Letter Sequence Other |
---|
TAC:MC8566, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) |
|
MONTHYEARML0602002922006-01-16016 January 2006 Cooper Nuclear Station - Revised and Supplemental Pages to License Amendment Request for Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences Project stage: Supplement ML0604605382006-02-0909 February 2006 Request for Additional Information Alternate Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences Project stage: RAI NLS2006017, Response to Request for Additional Information Fuel Handling Accident-Alternative Source Term Amendment2006-04-0707 April 2006 Response to Request for Additional Information Fuel Handling Accident-Alternative Source Term Amendment Project stage: Response to RAI ML0622602392006-09-0505 September 2006 License Amendment, Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences and Related Technical Specification Changes, MC8566 Project stage: Acceptance Review ML0624900372006-09-0505 September 2006 Technical Specifications, Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences and Related Technical Specification Changes, MC8566 Project stage: Other ML0626202992006-09-28028 September 2006 Correction to Safety Evaluation Re Amendment No. 222 Project stage: Approval 2006-04-07
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2021041, Request for Exception from Leak Testing Requirement of the Primary Containment Leakage Rate Testing Program2021-07-20020 July 2021 Request for Exception from Leak Testing Requirement of the Primary Containment Leakage Rate Testing Program ML20314A2352020-12-0202 December 2020 Issuance of Amendment No. 268 Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, Using the Consolidated Line Item Improvement Process ML19238A0072019-10-30030 October 2019 Issuance of Amendment No. 263 Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML18218A4832018-09-0606 September 2018 Issuance of Amendment No. 261 Safety Limit Minimum Critical Power Ratio ML18137A2102018-05-10010 May 2018 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio NLS2016010, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2016-03-22022 March 2016 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML15343A3012016-01-22022 January 2016 Issuance of Amendment No. 253 to Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML16021A3222016-01-12012 January 2016 Correction to License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML15216A2592015-08-27027 August 2015 Issuance of Amendment No. 252, Revise Technical Specification 3.5.2, ECCS - Shutdown, to Delete Condensate Storage Tank as Alternate Source of Makeup Water ML15168A1712015-07-14014 July 2015 Issuance of Amendment No. 251, Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications ML15135A0052015-05-29029 May 2015 Issuance of Amendment No. 250, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-413, Elimination of Requirements for a Post Accident Sampling System (PASS) NLS2014087, License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function2015-01-15015 January 2015 License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML14055A0232014-04-29029 April 2014 Issuance of Amendment No. 248, Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML13191A1052013-09-12012 September 2013 Issuance of Amendment No. 247, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report ML13085A0962013-03-29029 March 2013 Corrected Technical Specification (TS) and Safety Evaluation Pages for Amendment No. 245, Revise TS 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML12157A2062012-05-30030 May 2012 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio ML1136302582012-01-31031 January 2012 Issuance of Amendment No. 240, Revise Technical Specification 3.4.3, Safety/Relief Valves (Srvs) and Safety Valves (Svs), to Reduce Number of Required SRVs for Overpressure Protection NLS2011086, Supplement to License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves2011-10-0606 October 2011 Supplement to License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves NLS2011071, License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a2011-09-16016 September 2011 License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a ML1101002912011-01-0505 January 2011 Cooper - License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves NLS2009034, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2009-06-0202 June 2009 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process ML0906207232009-02-26026 February 2009 Corrected Technical Specification Pages Regarding Reactor Equipment Cooling System Margin Amendment ML0815402852008-06-30030 June 2008 Technical Specifications, Measurement Uncertainty Recapture Power Uprate ML0812202892008-05-12012 May 2008 Technical Specification Pages for Issuance of Amendment No. 230 Control Room Habitability, TSTF-448 NLS2008046, Response to Request for Additional Information for License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate2008-05-0909 May 2008 Response to Request for Additional Information for License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate NLS2007079, Corrected Technical Specification Pages2007-11-0505 November 2007 Corrected Technical Specification Pages NLS2007048, License Amendment Request for a One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve2007-08-16016 August 2007 License Amendment Request for a One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve ML0630405382006-10-31031 October 2006 Tech Spec Pages for Amendment 226 Regarding MSIV Leakage Exemption from 10 CFR Part 50, Appendix J ML0629602942006-10-23023 October 2006 Technical Specification, Revised Limiting Condition for Operation (LCO) 3.10.1, Scram Time Testing Activities ML0627700902006-10-0303 October 2006 Technical Specification Pgs Amd #224 - Issuance of Amendment Additional Extension of Appendix J, Type a Integrated Leakage Rate Test Interval ML0625003012006-09-0606 September 2006 Technical Specifications, Technical Specification (TS) Changes Associated with Inservice Testing Program, Section 5.5.6, Under TS Programs and Manuals, MD0335 ML0624900372006-09-0505 September 2006 Technical Specifications, Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences and Related Technical Specification Changes, MC8566 NLS2006042, License Amendment Request for Revision of Technical Specification 3.10.1, Inservice Leak and Hydrostatic Testing Operation2006-06-16016 June 2006 License Amendment Request for Revision of Technical Specification 3.10.1, Inservice Leak and Hydrostatic Testing Operation ML0612403772006-05-0303 May 2006 Correction to Amendment No. 218, Technical Specification Page 3.1-12 ML0612304692006-05-0202 May 2006 Technical Specifications, Changes to TS Leakage Limit for the Main Stream Isolation Valves ML0611802442006-04-27027 April 2006 Technical Specifications, Revised Pressure Vessel Fluence and Pressure Temp Curve Applicability to 30 Effective Full-Power Years of Operation ML0611001622006-04-18018 April 2006 Corrected Technical Specification Page 3.9-1 Re Refueling Operations NLS2006039, Corrected Technical Specification Page from Amendment No. 2182006-04-17017 April 2006 Corrected Technical Specification Page from Amendment No. 218 ML0609004412006-03-30030 March 2006 Technical Specification Pages, Change Request for Various Sections ML0628404572006-03-10010 March 2006 Tech Spec Pages for Amendment 217 Regarding Revise Technical Specifications Instrumentation Definitions NLS2006013, License Amendment Request to Update the American Society of Mechanical Engineers Code Referenced in TS Section 5.5.6, Inservice Testing Program2006-03-0707 March 2006 License Amendment Request to Update the American Society of Mechanical Engineers Code Referenced in TS Section 5.5.6, Inservice Testing Program NLS2006002, License Amendment Request for a One-Time Extension of Containment Integrated Leakage Rate Test Interval2006-01-30030 January 2006 License Amendment Request for a One-Time Extension of Containment Integrated Leakage Rate Test Interval NLS2006001, Application for TS Change to Add LCO 3.0.8 on Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2006-01-30030 January 2006 Application for TS Change to Add LCO 3.0.8 on Inoperability of Snubbers Using the Consolidated Line Item Improvement Process ML0602002922006-01-16016 January 2006 Cooper Nuclear Station - Revised and Supplemental Pages to License Amendment Request for Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences NLS2005102, License Amendment Request to Establish a Combined Main Steam Line Leakage Rate Technical Specification2005-12-30030 December 2005 License Amendment Request to Establish a Combined Main Steam Line Leakage Rate Technical Specification ML0601104792005-12-16016 December 2005 Corrected Technical Specification Pages Re Secondary Containment Isolation Instrumentation ML0535000852005-12-15015 December 2005 1 TS Page - Cooper Nuclear Station. Issuance of Amd. 214 Unit Staff Qualifications (Tac. MC7346) NLS2005051, Response to Request for Additional Information License Amendment Request to Revise the Required Channels Per Trip System for Primary & Secondary Containment Isolation and Control Room Emergency Filter System Instrumentation2005-08-0101 August 2005 Response to Request for Additional Information License Amendment Request to Revise the Required Channels Per Trip System for Primary & Secondary Containment Isolation and Control Room Emergency Filter System Instrumentation 2023-09-06
[Table view] |
Text
Secondary Containment Isolation Instrumentation 3.3.6.2 Table 3.3.6.2-1 (page 1 of 1)
Secondary Containment Isolation Instrumentation APPLICABLE MODES OR REQUIRED OTHER CHANNELS SPECIFIED PER SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS VALUE
- 1. Reaclor Vessel Water 1.2,3, 2 SR 3.3.6.2.1 ->- 42 inches Level - Low Low (Level 2) (a) SR 3.3.6.2.2 SR 3.3.6.2.3 SR 3.3.6.2.4
- 2. Drywv.Il Pressure - High 1,2.3 2 SR 3.3.6.2.2 < 1.84 psig SR 3.3.6.2.3 SR 3.3.6.2.4
- 3. Reactor Building Ventilation 1,2.3, 2 SR 3.3.6.2.1 <49mRfhr Exhaust Plenum (a),(b) SR. 3.3.6.2.2 Radiation - High SR 3.3.6.2.3 SR 3.3.6.2.4 (a) During operations with a potential for draining the reactor vessel.
(b) During movement of recently Irradiated fuel assemblies In secondary containment.
I Amendment 222_..3_5 3.3-57
CREF System Instrumentation 3.3.7.1 Table 3.3.7.1-1 (page I of 1)
Control Room Emergency Filter System Instrumentation APPLICABLE MODES OR REQUIRED OTHER CHANNELS SPECIFIED PER TRIP SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM REQUIREMENTS VALUE
- 1. Reactor Vessel Water 1.2,3, 2 SR 3.3.7.1.1 >-421nches L,3vel - Low Low (Level 2) (a) SR 3.3.7.1.2 SR 3.3.7.1.3 SR 3.3.7.1.4
- 2. Drywell Pressure - High 1,2.3 2 SR 3.3.7.1.2 < 1.84 pslg SR 3.3.7.1.3 SR 3.3.7.1.4
- 3. Reactor Building Ventilation 1.2.3. 2 SR 3.3.7.1.1 S 49 mRPhr Exhaust Plenum (a),(b) SR 3.3.7.1.2 Radiation - High SR 3.3.7.1.3 SR 3.3.7.1.4 (a) Duwing operations wIth a potential for draining the reactor vessel.
(b) Duitng movement of lately Irradiated fuel assemblies In the secondary containment I Cooper 3.3-63 Amendment 2 22
Secondary Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondary Containment LCO 3.6.4.1 The secondary containment shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Secondary containment A.1 Restore secondary 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Inoperable in MODE 1, 2, containment to or 3. OPERABLE status.
B. Required Action and B.1 Be In MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not AND met.
B.2 Be In MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> C. Secondary containment C.1 NOTE inoperable during LCO 3.0.3 Is not movement of recently irradiated fuel assemblies applicable. I in the secondary containment or during Suspend movement of Immediately OPDRVs. recently Irradiated fuel assemblies In the secondary containment.
'AND (continued)
Cooper 3.6-32 Amendment 2 2.2
Secondary Containment 3.6.4.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. (continued) C.2 Initiate action to suspend OPDRVs.
Immediately I SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1.1 Verify secondary containment vacuum is. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
> 0.25 inch of vacuum water gauge.
SR 3.6.4.1.2 Verify all secondary containment equipment 31 days hatches are closed and sealed.
SR 3.6.4.1.3 Verify one secondary containment access door in 31 days each access opening Is closed.
SR 3.6.4.1.4 Verify each SGT subsystem can maintain 18 months on a
> 0.25 inch of vacuum water gauge in the STAGGERED secondary containment for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at a flow rate TEST BASIS
<1780 cfm.
Cooper 3.6-33 Amendment 2 2_2
SCIVs 3.6.4.2 3.6 CONTAINMENT SYSTEMS 3.6.4.2 Secondary Containment Isolation Valves (SCIVs)
LCO 3.6.4.2 Each SCIV shall be OPERABLE.
APPLICABILITY: MODES 1. 2, and 3, During movement of recently irradiated fuel assemblies In the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
I ACTIONS NOTES
- 1. Penetration flow paths may be unisolated Intermittently under administrative controls.
- 2. Separate Condition entry is allowed for each penetration flow path.
- 3. Enter applicable Conditions and Required Actions for systems made Inoperable by SCIVs.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more penetration A.1 Isolate the affected 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> flow paths with one SCIV penetration flow path by inoperable, use of at least one dosed and de-activated automatic valve, dosed manual valve, or blind flange.
AND (continued)
Cooper 3.6-34 Amendment 222
SCIVs 3.6.4.2 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 -NOTE -
associated Completion LCO 3.0.3 is not Time of Condition A or B applicable.
not met during movement of recently irradiated fuel assemblies in the secondary containment or Suspend movement of recently Irradiated fuel Immediately I during OPDRVs. assemblies In the secondary containment.
AND D.2 Initiate action to suspend OPDRVs.
Immediately I
Cooper 3.6-36 Amendment No. 2 2.2
SGT System 3.6.4.3 3.6 CONTAINMENT SYSTEMS 3.6.4.3 Standby Gas Treatment (SGT) System LCO 3.6.4.3 Two SGT subsystems shall be OPERABLE.
APPLICABILITY: MODES 1,.2, and 3, During movement of recently irradiated fuel assemblies In the secondary containment, I During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One SGT subsystem A.1 Restore SGT subsystem 7 days Inoperable. to OPERABLE status.
B. Required Action and B.1 Be In MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not AND met In MODE 1, 2, or 3.
B.2 Be In MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> C. Required Action and - NOTE associated Completion LCO 3.0.3 is not applicable.
Time of Condition A not met during movement of recently Irradiated fuel assemblies In the C.1 Place OPERABLE SGT subsystem in operation.
Immediately I
secondary containment or during OPDRVs. OR (continued)
Cooper 3.6-38 Amendment No. 2 2.2
SGT System 3.6.4.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. (continued) C.2.1 Suspend movement of Immediately recently Irradiated fuel assemblies in secondary containment.
AND C.2.2 Initiate action to suspend OPDRVs.
Immediately 1 D. Two SGT subsystems D.1 Enter LCO 3.0.3 Immediately Inoperable In MODE I 2, or 3.
E. Two SGT subsystems E.1 - NOTE-Inoperable during LCO 3.0.3 Is not movement of recently Irradiated applicable.
I fuel assemblies In the secondary Suspend movement of Immediately I containment or recently irradiated fuel during OPDRVs. assemblies In secondary containment.
AND (continued)
Cooper 3.6-39 Amendment No. 222-
SGT System 3.6.4.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. (continued) E.2 Initiate action to Immediately suspend OPDRVs.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.3.1 Operate each SGT subsystem for 10 continuous 31 days hours with heaters operating.
SR 3.6.4.3.2 Perform required SGT filter testing in accordance In accordance with the Ventilation Filter Testing Program (VFTP). with the VFTP SR 3.6.4.3.3 Verify each SGT subsystem actuates on an actual 18 months or simulated initiation signal.
SR 3.6.4.3.4 Verify the SGT units cross tie damper is in the 18 months correct position, and each SGT room air supply check valve and SGT dilution air shutoff valve can be opened.
Amendment 2 22 3..2 3.6-40
CREF System 3.7.4 3.7 PLANT SYSTEMS 3.7.4 Control Room Emergency Filter (CREF) System LCO 3.7.4 The CREF System shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3, During movement of lately irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs).
I ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. CREF System inoperable. A.1 Restore CREF System to 7 days OPERABLE status.
B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not AND met in MODE 1, 2, or 3.
B.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)
Cooper 3.7-8 Amendment No. .2.2
CREF Systerm 3.7.4 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and -- NOTE.-O associated Completion LCO 3.0.3 is not applicable.
Time of Condition A not met during movement of lately irradiated fuel C.1 Suspend movement of lately Immediately assemblies In the irradiated fuel assemblies In secondary containment or the secondary containment.
during OPDRVs. AN..DD C.2 Initiate action to Immediately suspend OPDRVs.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.4.1 Operate the CREF System for> 15 minutes. 31 days (continued)
Cooper- 3.7-9 Amendment No. "7-e7, 2 2 2