021056, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-11-16016 November 2021 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2021018, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-05-11011 May 2021 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NLS2021015, (CNS) - Technical Specification Bases Changes2021-04-16016 April 2021 (CNS) - Technical Specification Bases Changes NLS2020007, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-04-0101 April 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process NLS2020004, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2020-04-0101 April 2020 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules NLS2019022, Application for Technical Specifications Improvement to Eliminate Requirements for Hydrogen/Oxygen Monitors (TSTF-447, Rev. 1)2019-05-23023 May 2019 Application for Technical Specifications Improvement to Eliminate Requirements for Hydrogen/Oxygen Monitors (TSTF-447, Rev. 1) NLS2019020, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit Mcpr.2019-05-23023 May 2019 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit Mcpr. NLS2019011, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2019-02-28028 February 2019 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. NLS2018010, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-06-11011 June 2018 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. ML18137A2102018-05-10010 May 2018 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio NLS2016046, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify Surveillance Requirement Usage Rule Application to Section 5.5 Testing.2016-08-26026 August 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify Surveillance Requirement Usage Rule Application to Section 5.5 Testing. NLS2016038, Supplement to License Amendment Request to Replace Figure with Text in Technical Specifications2016-06-13013 June 2016 Supplement to License Amendment Request to Replace Figure with Text in Technical Specifications ML16120A3702016-04-21021 April 2016 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio NLS2016010, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2016-03-22022 March 2016 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program NLS2016002, Application to Revise Technical Specifications to Adopt TSTF 535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs.2016-03-11011 March 2016 Application to Revise Technical Specifications to Adopt TSTF 535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. NLS2015103, License Amendment Request to Replace Figure with Text in Technical Specifications2015-09-0808 September 2015 License Amendment Request to Replace Figure with Text in Technical Specifications NLS2014087, License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function2015-01-15015 January 2015 License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function NLS2014030, License Amendment Request to Delete Condensate Storage Tank as an Alternate Source of Makeup Water2014-08-26026 August 2014 License Amendment Request to Delete Condensate Storage Tank as an Alternate Source of Makeup Water NLS2014028, License Amendment Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications2014-07-17017 July 2014 License Amendment Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications NLS2014035, License Amendment Request to Eliminate Requirements for Post Accident Sampling System for Boiling Water Reactors Using the Consolidated Line Item Improvement Process2014-07-14014 July 2014 License Amendment Request to Eliminate Requirements for Post Accident Sampling System for Boiling Water Reactors Using the Consolidated Line Item Improvement Process NLS2014022, License Amendment Request - Revision of Cyber Security Plan Implementation Schedule2014-03-14014 March 2014 License Amendment Request - Revision of Cyber Security Plan Implementation Schedule NLS2013014, License Amendment Request to Revise License Renewal License Condition 2.E2013-02-12012 February 2013 License Amendment Request to Revise License Renewal License Condition 2.E NLS2012042, Nebraska Public Power District (NPPD) - License Amendment Request for DPR- 46 for Cooper Nuclear Station to Revise the Physical Protection Protection License Condition Related to the Cyber Security Plan2012-06-14014 June 2012 Nebraska Public Power District (NPPD) - License Amendment Request for DPR- 46 for Cooper Nuclear Station to Revise the Physical Protection Protection License Condition Related to the Cyber Security Plan ML12157A2062012-05-30030 May 2012 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio NLS2012006, Nebraska Public Power District - Cooper Nuclear Station, License Amendment Request to Revise the Fire Protection Licensing Basis to NFPA 805 Per 10 CFR 50.48(c)2012-04-24024 April 2012 Nebraska Public Power District - Cooper Nuclear Station, License Amendment Request to Revise the Fire Protection Licensing Basis to NFPA 805 Per 10 CFR 50.48(c) NLS2011071, License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a2011-09-16016 September 2011 License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a NLS2011026, License Amendment Request for Administrative Revisions to Technical Specifications and to Remove an Expired One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve2011-03-26026 March 2011 License Amendment Request for Administrative Revisions to Technical Specifications and to Remove an Expired One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve ML1101002912011-01-0505 January 2011 Cooper - License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves NLS2010043, License Amendment Request on Non-Conservative Battery Terminal Voltage and Specific Gravity in Technical Specification Surveillance Requirements2010-10-29029 October 2010 License Amendment Request on Non-Conservative Battery Terminal Voltage and Specific Gravity in Technical Specification Surveillance Requirements NLS2010006, License Amendment Request to Correct Power Factor Limit and to Incorporate a Generic Revision in Technical Specification Surveillance Requirement 3.8.1.92010-02-25025 February 2010 License Amendment Request to Correct Power Factor Limit and to Incorporate a Generic Revision in Technical Specification Surveillance Requirement 3.8.1.9 ML1001900422010-02-0303 February 2010 Summary of Telephone Conference Call Held on 1/8/2010, Between the U.S. NRC and Nebraska Public Power District Related to a Clarification for Certain Responses to Requests for Additional Information for Cooper Nuclear Station ML0934309332009-12-0707 December 2009 SAMA Meteorological Anomaly Related to the Cooper Nuclear Station License Renewal Application Cooper Nuclear Station, Docket No. 50-298, DPR-46 NLS2009084, License Amendment Request for Approval of the Cyber Security Plan2009-11-19019 November 2009 License Amendment Request for Approval of the Cyber Security Plan NLS2009034, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2009-06-0202 June 2009 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process NLS2009010, License Amendment Request to Revise Nonconservative Battery Resistance Technical Specification Surveillance Requirements2009-03-11011 March 2009 License Amendment Request to Revise Nonconservative Battery Resistance Technical Specification Surveillance Requirements ML0829107682008-10-13013 October 2008 Cooper Nuclear Station - License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences ML0830302502008-09-24024 September 2008 Copper Nuclear Station, License Renewal Application, Environmental Report, Figure 2.1-1 - Figure 2.3.3 ML0830302462008-09-24024 September 2008 Copper Nuclear Station, License Renewal Application, Appendix E, Environmental Report ML0830302512008-09-24024 September 2008 Copper Nuclear Station, License Renewal Application, Environmental Report, Figure 2.4-1 - Figure 2.12-2 ML0830302442008-09-24024 September 2008 Copper Nuclear Station, License Renewal Application, Appendix D, Technical Specification Changes ML0830302362008-09-24024 September 2008 Cooper Nuclear Station, License Renewal Application, Cover Page ML0830302412008-09-24024 September 2008 Cooper Nuclear Station, License Renewal Application, Appendix a, Updated Safety Analysis Report Supplement ML0830302422008-09-24024 September 2008 Cooper Nuclear Station, License Renewal Application, Appendix B, Aging Management Programs and Activities ML0830302432008-09-24024 September 2008 Cooper Nuclear Station, License Renewal Application, Appendix C, Response to BWRVIP Applicant Action Items 2023-09-06
[Table view] Category:Technical Specifications
MONTHYEARML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2021041, Request for Exception from Leak Testing Requirement of the Primary Containment Leakage Rate Testing Program2021-07-20020 July 2021 Request for Exception from Leak Testing Requirement of the Primary Containment Leakage Rate Testing Program ML20314A2352020-12-0202 December 2020 Issuance of Amendment No. 268 Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, Using the Consolidated Line Item Improvement Process ML19238A0072019-10-30030 October 2019 Issuance of Amendment No. 263 Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML18218A4832018-09-0606 September 2018 Issuance of Amendment No. 261 Safety Limit Minimum Critical Power Ratio ML18137A2102018-05-10010 May 2018 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio NLS2016010, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2016-03-22022 March 2016 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML15343A3012016-01-22022 January 2016 Issuance of Amendment No. 253 to Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML16021A3222016-01-12012 January 2016 Correction to License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML15216A2592015-08-27027 August 2015 Issuance of Amendment No. 252, Revise Technical Specification 3.5.2, ECCS - Shutdown, to Delete Condensate Storage Tank as Alternate Source of Makeup Water ML15168A1712015-07-14014 July 2015 Issuance of Amendment No. 251, Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications ML15135A0052015-05-29029 May 2015 Issuance of Amendment No. 250, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-413, Elimination of Requirements for a Post Accident Sampling System (PASS) NLS2014087, License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function2015-01-15015 January 2015 License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML14055A0232014-04-29029 April 2014 Issuance of Amendment No. 248, Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML13191A1052013-09-12012 September 2013 Issuance of Amendment No. 247, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report ML13085A0962013-03-29029 March 2013 Corrected Technical Specification (TS) and Safety Evaluation Pages for Amendment No. 245, Revise TS 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML12157A2062012-05-30030 May 2012 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio ML1136302582012-01-31031 January 2012 Issuance of Amendment No. 240, Revise Technical Specification 3.4.3, Safety/Relief Valves (Srvs) and Safety Valves (Svs), to Reduce Number of Required SRVs for Overpressure Protection NLS2011086, Supplement to License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves2011-10-0606 October 2011 Supplement to License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves NLS2011071, License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a2011-09-16016 September 2011 License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a ML1101002912011-01-0505 January 2011 Cooper - License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves NLS2009034, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2009-06-0202 June 2009 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process ML0906207232009-02-26026 February 2009 Corrected Technical Specification Pages Regarding Reactor Equipment Cooling System Margin Amendment ML0815402852008-06-30030 June 2008 Technical Specifications, Measurement Uncertainty Recapture Power Uprate ML0812202892008-05-12012 May 2008 Technical Specification Pages for Issuance of Amendment No. 230 Control Room Habitability, TSTF-448 NLS2008046, Response to Request for Additional Information for License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate2008-05-0909 May 2008 Response to Request for Additional Information for License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate NLS2007079, Corrected Technical Specification Pages2007-11-0505 November 2007 Corrected Technical Specification Pages NLS2007048, License Amendment Request for a One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve2007-08-16016 August 2007 License Amendment Request for a One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve ML0630405382006-10-31031 October 2006 Tech Spec Pages for Amendment 226 Regarding MSIV Leakage Exemption from 10 CFR Part 50, Appendix J ML0629602942006-10-23023 October 2006 Technical Specification, Revised Limiting Condition for Operation (LCO) 3.10.1, Scram Time Testing Activities ML0627700902006-10-0303 October 2006 Technical Specification Pgs Amd #224 - Issuance of Amendment Additional Extension of Appendix J, Type a Integrated Leakage Rate Test Interval ML0625003012006-09-0606 September 2006 Technical Specifications, Technical Specification (TS) Changes Associated with Inservice Testing Program, Section 5.5.6, Under TS Programs and Manuals, MD0335 ML0624900372006-09-0505 September 2006 Technical Specifications, Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences and Related Technical Specification Changes, MC8566 NLS2006042, License Amendment Request for Revision of Technical Specification 3.10.1, Inservice Leak and Hydrostatic Testing Operation2006-06-16016 June 2006 License Amendment Request for Revision of Technical Specification 3.10.1, Inservice Leak and Hydrostatic Testing Operation ML0612403772006-05-0303 May 2006 Correction to Amendment No. 218, Technical Specification Page 3.1-12 ML0612304692006-05-0202 May 2006 Technical Specifications, Changes to TS Leakage Limit for the Main Stream Isolation Valves ML0611802442006-04-27027 April 2006 Technical Specifications, Revised Pressure Vessel Fluence and Pressure Temp Curve Applicability to 30 Effective Full-Power Years of Operation ML0611001622006-04-18018 April 2006 Corrected Technical Specification Page 3.9-1 Re Refueling Operations NLS2006039, Corrected Technical Specification Page from Amendment No. 2182006-04-17017 April 2006 Corrected Technical Specification Page from Amendment No. 218 ML0609004412006-03-30030 March 2006 Technical Specification Pages, Change Request for Various Sections ML0628404572006-03-10010 March 2006 Tech Spec Pages for Amendment 217 Regarding Revise Technical Specifications Instrumentation Definitions NLS2006013, License Amendment Request to Update the American Society of Mechanical Engineers Code Referenced in TS Section 5.5.6, Inservice Testing Program2006-03-0707 March 2006 License Amendment Request to Update the American Society of Mechanical Engineers Code Referenced in TS Section 5.5.6, Inservice Testing Program NLS2006002, License Amendment Request for a One-Time Extension of Containment Integrated Leakage Rate Test Interval2006-01-30030 January 2006 License Amendment Request for a One-Time Extension of Containment Integrated Leakage Rate Test Interval NLS2006001, Application for TS Change to Add LCO 3.0.8 on Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2006-01-30030 January 2006 Application for TS Change to Add LCO 3.0.8 on Inoperability of Snubbers Using the Consolidated Line Item Improvement Process ML0602002922006-01-16016 January 2006 Cooper Nuclear Station - Revised and Supplemental Pages to License Amendment Request for Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences NLS2005102, License Amendment Request to Establish a Combined Main Steam Line Leakage Rate Technical Specification2005-12-30030 December 2005 License Amendment Request to Establish a Combined Main Steam Line Leakage Rate Technical Specification ML0601104792005-12-16016 December 2005 Corrected Technical Specification Pages Re Secondary Containment Isolation Instrumentation ML0535000852005-12-15015 December 2005 1 TS Page - Cooper Nuclear Station. Issuance of Amd. 214 Unit Staff Qualifications (Tac. MC7346) NLS2005051, Response to Request for Additional Information License Amendment Request to Revise the Required Channels Per Trip System for Primary & Secondary Containment Isolation and Control Room Emergency Filter System Instrumentation2005-08-0101 August 2005 Response to Request for Additional Information License Amendment Request to Revise the Required Channels Per Trip System for Primary & Secondary Containment Isolation and Control Room Emergency Filter System Instrumentation 2023-09-06
[Table view] |
Text
N Nebraska Public Power District
'Always there when you need us" 50.90 NLS2009034 June 2, 2009 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process Cooper Nuclear Station, Docket No. 50-298, DPR-46
Reference:
Federal Register Notice 72 FR 63935, published November 13, 2007, Notice of Availability of Model Application Concerning Technical Specification Improvement to Revise Control Rod Notch Surveillance Frequency, Clarify SRM Insert Control Rod Action, and Clarify Frequency Example
Dear Sir or Madam:
The purpose of this letter is for the Nebraska Public Power District (NPPD) to request an amendment to Facility Operating License DPR-46 in accordance with the provisions of 10 CFR 50.4 and 10 CFR 50.90 to revise the Cooper Nuclear Station (CNS) Technical Specifications (TS). The proposed amendment would: (1) delete TS Surveillance Requirement (SR) 3.1.3.2 and revise SR 3.1.3.3 in TS 3.1.3, "Control Rod OPERABILITY", and (2) revise Example 1.4-3 in Section 1.4 "Frequency" to clarify the applicability of the 1.25 surveillance test interval extension consistent with the model application in the Reference. provides a description of the TS changes, the basis for the amendment, the no significant hazards consideration evaluation pursuant to 10 CFR 50.91 (a)(1), and the environmental impact evaluation pursuant to 10 CFR 51.22. Attachment 2 provides the proposed changes to the current CNS TS in marked up format. Attachment 3 provides the final typed TS pages to be issued with the amendment. Attachment 4 provides a summary of the regulatory commitments made in this submittal. Attachment 5 provides conforming changes to the TS Bases for Nuclear Regulatory Commission (NRC) information.
NPPD requests approval of the proposed amendment by May 31, 2010. Once approved, the amendment will be implemented within 60 days.
This proposed TS change has been reviewed by the necessary safety review committees (Station Operations Review Committee and Safety Review and Audit Board). Amendments to the CNS Facility Operating License through Amendment 232 issued March 20, 2009, have been incorporated into this request.
P.O. Box 98 / Brownville, NE 68321-0098 Telephone:COOPER NUCLEAR/ Fax: (402) 825-52117 (402) 825-3811 STATION www,.nppd.com A~oI
NLS2009034 Page 2 of 2 By copy of this letter and its attachments, the appropriate State of Nebraska official is notified in accordance with 10 CFR 50.91(b)(1). Copies are also being provided to the NRC Region IV office and the CNS Senior Resident Inspector in accordance with 10 CFR 50.4(b)(1).
Should you have any questions concerning this matter, please contact David Van Der Kamp, Licensing Manager, at (402) 825-2904.
I declare under penalty of perjury that the foregoing is true and correct.
Executed onj iC. , . O-0 0 (Date)
Sincerely, Stewart B. Minahan Vice President - Nuclear and Chief Nuclear Officer
/em Attachments
- 1. Descriptionand Assessment
- 2. Proposed Technical Specifications Changes
- 3. Revised Technical Specification Pages
- 4. Regulatory Commitments
- 5. Proposed Technical Specification Bases Changes cc: Regional Administrator w/attachments USNRC - Region IV Cooper Project Manager w/attachments USNRC - NRR Project Directorate IV-1 Senior Resident Inspector w/attachments USNRC - CNS Nebraska Health and Human Services w/ attachments.
Department of Regulation and Licensure NPG Distribution w/o attachments CNS Records w/attachments
NLS2009034 Page 1 of 3 Attachment 1 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process Cooper Nuclear Station, NRC Docket 50-298, DPR-46 1.0 Description 2.0 Assessment 2.1 Applicability of Published Safety Evaluation 2.2 Optional Changes and Variations 3.0 Regulatory Analysis 3.1 No Significant Hazards Consideration Determination 3.2 Verification and Commitments 4.0 Environmental Evaluation
NLS2009034 Page 2 of 3 Attachment 1 Description and Assessment Cooper Nuclear Station, NRC Docket 50-298, DPR-46 1.0 Description The proposed amendment would: (1) delete Technical Specification (TS) Surveillance Requirement (SR) 3.1.3.2 and revise SR 3.1.3.3 in TS 3.1.3, "Control Rod OPERABILITY", and (2) revise Example 1.4-3 in Section 1.4 "Frequency" to clarify the applicability of the 1.25 surveillance test interval extension.
The changes are consistent with Nuclear Regulatory Commission (NRC) approved Industry/Technical Specification Task Force (TSTF) Standard TS change TSTF-475-A, Revision 1. The Federal Register Notice, published on November 13, 2007, announced the availability of this TS improvement through the consolidated line item improvement process (CLIIP).
2.0 Assessment 2.1 Applicability of Published Safety Evaluation Nebraska Public Power District (NPPD) has reviewed the safety evaluation dated November 13, 2007, as part of the CLIIP. This review included a review of the NRC staff's evaluation, as well as the supporting information provided to support TSTF-475-A, Revision 1. NPPD has concluded that the justifications presented in the TSTF proposal and the safety evaluation prepared by the NRC staff are applicable to Cooper Nuclear Station (CNS) and justify this amendment for the incorporation of the changes to CNS TS.
2.2 Optional Changes and Variations NPPD is proposing two variations from the TS changes described in TSTF-475-A, Revision 1. The first variation is to reflect not renumbering the remaining SRs after deleting SR 3.1.3.2. This eliminates the need to revise Table 3.1.4-1. The second variation is in the Bases for SR 3.1.3.3 to reflect just the single SR 3.1.3.3 and to apply the potential power reduction basis to all withdrawn control rods rather than just those partially withdrawn. This conforms the Bases to the SR.
NLS2009034 Page 3 of 3 3.0 Regulatory Analysis 3.1 No Significant Hazards Consideration Determination NPPD has reviewed the proposed no significant hazards consideration determination (NSHCD) published in the Federal Register as part of the CLIIP.
NPPD has concluded that the proposed NSHCD presented in the Federal Register Notice is applicable to CNS and is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.91 (a).
3.2 Verification and Commitments As discussed in the notice of availability published in the Federal Register on November 13, 2007, for this TS improvement, NPPD verifies the applicability of TSTF-475-A to CNS, and commits to establishing Technical Specification Bases as proposed in TSTF-475-A, Revision 1, with the variations noted.
These changes are based on TSTF change traveler TSTF-475-A, Revision 1, that proposes revisions to the Standard TS by: (1) Revising the frequency of SR 3.1.3.2, notch testing of fully withdrawn control rod, from 7 days after the control rod is withdrawn and THERMAL POWER is greater than the Low Power Setpoint (LPSP) of the Rod Worth Minimizer (RWM) to 31 days after the control rod is withdrawn and THERMAL POWER is greater than the LPSP of the RWM, and (2) revising Example 1.4-3 in Section 1.4, "Frequency," to clarify that the 1.25 surveillance test interval extension in SR 3.0.2 is applicable to time periods discussed in NOTES in the "SURVEILLANCE" column in addition to the time periods in the "FREQUENCY" column.
4.0 Environmental Evaluation NPPD has reviewed the environmental evaluation included in the model safety evaluation dated November 13, 2007, as part of the CLIIP. NPPD has concluded that the staff's findings presented in that evaluation are applicable to CNS and the evaluation is hereby incorporated by reference for this application.
NLS2009034 Page 1 of 5 Attachment 2 Proposed Technical Specification Revisions (Markup)
Cooper Nuclear Station, Docket No. 50-298, DPR-46 Revised Technical Specification Pages 1.4-4 1.4-5 3.1-8 3.1-10
Frequency 1.4 1.4 Frequency EXAMPLES EXAMPLE 1.4-2 (continued)
"Thereafter" indicates future performances must be established per SR 3.0.2, but only after a specified condition is first met (i.e., the "once" performance in this example). If reactor power decreases to < 25% RTP, the measurement of both intervals stops. New intervals start upon reactor power reaching 25% RTP.
EXAMPLE 1.4-3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
NOTE--------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after > 25% RTP.
Perform channel adjustment. 7 days The interval continues whether or not the unit operation is
< 25% RTP between performances.
As the Note modifies the required performance of the Surveillance, it is construed to be part of the "specified Frequency." Should the 7 day interval be exceeded while operation is < 25% RTP, this Note allows 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after power reaches > 25% RTP to perform the Surveillance. The Surveillance is still considered to be within the "specified Frequency." Therefore, if the Surveillance were not performed within the 7 day interval (plus the extension allowed by SR 3.0.2), but operation was < 25% RTP, it would not constitute a failure of the SR or failure to meet the LCO. Also, no violation of SR 3.0.4 occurs when changing MODES, even with the 7 day Frequency not met, provided operation does not exceed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with power > 25% RTP.
(continued)
Cooper 1.4-4 Amendment No. 178
Frequency 1.4 1.4 Frequency EXAMPLES EXAMPLE 1.4-3 (continued) SK lovI-S Once the unit reaches 25% RTP, 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> would be lallowed for completing the Surveillance. If the Surveillance wee ot performed within this 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> interval there wou d then eb a failure to perform a Surveillance within the specified Frequency, and the provisions of SR 3.0.3 would apply.
EXAMPLE 1.4-4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
-- NOTE ------------------
Only required to be met in MODE 1.
Verify leakage rates are within limits. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Example 1.4-4 specifies that the requirements of this Surveillance do not have to be met until the unit is in MODE 1. The interval measurement for the Frequency of this Surveillance continues at all times, as described in Example 1.4-1. However, the Note constitutes an "otherwise stated" exception to the Applicability of this Surveillance.
Therefore, if the Surveillance were not performed within the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> interval (plus the extension allowed by SR 3.0.2),
but the unit was not in MODE 1, there would be no failure of the SR nor failure to meet the LCO. Therefore, no violation of SR 3.0.4 occurs when changing MODES, even with the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Frequency exceeded, provided the MODE change was not made into MODE 1. Prior to entering MODE I (assuming again that the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Frequency were not met), SR 3.0.4 would require satisfying the SR.
Cooper 1.4-5 Amendment No. 178
Control Rod OPERABILITY 3.1.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.3 3-92--
Perform &P 3.v 1.R 2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from SR 3.1.3.3 for discovery of each withdrawn Condition A OPERABLE control rod. concurrent with THERMAL POWER greater than the low power setpoint (LPSP) of the RWM.
AND A.4 Perform SR 3.1.1.1. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> B. Two or more withdrawn B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> control rods stuck.
C., One or more control C.1 ---------NOTE ---------
rods inoperable for RWM may be bypassed reasoýs: other than as allowed by CoidTti-on A or B. LCO 3.3.2.1, if required, to allow insertion of inoperable control rod and continued operation.
Fully insert 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> inoperable control rod.
AND C.2 Disarm the associated 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> CRD.
(continued)
Cooper 3.1-8 Amendment No. 178
Control Rod OPERABILITY 3.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.3.1 Determine the position of each control rod. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SR 3.1.3.2
(- kteý'
ýýyJS SR 3.1.3.3------------------ NOTE--------------------
Not required to be performed until 31 days after the control rod is withdrawn and THERMAL POWER is greater than the LPSP of the RWM.
Insert each lall withdrawn control rod 31 days at least one notch.
SR 3.1.3.4 Verify each control rod scram time from In accordance fully withdrawn to notch position 06 is with
< 7 seconds. SR 3.1.4.1, SR 3.1.4.2, SR 3.1.4.3, and SR 3.1.4.4 (continued)
Cooper 3.1-10 Amendment No.
NLS2009034 Page 1 of 5 Attachment 3 Proposed Technical Specification Revisions (Final Typed)
Cooper Nuclear Station, NRC Docket No. 50-298, DPR-46 Technical Specification Pages 1.4-4 1.4-5 3.1-8 3.1-10
Frequency 1.4 1.4 Frequency EXAMPLES EXAMPLE 1.4-2 (continued)
"Thereafter" indicates future performances must be established per SR 3.0.2, but only after a specified condition is first met (i.e., the "once" performance in this example). If reactor power decreases to < 25% RTP, the measurement of both intervals stops. New intervals start upon reactor power reaching 25% RTP.
EXAMPLE 1.4-3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
NOTE--------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after
> 25% RTP.
Perform channel adjustment. 7 days The interval continues whether or not the unit operation is < 25% RTP between performances.
As the Note modifies the required performance of the Surveillance, it is construed to be part of the "specified Frequency." Should the 7 day interval be exceeded while operation is < 25% RTP, this Note allows 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after power reaches > 25% RTP to perform the Surveillance.
The Surveillance is still considered to be within the "specified Frequency."
Therefore, if the Surveillance were not performed within the 7 day interval (plus the extension allowed by SR 3.0.2), but operation was < 25% RTP, it would not constitute a failure of the SR or failure to meet the LCO.
Also, no violation of SR 3.0.4 occurs when changing MODES, even with the 7 day Frequency not met, provided operation does not exceed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (plus the extension allowed by SR 3.0.2) with power
> 25% RTP.
(continued)
Cooper 1.4-4 Amendment No.
Frequency 1.4 1.4 Frequency EXAMPLES EXAMPLE 1.4-3 (continued)
Once the unit reaches 25% RTP, 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> would be allowed for completing the Surveillance. If the Surveillance were not performed within this 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> interval (plus the extension allowed by SR 3.0.2), there would then be a failure to perform a Surveillance within the specified Frequency, and the provisions of SR 3.0.3 would apply.
EXAMPLE 1.4-4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
NOTE ----------------------------
Only required to be met in MODE 1.
Verify leakage rates are within limits. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Example 1.4-4 specifies that the requirements of this Surveillance do not have to be met until the unit is in MODE 1. The interval measurement for the Frequency of this Surveillance continues at all times, as described in Example 1.4-1. However, the Note constitutes an "otherwise stated" exception to the Applicability of this Surveillance. Therefore, if the Surveillance were not performed within the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> interval (plus the extension allowed by SR 3.0.2), but the unit was not in MODE 1, there would be no failure of the SR nor failure to meet the LCO. Therefore, no violation of SR 3.0.4 occurs when changing MODES, even with the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Frequency exceeded, provided the MODE change was not made into MODE 1. Prior to entering MODE 1 (assuming again that the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Frequency were not met), SR 3.0.4 would require satisfying the SR.
Cooper 1.4-5 Amendment No.
Control Rod OPERABILITY 3.1.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.3 Perform SR 3.1.3.3 for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from each withdrawn discovery of OPERABLE control rod. Condition A
.concurrent with THERMAL POWER greater than the low power setpoint (LPSP) of the RWM.
AND A.4 Perform SR 3.1.1.1. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> B. Two or more withdrawn B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> control rods stuck.
C. One or more control rods C.1 ----------- NOTE------
inoperable for reasons RWM may be bypassed other than Condition A as allowed by or B. LCO 3.3.2.1, if required, to allow insertion of inoperable control rod and continued operation.
Fully insert inoperable 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> control rod.
AND C.2 Disarm the associated 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> CRD.
(continued)
Cooper 3.1-8 Amendment No.
Control Rod OPERABILITY 3.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.3.1 Determine the position of each control rod. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SR 3.1.3.2 (Deleted)
SR 3.1.3.3 --------------------- NOTE----------------
Not required to be performed until 31 days after the control rod is withdrawn and THERMAL POWER is greater than the LPSP of the RWM.
Insert each withdrawn control rod at least one notch. 31 days SR 3.1.3.4 Verify each control rod scram time from fully In accordance withdrawn to notch position 06 is < 7 seconds. with SR 3.1.4.1, SR 3.1.4.2, SR 3.1.4.3, and SR 3.1.4.4 (continued)
Cooper 3.1-10 Amendment No.
NLS2009034 Page 1 of 1 Attachment 4 Regulatory Commitments Cooper Nuclear Station, NRC Docket No. 50-298, DPR-46 The following table identifies those actions committed to by Nebraska Public Power District in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments. Please direct questions regarding these commitments to David Van Der Kamp, Licensing Manager.
REGULATORY COMMITMENT DUE DATE Nebraska Public Power District will establish the Technical Specification Bases changes for TS B 3.1.3 consistent with those Implementation of shown in TSTF-475-A, Reyision 1, "Control Rod Notch Testing License Amendment Frequency and SRM Insert Control Rod Action", with the variations noted.
NLS2009034 Page 1 of 5 Attachment 5 Proposed Technical Specification Bases Changes Cooper Nuclear Station, NRC Docket No. 50-298, DPR-46 Technical Specification Bases Pages B 3.1-15 B 3.1-16 B 3.1-19 B 3.1-20
('Jo ./
r9f;~c~AJ ~jsEA~~ Control Rod OPERABILITY EaJ"&-J-~(C5 \AA-A6- CATt,ý /10-TlfOAJ- B 3.1.3 (ON. ~~PAG&-ý0 ) O9C I A44 TF6 BASES APPLICABILITY In MODES I and 2, the control rods are assumed to function during a DBA or transient and are therefore. required to be OPERABLE in these MODES. In MODES'3 and 4, control rods are not able to be withdrawn since the reactor mode switch is in shutdown and a control rod block is applied. This provides adequate requirements for control rod OPERABILITY during these conditions. Control rod requirements in MODE 5 are located in LCO 3.9.5, "Control Rod OPERABILITY - Refueling."
ACTIONS The ACTIONS Table is modified by a Note indicating that a separate Condition entry is allowed for each control rod. This is acceptable, since the Required Actions for each Condition provide appropriate compensatory actions for each inoperable control rod. Complying with the Required Actions may allow for continued operation, and subsequent inoperable control rods are governed by subsequent Condition entry and application of associated Required Actions.
A.1. A.2, A.3, and A.4 A control rod is considered stuck if it will not insert by either CRD drive water or scram pressure. With a fully inserted control rod stuck, no actions are required as long as the control rod remains fully inserted.
The Required Actions are modified by a Note, which allows the rod worth minimizer (RWM) to be bypassed if required to allow continued operation.
LCO 3.3.2.1, "Control Rod Block Instrumentation," provides additional requirements when the RWM is bypassed to ensure compliance with the CRDA analysis. With one withdrawn control rod stuck, the local scram
., reactivity rate'assumptions may not be met ifthe stuck control rod separation criteria are not met. Therefore, a verification that the separation criteria are met must be performed immediately. The separation criteria are not met if a) the stuck control rod occupies a location adjacent to two "slow" control rods, b) the stuck control rod occupies a location adjacent to one "slow" control rod, and the one "slow" control rod is also adjacent to another "slow" control rod; or c) if the stuck control rod occupies a location adjacent to one "stow" control rod when there is another pair of "slow" control rods adjacent to one another.
('continued)
(continued)
Cooper 133.1-15 June 10, 1999 I
Control Rod OPERABILITY B 3.1.3 BASES ACTIONS A.1. A.2, A.3, and A.4 (continued).
The description of "slow" control rods is provided in LCO 3.1.4, "Control Rod Scram Times." In addition, the associated control rod drive must be disarmed (hydraulically) in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. The allowed Completion Time of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> is acceptable, considering the reactor can still be shut down, assuming no additional control. rods fail to insert, and provides a reasonable time to perform the Required Action in an orderly manner.
The control rod must be isolated from both scram and normal insert and withdraw pressure. Isolating the control rod from scram and normal insert and withdraw pressure prevents damage to the CRDM. The control rod should be isolated from scram and normal insert and withdraw pressure, while maintaining cooling water to the CRD.
Monitoring of the insertion capability of each withdrawn control rod must also be performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from discovery of Condition A concurrent with THERMAL POWER greater than the low power setpoint (LPSP) of the RWM. SR 3.1.3.3 performs periodic tests of the control ro i se ion capability of withdrawn control rods. Testing each withdrawn control rod ensures that a generic problem does not exist. This Completion Time also allows for an exception to the normal "time zero" for beginning the allowed outage time "clock". The Required Action A.3 Completion Time only begins upon discovery of Condition A concurrent with THERMAL POWER greater than the actual LPSP of the RWM since the notch insertions may not be compatible with the requirements of rod pattern control (LCO 3.1.6) and the RWM (LCO 3.3.2.1). The allowed Completion Time provides a reasonable time to test the control rods, considering the potential for a need to reduce power to perform the tests.
To allow continued operation with a withdrawn control.rod stuck, an evaluation of adequate SDM is also required within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Should a DBA or transient require a shutdown, to preserve the single failure criterion, an additional control rod would have to be assumed to fail to insert when required. Therefore, the original SDM demonstration may not be valid. The SDM must therefore be evaluated (by rneasurement or analysis) with the stuck control rod at its stuck position and the highest worth OPERABLE control rod assumed to be fully withdrawn.
(continued)
Cooper B 3.1-16 , June 10, 1999 1
Control Rod OPERABILITY
-. B 3.1.3 BASES ACTIONS E.1 (continued) active function (i.e., scram) of the control rods. The number of control rods permitted to be inoperable when operating above 10% RTP (e.g., no CRDA considerations) could be more than the value specified, but the occurrence of a large number of inoperable control rods could be indicative of a generic problem, and investigation and resolution of the potential problem should be undertaken. The allowed Completion Time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is reasonable, based on operating experience, to reach MODE 3 from full power in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.1.3.1 REQUIREMENTS The position of each control rod must be determined to ensure adequate information on control rod position is available to the operator for determining control rod OPERABILITY and controlling rod patterns. Control rod position may be determined by the use of OPERABLE position indicators, by moving control rods to a position with an OPERABLE indicator, or by the use of other appropriate methods. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Frequency of this SR is based on operating experience related to expected changes in control rod position and the availability of control rod position indications in the control room Z _ n *.2 -
J._.i..? SR 3.1.3.3 Control rod insertion capability is demonstrated by inserting each partially or fully withdrawn control rod at least one notch and observing that the control rod moves.
The control rod may then be returned to its original position. This ensures the control rod is not stuck and is Thi free to insert on a scram signal.
- S-urveillancef &r4i-G not required when THERMAL POWER is -ess-han or equal to the actual LPSP of the RWM, since the notch insertions may not be compatible with the requirements of the Banked Position Withdrawal Sequence BPWS LCO 3.1.6 and the RWM SR 3.1.3.)is base (counedof onprt x erltd- h changes *CRD / I (continued)
Cooper B 3.1-19 Revision 0
Control Rod OPERABILITY B 3.1.3 BASES SURVEILLANCE §I7IISR SR 3.1.3.3 (continued)
REQUIREMENTS L rods are tested at a 31 day Frequency, based on the potential power reduction required to allow the control rod movemen.and cons i rn ng S-9-,,*032 . [Furthermorei the 31 day r-equ-ency takes- into*
account operating experi.ence related to changes in CRD performance. At any time, if a control rod is immovable, a determination of that control rod's capability of insertion by scram (OPERABILITY) must be made and appropriate action taken.
ThW SRsa modified byVNote-. that allows$
31 days ' after withdrawal of the control rod and increasing power to above the LPSP, to perform the Surveillance. This acknowledges that the control rod must be first withdrawn and THERMAL POWER must be increased to above the LPSP before performance of the Surveillance, and therefore the Notes avoid potential conflicts with SR 3.0.3 and SR 3.0.4.
SR 3.1.3.4 Verifying that the scram time for each control rod to notch position 06 is < 7 seconds provides reasonable assurance that the controT rod will insert when required during a DBA or transient, thereby completing its shutdown. function.
This SR is performed in conjunction with the control rod scram time testing of SR 3.1.4.1, SR 3.1.4.2, SR 3.1.4.3, and SR 3.1.4.4. The LOGIC SYSTEM FUNCTIONAL TEST in LCO 3.3.1.1, "Reactor Protection System (RPS)
Instrumentation," and the functional testing of SDV vent and drain valve.s in LCO 3.1.8, "Scram Discharge Volume (SDV)
Vent and Drain Valves," overlap this Surveillance to provide complete testing of the assumed safety function. The associated Frequencies are acceptable, considering the more frequent testing performed to demonstrate other aspects of control rod OPERABILITY and operating experience, which shows scram times do not significantly change over an operating cycle.
(continued)
Cooper B 3.1-20 Revision 0
4 ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS© ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS©4 Correspondence Number: NLS2009034 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITMENT COMMITTED DATE COMMITMENT NUMBER OR OUTAGE Nebraska Public Power District will establish the Technical Specification Bases changes for TS Implementation of B3.1.3 consistent with those shown in TSTF-475-A, NLS2009034-01 License Amendment Revision 1, "Control Rod Notch Testing Frequency and SRM Insert Control Rod Action", with the variations noted.
4.- 4
- 4. 4
- 4. 4
- 4. 4
-4.- I 1~- I PROCEDURE 0.42 REVISION 23 PAGE 18 OF 26