ML20196D172
From kanterella
ML20196D172 | |
Person / Time | |
---|---|
Site: | Yankee Rowe, 07100014 |
Issue date: | 06/21/1988 |
From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
To: | |
Shared Package | |
ML20196D152 | List: |
References | |
50-029-88-09, 50-29-88-9, NUDOCS 8807010324 | |
Download: ML20196D172 (1) | |
Similar Documents at Yankee Rowe, 07100014 | |
---|---|
Category:NOTICE OF VIOLATION OF A REGULATION
MONTHYEARIR 07100014/20110241997-12-18018 December 1997
[Table view]Notice of Violation from Insp on 971014-1124.Violation Noted:Activities Affecting Quality Were Not Accomplished in Accordance W/Documented Procedures ML20059D6441993-12-28028 December 1993 Notice of Violation from Insp on 930826-1118.Violation Noted:On 930826,inspector Found Several Examples of High Radiation Areas Where Licensee Did Not Barricade or Properly Control Access to Prevent Inadvertent Entry ML20197H7151990-11-0606 November 1990 Notice of Violation from Insp on 900821-1001.Violation Noted:Corrective Action Implemented as Result of Failures of Emergency Lighting Surveillance Test Failed to Preclude Repetition of Failures ML20058D2871990-10-19019 October 1990 Notice of Violation from Insp on 900802-27.Violation Noted:Failure to Adequately Test EDGs After Major Overhaul ML20247B0801989-07-14014 July 1989 Notice of Violation from Insp on 890410-0521.Violation Noted:Licensee Failed to Properly Restore Circuitry Configuration of Module in Control Room Main Fire Panel During Surveillance Testing ML20245J7721989-04-25025 April 1989 Partially Deleted Notice of Violation from Insp on 890403-07 (Ref 10CFR73.21).Violation Info Withheld ML20235Y7921989-03-0202 March 1989 Notice of Violation from Insp on 881115-890117.Violations Noted:High Radiation Area in Shield Tank Cavity in Vapor Container Not Posted W/Sign or Signs Bearing Radiation Caution Symbol & Words of Warning on 890107 ML20235J1591989-02-15015 February 1989 Notice of Violation from Insp on 881227-30.Violation Noted: Operation of Reactor at Low Power for Indeterminate Periods of Time W/Certain Reactor Protective Sys Power Range Less Conservative than Limiting Safety Sys Settings Required IR 07100014/20050041988-06-21021 June 1988 Notice of Violation from Insp on 880401-0531.Violation Noted:Approved Written Meeting Minutes,Written Approvals or Disapprovals of Required Reviews & Ref Determinations Not Issued for Period 871014-0504 ML20153E0751988-04-27027 April 1988 Notice of Violation from Insp on 880110-15.Violation Noted: Fuses in Alarm Bistable Replaced in Kind W/Commercial Grade Fuses Not Purchased in Conformance to Procurement Documents ML20149J1221988-02-12012 February 1988 Notice of Violation from Insp on 871027-880119.Violation Noted:Failure to Notify NRC within 1 H of Initiation of Plant Shutdown IR 07100014/20110251987-12-0707 December 1987 Notice of Violation from Insp on 871014-1125.Violation Noted:Root Valve for Div 1 of LPCI & LPCS Injection Valve Closed During Surveillance & Not Reopened IR 07100014/20110051987-12-0202 December 1987 Notice of Violation from Insp on 871014-1105.Violation Noted:Adequate Procedures for Operation & Shutdown of Radwaste Bldg Heating & Ventilation Sys Not Available ML20235E9041987-09-16016 September 1987 Notice of Violation from Insp on 870511-29.Violation Noted: Licensee Failed to Plug All Steam Generator Tubes Exceeding Tech Spec Plugging Limit ML20237L8061987-08-24024 August 1987 Notice of Violation from Insp on 870615-19.Violation Noted:Worker Contaminated on 870530 W/Radioactive Hot Particle & Util Survey of Hot Particle Inaccurate ML20214D1721987-05-12012 May 1987 Notice of Violation from Insp on 870127-0417 ML20205F8741987-03-23023 March 1987 Notice of Violation from Insp on 870127-30 ML20214V5731986-12-0303 December 1986 Notice of Violation from Insp on 860929-1003 ML20215M6841986-10-24024 October 1986 Notice of Violation from Insp on 860610-1006 ML20206P1011986-08-19019 August 1986 Notice of Violation from Insp on 860626-0702.Violations Noted:Reactor Not Placed in Hot Standby & Then Cold Shutdown When Reactor Vessel Head Vent & Pressurizer Steam Space Vent Inoperable ML20140E7981986-03-24024 March 1986 Notice of Violation from Insp on 860107-0214 IR 05000321/20040261985-06-0404 June 1985 Notice of Violation from Insp on 850321-0426 ML20054K7811982-06-18018 June 1982 Notice of Violation from Insp on 820413-19,0506-07 & 19-28 ML20054G8831982-06-0404 June 1982 Notice of Violation from Insp on 820504-07 ML20148F8161974-11-14014 November 1974 Description of Violations from Insp on 741022-25 1997-12-18 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000029/19990021999-08-0404 August 1999
[Table view]Insp Rept 50-029/99-02 on 990411-0714.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Safe Operation of Sf Pool,Radiological Controls,Organization & Mgt Controls & Auditing & C/As for Decommissioning Activities IR 05000029/19990011999-05-0505 May 1999 Insp Rept 50-029/99-01 on 990101-0411.No Violations Noted. Major Areas Inspected:Cold Weather Preparations for Spent Fuel Pool,Radiological Controls & self-assessment & Auditing & Corrective Actions for Decommissioning Activities IR 05000029/19980031998-10-0101 October 1998 Insp Rept 50-029/98-03 on 980601-0731.No Violations Noted. Major Areas Inspected:Decommissioning Activities,Including Mods to Spent Fuel Pool Bldg & Radiological Controls IR 05000029/19980011998-06-24024 June 1998 Insp Repts 50-029/98-01 & 50-029/98-02 on 980101-0331.No Violations Noted.Major Areas Inspected:Mod to SFP Bldg, Radiological Controls & Decommissioning Activities IR 07100014/20110241997-12-18018 December 1997 Notice of Violation from Insp on 971014-1124.Violation Noted:Activities Affecting Quality Were Not Accomplished in Accordance W/Documented Procedures IR 05000029/19970021997-09-23023 September 1997 Insp Rept 50-029/97-02 on 970401-0814.No Violations Noted. Major Areas Inspected:Licensee Activities Re Decommissioning IR 05000029/19970011997-05-16016 May 1997 Insp Rept 50-029/97-01 on 970301-31.No Violations Noted. Major Areas Inspected:Facility Operations PNO-I-97-026, on 970427,Yankee Atomic Electric Will Begin Shipment of Reactor Vessel for Disposal.First Phase of Shipment Will Involve Heavy Haul Truck from Rowe,Ma Site to Railway Approx Six Miles Away Near Hoosac Tunnel1997-04-25025 April 1997 PNO-I-97-026:on 970427,Yankee Atomic Electric Will Begin Shipment of Reactor Vessel for Disposal.First Phase of Shipment Will Involve Heavy Haul Truck from Rowe,Ma Site to Railway Approx Six Miles Away Near Hoosac Tunnel IR 05000029/19960041997-01-24024 January 1997 Insp Rept 50-029/96-04 on 961119-21.No Violations Noted. Major Areas Inspected:Insp Verified by Observation, Documentation Review &/Or Discussions W/Responsible or Involved Plant Staff IR 05000029/19960031996-10-16016 October 1996 Insp Rept 50-029/96-03 on 960827-29.No Violations Noted. Major Areas Inspected:Operations,Rp Program,Including Operations,Staffing,Mgt & Licensee Experience in Identifying & Correcting Weaknesses Re Control of Radioactive Matls ML20059D6441993-12-28028 December 1993 Notice of Violation from Insp on 930826-1118.Violation Noted:On 930826,inspector Found Several Examples of High Radiation Areas Where Licensee Did Not Barricade or Properly Control Access to Prevent Inadvertent Entry IR 05000029/19930071993-12-28028 December 1993 Insp Rept 50-029/93-07 on 930826-1118.Violation Noted. Major Areas Inspected:Posting of Radiological Areas & Other Controls,Organization & Staffing,Exposure ALARA Program & Radiological Info Available to Workers PNO-I-93-070, on 931208,last Four SGs from Yankee Rowe Plant Transported by Heavy Hauler Truck & Trailer to Rail Line Approx Six Miles from Plant.One Protester Observed.States of Ma & VT Informed1993-12-0909 December 1993 PNO-I-93-070:on 931208,last Four SGs from Yankee Rowe Plant Transported by Heavy Hauler Truck & Trailer to Rail Line Approx Six Miles from Plant.One Protester Observed.States of Ma & VT Informed PNO-I-93-067, on 931207,painted-over School Bus Containing Protestors from Citizen Awareness Network & Greenpeace Blocked Yankee Rowe Access Route in Effort to Prevent Off Site Transport of Third of Four SGs1993-12-0707 December 1993 PNO-I-93-067:on 931207,painted-over School Bus Containing Protestors from Citizen Awareness Network & Greenpeace Blocked Yankee Rowe Access Route in Effort to Prevent Off Site Transport of Third of Four SGs ML20059M5771993-11-15015 November 1993 PNO-1-93-064A:on 931116 & 17,util Plans to Ship Two of Four Steam Generators from Plant to Radwaste Depository at Barnwell,Sc.Licensee Will Evaluate Weather Conditions on Morning of Transportation.Commonwealth of Ma Informed IR 05000029/19930081993-11-0909 November 1993 Insp Rept 50-029/93-08 on 931018-19.No Violations Noted. Major Areas Inspected:Mgt Support & Audits Protected Area Barriers,Detection & Assessment Aids Protected Area Access Control of Personnel,Alarm Stations & Communications IR 05000029/19930051993-08-18018 August 1993 Insp Rept 50-029/93-05 on 930510-0731.No Violations Noted. Major Areas Inspected:Operations,Maint Engineering & Plant Support,Including Radiological Controls,Security,Fire Protection & Housekeeping & Administration IR 05000029/19920111993-02-0505 February 1993 Insp Rept 50-029/92-11 on 921114-930201.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Security,Engineering & Technical Support & Safety Assessment & Quality Verification IR 05000029/19920101992-11-23023 November 1992 Insp Rept 50-029/92-10 on 921104-06.One Open Items Noted. Major Areas Inspected:Contamination Monitoring of Guardhouse,Postings & Other Controls,Radiological Control of Work in Progress & Organization & Staffing ML20127F1051992-11-23023 November 1992 Corrected Cover Page for Insp Rept 50-029/92-10 on 921104-06.No Radiological Safety Concerns or Violations Noted.Major Areas Inspected:Contamination Monitoring at Guardhouse,Postings & Other Controls Observed During Tours IR 05000029/19900231990-12-0505 December 1990 Insp Rept 50-029/90-23 on 901105-09.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Controls & Radiological Environ Monitoring Programs ML20062H0801990-11-19019 November 1990 Insp Rept 50-029/90-21 on 901015-19.Noncited Violation Noted.Areas Inspected:Response to Bulletin 79-14 Re Seismic Analysis of as-built safety-related Piping Sys PNO-I-90-096, on 901109,reactor Manually Tripped Following Receipt of Alarms Indicating Automatic Scram Occurred1990-11-0909 November 1990 PNO-I-90-096:on 901109,reactor Manually Tripped Following Receipt of Alarms Indicating Automatic Scram Occurred ML20197H7151990-11-0606 November 1990 Notice of Violation from Insp on 900821-1001.Violation Noted:Corrective Action Implemented as Result of Failures of Emergency Lighting Surveillance Test Failed to Preclude Repetition of Failures IR 05000029/19900161990-11-0606 November 1990 Insp Rept 50-029/90-16 on 900821-1001.Violation Noted.Major Areas Inspected:Daytime & Backshifts in Areas of Plant Operations,Radiological Controls,Maint & Surveillance, Emergency Preparedness,Security ML20058D2871990-10-19019 October 1990 Notice of Violation from Insp on 900802-27.Violation Noted:Failure to Adequately Test EDGs After Major Overhaul IR 05000029/19900811990-09-28028 September 1990 Insp Rept 50-029/90-81 on 900709-20 & 0806-10.Weaknesses & Unresolved Item Noted.Major Areas Inspected:Maint Program IR 05000029/19900121990-09-24024 September 1990 Insp Rept 50-029/90-12 on 900619-0820.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Security,Engineering/Technical Support,Safety Assessment/Quality Verification & Repts ML20058D3651990-09-14014 September 1990 Insp Rept 50-029/90-17 on 900730-0803.No Violations Noted. Major Areas Inspected:Audit of Licensee Action in Response to Recommendation Described in Generic Ltr 88-17 ML20059K7171990-09-0707 September 1990 Insp Rept 50-029/90-14 on 900802-27.Violations Noted Re Failure to Demonstrate Emergency Diesel Generators Operability at Required Capacity Under Design Basis Conditions.Major Areas Inspected:Emergency Diesel Generator IR 05000029/19900131990-08-0303 August 1990 Insp Rept 50-029/90-13 on 900709-13.One Noncited Violation Noted.Major Areas Inspected:Implementation of Radiation Protection Program During Current Refueling Outage & Review of Training & Qualification of Contractor Technicians IR 05000029/19900111990-08-0101 August 1990 Insp Rept 50-029/90-11 on 900619-22.No Violations or Deviations Noted.Major Areas Inspected:Safety Injection Tank Design & Replacement Procedures Together W/Walkdown of Safety Injection Sys Pumps,Valves & Piping IR 05000029/19900061990-07-24024 July 1990 Exam Rept 50-029/90-06OL on 900619-21.Exam Results:All Three Candidates Passed Exams & Issued Licenses IR 05000029/19900091990-07-16016 July 1990 Insp Rept 50-029/90-09 on 900515-0618.No Violations Noted. Major Areas Inspected:Operational Safety,Plant Operations, Radiological Controls,Maint & Surveillance,Emergency Preparedness,Security & Engineering/Technical Support PNO-I-90-042, on 900519,security Discovered Unauthorized Firearm Behind Seat of Contractor Truck in Protected Area. Driver Stated Weapon Hidden Under Numerous Other Items & Slipped His Mind.Firearm Almost Rusted Closed1990-05-21021 May 1990 PNO-I-90-042:on 900519,security Discovered Unauthorized Firearm Behind Seat of Contractor Truck in Protected Area. Driver Stated Weapon Hidden Under Numerous Other Items & Slipped His Mind.Firearm Almost Rusted Closed IR 05000029/19900051990-02-16016 February 1990 Physical Security Insp Rept 50-029/90-05 on 900207-09.No Violations Noted.Major Areas Inspected:Implementation of Safeguards Info & Personnel Access Control Programs at Corporate Ofc IR 05000029/19890111989-08-28028 August 1989 Insp Rept 50-029/89-11 on 890626-0731.Unresolved Items Noted Re Plant Operations Review Committee Actions to Address Task Force Investigation Results of 890725 Loss of Emergency Bus.Areas Investigated:Security & LERs PNO-I-89-073, on 890825,when Tagging Removed on 5-inch Diameter Bypass Line,Pressure Boundary Leakage Discovered from Defect in Socket Weld Connection Between Vent & Bypass Lines.Plant Shutdown.Leakage Rate Less than 1 Gpm1989-08-25025 August 1989 PNO-I-89-073:on 890825,when Tagging Removed on 5-inch Diameter Bypass Line,Pressure Boundary Leakage Discovered from Defect in Socket Weld Connection Between Vent & Bypass Lines.Plant Shutdown.Leakage Rate Less than 1 Gpm IR 05000029/19890131989-08-23023 August 1989 Physical Security Insp Rept 50-029/89-13 on 890724-28.No Violations Noted.Major Areas Inspected:Action on Findings of NRC Regulatory Effectiveness Review,Mgt Support,Security Program Plan,Audits & Protected & Vital Area Physical PNO-I-89-071, on 890816,licensee Began Controlled Power Reduction to 20% of Rated Power to Investigate Leaking Inlet Flange of Safety Valve Located on Bypass Line of Main Coolant Loop 2.Flange Become Encrusted W/Solidified Boron1989-08-17017 August 1989 PNO-I-89-071:on 890816,licensee Began Controlled Power Reduction to 20% of Rated Power to Investigate Leaking Inlet Flange of Safety Valve Located on Bypass Line of Main Coolant Loop 2.Flange Become Encrusted W/Solidified Boron IR 05000029/19890151989-08-15015 August 1989 Emergency Preparedness Insp Rept 50-029/89-15 on 890731-0803.No Violations Noted.Major Areas Inspected: Changes to Emergency Preparedness Program & Facilities, Equipment,Instrumentation & Supplies ML20246Q0301989-08-10010 August 1989 Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering & Offsite Support for Plants & Implementation of Mods IR 05000029/19890031989-08-0909 August 1989 Requalification Exam Rept 50-029/89-03OL on 890620-30.Exam Results:Six Senior Reactor Operators (SRO) & Six Reactor Operators Passed Exams.Three SROs Failed One or More Portions of Exams IR 05000029/19890121989-08-0101 August 1989 Insp Rept 50-029/89-12 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys, Transportation & Liquid & Gaseous Effluents Programs, Including:Mgt Controls,Audits,Qa & Program Implementation IR 05000029/19890091989-07-25025 July 1989 Insp Rept 50-029/89-09 on 890522-0625.No Violations Noted. Major Areas Inspected:Daytime & Backshifts of Previous Insp Findings,Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & LERs IR 05000029/19890101989-07-20020 July 1989 Insp Rept 50-029/89-10 on 890705-07.No Violations Noted. Major Areas Inspected:Operational Radiological Environ Monitoring Program Including Mgt Controls & Licensee Program for QC of Analytical Measurements ML20247B0801989-07-14014 July 1989 Notice of Violation from Insp on 890410-0521.Violation Noted:Licensee Failed to Properly Restore Circuitry Configuration of Module in Control Room Main Fire Panel During Surveillance Testing IR 05000029/19890061989-07-14014 July 1989 Insp Rept 50-029/89-06 on 890410-0521.Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & Radiological Controls IR 05000029/19890081989-07-0606 July 1989 Insp Rept 50-029/89-08 on 890530-0601.No Violations Noted. Major Areas Inspected:Fire Protection/Prevention Program, Including Program Admin & Organization,Admin Control & Combustibles & Admin Control of Ignition Sources IR 05000029/19890071989-06-0707 June 1989 Insp Rept 50-029/89-07 on 890524-26.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Changes in Radiation Protection Program & ALARA 1999-08-04 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20196D172&oldid=2980631"