Corrected Technical Specification Pages Regarding Reactor Equipment Cooling System Margin Amendment
ML090620723
Person / Time
Site: Cooper Entergy icon.png
Issue date: 02/26/2009
From: Minahan S
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC MD8374
Download: ML090620723 (7)


Text

N Nebraska Public Power District "Always there when you need us" 50.90 NLS2009013 February 26, 2009 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Corrected Technical Specification Pages Regarding Reactor Equipment Cooling System Margin Amendment (TAC No. MD8374)

Cooper Nuclear Station, Docket No. 50-298, DPR-46

Reference:

Letter from Stewart B. Minahan, Nebraska Public Power District, to the U.S.

Nuclear Regulatory Commission, dated March 24., 2008, "License Amendment Request to Revise Technical Specification 3.7.3, Reactor Equipment Cooling System"

Dear Sir or Madam:

The purpose of this letter is to submit to the Nuclear Regulatory Commission (NRC) corrected proposed Technical Specification (TS) pages for the Cooper Nuclear Station (CNS) Facility Operating License DPR-46. The letter referenced above submitted a license amendment request to revise CNS TS in accordance with the provisions of 10 CFR 50.4 and 10 CFR 50.90. The proposed amendment allows credit for the ability to align the Service Water System to the Reactor Equipment Cooling (REC) System in order to provide required cooling to the essential loads of the REC System during mitigation of the design basis loss-of-coolant accident.

As agreed between CNS and NRC, proposed Note 1 to Surveillance Requirement (SR) 3.7.3.1 is being clarified to say, "SR 3.0.1 is not applicable when both Service Water backup subsystems are OPERABLE." provides the proposed changes to the current CNS TS in marked up format. provides the final typed TS pages to be issued with the amendment. No regulatory commitments are made in this submittal.

The information submitted by this letter does not change the conclusions or the basis of the no significant hazards consideration evaluation or the environment impact evaluation provided with the reference above.

COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www nppd.com

NLS2009013 Page 2 of 2 By copy of this letter and its attachments, the appropriate State of Nebraska official is notified in accordance with 10 CFR 50.91 (b)(1). Copies are also being provided to the NRC Region IV office and the CNS Senior Resident Inspector in accordance with 10 CFR 50.4(b)(1).

Should you have any questions concerning this matter, please contact David Van Der Kamp, Licensing Manager, at (402) 825-2904.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on (Date)

Sincerely, tewa Minahan Vice President - Nuclear and Chief Nuclear Officer

/em Attachments cc: Regional Administrator w/attachments USNRC - Region IV Cooper Project Manager w/attachments USNRC - NRR Project Directorate IV-1 Senior Resident Inspector w/attachments USNRC - CNS Nebraska Health and Human Services w/attachments Department of Regulation and Licensure NPG Distribution w/o attachments CNS Records w/attachments

NLS2009013 Page 1 of 2 Attachment 1 Proposed Technical Specification Revisions (Markup)

Cooper Nuclear Station, Docket No. 50-298, DPR-46 Revised Technical Specification Pages 3.7-7

REC System 3.7.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3 Verify the REC-"urg tzr.k,-',cr limits.

-- cvcl is within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> I

SR 3.7.3.2 Verify the temperature of the REC supply water is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

< 100 0 F.

SR 3.7.3-3.......------------------ NOTE ----------------------------

Isolation of flow to individual components does not render REC System inoperable.

Verify each REC subsystem manual, power 31 days operated, and automatic valve in the flow paths servicing safety related cooling loads, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.7.3.4 Verify each REC subsystem actuates on an 18 months actual or simulated initiation signal.

2. REC system leakage beyond limits by itself) is only a degradation of the REC system and does not result in the REC system being inoperable.

meodwo-f tic, 3.7-7 4V+742--

NLS2009013 Page 1 of 2 Attachment 2 Proposed Technical Specification Revisions (Re-Typed)

Cooper Nuclear Station, Docket No. 50-298, DPR-46 Revised Technical Specification Pages 3.7-7

REC System 3.7.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 ------------------- NOTES--------------

1. SR 3.0.1 is not applicable when both Service Water backup subsystems are OPERABLE.
2. REC system leakage beyond limits by itself is only a degradation of the REC system and does not result in the REC system being inoperable.

Verify the REC system leakage is within limits. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SR 3.7.3.2 Verify the temperature of the REC supply water is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

< 1000 F.

SR 3.7.3.3 -------------------- NOTE---------------

Isolation of flow to individual components does not render REC System inoperable.

Verify each REC subsystem manual, power 31 days operated, and automatic valve in the flow paths servicing safety related cooling loads, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.7.3.4 Verify each REC subsystem actuates on an 18 months actual or simulated initiation signal.

Cooper 3.7-7 Amendment No.

4 ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS© ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS@4 Correspondence Number: NLS2009013 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITMENT COMMITTED DATE COMMITMENT NUMBER OR OUTAGE None 1- 4 1~ I

4. 4 4- 4
  • 1 I I I I I I PROCEDURE 0.42 REVISION 23 PAGE 18 OF 25