MONTHYEARML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A1122023-11-0909 November 2023 Project Manager Assignment ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22304A0052022-10-26026 October 2022 Surveillance Capsule Location (Re-insertion Into the Reactor Vessel) IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information IR 05000298/20224022022-09-29029 September 2022 NRC Security Inspection Report 05000298/2022402 (Full Report) IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) IR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 IR 05000298/20220022022-07-28028 July 2022 Integrated Inspection Report 05000298/2022002 ML22200A2772022-07-21021 July 2022 Correction to Proposed Inservice Testing Alternative RS-01, Revision of Error in Safety Evaluation ML22152A1232022-07-18018 July 2022 Issuance of Amendment No. 271 Request for Exception from Certain Primary Containment Leak Rate Testing Requirements IR 05000298/20224012022-06-29029 June 2022 Security Baseline Inspection Report 05000298/2022401 IR 05000298/20224032022-06-28028 June 2022 Security Baseline Inspection Report 05000298/2022403 IR 05000298/20220102022-06-16016 June 2022 Triennial Fire Protection Inspection Report 05000298/2022010 ML22140A1612022-06-0808 June 2022 Proposed Inservice Inspection Alternative RR5-01 Revision 1 ML22147A1122022-06-0101 June 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022301 ML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 IR 05000298/20220012022-04-28028 April 2022 Integrated Inspection Report 05000298/2022001 IR 05000298/20224042022-04-13013 April 2022 Material Control and Accounting Program Inspection Report 05000298/2022404 - (Public) ML22084A6032022-04-0404 April 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection 05000298/2022002 and Request for Information ML22090A2892022-04-0101 April 2022 John Larson'S Invitation to Participate in the 8th Nuclear Regulatory Commission'S Workshop on Vendor Oversight ML22045A0012022-03-31031 March 2022 Proposed Inservice Inspection Alternative RI5- 02 Revision 3 IR 05000298/20210062022-03-0202 March 2022 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) IR 05000298/20210042022-01-24024 January 2022 Integrated Inspection Report 05000298/2021004 ML21350A0582021-12-21021 December 2021 Withdrawal of an Amendment Request ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements 2024-01-03
[Table view] Category:Technical Specifications
MONTHYEARML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2021041, Request for Exception from Leak Testing Requirement of the Primary Containment Leakage Rate Testing Program2021-07-20020 July 2021 Request for Exception from Leak Testing Requirement of the Primary Containment Leakage Rate Testing Program ML20314A2352020-12-0202 December 2020 Issuance of Amendment No. 268 Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, Using the Consolidated Line Item Improvement Process ML19238A0072019-10-30030 October 2019 Issuance of Amendment No. 263 Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML18218A4832018-09-0606 September 2018 Issuance of Amendment No. 261 Safety Limit Minimum Critical Power Ratio ML18137A2102018-05-10010 May 2018 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio NLS2016010, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2016-03-22022 March 2016 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML15343A3012016-01-22022 January 2016 Issuance of Amendment No. 253 to Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML16021A3222016-01-12012 January 2016 Correction to License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML15216A2592015-08-27027 August 2015 Issuance of Amendment No. 252, Revise Technical Specification 3.5.2, ECCS - Shutdown, to Delete Condensate Storage Tank as Alternate Source of Makeup Water ML15168A1712015-07-14014 July 2015 Issuance of Amendment No. 251, Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications ML15135A0052015-05-29029 May 2015 Issuance of Amendment No. 250, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-413, Elimination of Requirements for a Post Accident Sampling System (PASS) NLS2014087, License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function2015-01-15015 January 2015 License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML14055A0232014-04-29029 April 2014 Issuance of Amendment No. 248, Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML13191A1052013-09-12012 September 2013 Issuance of Amendment No. 247, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report ML13085A0962013-03-29029 March 2013 Corrected Technical Specification (TS) and Safety Evaluation Pages for Amendment No. 245, Revise TS 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML12157A2062012-05-30030 May 2012 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio ML1136302582012-01-31031 January 2012 Issuance of Amendment No. 240, Revise Technical Specification 3.4.3, Safety/Relief Valves (Srvs) and Safety Valves (Svs), to Reduce Number of Required SRVs for Overpressure Protection NLS2011086, Supplement to License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves2011-10-0606 October 2011 Supplement to License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves NLS2011071, License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a2011-09-16016 September 2011 License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a ML1101002912011-01-0505 January 2011 Cooper - License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves NLS2009034, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2009-06-0202 June 2009 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process ML0906207232009-02-26026 February 2009 Corrected Technical Specification Pages Regarding Reactor Equipment Cooling System Margin Amendment ML0815402852008-06-30030 June 2008 Technical Specifications, Measurement Uncertainty Recapture Power Uprate ML0812202892008-05-12012 May 2008 Technical Specification Pages for Issuance of Amendment No. 230 Control Room Habitability, TSTF-448 NLS2008046, Response to Request for Additional Information for License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate2008-05-0909 May 2008 Response to Request for Additional Information for License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate NLS2007079, Corrected Technical Specification Pages2007-11-0505 November 2007 Corrected Technical Specification Pages NLS2007048, License Amendment Request for a One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve2007-08-16016 August 2007 License Amendment Request for a One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve ML0630405382006-10-31031 October 2006 Tech Spec Pages for Amendment 226 Regarding MSIV Leakage Exemption from 10 CFR Part 50, Appendix J ML0629602942006-10-23023 October 2006 Technical Specification, Revised Limiting Condition for Operation (LCO) 3.10.1, Scram Time Testing Activities ML0627700902006-10-0303 October 2006 Technical Specification Pgs Amd #224 - Issuance of Amendment Additional Extension of Appendix J, Type a Integrated Leakage Rate Test Interval ML0625003012006-09-0606 September 2006 Technical Specifications, Technical Specification (TS) Changes Associated with Inservice Testing Program, Section 5.5.6, Under TS Programs and Manuals, MD0335 ML0624900372006-09-0505 September 2006 Technical Specifications, Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences and Related Technical Specification Changes, MC8566 NLS2006042, License Amendment Request for Revision of Technical Specification 3.10.1, Inservice Leak and Hydrostatic Testing Operation2006-06-16016 June 2006 License Amendment Request for Revision of Technical Specification 3.10.1, Inservice Leak and Hydrostatic Testing Operation ML0612403772006-05-0303 May 2006 Correction to Amendment No. 218, Technical Specification Page 3.1-12 ML0612304692006-05-0202 May 2006 Technical Specifications, Changes to TS Leakage Limit for the Main Stream Isolation Valves ML0611802442006-04-27027 April 2006 Technical Specifications, Revised Pressure Vessel Fluence and Pressure Temp Curve Applicability to 30 Effective Full-Power Years of Operation ML0611001622006-04-18018 April 2006 Corrected Technical Specification Page 3.9-1 Re Refueling Operations NLS2006039, Corrected Technical Specification Page from Amendment No. 2182006-04-17017 April 2006 Corrected Technical Specification Page from Amendment No. 218 ML0609004412006-03-30030 March 2006 Technical Specification Pages, Change Request for Various Sections ML0628404572006-03-10010 March 2006 Tech Spec Pages for Amendment 217 Regarding Revise Technical Specifications Instrumentation Definitions NLS2006013, License Amendment Request to Update the American Society of Mechanical Engineers Code Referenced in TS Section 5.5.6, Inservice Testing Program2006-03-0707 March 2006 License Amendment Request to Update the American Society of Mechanical Engineers Code Referenced in TS Section 5.5.6, Inservice Testing Program NLS2006002, License Amendment Request for a One-Time Extension of Containment Integrated Leakage Rate Test Interval2006-01-30030 January 2006 License Amendment Request for a One-Time Extension of Containment Integrated Leakage Rate Test Interval NLS2006001, Application for TS Change to Add LCO 3.0.8 on Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2006-01-30030 January 2006 Application for TS Change to Add LCO 3.0.8 on Inoperability of Snubbers Using the Consolidated Line Item Improvement Process ML0602002922006-01-16016 January 2006 Cooper Nuclear Station - Revised and Supplemental Pages to License Amendment Request for Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences NLS2005102, License Amendment Request to Establish a Combined Main Steam Line Leakage Rate Technical Specification2005-12-30030 December 2005 License Amendment Request to Establish a Combined Main Steam Line Leakage Rate Technical Specification ML0601104792005-12-16016 December 2005 Corrected Technical Specification Pages Re Secondary Containment Isolation Instrumentation ML0535000852005-12-15015 December 2005 1 TS Page - Cooper Nuclear Station. Issuance of Amd. 214 Unit Staff Qualifications (Tac. MC7346) NLS2005051, Response to Request for Additional Information License Amendment Request to Revise the Required Channels Per Trip System for Primary & Secondary Containment Isolation and Control Room Emergency Filter System Instrumentation2005-08-0101 August 2005 Response to Request for Additional Information License Amendment Request to Revise the Required Channels Per Trip System for Primary & Secondary Containment Isolation and Control Room Emergency Filter System Instrumentation 2023-09-06
[Table view] |
Text
N Nebraska Public Power District "Always there when you need us" 50.90 NLS2009013 February 26, 2009 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Corrected Technical Specification Pages Regarding Reactor Equipment Cooling System Margin Amendment (TAC No. MD8374)
Cooper Nuclear Station, Docket No. 50-298, DPR-46
Reference:
Letter from Stewart B. Minahan, Nebraska Public Power District, to the U.S.
Nuclear Regulatory Commission, dated March 24., 2008, "License Amendment Request to Revise Technical Specification 3.7.3, Reactor Equipment Cooling System"
Dear Sir or Madam:
The purpose of this letter is to submit to the Nuclear Regulatory Commission (NRC) corrected proposed Technical Specification (TS) pages for the Cooper Nuclear Station (CNS) Facility Operating License DPR-46. The letter referenced above submitted a license amendment request to revise CNS TS in accordance with the provisions of 10 CFR 50.4 and 10 CFR 50.90. The proposed amendment allows credit for the ability to align the Service Water System to the Reactor Equipment Cooling (REC) System in order to provide required cooling to the essential loads of the REC System during mitigation of the design basis loss-of-coolant accident.
As agreed between CNS and NRC, proposed Note 1 to Surveillance Requirement (SR) 3.7.3.1 is being clarified to say, "SR 3.0.1 is not applicable when both Service Water backup subsystems are OPERABLE." provides the proposed changes to the current CNS TS in marked up format. provides the final typed TS pages to be issued with the amendment. No regulatory commitments are made in this submittal.
The information submitted by this letter does not change the conclusions or the basis of the no significant hazards consideration evaluation or the environment impact evaluation provided with the reference above.
COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www nppd.com
NLS2009013 Page 2 of 2 By copy of this letter and its attachments, the appropriate State of Nebraska official is notified in accordance with 10 CFR 50.91 (b)(1). Copies are also being provided to the NRC Region IV office and the CNS Senior Resident Inspector in accordance with 10 CFR 50.4(b)(1).
Should you have any questions concerning this matter, please contact David Van Der Kamp, Licensing Manager, at (402) 825-2904.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on (Date)
Sincerely, tewa Minahan Vice President - Nuclear and Chief Nuclear Officer
/em Attachments cc: Regional Administrator w/attachments USNRC - Region IV Cooper Project Manager w/attachments USNRC - NRR Project Directorate IV-1 Senior Resident Inspector w/attachments USNRC - CNS Nebraska Health and Human Services w/attachments Department of Regulation and Licensure NPG Distribution w/o attachments CNS Records w/attachments
NLS2009013 Page 1 of 2 Attachment 1 Proposed Technical Specification Revisions (Markup)
Cooper Nuclear Station, Docket No. 50-298, DPR-46 Revised Technical Specification Pages 3.7-7
REC System 3.7.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3 Verify the REC-"urg tzr.k,-',cr limits.
-- cvcl is within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> I
SR 3.7.3.2 Verify the temperature of the REC supply water is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
< 100 0 F.
SR 3.7.3-3.......------------------ NOTE ----------------------------
Isolation of flow to individual components does not render REC System inoperable.
Verify each REC subsystem manual, power 31 days operated, and automatic valve in the flow paths servicing safety related cooling loads, that is not locked, sealed, or otherwise secured in position, is in the correct position.
SR 3.7.3.4 Verify each REC subsystem actuates on an 18 months actual or simulated initiation signal.
- 2. REC system leakage beyond limits by itself) is only a degradation of the REC system and does not result in the REC system being inoperable.
meodwo-f tic, 3.7-7 4V+742--
NLS2009013 Page 1 of 2 Attachment 2 Proposed Technical Specification Revisions (Re-Typed)
Cooper Nuclear Station, Docket No. 50-298, DPR-46 Revised Technical Specification Pages 3.7-7
REC System 3.7.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 ------------------- NOTES--------------
- 1. SR 3.0.1 is not applicable when both Service Water backup subsystems are OPERABLE.
- 2. REC system leakage beyond limits by itself is only a degradation of the REC system and does not result in the REC system being inoperable.
Verify the REC system leakage is within limits. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SR 3.7.3.2 Verify the temperature of the REC supply water is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
< 1000 F.
SR 3.7.3.3 -------------------- NOTE---------------
Isolation of flow to individual components does not render REC System inoperable.
Verify each REC subsystem manual, power 31 days operated, and automatic valve in the flow paths servicing safety related cooling loads, that is not locked, sealed, or otherwise secured in position, is in the correct position.
SR 3.7.3.4 Verify each REC subsystem actuates on an 18 months actual or simulated initiation signal.
Cooper 3.7-7 Amendment No.
4 ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS© ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS@4 Correspondence Number: NLS2009013 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITMENT COMMITTED DATE COMMITMENT NUMBER OR OUTAGE None 1- 4 1~ I
- 4. 4 4- 4
- 1 I I I I I I PROCEDURE 0.42 REVISION 23 PAGE 18 OF 25