Category:Letter
MONTHYEARML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A1122023-11-0909 November 2023 Project Manager Assignment ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22304A0052022-10-26026 October 2022 Surveillance Capsule Location (Re-insertion Into the Reactor Vessel) IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information IR 05000298/20224022022-09-29029 September 2022 NRC Security Inspection Report 05000298/2022402 (Full Report) IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) IR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 IR 05000298/20220022022-07-28028 July 2022 Integrated Inspection Report 05000298/2022002 ML22200A2772022-07-21021 July 2022 Correction to Proposed Inservice Testing Alternative RS-01, Revision of Error in Safety Evaluation ML22152A1232022-07-18018 July 2022 Issuance of Amendment No. 271 Request for Exception from Certain Primary Containment Leak Rate Testing Requirements IR 05000298/20224012022-06-29029 June 2022 Security Baseline Inspection Report 05000298/2022401 IR 05000298/20224032022-06-28028 June 2022 Security Baseline Inspection Report 05000298/2022403 IR 05000298/20220102022-06-16016 June 2022 Triennial Fire Protection Inspection Report 05000298/2022010 ML22140A1612022-06-0808 June 2022 Proposed Inservice Inspection Alternative RR5-01 Revision 1 ML22147A1122022-06-0101 June 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022301 ML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 IR 05000298/20220012022-04-28028 April 2022 Integrated Inspection Report 05000298/2022001 IR 05000298/20224042022-04-13013 April 2022 Material Control and Accounting Program Inspection Report 05000298/2022404 - (Public) ML22084A6032022-04-0404 April 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection 05000298/2022002 and Request for Information ML22090A2892022-04-0101 April 2022 John Larson'S Invitation to Participate in the 8th Nuclear Regulatory Commission'S Workshop on Vendor Oversight ML22045A0012022-03-31031 March 2022 Proposed Inservice Inspection Alternative RI5- 02 Revision 3 IR 05000298/20210062022-03-0202 March 2022 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) IR 05000298/20210042022-01-24024 January 2022 Integrated Inspection Report 05000298/2021004 ML21350A0582021-12-21021 December 2021 Withdrawal of an Amendment Request ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements 2024-01-03
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21040A3002021-03-29029 March 2021 Issuance of Amendment No. 269 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML20314A2352020-12-0202 December 2020 Issuance of Amendment No. 268 Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, Using the Consolidated Line Item Improvement Process ML20282A1762020-10-22022 October 2020 Issuance of Amendment No. 267 Regarding Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules ML20212J1762020-08-24024 August 2020 Temporary Exemption from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Section VI (EPID L 2020-LLE-0110 (Covid 19)) ML19352G1942020-01-28028 January 2020 Issuance of Amendment No. 264 Elimination of Technical Specification Requirements for Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process ML19238A0072019-10-30030 October 2019 Issuance of Amendment No. 263 Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML18348B1032019-02-21021 February 2019 Issuance of Amendment No. 262 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML18218A4832018-09-0606 September 2018 Issuance of Amendment No. 261 Safety Limit Minimum Critical Power Ratio ML18186A5492018-08-0101 August 2018 Issuance of Amendment No.260 Revision to Technical Specifications to Adopt (TSTF) Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MG0138; EPID L-2017-LLA-0290) ML17144A0822017-06-20020 June 2017 Issuance of Amendment No. 259 Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17061A0502017-03-31031 March 2017 Issuance of Amendment No. 258 Adoption of TSTF-425, Revision 3, ML16272A1372016-10-17017 October 2016 Issuance of Amendment No. 257 Revision of Technical Specifications - Safety Limit Minimum Critical Power Ratio ML16146A7492016-07-25025 July 2016 Issuance of Amendment No. 255 Replacement of Technical Specification Figure 4.1-1 with Text ML16119A4332016-07-25025 July 2016 Issuance of Amendment No. 254 Adoption of Technical Specification Task Force Change Traveler TSFT-535, Revision 0 ML16158A0222016-07-25025 July 2016 Issuance of Amendment No. 256 to Relocate the Pressure-Temperature Curves to a Pressure-Temperature Limits Report ML15343A3012016-01-22022 January 2016 Issuance of Amendment No. 253 to Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML15216A2592015-08-27027 August 2015 Issuance of Amendment No. 252, Revise Technical Specification 3.5.2, ECCS - Shutdown, to Delete Condensate Storage Tank as Alternate Source of Makeup Water ML15168A1712015-07-14014 July 2015 Issuance of Amendment No. 251, Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications ML15135A0052015-05-29029 May 2015 Issuance of Amendment No. 250, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-413, Elimination of Requirements for a Post Accident Sampling System (PASS) ML14323A6442014-12-12012 December 2014 Issuance of Amendment No. 249, Request to Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14055A0232014-04-29029 April 2014 Issuance of Amendment No. 248, Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML13191A1052013-09-12012 September 2013 Issuance of Amendment No. 247, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report ML13148A2252013-06-26026 June 2013 Issuance of Amendment No. 246, Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML13032A5262013-02-22022 February 2013 Issuance of Amendment No. 245, Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML12341A1112012-12-31031 December 2012 Correction to Safety Evaluation Pages Issued with Amendment No. 243 Dated 11/9/2012, Revise TS 2.0, Safety Limits, to Revise Safety Limit Minimum Critical Power Ratio Values of a Cycle-Specific Calculation ML12318A1602012-12-13013 December 2012 Issuance of Amendment No. 244, Revise Physical Protection License Condition Related to Cyber Security Plan Implementation Schedule Milestone 6 ML12299A0922012-11-0909 November 2012 Issuance of Amendment No. 243, Revise Technical Specification 2.0, Safety Limits, to Revise Safety Limit Minimum Critical Power Ratio Values of a Cycle-Specific Calculation ML12251A0982012-09-28028 September 2012 Issuance of Amendment No. 242, Revise Technical Specifications to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4, Option a ML1201302052012-02-16016 February 2012 Issuance of Amendment No. 241, Editorial Changes to Several Technical Specifications (Tss) and Revise TS 5.5.6 to Remove Expired One-Time Exception to 5-Year Test Frequency for a Safety Valve ML1136302582012-01-31031 January 2012 Issuance of Amendment No. 240, Revise Technical Specification 3.4.3, Safety/Relief Valves (Srvs) and Safety Valves (Svs), to Reduce Number of Required SRVs for Overpressure Protection ML1128502652011-10-28028 October 2011 Issuance of Amendment No. 239, Correction of Non-Conservative Values in Battery Terminal Voltage and Specific Gravity Values in Technical Specification Surveillance Requirements ML1118010812011-07-27027 July 2011 License Amendment, Issuance of Amendment No. 238, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1103401602011-02-28028 February 2011 License Amendment, Issuance of Amendment 237, Revising Technical Specification Surveillance Requirement 3.8.1.9, Diesel Generator Load Test, in TS Section 3.8.1 to Correct Non-Conservative Power Factor Value ML0815402802008-06-30030 June 2008 Issuance of Amendment Measurement Uncertainty Recapture Power Uprate ML0814200582008-06-10010 June 2008 Correction to Amendment No. 230 Control Room Envelope Habitability License Pages 4 & 5 and SE Pages 3, 4, 8, and 9 ML0812202812008-05-12012 May 2008 Issuance of Amendment No. 230 Control Room Habitability, TSTF-448 ML0730600362007-12-0404 December 2007 Issuance of Amendment No. 228, Revise TS 5.5.6, Inservice Testing Program, to Allow a One-Time Extension of the 5-yr Frequency Requirement for Setpoint Testing of Safety Valve MS-RV-70ARV ML0721300232007-09-0606 September 2007 License Amendment, Issuance of Amendment No. 227 Onsite Spent Fuel Storage Expansion ML0721800082007-08-0909 August 2007 Revised Pages of Facility Operating License No. DPR-46 ML0625400892006-10-31031 October 2006 Issuance of Amendment 226 MSIV Leakage Exemption from 10 CFR 50, Appendix J ML0625400242006-10-0303 October 2006 Issuance of Amendment Additional Extension of Appendix J, Type a Integrated Leakage Rate Test Interval ML0614400492006-09-0606 September 2006 License Amendment, Technical Specification (TS) Changes Associated with Inservice Testing Program, Section 5.5.6, Under TS Programs and Manuals, MD0335 ML0622602392006-09-0505 September 2006 License Amendment, Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences and Related Technical Specification Changes, MC8566 ML0612300512006-05-0303 May 2006 Correction to Amendment No. 218 ML0606700422006-05-0202 May 2006 Issuance of License Amendment Inoperability of Snubbers ML0606901692006-05-0202 May 2006 License Amendment, Changes to TS Leakage Limit for the Main Stream Isolation Valves ML0608103392006-04-27027 April 2006 License Amendment, Revised Pressure Vessel Fluence and Pressure Temperature Curve Applicability to 30 Effective Full-Power Years of Operation 2024-01-03
[Table view] Category:Safety Evaluation
MONTHYEARML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML22200A2772022-07-21021 July 2022 Correction to Proposed Inservice Testing Alternative RS-01, Revision of Error in Safety Evaluation ML22152A1232022-07-18018 July 2022 Issuance of Amendment No. 271 Request for Exception from Certain Primary Containment Leak Rate Testing Requirements ML22140A1612022-06-0808 June 2022 Proposed Inservice Inspection Alternative RR5-01 Revision 1 ML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 ML22045A0012022-03-31031 March 2022 Proposed Inservice Inspection Alternative RI5- 02 Revision 3 ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements ML21040A3002021-03-29029 March 2021 Issuance of Amendment No. 269 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML20314A2352020-12-0202 December 2020 Issuance of Amendment No. 268 Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, Using the Consolidated Line Item Improvement Process ML20282A1762020-10-22022 October 2020 Issuance of Amendment No. 267 Regarding Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules ML20255A2172020-09-15015 September 2020 Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML20077L3392020-03-19019 March 2020 Proposed Inservice Inspection Alternatives RP5-02 and RI5-02 ML19352G1942020-01-28028 January 2020 Issuance of Amendment No. 264 Elimination of Technical Specification Requirements for Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process ML19238A0072019-10-30030 October 2019 Issuance of Amendment No. 263 Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML19079A0702019-05-0707 May 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4384; EPID No. L-2014-JLD-0046) ML19092A1402019-04-29029 April 2019 Proposed Inservice Inspection Alternative PR5-02 ML18348B1032019-02-21021 February 2019 Issuance of Amendment No. 262 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML18218A4832018-09-0606 September 2018 Issuance of Amendment No. 261 Safety Limit Minimum Critical Power Ratio ML18186A5492018-08-0101 August 2018 Issuance of Amendment No.260 Revision to Technical Specifications to Adopt (TSTF) Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MG0138; EPID L-2017-LLA-0290) ML18183A3252018-07-31031 July 2018 Requests for Relief Associated with - the Fifth 10-year Inservice Inspection Interval Program (CAC Nos. MG0175 Through MG0179; Epids L-2017-LLR-0062 Through L-2017-LLR-0066) ML18064A1022018-03-22022 March 2018 Request No. RI-21, Revision 1 - Request for Relief Concerning Examinations for the Fourth 10-Year Inservice Inspection Interval (CAC No. MF9623; EPID L-2017-LLR-0026) ML17226A0322017-09-20020 September 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17144A0822017-06-20020 June 2017 Issuance of Amendment No. 259 Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17061A0502017-03-31031 March 2017 Issuance of Amendment No. 258 Adoption of TSTF-425, Revision 3, ML16272A1372016-10-17017 October 2016 Issuance of Amendment No. 257 Revision of Technical Specifications - Safety Limit Minimum Critical Power Ratio ML16158A0222016-07-25025 July 2016 Issuance of Amendment No. 256 to Relocate the Pressure-Temperature Curves to a Pressure-Temperature Limits Report ML16146A7492016-07-25025 July 2016 Issuance of Amendment No. 255 Replacement of Technical Specification Figure 4.1-1 with Text ML16119A4332016-07-25025 July 2016 Issuance of Amendment No. 254 Adoption of Technical Specification Task Force Change Traveler TSFT-535, Revision 0 ML16048A3402016-02-24024 February 2016 Request for Inservice Inspection Program Alternative RP5-01 for Implementation of Code Case N-795 ML16042A3262016-02-24024 February 2016 Request for Relief RR5-01, Alternative Weld Overlay Repair for a Dissimilar Metal Weld Joining Nozzle to Control Rod Drive End Cap in Lieu of Specific ASME Boiler and Pressure Vessel Code Requirements ML16034A4792016-02-17017 February 2016 Request for Relief RI5-02, Alternative to Use Boiling Water Reactor Vessel and Internals Project Guidelines in Lieu of Specific ASME Code Requirements ML16034A3032016-02-12012 February 2016 Request for Relief RC3-01 for Alignment of Inservice Inspection and Containment Inservice Inspection (CAC No. MF6333 ML16014A1742016-02-12012 February 2016 Request for Relief RP-01 Through RP-09, RV-01 Through RV-05, and RG-01 Alternative to ASME OM Code Requirements for Inservice Testing for the Fifth Ten-Year Program Interval (CAC Nos. MF5911, MF5913, MF5914, MF5915, MF5916, Etc.) ML15343A3012016-01-22022 January 2016 Issuance of Amendment No. 253 to Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML15216A2592015-08-27027 August 2015 Issuance of Amendment No. 252, Revise Technical Specification 3.5.2, ECCS - Shutdown, to Delete Condensate Storage Tank as Alternate Source of Makeup Water ML15168A1712015-07-14014 July 2015 Issuance of Amendment No. 251, Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications ML15135A0052015-05-29029 May 2015 Issuance of Amendment No. 250, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-413, Elimination of Requirements for a Post Accident Sampling System (PASS) ML15134A2422015-05-20020 May 2015 Relief Request RI-08, Revision 0, Relief from Reactor Vessel Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections, for the Fourth 10-Year Inservice Inspection Interval ML14365A0932015-01-13013 January 2015 Correction to Safety Evaluation Dated December 12, 2014, Regarding Amendment No. 249, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14323A6442014-12-12012 December 2014 Issuance of Amendment No. 249, Request to Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14190A0042014-07-25025 July 2014 Redacted, Review of License Renewal Commitment Review Related to Core Plate Hold Down Bolt Inspection Plan and Analysis (TAC Nos. ME9550 and MF3557) ML14055A0232014-04-29029 April 2014 Issuance of Amendment No. 248, Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML13263A1532013-10-0707 October 2013 Correction to Amendment No. 247 Issued 9/12/13, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report ML13191A1052013-09-12012 September 2013 Issuance of Amendment No. 247, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report ML13148A2252013-06-26026 June 2013 Issuance of Amendment No. 246, Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML13143A3452013-06-0606 June 2013 Safety Assessment in Response to Information Request Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment ML13032A5262013-02-22022 February 2013 Issuance of Amendment No. 245, Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML12313A1112013-01-22022 January 2013 Relief Request RI-07 from ASME Code Requirements for Residual Heat Removal Shell Circumferential and Nozzle to Head Welds, Fourth 4th 10-Year Inservice Inspection Interval 2024-01-03
[Table view] |
Text
October 31, 2006 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P.O. Box 98 Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - ISSUANCE OF AMENDMENT RE: MSIV LEAKAGE EXEMPTION FROM 10 CFR PART 50, APPENDIX J (TAC NO.
MD0570)
Dear Mr. Edington:
The Commission has issued the enclosed Amendment No. 226 to Facility Operating License No. DPR-46 for the Cooper Nuclear Station. The amendment consists of changes to the Technical Specifications in response to your application dated March 15, 2006.
The amendment would revise Cooper Nuclear Station Technical Specification 5.5.12, "Primary Containment Leakage Rate Testing Program," by adding two sub-paragraphs to note exemptions from Section III.A and Section llI.B of Part 50, Appendix J, Option B of Title 10 of the Code of Federal Regulations. These two sub-paragraphs allow the leakage contribution from the four main steam line penetrations, referred to as the Main Steam Isolation Valve leakage, to be excluded.
A copy of our related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Brian Benney, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298
Enclosures:
- 1. Amendment No. 226 to DPR-46
- 2. Safety Evaluation cc w/encls: See next page
PKG ML062540127 (ML062540089, TS Pgs ML063040538)
OFFICE NRR/LPL4/PM NRR/LPL4/LA OGC-NLO NRR/SCVB/BC NRR/LPL4/BC NAME BBenney LFeizollahi BPoole RDennig DTerao DATE 10/11/06 9/27/06 10/25/06 8/30/06 10/26/06 NEBRASKA PUBLIC POWER DISTRICT DOCKET NO. 50-298 COOPER NUCLEAR STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 226 License No. DPR-46
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Nebraska Public Power District (the licensee),
dated March 15, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. DPR-46 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 226, are hereby incorporated in the license. The Nebraska Public Power District shall operate the facility in accordance with the Technical Specifications.
- 3. The license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: October 31, 2006
ATTACHMENT TO LICENSE AMENDMENT NO. 226 FACILITY OPERATING LICENSE NO. DPR-46 DOCKET NO. 50-298 Replace the following pages of the Appendix A Technical Specifications with the enclosed revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT 5.0-16 5.0-16 5.0-17 5.0-17
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 226 TO FACILITY OPERATING LICENSE NO. DPR-46 NEBRASKA PUBLIC POWER DISTRICT COOPER NUCLEAR STATION DOCKET NO. 50-298
1.0 INTRODUCTION
By letter dated March 15, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML060790435), the Nebraska Public Power District, the licensee for Cooper Nuclear Station (CNS), submitted a request for exemption from certain requirements of Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix J, Option B to allow the exclusion of main steam isolation valve (MSIV) leakage from the summation of containment leak rate test results and corresponding change to Technical Specifications (TS) 5.5.12, "Primary Containment Leakage Rate Testing Program." The proposed TS change adds two sub-paragraphs in TS 5.5.12 to note this exemption. The radiological consequences of main steam line leakage is modeled as a separate primary containment release path to the environment that bypasses secondary containment and its effects are specifically accounted for in the dose analysis.
In accordance with 10 CFR 50.12, the licensee has requested a permanent exemption for CNS from the requirements of 10 CFR Part 50, Appendix J, Option B,Section III.A and Section III.B.
The exemption from Section III.A would allow exclusion of the MSIV leakage from the overall integrated leakage rate measurement when performing a Type A test. The exemption from Section III.B would allow exclusion of the MSIV leakage from the combined leakage rate of the containment local leak rate tests (Types B and C).
The licensee indicated that this request for exemption is similar to exemptions granted for Vermont Yankee Nuclear Power Station on March 17, 2005, and Browns Ferry Nuclear Plant, Units 2 and 3, on March 14, 2000. However, it is different in that CNS is not requesting an increase in the allowable leakage rate criteria through the MSIVs.
2.0 REGULATORY EVALUATION
Section 50.54(o) of 10 CFR requires that primary reactor containments for water-cooled power reactors be subject to the requirements of Appendix J to 10 CFR Part 50. Appendix J specifies the leakage test requirements, schedules, and acceptance criteria for tests of the leak tight
integrity of the primary reactor containment and systems, and components which penetrate the containment. Option B,Section III.A requires, among other things, that the overall integrated leak rate must not exceed the allowable leakage (La) with margin, as specified in TSs. The overall integrated leak rate is defined in 10 CFR Part 50, Appendix J as "the total leakage rate through all tested leakage paths, including containment welds, valves, fittings, and components that penetrate the containment system." This includes the contribution from MSIV leakage.
The licensee has requested exemption from Option B,Section III.A requirements to permit exclusion of MSIV leakage from the overall integrated leak rate test measurement.
Option B,Section III.B of 10 CFR Part 50, Appendix J requires, among other things, that the sum of the leakage rates at accident pressure of Type B tests and pathway leakage rates from Type C tests be less than the performance criterion (La) with margin, as specified in the TS.
The licensee also requests an exemption from this requirement, to permit exclusion of the MSIV contribution to the sum of the Type B and Type C tests.
Pursuant to 10 CFR 50.12, the Commission may, upon application by any interested person or upon its own initiative, grant exemptions from the requirements of 10 CFR Part 50 when (1) the exemptions are authorized by law, will not present an undue risk to public health and safety, and are consistent with the common defense and security, and (2) when special circumstances are present. Special circumstances are present when, according to 10 CFR Part 50.12(a)(2):
(i) Application of the regulation in the particular circumstances conflicts with other rules or requirements of the Commission; or (ii) Application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule; or (iii) Compliance would result in undue hardship or other costs that are significantly in excess of those contemplated when the regulation was adopted, or that are significantly in excess of those incurred by others similarly situated; or (iv) The exemption would result in benefit to the public health and safety that compensates for any decrease in safety that may result from the grant of the exemption; or (v) The exemption would provide only temporary relief from the applicable regulation and the licensee or applicant has made good faith efforts to comply with the regulation; or (vi) There is present any other material circumstance not considered when the regulation was adopted for which it would be in the public interest to grant an exemption. If such condition is relied on exclusively for satisfying paragraph (a)(2) of this section, the exemption may not be granted until the Executive Director for Operations has consulted with the Commission.
3.0 DISCUSSION AND TECHNICAL EVALUATION Part 50 of 10 CFR, Appendix J testing ensures that primary containment leakage following a design-basis loss-of-coolant accident will be within the allowable leakage limits specified in plant TSs and assumed in the safety analyses for determining radiological consequences. For CNS, the acceptance criteria limit for the Type A test containment integrated leakage rate test (CILRT) is 0.75 La for return to power following performance of the CILRT. This limit is shown in CNS TS 5.5.12, "Primary Containment Leakage Rate Testing Program." The 0.75 La acceptance criterion allows for a 25 percent margin for degradation during plant operation. The CILRT currently includes leakage through the closed MSIVs. The acceptance limit for the sum of the leakage rates for all Type B and Type C local leak rate tests is 0.60 La. This limit currently includes leakage through the closed MSIVs.
The MSIV leakage effluent has a different pathway to the environment, compared to other penetrations. It is not directed into the secondary containment and filtered through the standby gas treatment system as is other containment leakage. Instead, the MSIV leakage is directed through the main steam, drain piping into the condenser and is released into the environment as an unfiltered ground level effluent. The licensee analyzed the MSIV leakage pathway and the containment leakage pathways separately in a dose consequences analysis. The calculated radiological consequences of the combined leakage were found to be within the criteria of 10 CFR Part 100 and General Design Criterion (GDC) 19. The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the licensees analyses and found them acceptable as described in a safety evaluation dated September 1, 2004 (ADAMS Accession No. ML042470174). By separating the MSIV leakage acceptance criteria from the overall integrated leak rate test criterion, and from the Type B and C leakage sum limitation, the CNS containment leakage testing will be made more consistent with the limiting assumptions used in the associated accident consequences analyses. The amendment associated with this exemption will revise TS 5.5.12 by adding two sub-paragraphs (4. and 5.) to reflect exemptions from Sections III.A and Section III.B of 10 CFR Part 50, Appendix J. The requested exemption from Appendix J requirements for MSIV leakage rates will allow the CNS Containment Leakage Rate Testing Program to more closely align with the assumptions used in the associated accident analysis. The licensee stated and the NRC staff finds it acceptable, that approval of this exemption will not result in any change to the LOCA dose calculation.
The exemption and amendments together would implement the recommendation of Topical Report NEDC-31858, BWR Report for Increasing MSIV Leakage Rate Limits and Elimination of Leakage Control Systems. The topical report was evaluated by the NRC staff and accepted in a safety evaluation dated March 3, 1999 (ADAMS Accession No. ML010640286). The special circumstances associated with MSIV leakage testing are fully described in the topical report. These circumstances relate to the monetary costs and personnel radiation exposure involved with maintaining MSIV leakage limits more restrictive than necessary to meet offsite dose criteria and control room habitability criteria.
The underlying purpose of Appendix J is to assure that containment leak tight integrity is maintained (a) as tight as reasonably achievable, and (b) sufficiently tight so as to limit effluent release to values bounded by the analyses of radiological consequences of design-basis
accidents. The NRC staff has determined that the intent of the rule is not compromised by the proposed action because, based on the environmental assessment, granting of this exemption will have no significant impact on the quality of the human environment (71 FR 61074).
Pursuant to 10 CFR 50.12, an exemption is authorized by law and will not present an undue risk to the public health and safety, and there are special circumstances present, as specified in 10 CFR 50.12(a)(2)(ii). Therefore, an exemption can be granted from the requirements of Sections III.A and III.B of Option B of Appendix J to 10 CFR Part 50. The exemption allows exclusion of MSIV leakage from the overall integrated leak rate test measurement and from the sum of Type B and C test measurements used to determine compliance with TS surveillance requirements for containment operability.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Nebraska State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
Pursuant to 10 CFR 51.21, 51.32, and 51.35, an environmental assessment and finding of no significant impact was published in the Federal Register on October 17, 2006 (71 FR 61074).
Accordingly, based upon the environmental assessment, the Commission has determined that the issuance of this amendment will not have a significant effect on the quality of the human environment.
6.0 CONCLUSION
Based on the above, the NRC staff finds that the licensees proposed request for an exemption to allow exclusion of MSIV leakage from the overall integrated leak rate test measurement and from the sum of Type B and C test measurement requirements of Sections III.A and III.B of Option B of Appendix J to 10 CFR Part 50 may be granted and the corresponding changes to CNS TS 5.5.12 are acceptable. The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Raj Goel Date: October 31, 2006
Cooper Nuclear Station cc:
Mr. William J. Fehrman Senior Resident Inspector President and Chief Executive Officer U.S. Nuclear Regulatory Commission Nebraska Public Power District P.O. Box 218 1414 15th Street Brownville, NE 68321 Columbus, NE 68601 Regional Administrator, Region IV Mr. Gene Mace U.S. Nuclear Regulatory Commission Nuclear Asset Manager 611 Ryan Plaza Drive, Suite 400 Nebraska Public Power District Arlington, TX 76011 P.O. Box 98 Brownville, NE 68321 Director, Missouri State Emergency Management Agency Mr. John C. McClure P.O. Box 116 Vice President and General Counsel Jefferson City, MO 65102-0116 Nebraska Public Power District P.O. Box 499 Chief, Radiation and Asbestos Columbus, NE 68602-0499 Control Section Kansas Department of Health Mr. Paul V. Fleming and Environment Licensing Manager Bureau of Air and Radiation Nebraska Public Power District 1000 SW Jackson P.O. Box 98 Suite 310 Brownville, NE 68321 Topeka, KS 66612-1366 Mr. Michael J. Linder, Director Mr. Daniel K. McGhee Nebraska Department of Environmental Bureau of Radiological Health Quality Iowa Department of Public Health P.O. Box 98922 Lucas State Office Building, 5th Floor Lincoln, NE 68509-8922 321 East 12th Street Des Moines, IA 50319 Chairman Nemaha County Board of Commissioners Mr. Keith G. Henke, Planner Nemaha County Courthouse Division of Community and Public Health 1824 N Street Office of Emergency Coordination Auburn, NE 68305 930 Wildwood P.O. Box 570 Jefferson City, MO 65102 Ms. Julia Schmitt, Manager Radiation Control Program Jerry C. Roberts, Director of Nuclear Nebraska Health & Human Services R & L Safety Assurance Public Health Assurance Nebraska Public Power District 301 Centennial Mall, South P.O. Box 98 P.O. Box 95007 Brownville, NE 68321 Lincoln, NE 68509-5007 Mr. Donald A. Flater Mr. H. Floyd Gilzow Radiation Control Program Director Deputy Director for Policy Bureau of Radiological Health Missouri Department of Natural Resources Iowa Department of Public Health P.O. Box 176 Lucas State Office Building, 5th Floor Jefferson City, MO 65102-0176 321 East 12th Street Des Moines, IA 50319 October 2006
Cooper Nuclear Station cc:
Mr. John F. McCann, Director Licensing, Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601-1813 October 2006