ML18192B984

From kanterella
Revision as of 21:35, 20 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Technical Requirements Manual, Vol. 1, Revision 112
ML18192B984
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/26/2018
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18192B984 (9)


Text

DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 06/26/18 To: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 112 1 IR 06/26/18 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/0 Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: u18085

\ LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I

  • Revision 112 dated 06/26/2018 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 111 has been inserted prior to inserting these pages.

SECTION

  • REMOVE and DESTROY INSERT In Front of TRM: Manual Title Page Rev 111 05/03/2017 Title Page Rev 112 06/26/2018 Immediately following List of Effective Pages List of Effective Pages .

Title Page LEP-1 through LEP-4 Rev 111 LEP-1 through LEP-4 Rev 112 06/26/2018 05/03/2017 3.12 Fire Protection TRM 3.12-8 Rev 57 09/02 TRM 3.12-8 Rev 112 06/18 B3.12 Fire Protection TRM B3 .12.2-1 Rev 44 05/01 TRM B3.12.2-l Rev 112 06/18

  • END
  • Fermi 2 Technical Requirements Manual
  • Volume I DTE Electric
  • DTC: TM1RM Date 06/26/2018 I File: 1754 ARMS - INFORMATION DSN: 1RMVOLI Recipient ll\1-fJ I Rev: 112

_.,

I '

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES

ii iii iv Revision Revision Revision Revision Revision 106 107 105 106 TRM 3.3-31 TRM 3.3-32 TRM 3.3-33 TRM 3.3-34 Revision Revision 31 Revisi.on 31 Revision 31 Revision 31 TRM v Revision 107 TRM 3.3-34a Revision 106 TRM vi Revision 31 TRM 3.3-35 Revision 60 TRM 1.0-a Revision 31 TRM 3.3-36 Revision 104 TRM 1.0-1 Revision 31 TRM 3.3-37 Revision 72 TRM 2.0-1 Revision 31 TRM 3.3-38 Revision 31 TRM 3.0-a Revision 31 TRM 3.3-39 Revision 31 TRM 3.0-1 Revision 63 TRM 3.3-40 R;evision 56 TRM 3.0-2 Revision 72 TRM 3.3-41 Revision 56 TRM 3.0-3 Revision 54 TRM 3.3-42 Revision 45 TRM 3.0-4 Revision 72 TRM 3.3-43 Revision 62 TRM 3.1-a Revision 31 TRM 3.3-44 Revision 72 TRM 3.1-1 Revision 31 TRM 3.3-45 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-46 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-47 Revision\31 TRM 3.3-b Revision 31 TRM 3 .3-48 Revision 31 TRM 3.3-c Revision 106 TRM 3.3-49 Revision 31 TRM 3.3-d Revision 31 *TRM 3.4-a Revision 31 TRM 3.3-1 Revision 106 TRM 3.4-1 Revision 36 TRM 3.3-2 Revision 106 TRM 3.4-la Revision 71

  • TRM 3.3-3 Revision 31 TRM 3.4-lb Revision 71 TRM 3.3-4 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-3 Revision 31' TRM 3.3-6 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-8 Revision 106 TRM 3.4-6 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-;l.O Revision 106 TRM 3.4-8 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-12 Revision 67 TRM*3.4-10 Revision 31 TRM 3.3-13 Revision 74 TRM 3.5-1 Revision 31 TRJ:,1 3.3-13a Revision 67 TRM 3.6-a Revision 70 TRM 3.3-14 Revision 67 TRM 3.6-1 Revision 60 TRM 3.3-15 Revision 31 TRM 3. 6-2 Revision 67 TRM 3.3-16 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-17 Revision 31 TRM 3. 6-4 Revision 109 TRM 3.3-18 Revision 100 TRM 3.6-5 Revision 87 TRM 3.3-19 Revision 31 TRM 3.6-6 Revision 33 TRM 3.3-20 Revision 31 TRM 3. 6-7 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-8 Revision 31 TRM 3.3-22 Revision 31 TRM 3.6-9 .Revision 85 TRM 3.3-23 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-24 Revision 31 TRM 3. 6-11 Rev:i.sion 31 TRM 3.3-25 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-26 Revision 31 TRM 3.6-13 Revision 71
  • TRM 3.3-27 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-28 Revision 76 TRM 3.6-15 Revision 31 TRM 3.3-29 Revision 76 TRM 3.6-16 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-17 Revision 31 TRM Vol. I LEP-1 REV 112 06/26/2018

'-*.!,

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES

  • Page TRM TRM TRM TRM 3.6-18 3.6-19 3.6-20 3.6-21 Revision Revision Revision Revision Revision 31 31 31 31 Page TRM TRM TRM TRM 3.8-12 3.8-13 3.8-14 3.8-15 Revision Revision Revision Revision Revision 31 61 46 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3. 6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRM 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3 .11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 107 TRM 3.12-2 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-3 Revision 31 TRM 3.7-2 Revision 107 TRM 3.12-4 Revision 102 TRM 3.7-3 Revision 70 TRM 3.12-5 Revision 108 TRM 3.7-4 Revision 73 TRM 3.12-6. Revision 53
  • TRM 3. 7-5* Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-6 Revision 31 TRM 3.12-8 Revision 112 TRM 3.7-7 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-8 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-9 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-10 Revision 44 TRM 3.12-12 Revision 31 TRM 3. 7-11 Revision 31 TRM 3.12-13 Revision 75 TRM 3.7-12 Revision 72 TRM 3.12-14 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-15 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-16 Revision 75 TRM 3.7-15 Revision 98 TRM 3.12-17 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-18 Revision 75 TRM 3.7-17 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-18 Revision 77 TRM 3.12-20 Revision 75 TRM 3.7-19 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-22 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-3 Revision 96 TRM 3.12-26 Revision 75 TRM 3.8-4 Revision 96 TRM 3.12-27 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-29 Revision 78 TRM 3.8-7 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-8 Revision 50 TRM 4.0-1 Revision 31
  • TRM 3.8-9 Revision 50 TRM 5.0-a Revision 105 TRM 3.8-10 Revision 50 TRM 5.0-1 Revision 105 TRM 3.8-11 Revision 50 TRM 5.0-2 Revision 105 TRM Vol. I LEP-2 REV 112 06/26/2018
  • '

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES

  • TRM TRM TRM TRM Bl. 0-1 B2.0-1 B3.0-1 B3.0-2 Revision Revision Revision Revision Revision 31 31 63 63 TRM TRM TRM TRM B3.6.2-l B3.6.3-1 B3.6.4-1 B3.6.5-1 Revision Revision Revision Revision Revision 67 87 31 31 TRM B3.0-2a Revision 72 TRM B3.6.6-1 Revision 70 TRM B3. 0-2b Revision 72 TRM B3.6.7-1 Revision 31 TRM B3.0-2c Revision 72 TRM B3.6.8-l Revision 31 TRM B3. 0-3 Revision 31 TRM B3.7.l-1 Revision 31 TRM B3.0-4 Revision 31 TRM B3.7.2-1 Revision 107 TRM B3. 0-5 Revision 54 TRM B3.7.3-l Revision 73 trRM B3.0-6 Revision 72 TRM B3.7.4-l Revision 31 TRM B3. 0-7 Revision 72 TRM B3.7.4-2 Revision 31 TRM B3.1-1 Revision 31 TRM B3.7.5-1 Revision 31 TRM B3.2-1 Revision 31 TRM B3.7.6-l Revision 31 TRM B3.3.1-1 Revision 31 TRM B3.7.7-1 Revision 99 TRM B3.3 .. 1-2 Revision 31 TRM B3.7.8-l Revision 31 TRM B3.3.2-1 Revision 31 TRM B~.7.9-1 Revision 79 TRM B3.3.2-2 Revision 31 TRM B3.8.l-l Revision 31 TRM B3.3.3-1 Revision 67 TRM B3.8.2-1 Revision 31 TRM B3.3.4-1 Revision 31 TRM B3.8.3-1 Revision 96 TRM B3.3.4-2 Revision 84 TRM B3.8.4-1 Revision 31 TRM B3.3.5-1 Revision 31 TRM B3.8.5-l Revision 31 TRM B3.3.5-2 Revision 31 TRM B3.8.6-l Revision 43
  • TRM B3.3.6-1 Revision 31 TRM B3.9.l-l Revision 31 TRM B3.3.6-2 Revision 31 TRM B3.9.2-l Revision 65 TRM B3.3.6-3 Revision 31 TRM B3.9.3-l Revision. 31 TRM B3.3.6-4 Revision 31 TRM B3.9.4-l Revision 31 TRM B3.3.6-5 Revision 76 TRM B3.10-1 Revision 31 TRM B3.3.6-6 Revision 76 TRM B3 .11.1-1 Revision 31 TRM B3.3.7-1 Revision 31 TRM B3.12.l-l Revision 31 TRM B3.3.7-2 Revision 31 TRM B3.12.2-1 Revision 112 TRM B3.3.7-3 Revision 106 TRM B3.12.3-l Revision 31 TRM B3.3.8-1 Revision 31 TRM B3.12.4-l Revision 31 TRM B3.3.9-1 Revision 31 TRM B3.12.5-l Revision 31 TRM B3.3.10-1 Revision 56 TRM B3.12.6-1 Revision 31 TRM B3.3.11-1 Revision 45 TRM B3.12.7-1 Revision 31 TRM B3.3.12-1 Revision 62 TRM B3.12.8-1 Revision 31 TRM B3.3.13-1 Revision 31 TRM B3.3.14-1 Revision 31 TRM B3.4.1-1 Revision 31 TRM B3.4.1-2 Revision 71 TRM B3.4.1-3 Revision 71 TRM B3.4.1-4 Revision 71 TRM B3.4.1-5 Revision 71 TRM B3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRM B3.4.4-1 Revision 31 TRM ;83.4.5-1 Revision 31-
  • TRM B3.4.6-1 Revision 31 TRM B3.4.7-1 Revision 31 TRM B3.5-1 Revision 31 TRM B3.6.1-1 Revision 31 TRM Vol. I LEP-3 REV 112 06/26/2018

1~*.

.;

FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I

LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 19, Revision 0 Page Revision Notation Page 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 10 0 11 0 12 0 13 0 14 0 15 0 16 0 17 0

  • 18 19 20 21 22 23 0

0 0

0 0

0 24 0

  • TRM Vol. I LEP-4 REV 112 06/26/2018

Fire Suppression Water System TR 3.12.2

  • TR 3.12 TR 3.12.2 TRLCO 3.12.2 FIRE PROTECTION Fire Suppression Water System The fire suppression water system shall be OPERABLE with:
a. Two fire suppression pumps, each with a capacity of 2500 gpm, with their discharge aligned to the fire suppression header;
b. The general service water intake structure water level

_2: 562 feet; and

c. An OPERABLE flow path capable of taking suction from the general service water intake structure and transferring the water through distribution piping with OPERABLE sectionalizing control or isolation valves to the yard hydrant curb valves, the last valve ahead of the water flow alarm device in each sprinkler or hose standpipe and the last valve ahead of the spray system required to be OPERABLE per TRLCO 3.12.3, TRLCO 3.12.6, and TRLCO 3.12.7.

APPLICABILITY: At all times.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME

A.1 OR Restore the inoperable pump to OPERABLE status.

14 days A.2 Provide an alternate 14 days backup pump.

B. The fire suppression B.1 Establish backup fire 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> water system suppression water inoperable for reasons system.

other than Condition A. OR B.2 Perform evaluation to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> determine extent of inoperability and establish required compensatory measures.

C. Required Actions and C.1 Be in MODE 2. 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> associated Completion Time of Condition B AND not met.

  • C.2 Be in MODE 3. 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> AND C.3 Be in MODE 4. 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> TRM Vol. I TRM 3.12-8 REV 112 06/18

Fire Suppression Water System TR B3.12.2

  • TR B3.12 TR B3.12.2 BASES FIRE PROTECTION Fire Suppression Water System The OPERABILITY of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety-related equipment is located. The fire suppression systems consists of the water system, spray and/or* sprinkler systems, CO2 systems, Halon systems, and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety-related equipment and is a major element in the facility fire protection program.

In the event that portions of the fire suppression systems are inoperable, alternate backup fire fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to. service. When the inoperable fire fighting equipment is intended for use as a backup means of fire suppression, a longer period of time is allowed to provide an alternate means of fire fighting than if the inoperable equipment is the primary means of fire suppression.

The surveillance requirements provide assurances that the minimum OPERABILITY requirements of the fire suppression systems are met. An allowance is made for ensuring a sufficient volume of Halon in the Halon storage tanks by verifying the weight and pressure of the tanks .

  • An exception is made to TRSR 3.12.2.6 and TRSR 3.12.2.11 for valves not accessible during unit operation.

T8000F037.

The valve that meets this criterion is In the event the fire suppression water system becomes inoperable, immediate compensatory measures must be taken since this system provides the major fire suppression capability of the plant.

It may be necessary to perform a fire protection engineering evaluation to determine the extent of inoperability of the fire suppression water system. The evaluation would also determine which conditions in TRLCO 3.12.3,.TRLCO 3.12.6, and TRLCO 3.12.7 are applicable based on the fire suppression water system inoperability. The evaluation may determine that required actions in these other TRLCOs are adequate compensatory measures. If the evaluation determines there are no adequate compensatory measures and no backup fire suppression water system can be established within the allowed time, then entry into Action C is required .

  • TRM Vol. I TRM B3.12.2-l REV. 112 06/18