Technical Specifications, Changes to TS Leakage Limit for the Main Stream Isolation Valves
ML061230469
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/02/2006
From:
Plant Licensing Branch III-2
To:
Benney B, NRR/DLPM, 415-3764
Shared Package
ML061230223 List:
References
TAC MC9517
Download: ML061230469 (1)


Text

PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.1.3.6 Verify the isolation time of each MSIV is In accordance

> 3 seconds and < 5 seconds.

with the Inservice Testing Program SR 3.6.1.3.7 Verify each automatic PCIV actuates to the 18 months isolation position on an actual or simulated isolation signal.

SR 3.6.1.3.8 Verify a representative sample of reactor 18 months instrumentation line EFCVs actuate to the isolation position on an actual or simulated instrument line break.

SR 3.6.1.3.9 Remove and test the explosive squib from each 18 months on a shear isolation valve of the TIP System.

STAGGERED TEST BASIS SR 3.6.1.3.10 Verify combined main steam line leakage rate is In accordance

< 46 scfh when tested at > 29 psig.

with the Primary Containment Leakage Rate Testing Program (continued)

I Cooper 3.6-14 Amendment No.

220